current projects - portal.slac.stanford.edu · current projects ape meeting, 17 aug. 2010. lcls...
TRANSCRIPT
Current ProjectsAPE meeting, 17 Aug. 2010
LCLS Stopper 0
• ST0.1 top: X-ray filter/attenuator fork
• ST0.1 side: beryllium COTR filter
• ST0.2 Thermal Acoustic X-ray energy monitor (coming soon!) + YAGXRAY
• currently YAGXRAY pop-in only
• ST0.3 B4C modifications (rotary)
3
4
ST0.1 Samples fork
K- and L- edge materialsfor both low and high
energy photons,attenuator test materials
for high energywavefront preservation
Fifteen 5x5 mm sample slots available at any time,
rapid turn around
Filter with Be attenuator, visible
distortionDiamond attenuator
ST0.1 Samples fork
K- and L- edge materialsfor both low and high
energy photons,attenuator test materials
for high energywavefront preservation
Fifteen 5x5 mm sample slots available at any time,
rapid turn around
Revision Three in progress, a combination calorimeter
and acoustic-impulsemonitor for measuringphoton pulse energy.
YAGXRAY pop-in currentlyresides here, the YAG screen
will be added to the bottom ofthis monitor.
ST0.2 Thermal AcousticEnergy Monitor
Previous forkpopulation
YAGXRAY
B4C component of Thermac monitor
(hidden)
W shield
B4C shield
ST0.3 Rotary B4C Target
Allows inspection of B4CMPS shutter without interruption
of photon experiments.
Better optical setup, nomirror required.
Stopper 0, approximately
future vacuum pump
YAGXRAY and B4C Cameras
(behind)
Other projects
• ATF2 BPM support (this fall)
• Cavity BPM LO distribution upgrade
• IPBPM dual-frequency LO sources
• In-vacuum motion capability (Attocube)