cuiabá gold mine greenstone belt iron quadrangle mg · pdf filegreenstone belt –...

34
Cuiabá Gold Mine Exploration Success in a Mature Greenstone Belt Iron Quadrangle MG Brazil PDAC 2017 BRAZILIAN MINING DAY Rodrigo Martins

Upload: dinhnguyet

Post on 24-Mar-2018

217 views

Category:

Documents


3 download

TRANSCRIPT

Cuiabá Gold Mine – Exploration Success in a Mature

Greenstone Belt – Iron Quadrangle – MG – Brazil

PDAC 2017 – BRAZILIAN MINING DAY Rodrigo Martins

AGENDA AGENDA

AngloGold Ashanti

AngloGold Ashanti Brazil

Iron Quadrangle – GB Rio das Velhas

Cuiabá Mine

Exploration Works & Results

Final Comments

ANGLOGOLD ASHANTI 2016 – KEY

INDICATORS

ANGLOGOLD ASHANTI

Exploration Strategy

• Primary focus on countries with synergies to optimize cost and opportunities, targeting > 6 MOz Discovery with

high margin, low capital potential by 2019

• Greenfields Exploration team delivers ounces consistently at <$25/Oz

• Credited with share in eight discoveries from 2001-2015 hosting 73.3 MOz attributable gold in reserves and

resources

• Most gold discovered by any of the profiled companies, almost twice that of nearest competitor

Business Unities

In operation since 1985

Resources & Reserves

7.2MOz / 1.37MOz

Production

5.54 MOz

Production in 2016:

312 KOz

Employees: 1997

CBLM

In operation since 2002

Resources & Reserves

5.7MOz / 0.50MOz

Production

0.57 MOz + 1.8MOz (SB)

Production in 2016:

108 KOz

Employees: 769

CDS

In operation since 1989

Resources & Reserves

3.6MOz / 0.47MOz

Production

4.05 MOz

Production in 2016:

138 KOz

Employees: 1128

MSG

ANGLOGOLD ASHANTI BRAZIL

0

100.000

200.000

300.000

400.000

500.000

600.000

1975

1976

1977

1978

1979

1980

1981

1982

1983

1984

1985

1986

1987

1988

1989

1990

1991

1992

1993

1994

1995

1996

1997

1998

1999

2000

2001

2002

2003

2004

2005

2006

2007

2008

2009

2010

2011

2012

2013

2014

2015

2016

Oz

Nova Lima Mines BU Cuiabá Lamego BU CdS BU Serra Grande

GOLD

PRODUCTION

SINCE 1975 –

10MOz

ANGLOGOLD ASHANTI BRAZIL

Mina Velha

Shutdown

Raposos Mine

Shutdown

São Bento Mine

Acquisition

Serra Grande 50%

Acquisition

ANGLOGOLD ASHANTI – BF EXPLORATION

• Resources Addition – 7.9MOz

• Resources Conversion - 2.2MOz

US

$K

KO

z

0

200

400

600

800

1000

1200

1400

1600

1800

2000

0

5.000

10.000

15.000

20.000

25.000

30.000

35.000

40.000

2011 2012 2013 2014 2015 2016 2017

Exploration (US$ M) Resources Conversion EX2A (KOz) Resources Addition EX2B (KOz)

IRON QUADRANGLE OVERVIEW

IRON QUADRANGLE

• First geological records from 1720

• Volcanic vs Sedimentary rocks – 10% x 90%

• Hundreds of gold occurrences

• High structural complexity

• Continuity, controls and mineralization styles?

Banded Iron Formation?

• Outcrops / anomalies vs deposits dimensions –

Blind deposits?

• Bonanzas zones vs pinch and swell

• Depth limits

• Models interpretations vs database

IRON QUADRANGLE

• First geological records from 1720

• Volcanic vs Sedimentary rocks – 10% x 90%

• Hundreds of gold occurrences

• High structural complexity

• Continuity, controls and mineralization styles?

Banded Iron Formation?

• Outcrops / anomalies vs deposits dimensions –

Blind deposits?

• Bonanzas zones vs pinch and swell

• Depth limits

• Models interpretations vs database

100MOz Gold Province

35Moz??

2,400m

• 2,500m depth

• 13MOz (400ton Au) produced

• High Cut off

• Shutdown - 1995

• 3.0MOz remains at depth

• No exploration works along the

history

• Full size potential - > 20MOz??

MINA VELHA 1955

IRON QUADRANGLE

CUIABÁ COMPLEX

CUIABÁ COMPLEX Operations LAMEGO MINE

6 years in operation

LoM: 2024

Main access: ramp

Employees: 321 employees - Payroll

Historical Production Data

Gold produced: 280 KOz / 48 KOzy

Ore Tonnes Produced: 1.2 Mt / 0,45 Mty

Average feed grade: 4.36 g/t

CUIABÁ MINE

30 years in operation

LoM: 2035

Main access: Shaft / ramp

Employees:1,621 employees - Payroll

Historical Production Data

Gold produced: 5.2 MOz / 265 KOzy

Ore Tonnes Produced: 21 Mt / 1,3 Mty

Average feed grade: 7.81 g/t

0

50

100

150

200

250

300

350

400

450

2011

2012

2013

2014

2015

2016

2017

2018

2019

2020

2021

2022

2023

2024

2025

2026

2027

2028

2029

2030

2031

2032

Strategic Option Base Case

3.6 MOz Endowment

+4.6 MOz??

Gold Production (KOz/y) BUP 16

5.4 MOz

• Tubular fold - 115/30º

• Major orebodies hosted on BIF + sulphides (pyrite, pyrrothite

and arsenopyrite)

• Satellites orebodies hosted on hydrothermal zones in

metabasalts and metassediments

• Structural controlled

Level 03

CATEGORY Au MOz

P & P 1.37 31 Dec. 2016

Reserves

CATEGORY Au MOz

Measure 2.39

Indicated 1.99

Inferred 2.84

Total: 7.22

Mineral Resources

CUIABÁ COMPLEX

Level 07

Level 12

Level 18

0 1000

Metandesite

BIF

Legend

Deep Drilling

• Tubular fold

• Geometry changing and increasing at depth

• Down plunge continuity still opened

• High structural complexity

Level 4

Level 12

Level 14

Cuiabá Structure Geometry

CUIABÁ COMPLEX

Level 16

EXPLORATION CB COMPLEX

Cuiabá Complex – Strategy in Place and Endowment Definition

EXPLORATION STRATEGY

• Increase geological information at depth

• Increase confidence level at depth

• Increase number of production areas from narrow vein orebodies

• Add production from satellite orebodies

100

50

0 25

Margin (%)

Ore

bo

dy

Cap

abili

ty

(Koz/y

)

FGS

2.5MOz

9.44g/t

SER

0.73Moz

11.32g/t

BAL

1.0MOz

9.14 g/t

GAL

0.73Moz

7.86g/tCAR

0.70Moz

5.90g/t

CG

0.2Moz

9.14g/t

CP

0.33Moz

3.96g/t

AV

0.09Moz

3.88g/t

QM

0.18Moz

4.56g/t

GALFW

0.17Moz

8.66g/t

OTHER

0.31Moz

6.18g/t

Cuiabá Main Orebodies

Cuiabá Satellites

Lamego

VQZ

Cuiabá Secondary

Increase confidence level

in depth

Increase number of

productions areas at

Narrow veins

Add production from

Satellites

Increase geological

information in depth

50

>1Moz

Grade g/t

>500 koz

Grade g/t>250 koz

>100

koz

Ore

body

Siz

e

Mineral Resources & Grade

<100

koz

>2Moz koz

Grade g/t

Mine Entrance

(234m)

Level 11

Level 18

Level 32

Level 25

Current Shaft

System

Level 45

Surface Exploration Campaign (2013/15)

ORD – 4Levels

Current Ramp

Position – L18

BST/Inferred Resources – 8 Levels

Resources & Reserves Rationale

From Production

PRODUCTION

4 Levels

Indicated Resources – 4 Levels

4 Levels

8 Levels

FGS (L24)

BAL (L26)

VQz (L21/24)

SER (L23)

Cuiabá Mine – Reserves Addition and Risk Mitigation at Short Term EXPLORATION STRATEGY

Cuiabá Mine – Potential Definition

EXPLORATION STRATEGY

L21

L11

L32

L45

Down

Plunge

Continuity

BST+BSI

1996

Drilling Campaign

Satellites

Deep Drilling 2013-15

Shaft

Deep Drilling 2016-18

+2.0 MOz*

+1.6 MOz??

L18 (Current Operation)

2013 MR = 4.29 MOz

Endowment = 16 MOz??

2018

2015 MR = 5.67 MOz

MR = 6.27 MOz??

Cuiabá Mine – Exploration Progress

0

20.000

40.000

60.000

80.000

100.000

120.000

2009 2010 2011 2012 2013 2014 2015 2016 2017

Met

ers

Mine Geology (Executed) Mine Geology (Program) UG Exploration (Executed)

Surface Exploration (Executed) UG Exploration (Program)

Resources vs Exploration

EXPLORATION STRATEGY

Drilling Progress CB

KOz

0

2.000

4.000

6.000

8.000

10.000

12.000

14.000

16.000

0

1.000

2.000

3.000

4.000

5.000

6.000

7.000

8.000

2009 2010 2011 2012 2013 2014 2015 2016 2017

Measured Indicated Inferred Exploration US$K

EXPLORATION RESULTS CB COMPLEX

DEEP DRILLING

1048m

-137m

-825m

Level 28

Level 24

Level 17

Level 7

CBA13

Shaft

OP

Level 21

Level 11

2013/15 1996 2017

DEEP DRILLING

FGS

FGS

BAL

BAL

GAL GAL

SER

CGA

FGS

SER

PC40 PC43 PC39 PC46

GALFW

VIA

VQZ

SW NE

N20

N21

N22

N23

A

B

Plunge

• US$13M invested since 2013

• 56 positive intersections higher than cut off and 40% outside FFB

• 13 mother drillholes and 9 controlled derivations

• Deepest DDH in Brazil – 2,396m

Au

< 1 g/t

< 2 g/t

> =10 g/t

< 4 g/t

< 10 g/t

DEEP DRILLING • Measurement of the geological structures from

previous drill holes

• Design the geological model of the main ore bodies –

azimuth and changes (structure opening in depth)

• Control the drill hole deviation to reach the expected

zone

117/20

N19

115/15

N28

113/19

N24

115/16

CBA13 plan

CBA13 plan

Simulation

DEEP DRILLING QAQC at core orientation

(comparison reference line in each run)

Structures collection

(mark, describe, photo and measure) Analysis of structures

(fold classification, plunge determination, orientation of the best section)

Draw the structures in 3D

(Draw planes and lines) Selection of structures to built the fold

(Lines from planes) Fold interpretation

(Section perpendicular to the fold axis) Digitalized fold section

(Section will guide the geological model) Fold in S

S1

S0

L2

Plunge

115/16

Beding fold with S1 axial plan

M fold in

hinge zone

Cuiabá Mine – Serrotinho Orebody

L21

L20

0.80m @ 17.39 g/t

1.0m @ 5.16 g/t

19.97m @ 25.3 g/t

&

[email protected] g/t

1.62m @ 8.99 g/t

5.74m @10.15 g/t

0.80m @ 6.04 g/t

Massive Sulfide

SW NE

FGS

BAL

GAL

SER

FGS

VQZ

CGA

Plunge

Az120

L 3

L 11

L18 L21

L24

NE

SW

DEEP DRILLING

L23

L24

L25

L26

3.36m @ 7.19 g/t [email protected] g/t

[email protected] g/t

[email protected] g/t

2.10m @31.84g/t

6.08m @17.17g/t

[email protected] g/t

[email protected]/t [email protected] g/t

[email protected] g/t

Cuiabá Mine – Fonte Grande Sul Orebody

DEEP DRILLING

Cuiabá Mine – Satellites Orebodies – FGS FW – Quartz Vein

[email protected]/t

[email protected]/t

[email protected]/t [email protected]/t

[email protected]/t

[email protected]/t

[email protected]/t

[email protected]/t

[email protected]/t

L16

L18

L20

L22

VQZ - L17

VGs

Quartz Vein

SATELLITES OREBODIES

SATELLITES ORE BODIES

1.83m m@ 175.8 g/t

0.86 m@ 8.17 g/t

1.95 m@ 10.80 g/t

15.03 m@ 23.86g/t

Main exploration target

44 KOz @ 6.08 g/t per level

(740 Oz/vm)

[email protected]/t [email protected]/t

[email protected]/t

[email protected]/t

[email protected]/t

[email protected]/t

[email protected]/t

Level 17

Cuiabá Mine – Satellites Orebodies – FGS FW – Quartz Vein

SATELLITES ORE BODIES Cuiabá Mine – Satellites Orebodies – FGS FW – Quartz Vein

REGIONAL WORKS – RV3D

Objective

• To understand Cuiabá & Lamego correlation

• To identify and generate new prospective targets

• Add new resources to AngloGold on short term

• New mine portal

Old Working

MCB

LM

CDS

MV RV3D area

QF Map

LAMEGO CUIABÁ

LAMEGO CUIABÁ

FINAL COMMENTS

FINAL COMMENTS • CUIABÁ MINE

• Cuiabá Mine is a giant deposit >20MOz

• Depth limit is completely undefined

• Multiple ore types – BIF, Quartz veins, metabasalts, etc

• Exploration is the key investment at Cuiabá Strategy

definition

• IRON QUADRANGLE

• IQ still has high potential at gold deposits

• Plunge and mineralization models

• Paradigms and market conditions locked new

discoveries

• The current potential is limited by urban growth and

environmental issues

• IQ is still few explored compared to other gold provinces

• Mina Grande – Why was it just one??

• Recent results from Cuiabá Mine confirms the potential

• Systematic works and technology applied at Exploration

are the keys points at the success

!

THANK YOU