CTCI Corporation
The 2nd Investor
Conference, 2017
2017.10.03
1
Agenda
• Operation Review – 2017 Q1~Q3
• Business Outlook and Operation Strategies
• Financial Highlights – the1st Half of 2017
2
Operation Review – 2017 Q1~Q3
3
Copyright © 2016 CTCI All Rights Reserved.
Accomplishments Review
4
Accomplishments of project execution
• RAPID Package 1 RFCC Project awarded for Outstanding Executions for Pengerang Integrated Complex
• SAMAC MMA/PMMA Project awarded SABIC Green Flag for Best EHSS Performance Three Times
• CPC Talin Refinery No.11 DHDS Project awarded Outstanding HSE Performance
• Singapore Thomson Line Trackwork Project awarded LTA Annual Safety Award 2017
Company Honors
• Listed by Dow Jones Sustainability Indices (DJSI) in its Emerging Markets index for consecutive years
• Evaluated as Top 5% in “Corporate Governance Evaluation System”
• Listed among “Top 100 for Excellence in Corporate Social Responsibility” by CommonWealth Magazine
in 2017
Copyright © 2016 CTCI All Rights Reserved.
Accomplishments Review
The CommonWealth Magazine Top 2,000
Enterprises Survey
Sector 2016 2017
International Contractors 100 99
Global Contractors 139 125
International Design Firms 92 71
Global Design Firms 147 126
5
Sector Company 2015 2016
Contractor
CTCI Corp. 1 1
CTCI SEC 30 31
CTCI MAC 41 42
CTCI REI 51 54
Investment Holding
Company KD Holding 8 8
Environmental
Services SESC 2 3
IT Equipment Sales
and Services CTCI ASI 33 42
Item Company 2015 2016
Top 50 Most
Profitable Companies
(net profit after tax)
CTCI Corp. 32 28
ENR Magazine Rankings
Copyright © 2016 CTCI All Rights Reserved.
CSR Activities-1
6
To Improve Educational
Quality
To Cultivate Outstanding
Talents
To Encourage Academic Research
To Build Lifelong
Educational Environment
July- 2017 Exploring Taiwan 120 hours
Activity-Taiwan in My Eyes
August- 2017 Youth Sustainability
Leadership Camp
August- 2017 Zhishan Shilin Glory Culture
Festival
September-The Lecture of Taiwan
Engineering Technology in Retrospect and
Prospect
November-The Exploring Taiwan SDGs
Action
December-2017 CSR Academic Paper Awards
Long-term talent enhancement
plans, including establishing
internship programs and planning
corporate visits and scholarships.
In year 2016, CTCI devoted
7,556 working hours and NTD
4,000,000 toward promoting
academic research
From 2011 to 2016, we have
offered scholarships to aid 69
students with engineering
background. The accumulated
disbursement amount has
reached NTD 3.73 million
Active participation in relevant
nonprofit organizations and serve
in director and / or supervisory
roles in these groups to
contribute toward the promotion
of these groups. In 2016, CTCI
devoted NTD 2,009,700 toward
the operations of these groups
We have developed a long-term
partnership with the nonprofit
groups and provide emergency
relief to the needy. In 2016,
CTCI devoted NTD 2,071,451
Copyright © 2016 CTCI All Rights Reserved. 7
CSR Activities-2
• The launch of new CTCI global web
portal
• The publication of CTCI Reliable quarterly
E-Newsletter
• CSR Report • Group Chairman Attends 2017 CommonWealth
Economic Forum as a Panel Speaker • Listed by Dow Jones Sustainability
Indices (DJSI) for consecutive years
Copyright © 2016 CTCI All Rights Reserved.
Unit: NT$, Billion
Backlog and Breakdown
8
Taiwan 56%
Southeast Asia 24%
China 2%
Middle East 17%
Other 1%
Hydrocarbon 34%
Environmental 38%
Transportation 5%
Power 15%
Industrial 7%
Other 1%
164
187 191
203
178
0
50
100
150
200
250
2013 2014 2015 2016 2017/8
Copyright © 2016 CTCI All Rights Reserved.
New Contracts and Breakdown
9
66.9
77.9
64.5
85.6
25.3
0
10
20
30
40
50
60
70
80
90
2013 2014 2015 2016 2017/8
Unit: NT$, Billion
Taiwan 50%
Southeast Asia 35%
China 10%
Middle East 3%
United States 2%
Hydrocarbon 39%
Environmental 9%
Transportation 9%
Power 6% Industrial 23%
Other 14%
Copyright © 2016 CTCI All Rights Reserved.
The projects to be awarded by the end of this year
10
Total bidding amount is up to
NT$ 220 billion dollars
Unit: NT$, Billion
Hydrocarbon 100
Hydrocarbon 40
Hydrocarbon 10
Hydrocarbon 12
Transportation 15
Power 28
Industrial 15
0
10
20
30
40
50
60
70
80
90
100
Middle East Southeast Asia United States Taiwan
Copyright © 2016 CTCI All Rights Reserved. 11
Representative New Projects in 2017
Taiwan
IFSC HHCR Construction Work, EPC
MRT Sanxia--Yingge Line MEP Project, PCs
Chin-Pao-San Arrival Hall & Amphitheater MEP Project,
PCs
Taoyuan airport BHS and electromechanical system
installation and revamping Project
Gangshan EfW Plant O&M
Copyright © 2016 CTCI All Rights Reserved. 12
China
Generation 10.5 Glass Substrate
Project PWTS system, EPCC
BASF EGSA CN Project Phase II,
EPCC
80 KTA SSBR Project Phase II,
EPCC
United States
120,000 BPSD Crude Oil
Processing
Middle East
Yansab Butadiene Project, FEED
Europe
INEOS-KTA New Ethylene Furnace
Project, FEED
Southeast Asia
Package 28B EURO 5 Mogas
Project, EPCC
Track 4A, 1440MW Combined Cycle
Power Plant, EPCC
KLLRT3 Power Supply Project,
EPCC
TOP E&I Work for Crude Oil Tank
Project, EPCC
GPSC Rayong Waste To Energy RDF
Plant Project, EPCC
Representative New Projects in 2017
Copyright © 2016 CTCI All Rights Reserved.
Major Projects Awarded- Southeast Asia
Client PRPC Refinery and Cracker Sdn Bhd
Project Package 28B EURO 5 Mogas Project, EPCC
Contractor Consortium of CTCI and MIE Industrial Sdn Bhd
Scale
TAME: 17,500BPSD
ISOM: 10,000BPSD
CNHT: 43,000BPSD
Scope Design, Procurement, Construction and Commissioning
Location Malaysia
13
• This is the 2nd project in RAPID Complex awarded by Petronas
Johor
Copyright © 2016 CTCI All Rights Reserved.
Client Southern Power Generation Sdn. Bhd.
Project Track 4A, 1440MW Combined Cycle Power Plant, EPCC
Contractor Consortium of CTCI and GE
Scale 2 x 720MW
Scope Design, Procurement, Construction and Commissioning
Location Malaysia
14
• This is the first time to be within the consortium with GE for combined cycle power plant,
and the first time to be awarded the project by Tenaga Nasional Berhad (TNB)
Johor
Major Projects Awarded- Southeast Asia
Copyright © 2016 CTCI All Rights Reserved.
Client Prasarana Malaysia Bhd
Project KLLRT3 Power Supply Project, EPCC
Contractor CTCI CMCE JV Sdn Bhd
Scale 38 km (26 stations and 1 depot)
Scope Design, Procurement, Construction and Commissioning
Location Malaysia
15
• This is the first rail transportation project in Malaysia, and the first overseas project for
power supply system in rail transportation
Kuala Lumpur
Major Projects Awarded- Southeast Asia
Copyright © 2016 CTCI All Rights Reserved.
Major Projects Awarded- China
Client US-based Display Technology Co., Ltd.
Project Generation 10.5 Glass Substrate Project PWTS system, EPCC
Contractor CTCI and CTCI Beijing
Scale
DI: 102 CMH
GPW: 260 CMH
DET: 3.6 CMH
Scope Design, Procurement, Construction and Commissioning
Location China
16
• This is one of the most critical water treatment system for the most advanced Generation
10.5 Glass Substrate project from an US-based company
Hefei
Copyright © 2016 CTCI All Rights Reserved.
Major Projects Awarded- China
Client BASF High Purity Electronic Chemicals (Jiaxing) Co., Ltd.
Project BASF EGSA CN Project Phase II, EPCC
Contractor CTCI and CTCI Beijing
Scale 12,000 tons per year
Scope Design, Procurement, Construction and Commissioning
Location China
17
• Awarded the EPC work again for the Phase II project
Zhejiang
Copyright © 2016 CTCI All Rights Reserved. 18
• Awarded the EPC work again for the Phase II project
Client ZHENJIANG CHIMEI CHEMICAL CO.,LTD
Project 80 KTA SSBR Project Phase II, EPCC
Contractor CTCI and CTCI Beijing
Scale 80,000 tons per year
Scope Design, Procurement, Construction and Commissioning
Location China
Jiangsu
Major Projects Awarded- China
Copyright © 2016 CTCI All Rights Reserved.
Major Projects Awarded – The Middle East
19
• Continuously awarded by SABIC group, and will strive for the following EPC opportunity
Client Yanbu National Petrochemical Company (Yansab)
Project Yansab Butadiene FEED Project
Contractor CTCI
Scale 136,000 tons per year
Scope FEED
Location KSA
Copyright © 2016 CTCI All Rights Reserved.
Major Projects Awarded- The United States
Client Centurion Midstream Group (CMG)
Project 120,000 BPSD Crude Oil Processing
Contractor CTCI and CTCI Americas
Scale CDU:120,000 BPSD
Scope Integrated Project Management Team, Early Start Plan, FEED
Location The United States
20
• This is the first American client since CTCI Americas was founded
Texas
Business Outlook and Operation
Strategies
21
Outlook
• Taiwan Power Company has planned eight power plant expansion
projects amount totally NT$ 500 billion, including Dah-Tam, Gao-Yuan,
Shen-Ao, etc.
• CPC Corporation’s investment plan amounts NT$ 200 billion, such as
the Taoyuan Refinery Revamping Project, the Third LNG Terminal
Project, CPC Talin Tank Farm Project and projects for high-value
petrochemical products
• MRT projects such as Taoyuan Green Line, Wanda Line, and Xinyi
Eastern Extension and Xinzhuang Depot E&M System Project
• The six Wastewater Reclamation projects in Taiwan have been
planned by CPAMI since last year, and will be continuously open for
bidding in the future
Strategies • Continuously maintain close cooperation with major equipment suppliers to stabilize the domestic
power plant market
• Aggressively seek for the domestic investment plan for high-value petrochemical products
Outlook and Strategies─Taiwan
The government policies to stimulate the economy include the “Forward-looking Infrastructure
Construction Project” and several power plant expansion projects in response to the nuclear-
free policy
Outlook
• Thai Oil refinery plant and IPP gas-fired power plants in
Thailand
• Incineration Plant in Philippines
• RAPID petrochemical EPC projects and IPP
gas-fired power plant in Malaysia
• ExxonMobil refinery plant and MRT project in Singapore
• Lube oil blending plant and power plant in Vietnam
• Pertamina Balikpapan refinery plant in Indonesia
• LNG receiving terminal projects in India
Strategies • Expand the business lines in the area and extend the market to Burma, Brunei, Bengal and
Pakistan, etc.
After the situation of Southeast Asia are stabilized politically and economically, many
infrastructure and petrochemical projects were released
Outlook and Strategies– Southeast Asia
Outlook
• Aramco invests in gas industry and has first
released the projects amounted US$ 4 billion this
year in KSA
• Borouge petrochemcial complex in UAE
• Qatar Petroleum gasoline project in Qatar
• Sonatrach four new refinery plants in Algeria
Major potential opportunities are downstream petrochemical plants based on strategic
plan for country economy development and private investment
Strategies • To cultivate the relationship with clients such as SABIC and Qatar Petroleum, etc.
• To develop the new markets such as Kuwait, UAE, Iran, Africa and Turkey
Outlook and Strategies– Middle East and Africa
Outlook
• Petrochemical expansion projects invested by
Formosa group and the joint venture of ExxonMobil
and SABIC in Texas
• Petrochemical expansion projects invested by
Formosa group in Louisiana
• LCD panel plant invested by Foxconn in Wisconsin
Strategies
• With the support of senior American management team, CTCI will aggressively strive for
projects from American clients
• Seek for the local strategic alliance to support the demand for labor for the local
construction work
• Apply modularization to large equipment to minimize the site manpower
Outlook and Strategies-The United States
• The cheap shale gas boosted the investment on petrochemical plants, and the cross
border investors also invested in new capacity
• Attracted by Trump’s policy, Taiwanese electronic companies and traditional
companies plan to invest in the United States
Strategies
• CTCI Beijing will be able to receive the state guarantee for the project finance by
cooperating with China Export & Credit Insurance Corporation (Sinosure), which is
beneficial for CTCI to win the project
Outlook
• PTA/PET detail design work in Russia
• PTA/PET FEED work in Kazakhstan
The abundant gas and petroleum resources in Russia and Kazakhstan provide many
opportunities for petrochemical industry
Outlook and Strategies- CIS
•27
Group Research & Innovation Center Established
• Integrate group innovation resources
• Enhance iEPC capability
• Develop Intelligent Solution Cloud ( iSC)
iEPC
iSC
( Intelligent Solution Cloud)
Smart Search
Image
Recognition
Engineering
Natural Languages
Engineering
Assistant by AI
IoT
Smart
Service Platform
Smart City
Big Data
Copyright © 2016 CTCI All Rights Reserved.
iEPC
28
Innovation Thinking of i EPC-Turnkey Service
Construction
Procurement
Engineering
Project
Management
Smart Fabrication
Smart Installation
Smart Procurement
Smart CAE/CAD
Auto-Design by AI
Distributed Schedule Control
/Agile Reaction
Copyright © 2016 CTCI All Rights Reserved.
Taiwan
Hydrocarbon:18bn
Infrastructure, Environment, and Power:38.5bn
Total Amount
Hydrocarbon:533.1bn
Infrastructure, Environment and Power:104.3bn
China
Hydrocarbon:20bn
Infrastructure, Environment, and Power:5.6bn
CIS and Others:
Hydrocarbon:1.1bn
2017Q4~2018Q3 Potential Opportunities
29
United States
Hydrocarbon:90.3bn
Unit:NT$
Southeast Asia
Hydrocarbon:87.4bn
Infrastructure, Environment, and Power:54.2bn
Middle East
Hydrocarbon:273.3bn
Infrastructure, Environment, and Power:6bn
India
Hydrocarbon:43.0bn
Financial Highlights – 1st Half of 2017
30
Copyright © 2016 CTCI All Rights Reserved.
Consolidated Sales Revenues and Breakdown
31
52.2
57.7
67.1 70.5
43.7
0
10
20
30
40
50
60
70
80
2013 2014 2015 2016 2017/8
Unit: NT$, Billion
Taiwan 48%
South East Asia 19%
China 4%
Middle East 28%
Others 1%
Hydrocarbon 53%
Environmental 9%
Transportation 4%
Power 25%
Industrial 6%
Others 3%
Copyright © 2016 CTCI All Rights Reserved.
Consolidated Income Statement in 1st Half of 2017
Unit: NT$, Thousand
2017/06/30 2016/06/30 YOY
Sales Revenues 32,479,440 100% 31,788,598 100% 2.2%
Operating costs (30,105,962) -92.7% (28,851,536) -90.8% 4.3%
Gross Profit 2,373,478 7.3% 2,937,062 9.2% -19.2%
Operating expenses (1,020,816) -3.1% (927,869) -2.9% 10.0%
Operating income 1,352,662 4.2% 2,009,193 6.3% -32.7%
Total non-operating income and
expenses 879,371 2.7% 7,694 0.0% 11,329%
Profit before income tax 2,232,033 6.9% 2,016,887 6.3% 10.7%
Income tax expense (331,957) -1.0% (465,865) -1.5% -28.7%
Profit for the period 1,900,076 5.9% 1,551,022 4.9% 22.5%
Profit attributable to Owners of
the parent 1,657,531 5.1% 1,028,778 3.2% 61.1%
Total basic earnings per share 2.18 1.35
32
Copyright © 2016 CTCI All Rights Reserved.
Consolidated Balance Sheet in 1st Half of 2017
Unit: NT$, Thousand
2017/06/30 2016/06/30 2017/06/30 2016/06/30
Current assets* 47,487,187 48,050,606 Current liabilities 38,074,466 38,019,557
Financial assets 1,257,037 1,083,283 Non-current
liabilities 5,194,840 5,676,556
Non-current assets 15,186,626 14,558,797 Long-term
borrowings 2,093,150 2,437,150
Property, plant and
equipment 6,714,693 6,873,492
Other non-current
liabilities 3,101,690 3,239,406
Intangible assets 91,738 86,263 Total Liabilities 43,269,306 43,696,113
Other non-current
assets 8,380,195 7,599,042 Total equity 19,404,507 18,913,290
Total assets 62,673,813 62,609,403 Total liabilities and
equity 62,673,813 62,609,403
Cash and cash equivalents:NT$15.1bn
33
Copyright © 2016 CTCI All Rights Reserved.
Dividend Payout
34
Unit: NT$
2.13
2.41 2.65
2.91
3.22 3.32
2.22
2.51 2.69
2.91
1.74 1.92
2.37 2.42
2.76 2.84
1.99 2.23
2.40 2.60
87%
80%
89%
83% 86% 85%
90% 89% 89% 89%
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
0.00
0.50
1.00
1.50
2.00
2.50
3.00
3.50
4.00
4.50
5.00
2007 2008 2009 2010 2011 2012 2013 2014 2015 2016
EPS Cash DPS Cash Dividend Payout Ratio(%)
Copyright © 2016 CTCI All Rights Reserved. 35