Bihar Rajya Pul Nirman Nigam Ltd, PatnaProgress Report of Ongoing Schemes for Projects Date:Sep_2019
Division: --:Select:--, Printed on: 22/10/2019 Approved by SPEAchievement for the month / till month
Physical Financial
1 2 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1 520.00 M 0.00/100.00
5.00/75.00
0.00/0.00
5.00/15.00
0.00/485.53
2 300.00 M 0.00/100.00
0.00/100.00
0.00/100.00
0.00/25.00
0.00/402.32
3 240.00 M 5.00/20.00
0.00/0.00
0.00/0.00
0.00/0.00
0.00/240.13
Sl.N
o
Div
isio
n
Nam
e O
f Wor
k
Hea
d / S
ub H
ead
Dis
tirct
Adm
inis
trat
ive
App
rova
l
Type
/Len
gth
Of B
ridg
e(M
)
Agr
eem
ent A
mou
nt
Len
gth
of A
ppro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
f Sch
edul
ed c
ompl
etio
n
Rev
ised
Dat
e of
com
plet
ion
Lik
ely
date
of c
ompl
etio
n
Rem
arks
Foun
datio
n (in
%)
Sub-
Stru
ctur
e (in
%)
Supe
r-St
ruct
ure
(in %
)
App
roac
h (in
%)
Cum
ulat
ive
3 19
Gay
a
Construction of H.L.R.C.C. 7 x 16.50 mBridge including approach road,
Protection work and Miscellaneouswork over Punpun River between
Shahganj & Gohra in Kurtha Block ofArwal District Under NABARD
Scheme.
Nab
ard
RWD
Arw
al
918.
5000
00 /
3099
/ 14
Aug
201
8
RC
C/1
19.8
5
763.
41
07 M
ar 2
019
06 S
ep 2
020
06 S
ep 2
020
Pier shaft & Earth filling work is in progress.
Gay
a
Construction of H.L.R.C.C. 5x18.75mBridge including approach road andprotection work over Punpun River
between Bhagwatipur - Kusre village inArwal District under NABARD
Scheme. (R.A.S. Enterprises,9199245601)
Nab
ard
RC
D
Arw
al
569.
2900
00 /
7135
(s) /
05
Sep
2013
RC
C/9
7.00
492.
67
10 D
ec 2
013
10 Ju
n 20
15 Requisition is submitted D.M., Arwal vide letter no.-1390 dt.26-11-2018. Verification of LPC completed.
Gay
a
Construction of H.L.R.C.C. 19 x 18.00m Bridge inplace of damaged bridge
Over Falgu River at Ratan BighaVillage including approach road,
Protection work, Diversion Work andMiscellaneous work in 16th K.M. of
Ghoshi-Islampur-Giriyak Road inJehanabad District.
Plan
Jeha
naba
d
2331
.040
000
/ 560
1 (S
) / 2
1 Ju
l 201
8
RC
C/3
53.4
0
2007
.07
21 F
eb 2
019
20 F
eb 2
021
20 F
eb 2
021
Dismentaling work Completed. Piling work in progress.31/132 No's pile completed.
10/22/2019 MPR Report :: Sep_2019
2/49
Achievement for the month / till month
Physical Financial
4 0.00/0.00
0.00/0.00
0.00/0.00
0.00/0.00
0.00/26.85
5 1300.00M
0.00/100.00
0.00/100.00
0.00/0.00
3.00/48.00
0.00/692.16
6 110.00 M 0.00/100.00
0.00/100.00
0.00/100.00
0.00/50.00
0.00/34.77
7 200.00 M 0.00/0.00
0.00/0.00
0.00/0.00
0.00/0.00
58.72/60.56
Sl.N
o
Div
isio
n
Nam
e O
f Wor
k
Hea
d / S
ub H
ead
Dis
tirct
Adm
inis
trat
ive
App
rova
l
Type
/Len
gth
Of B
ridg
e(M
)
Agr
eem
ent A
mou
nt
Len
gth
of A
ppro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
f Sch
edul
ed c
ompl
etio
n
Rev
ised
Dat
e of
com
plet
ion
Lik
ely
date
of c
ompl
etio
n
Rem
arks
Foun
datio
n (in
%)
Sub-
Stru
ctur
e (in
%)
Supe
r-St
ruct
ure
(in %
)
App
roac
h (in
%)
Cum
ulat
ive
Gay
a
Construction of Retaining wall &addional lane approach road for newelyConstructed H.L. R.C.C. Bridge over
Falgu River at Barari village inMashauri-Okri-Telhara-Ekangarsarai
road in Jehanabad District Under NONPLAN (2 x 120.00 M).
Non
-Pla
n
Jeha
naba
d
249.
8400
00 /
217(
s) /
04 Ja
n 20
12
RC
C/1
20.0
0
L/A Issue. 2 No's L.P.C. for payment pending before DLAO.Payment Pending at DLAO Level.
Gay
a
Construction of H.L.R.C.C. 7 x 18.75 mBridge over river Punpun with approach
road, Protection work andMiscellaneous work in between
Khudwa - Kalen village in AurangabadDistrict Under MMADY Scheme. (JAIMATA DI ROAD CONSTRUCTION
PVT. LTD., PATNA)
MM
AD
Y
Aur
anga
bad
1318
.000
000
/ 111
0 / 3
0 A
pr 2
018
RC
C/1
35.5
6
1110
.00
25 D
ec 2
018
24 Ju
n 20
20
24 Ju
n 20
20 Foundation & Sub Structure finished. Super Structure workwill be done after rain. Approach 1600 m upto GSB
complete. Drain work is in progress.
Gay
a
Construction of Multi Cell Box Culvertof 3 x 7.020 m Over Bagahi Canal nearProposed Power Sub - Station of PowerGrid Corporation of India in Sherghati
Block of Gaya District. (SatyendraKumar Yadav, Gaya)
Oth
ers
Gay
a
100.
9500
00 /
M.O
.U. /
03
Dec
201
8
RC
C/2
3.26
94.4
8
21 F
eb 2
019
20 Ju
l 201
9
31 O
ct 2
019
Foundation, Sub Structure, Super Structure & Railing work iscompleted. Approach Road is in progress.
Gay
a
Construction of H.L.R.C.C. Bridgeincluding approach road, Protectionwork and Miscellaneous work over
Dhadhar River of Gaya-Fatehpur-GopiMore-Murli Road (Gaya-Rajauli Road
SH-70) in Gaya District Under PlanScheme. (Baban Kumar Singh, Gaya)
Plan
Gay
a
700.
0000
00 /
960
(S) /
01
Feb
2018
RC
C/1
25.0
0
07 M
ar 2
019
06 S
ep 2
020
06 S
ep 2
020
Diversion & Dismentling of existing bridge work iscompleted. Pile work is in progress.
10/22/2019 MPR Report :: Sep_2019
3/49
Achievement for the month / till month
Physical Financial
8 300.00 M 5.00/95.00
10.00/50.00
0.00/0.00
0.00/0.00
158.39/436.42
9 200.00 M 0.00/100.00
0.00/100.00
5.00/50.00
0.00/20.00
0.00/69.41
10 200.00 M 0.00/100.00
0.00/100.00
0.00/95.00
0.00/50.00
0.00/116.69
11 200.00 M 0.00/100.00
0.00/100.00
0.00/80.00
0.00/10.00
0.00/149.60
Sl.N
o
Div
isio
n
Nam
e O
f Wor
k
Hea
d / S
ub H
ead
Dis
tirct
Adm
inis
trat
ive
App
rova
l
Type
/Len
gth
Of B
ridg
e(M
)
Agr
eem
ent A
mou
nt
Len
gth
of A
ppro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
f Sch
edul
ed c
ompl
etio
n
Rev
ised
Dat
e of
com
plet
ion
Lik
ely
date
of c
ompl
etio
n
Rem
arks
Foun
datio
n (in
%)
Sub-
Stru
ctur
e (in
%)
Supe
r-St
ruct
ure
(in %
)
App
roac
h (in
%)
Cum
ulat
ive
Gay
a
Construction of H.L.R.C.C. 9x21.00mBridge including approach road andprotection work over Morhar RiverBetween Chitabkala and Gendabagvillage in Sherghati Block in Gaya
District.Pl
an
Gay
a
1610
.870
000
/ 353
(s) /
01
Feb
2018
RC
C/1
94.4
0
928.
98
10 M
ay 2
018
09 F
eb 2
020
09 F
eb 2
020 Pile work is completed. Out of 10, 9 nos of pile cap
completed. 5 nos shaft complete. Hammer head A1, P1, P4 &A2 completed & P5 hammer head reinforcement laying work
is in progress.
Gay
a
Construction of H.L.R.C.C. 3x21.00mBridge including approach road and
protection work in Bhalua to PaharpurRoad (K.M. 0 to K.M. 26.325) in
Chainage 600 M in Gaya District underPLAN Scheme. (Ramiya Construction
Pvt. Ltd., Gaya)
Plan
Gay
a
556.
2800
00 /
1146
6(s)
/ 28
Nov
201
1
RC
C/6
4.84
315.
23
10 M
ay 2
018
09 N
ov 2
019
09 N
ov 2
019 Work is in Progress. Span no.-1 deck slab is completed.
Girder work in span 3 is completed & deck slab work is inProgress.
Gay
a
Construction of H.L.R.C.C. 3x14.00mBridge including approach road andprotection work in Dhangai Bazar to
B.B. Pesra-Sobh to G.T. Road (K.M. 0to K.M. 14.10) in Chainage 13970 M in
Gaya District under PLAN Scheme.(M/s. JAY SHANKAR RAY,
Muzaffarpur)
Plan
Gay
a
429.
7300
00 /
1153
9(s)
/ 01
Dec
201
4
RC
C/5
5.84
227.
03
26 D
ec 2
016
25 M
ar 2
018
30 A
pr 2
019
31 O
ct 2
019 Work is in Progress. Recommended to debar. span no.-1, 2 &
3 of deck Slab is completed. Railing, wearing coat &Approach Road is in Progress.
Gay
a
Construction of H.L.R.C.C. 3x14.00mBridge including approach road andprotection work in Dhangai Bazar to
B.B. Pesra-Sobh to G.T. Road (K.M. 0to K.M. 14.10) in Chainage 4545 M in
Gaya District under PLAN Scheme.(Shree Tirupati Balaji Enterprises,
9470664329)
Plan
Gay
a
450.
6200
00 /
1153
9(s)
/ 01
Dec
201
4
RC
C/4
3.84
280.
78
18 F
eb 2
016
17 M
ay 2
017
31 M
ar 2
019
31 O
ct 2
019 Work is in Progress. Span No.-1, 2 & 3 deck slab work
completed. Railing & Wearing Coat work is in Progress.Earth work in approach road in progress. Contractor has been
debarred.
10/22/2019 MPR Report :: Sep_2019
4/49
Achievement for the month / till month
Physical Financial
12 160.00 M 0.00/100.00
0.00/100.00
0.00/100.00
0.00/80.00
0.00/972.18
13 100.00 M 0.00/80.00
0.00/25.00
0.00/0.00
0.00/0.00
0.00/520.10
14 380.00 M 0.00/0.00
0.00/0.00
0.00/0.00
0.00/0.00
0.00/0.00
15 475.00 M 0.00/100.00
0.00/100.00
15.00/85.00
0.00/5.00
0.00/564.80
Sl.N
o
Div
isio
n
Nam
e O
f Wor
k
Hea
d / S
ub H
ead
Dis
tirct
Adm
inis
trat
ive
App
rova
l
Type
/Len
gth
Of B
ridg
e(M
)
Agr
eem
ent A
mou
nt
Len
gth
of A
ppro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
f Sch
edul
ed c
ompl
etio
n
Rev
ised
Dat
e of
com
plet
ion
Lik
ely
date
of c
ompl
etio
n
Rem
arks
Foun
datio
n (in
%)
Sub-
Stru
ctur
e (in
%)
Supe
r-St
ruct
ure
(in %
)
App
roac
h (in
%)
Cum
ulat
ive
Gay
a
Construction of H.L.R.C.C. 17x21.75mBridge including approach road andprotection work over river Muhane
between Silaunjua-Bataspur village inBodhGaya Block of Gaya District underNABARD Scheme. (Ajay Engicon Pvt.
Ltd., Aurangabad (Bihar).
Nab
ard
RWD
Gay
a
983.
9500
00 /
1127
.86
/ 05
Mar
201
2
RC
C/3
80.0
0
983.
95
15 M
ar 2
013
14 S
ep 2
014
31 M
ar 2
019
31 O
ct 2
019 Bridge work completed. One side approach Road work
stopped due to L/A Problem. L.A. process completed.Possession Certificate given by DLAO, Gaya vide letter
no.-689 dt. 28-09-2019.
Exte
rnal
Pro
ject
Div
isio
n Construction of H.L, R.C.CBridge(3X25) with its approach road in
along Kakurwa Dhar in 24th Km ofChandradei-Bangama-paktola-Matiary-Mongra road in the district of Araria.
{Nirman Engicons Pvt. Ltd., At + P.O.-Mohanpur, District-Begusarai
(Bihar)-851131}(PKG41)
WB
P Ph
ase-
2
Ara
ria
757.
7600
00 /
404
/ 28
May
201
4
75.0
0
27 F
eb 2
016
26 A
ug 2
017
30 Ju
n 20
19
1. A2 & P2 well cap completed. 2. A1,P1 stenning inprogress. 3. Contractor is debarred. 4. By June,2020 it will be
completed. 5. LD is imposed. 6. Due to flood work isstopped.
Exte
rnal
Pro
ject
Div
isio
n
Construction of H.L, R.C.CBridge(4X21) in 13th Km of Nasir
Chowk Belwa Mazgama-Mongara roadin the district of Araria.(Braj KishoreRoy, Village-Kamrgama, Post-TiraJatmalpur, P.S-Kalyanpur, District-
Samastipur-847301)(PKG-20)
WB
P Ph
ase-
2
Ara
ria
775.
0000
00 /
552
/ 26
Oct
201
8
84.0
0
02 M
ar 2
016
01 Ju
n 20
17
1. Design Changed from pile to well and No. of span alsoincreased from 3 to 4. 2. Estimate for revise AA is approvedfrom BAPEPS Letter No.-552/2018 Dated-26.10.2018 and
approval of varriation awaited. 3. Contractor is not interestedto start work due to old rate and has requested to cancel the
agreement.
Exte
rnal
Pro
ject
Div
isio
n
Construction of H.L, R.C.CBridge(2X25) with its approach road in25th K.M. of Falka-Sripur-Bhawanipur-Karman Chowk road (at Balia Ghat) inthe District of Purnea.{Basant VanijyaLimited, Lakhibagh, Manpur, Gaya-
825003 (Bihar)}(PKG-19B)
WB
P Ph
ase-
2
Purn
ia
608.
4500
00 /
404
/ 28
May
201
4
50.0
0
27 F
eb 2
016
26 F
eb 2
018
31 M
ay 2
019 1. 2/2 Deck Slab Casted. 2. Crash Barrier Completed. 3. By
December,2019 it will be completed. 4. So cause issued tocontractor and LD is imposed.
10/22/2019 MPR Report :: Sep_2019
5/49
Achievement for the month / till month
Physical Financial
16 1700.00M
0.00/100.00
0.00/100.00
0.00/100.00
0.00/85.00
0.00/904.37
17 2000.00M
0.00/0.00
0.00/0.00
0.00/0.00
0.00/0.00
64.69/336.39
18 0.00 M 0.00/0.00
0.00/0.00
0.00/0.00
0.00/0.00
0.00/144.38
19 320.00 M 0.00/0.00
0.00/0.00
0.00/0.00
0.00/0.00
0.00/68.49
Sl.N
o
Div
isio
n
Nam
e O
f Wor
k
Hea
d / S
ub H
ead
Dis
tirct
Adm
inis
trat
ive
App
rova
l
Type
/Len
gth
Of B
ridg
e(M
)
Agr
eem
ent A
mou
nt
Len
gth
of A
ppro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
f Sch
edul
ed c
ompl
etio
n
Rev
ised
Dat
e of
com
plet
ion
Lik
ely
date
of c
ompl
etio
n
Rem
arks
Foun
datio
n (in
%)
Sub-
Stru
ctur
e (in
%)
Supe
r-St
ruct
ure
(in %
)
App
roac
h (in
%)
Cum
ulat
ive
Exte
rnal
Pro
ject
Div
isio
n Construction of H.L, R.C.CBridge(3X33) in 11th K.M. of
Baluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road in Placeof SP Bridge in the district of Saharsa.
(Devraha Construction Pvt. Ltd.,Goutam Nagar, Ward No.-12, Saharsa-
852201) (PKG- 18)
WB
P Ph
ase-
2
Saha
rsa
1632
.710
000
/ 404
/ 28
May
201
4
99.0
0
29 S
ep 2
016
29 S
ep 2
018
31 M
ar 2
019 1. Bridge Completed. 2. WMM work under progress. 3. LD
is imposed. 4. By November,2019 it will be completed 5. Socause issued to contractor and LD is imposed.
Muz
affa
rpur Construction of Pontoon Bridge in river
Ganga between Chakosanghat toJamindari Ghat (including opening &Resetting for 5 Years) of Bidupur in
district Vaishali.
Plan
Vais
hali
3013
.650
000
/ 233
8(S)
/ 31
Mar
201
6
Pont
oon
Brid
ge/5
97.0
0
7660
8900
.00
06 F
eb 2
018
05 F
eb 2
023
Work Completed. 5 Year Maintance Period Year 2023
Bha
galp
ur
Re-setting, Repairing, Dissmentalling,maintainence work during flood
available 28 ests module of Pontoonbridge on Koshi river at Vijay Ghat
between Naugachhia & Dholbajja bazarin Bhagalpur District Pontoon Bridgeon Koshi river at Vijay Ghat betweenNougachia & Dholbajja bazar Year
2017-21-22 M/s Shailesh Kumar, GopalGoshala, Nogachia, Bhagalpur. Mob
No. 9431871130
Plan
Bha
galp
ur
394.
7500
00 /
1179
4(s)
/ 19
Dec
201
7
28.0
0
3753
8000
.00
18 F
eb 2
018
17 F
eb 2
023
31 M
ar 2
019
Due to rainy season pipa bridge has been dismantled and keptsafely by concern Contractor.
Patn
a-1 Construction of Cable Suspension
Bridge (Laxman Jhula) across PunpunRiver at Punpun ghat at the east side of
Railway bridge in district Patna
Plan
Patn
a
4677
.290
000
/ 116
6(S)
/ 31
Jan
2019
Oth
ers/
0.00
31 A
ug 2
019
02 M
ar 2
021
02 M
ar 2
021
Mobilization work is under progress.
10/22/2019 MPR Report :: Sep_2019
6/49
Achievement for the month / till month
Physical Financial
20 0.00 M 0.00/0.00
0.00/0.00
0.00/0.00
0.00/0.00
0.00/25.12
21 0.00 M 43.00/95.00
0.00/0.00
0.00/0.00
0.00/0.00
0.00/25.12
22 0.00 M 0.00/100.00
0.00/100.00
0.00/100.00
0.00/0.00
154.37/941.30
23 0.00 M 0.00/100.00
0.00/100.00
0.00/100.00
0.00/0.00
0.00/25.56
Sl.N
o
Div
isio
n
Nam
e O
f Wor
k
Hea
d / S
ub H
ead
Dis
tirct
Adm
inis
trat
ive
App
rova
l
Type
/Len
gth
Of B
ridg
e(M
)
Agr
eem
ent A
mou
nt
Len
gth
of A
ppro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
f Sch
edul
ed c
ompl
etio
n
Rev
ised
Dat
e of
com
plet
ion
Lik
ely
date
of c
ompl
etio
n
Rem
arks
Foun
datio
n (in
%)
Sub-
Stru
ctur
e (in
%)
Supe
r-St
ruct
ure
(in %
)
App
roac
h (in
%)
Cum
ulat
ive
Patn
a-1 (b) Construction of Jan Nayak Karpuri
Chhatrawas Chahar Diwari (Hostel) indistrict Patna.
Wel
fare
Dep
artm
ent
Patn
a
375.
8700
00 /
38(S
) / 1
3 A
pr 2
018
Oth
ers/
0.00
25 M
ar 2
019
25 D
ec 2
020
25 D
ec 2
020
Boundary Wall Completed.
Patn
a-1
(a) Construction of Jan Nayak KarpuriChhatrawas (Hostel) in district Patna.
Wel
fare
Dep
artm
ent
Patn
a
375.
8700
00 /
38(S
) / 1
3 A
pr 2
018
Oth
ers/
0.00
25 D
ec 2
020
122/122 Pile work completed. 24/27 Pile Cap work is underprogress.
Patn
a-1
Construction of Incubation Centre I.I.T.Patna (Bihta) O
ther
s
Patn
a
1640
.700
000
/ / 1
7 N
ov 2
016
Oth
ers/
0.00
06 O
ct 2
018
05 A
pr 2
020
05 A
pr 2
020
Finishing & Utility work in progress.
Patn
a-1
Construction of Accomodation withtoilet facility for Pataients and theirattendents in the campus of Indira
Ghandhi Institute of Medical Sciences(IGIMS) Patna (Total Area 2712sqft)
Plan
Patn
a
92.0
0000
0 / 2
22/1
8 / 2
9 Se
p 20
18
Oth
ers/
0.00
15 F
eb 2
019
14 N
ov 2
019
14 N
ov 2
019
Work Completed
10/22/2019 MPR Report :: Sep_2019
7/49
Achievement for the month / till month
Physical Financial
24 200.00 M 0.00/0.00
0.00/0.00
0.00/0.00
0.00/0.00
0.00/1.33
25 100.00 M 0.00/60.00
0.00/0.00
0.00/0.00
0.00/0.00
0.00/38.55
26 290.00 M 0.00/25.00
0.00/0.00
0.00/0.00
0.00/0.00
0.00/185.17
27 0.00 M 32.00/40.00
0.00/0.00
0.00/0.00
0.00/0.00
0.00/8.59
Sl.N
o
Div
isio
n
Nam
e O
f Wor
k
Hea
d / S
ub H
ead
Dis
tirct
Adm
inis
trat
ive
App
rova
l
Type
/Len
gth
Of B
ridg
e(M
)
Agr
eem
ent A
mou
nt
Len
gth
of A
ppro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
f Sch
edul
ed c
ompl
etio
n
Rev
ised
Dat
e of
com
plet
ion
Lik
ely
date
of c
ompl
etio
n
Rem
arks
Foun
datio
n (in
%)
Sub-
Stru
ctur
e (in
%)
Supe
r-St
ruct
ure
(in %
)
App
roac
h (in
%)
Cum
ulat
ive
Patn
a-1
Construction of H.L. R.C.C. Bridge(6x18.00m) over river Punpun betweenNashopur (Naubatpur Block) PoaawanGhat (Masaudhi Block) in Kahaguri-Khaurat Road in the district of Patna.
Plan
Patn
a
1369
.000
000
/ 229
6(S)
/ 05
Mar
201
9
RC
C/1
08.0
0
14 A
ug 2
019
13 A
ug 2
021
13 A
ug 2
021
Mobilization work is under progress.
Patn
a-1
Construction of H.L. R.C.C. Bridge(6x18.00m) in place of damaged bridge
in 12th Km of Pali-Ullar-MasaudhiRoad under Pali Block in the district of
Patna.
Plan
Patn
a
1346
.310
000
/ 746
1(S)
/ 26
Sep
201
8
RC
C/0
.00
06 M
ar 2
019
05 M
ar 2
021
05 M
ar 2
021
54/54 Pile Completed.
Patn
a-1
Construction of H.L. R.C,.C. bridgeMusnaper to Masaurhi-Noubatpur via
duct NH-83 Potahi & Patna GayaRailway line cross 20 km in between
Shahwajpur, Block-Punpu and ChakkanBigha, Block-Noubatpur Approach
road, Protection work with LA(6x18m)on the punpun river.
Plan
Patn
a
1427
.170
000
/ 446
4(s)
/ 14
Jun
2018
RC
C/1
11.6
0
05 M
ar 2
019
04 M
ar 2
021
04 M
ar 2
021
A1-12/12 P1-6/6 P2-6/6 P3-6/6 P4-6/6 P5-1/6 Total - 37/54Pile Completed.
Patn
a-1
Construction of left turning ramp 9Extra Arm) connecting Newly
constructed Mithapur-Chiraiyatand viaRailway Station Flyover (P30-P31)with Chiraiyatand Exhibition Road
Flyover in Patna.
Plan
Patn
a
818.
0000
00 /
8573
(S) /
15
Nov
201
8
RC
C/0
.00
09 M
ar 2
019
08 D
ec 2
019
08 D
ec 2
019
10/22/2019 MPR Report :: Sep_2019
8/49
Achievement for the month / till month
Physical Financial
28 585.00 M 0.00/0.00
0.00/0.00
0.00/0.00
0.00/0.00
0.00/340.69
29 100.00 M 0.00/100.00
0.00/100.00
0.00/97.00
0.00/25.00
0.00/651.21
30 400.00 M 0.00/0.00
0.00/0.00
0.00/0.00
0.00/0.00
0.00/162.77
31 2000.00M
0.00/0.00
0.00/0.00
0.00/0.00
0.00/0.00
0.00/334.35
Sl.N
o
Div
isio
n
Nam
e O
f Wor
k
Hea
d / S
ub H
ead
Dis
tirct
Adm
inis
trat
ive
App
rova
l
Type
/Len
gth
Of B
ridg
e(M
)
Agr
eem
ent A
mou
nt
Len
gth
of A
ppro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
f Sch
edul
ed c
ompl
etio
n
Rev
ised
Dat
e of
com
plet
ion
Lik
ely
date
of c
ompl
etio
n
Rem
arks
Foun
datio
n (in
%)
Sub-
Stru
ctur
e (in
%)
Supe
r-St
ruct
ure
(in %
)
App
roac
h (in
%)
Cum
ulat
ive
Patn
a-1
Construction of Pontoon Bridge in riverGanga between Kachidargah to
Rustampur (Raghopur) (includingsetting, Resetting for 5 Years) of
Raghopur Block in district Vaishali.Pl
an
Patn
a
751.
5700
00 /
1180
4(s)
/ 19
Dec
201
7
Pont
oon
Brid
ge/0
.00
06 F
eb 2
018
15 Ju
n 20
22
15 Ju
n 20
22 Pontoon Sets dismantled from dated-09.07.2019 (MonsoonPeriod) and will be Re-installed after Monsoon.
Patn
a-1 Construction of H.L.R.C.C. Bridge
5x24.0 m in Punpun River in 11th Kmof Masaurhi-Naubatpur Pitmas Road in
Patna District.
Plan
Patn
a
1155
.000
000
/ 878
0(s)
/ 09
Oct
201
7
RC
C/1
20.0
0
25 A
pr 2
018
26 O
ct 2
019
26 O
ct 2
019 Foundation Completed. Sub-structure Completed. Girder &
Dec Slab of all five span is completed. Approach road workare in progress.
Patn
a-1
Construction of Pontoon Bridge in riverGanga between Gyaspur to KaladiyaraDiyara (including opening & Resettingfor 5 Years) of Bakhtiyarpur Block in
district Patna.
Non
-Pla
n
Patn
a
582.
2300
00 /
1196
4(s)
/ 21
Dec
201
7
Pont
oon
Brid
ge/0
.00
06 F
eb 2
018
15 Ju
n 20
22
15 Ju
n 20
22 Pontoon Sets dismantled from dated-09.07.2019 (MonsoonPeriod) and will be Re-installed after Monsoon.
Patn
a-1 Construction of Pontoon Bridge in river
Ganga between Danapur to PanapurDiyara (including opening & Resetting
for 5 Years) in district Patna. Non
-Pla
n
Patn
a
1114
.990
000
/ 119
65(s
) / 2
1 D
ec 2
017
Pont
oon
Brid
ge/0
.00
06 F
eb 2
018
15 Ju
n 20
22
15 Ju
n 20
22 Pontoon Sets dismantled from dated-10.07.2019 (MonsoonPeriod) and will be Re-installed after Monsoon.
10/22/2019 MPR Report :: Sep_2019
9/49
Achievement for the month / till month
Physical Financial
32 60.00 M 0.00/0.00
0.00/0.00
0.00/0.00
0.00/0.00
0.00/0.56
33 120.00 M 0.00/85.00
0.00/75.00
0.00/65.00
0.00/40.00
0.00/147.44
34 610.00 M 0.00/100.00
0.00/100.00
0.00/100.00
0.00/90.00
100.00/2550.99
35 1050.00M
0.00/100.00
0.00/100.00
0.00/100.00
0.00/0.00
0.00/1676.70
Sl.N
o
Div
isio
n
Nam
e O
f Wor
k
Hea
d / S
ub H
ead
Dis
tirct
Adm
inis
trat
ive
App
rova
l
Type
/Len
gth
Of B
ridg
e(M
)
Agr
eem
ent A
mou
nt
Len
gth
of A
ppro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
f Sch
edul
ed c
ompl
etio
n
Rev
ised
Dat
e of
com
plet
ion
Lik
ely
date
of c
ompl
etio
n
Rem
arks
Foun
datio
n (in
%)
Sub-
Stru
ctur
e (in
%)
Supe
r-St
ruct
ure
(in %
)
App
roac
h (in
%)
Cum
ulat
ive
Patn
a-1
(b) Construction of Balance work ofone span out of three span H.L.R.C.C.
Bridge (1x16.50M) across Dhaba Riverin 4th Km. of Khusrupur-Nagarnausa
Road at Nirmali chak Middle Vidayalayin Patna Dist. Including Approach in
both side and Bituminous work thereof.
Nab
ard
Patn
a
418.
9800
00 /
1871
(s) /
03
Mar
201
4
RC
C/1
6.50
Due to unavailibility of land, the work is stopped. Landowners had denied to given on Perpetual Lease because
nature of land decided by Six Man Committee is(Agriculture) not accepted by land owners. Land acquisitionunder LA act 2003 has been requested to D.M. Patna videthis office letter no.402, dated-16.02.2019 S.I.A. is under
progress.
Patn
a-1
(a) Construction of H.L.R.C.C. Bridge,3x16.50M and approach road work in
4th Km. of Khusrupur-NagarnausaRoad at Nirmali chak Middle School of
Khusrupur Block, in the District ofPatna.
Nab
ard
Patn
a
418.
9800
00 /
1871
/ 03
Mar
201
4
RC
C/5
1.38
24 N
ov 2
014
23 N
ov 2
015
23 N
ov 2
015
Due to unavailibility of land, the work is stopped. Landowners had denied to given on Perpetual Lease because
nature of land decided by Six Man Committee is(Agriculture) not accepted by land owners. Land acquisitionunder LA act 2003 has been requested to D.M. Patna videthis office letter no.402, dated-16.02.2019 S.I.A. is under
progress.
Bha
galp
ur
Balance work (Approach Road) forConstriction of H. L. R.C.C. Bridge
12X24.75m in Khrik Chorhar road atchorhar ghat of old kosi river branch inkharik Block District Bhagalpur underNabard loan project (RIDF-XVII) M/s
Rajiv Kumar Singh, Kharik, Bhagalpur.Mob.no. 9934095945
Nab
ard
Bha
galp
ur
2460
.570
000
/ 250
2(s)
/ 25
Mar
201
3
RC
C/3
04.3
6
2353
9669
.00
12 Ju
n 20
19
11 O
ct 2
019
31 D
ec 2
019
(i) L.A. -7.39 Acre. (ii) Section 11 notified on letter No. 03(P) LA dt- 10.03.2018 (iii) Six Member Committee under theChairmanship of D.M has been constituted for rehabilitation
& Re-arrangment. Vid office Commnique No. 340 dated-18.08.2018 (iv)Total Raiyat- 29 No. (v) Mauza- 2
(Maheshpur- 4.98 Acre & Ishapur- 2.41 Acre. (vi) DLAOBhagalpur Demanded Rs. 73,36,594.00 vide his letter no. 530
dated 04.12.2018 and the same was deposited to DLAOBhagalpur vide letter no. 05(we) dated 05.01.2019 of this
office. (vii) DLAO Bhagalpur Demanded Rs.1,23,51,596.00vide his letter no. 202 dated. 26.04.2019 and Lt No. 332dated- 29.06.2019 (viii) Section-19 is in progress. (ix)
Declaration of Section- 19(1) for Land Acquisition has beenpublish by D.L.A.O, Bhagalpur in News Papers.
Bha
galp
ur
Balance work (Approach Road) forConstruction of H.L. RCC Bridge
14x18.75 m on gerua river near baisavillage in Sanhaula-Baisa-Hanwara
road in Sanhaula Block districtBhagalpur under Nabard loan project
(RIDF-XVIII) M/s Sri Ram Enterprises,Bhagalpur. Mob.no. 9431422278
Nab
ard
Bha
galp
ur
2296
.080
000
/ 250
1(s)
/ 25
Mar
201
3
RC
C/2
51.6
8
2500
0000
.00
12 Ju
n 20
19
11 O
ct 2
019
31 D
ec 2
019
Bhagalpur (i) Land Acquisition-4.33 Accre Bhagalpur, Bihar.(ii) Total no of Raiyat-35 (iii) No of Mauza- 1 (Baisa) (iv)
Section 11 notified on letter No. 107 dt-30.03.18 (v) DLAOBhagalpur Demanded Rs. 1,69,36,343 vide his letter no. 535
dated 05.12.2018 and the same was deposited to DLAOBhagalpur vide letter no. 06(we) dated 05.01.2019 of thisoffice. (vi) Section-19 is in progress. (vii) Declaration ofSection- 19(1) for Land Acquisition has been publish by
D.L.A.O, Bhagalpur in News Papers.
10/22/2019 MPR Report :: Sep_2019
10/49
Achievement for the month / till month
Physical Financial
36 250.00 M 0.00/100.00
0.00/100.00
0.00/100.00
0.00/40.00
0.00/394.89
37 330.00 M 0.00/100.00
0.00/100.00
0.00/100.00
0.00/50.00
0.00/369.77
38 410.00 M 0.00/100.00
0.00/100.00
0.00/100.00
0.00/25.00
0.00/1257.25
39 200.00 M 4.00/52.00
0.00/0.00
0.00/0.00
0.00/0.00
0.00/630.50
Sl.N
o
Div
isio
n
Nam
e O
f Wor
k
Hea
d / S
ub H
ead
Dis
tirct
Adm
inis
trat
ive
App
rova
l
Type
/Len
gth
Of B
ridg
e(M
)
Agr
eem
ent A
mou
nt
Len
gth
of A
ppro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
f Sch
edul
ed c
ompl
etio
n
Rev
ised
Dat
e of
com
plet
ion
Lik
ely
date
of c
ompl
etio
n
Rem
arks
Foun
datio
n (in
%)
Sub-
Stru
ctur
e (in
%)
Supe
r-St
ruct
ure
(in %
)
App
roac
h (in
%)
Cum
ulat
ive
Dar
bhan
ga
Construction of HL RCC bridge(4x14.50M) Ujjan PWD Road in
Ghanshyampur Kathbara-Lagma KkoraMcheta-Lalpatti Road of 11.10 KM in(4x14.50 m) the District of Darbhanga.
Royal Engineers.FD
R
Dar
bhan
ga
842.
0500
00 /
289(
s) /
10 Ja
n 20
18
58.0
0
6077
6701
.00
05 M
ay 2
018
04 N
ov 2
019
04 N
ov 2
019
Approach road work in progress.Traffic started.
Dar
bhan
ga costruction of HLRCC bridge at damlaghat in bisfi block (3x21.75 m) SriKrishna Kant Thakur,9430897941 M
MSN
Y
Mad
huba
ni
470.
4700
00 /
8291
(s) /
01
Sep
2014
RC
C/6
7.12
3747
6383
.00
01 O
ct 2
014
01 Ja
n 20
16 One side B.T. approach and other side Earthen approachcompleted. Traffic Started. I
Remarks for LA: Sec.-11 is in Progress.
Dar
bhan
ga
Construction of HLRCC bridge withLand acquisition ,approach road andprotection work near naiyam gram at
pachphutiya ghat in Bagmati river(7x24.75 m) Hari Construction &
Associate Pvt. Ltd., Begusarai
BD
F
Dar
bhan
ga
2319
.190
000
/ 181
6(s)
/ 28
Feb
201
4
RC
C/1
77.5
6
1295
9003
1.00
03 M
ar 2
014
02 M
ar 2
016
Remarks for LA: Darbhanga-Sec.-19 in progress.samastipur-Sec.-11 in progress.
Dar
bhan
ga
Construction of HL RCC bridge(4X18.75M) in 15 Km of Bathiya-
Narayanpur- Kakodha-Devena-Rajkharwar with approach road,
Diversion work and Miscellaneouswork in the District of Darbhanga.
FDR
Dar
bhan
ga
1067
.000
000
/ 292
(s) /
12
Jan
2018
RC
C/7
7.48
8029
7962
.00
11 A
pr 2
018
10 O
ct 2
019
30 Ju
n 20
20
Work In Progress
10/22/2019 MPR Report :: Sep_2019
11/49
Achievement for the month / till month
Physical Financial
40 250.00 M 0.00/100.00
0.00/100.00
0.00/100.00
0.00/40.00
0.00/591.89
41 250.00 M 0.00/100.00
0.00/100.00
0.00/100.00
0.00/40.00
0.00/426.62
42 200.00 M 0.00/0.00
0.00/0.00
0.00/0.00
0.00/0.00
0.00/2.62
43 400.00 M 0.00/40.31
0.00/20.00
0.00/0.00
0.00/0.00
0.00/156.26
Sl.N
o
Div
isio
n
Nam
e O
f Wor
k
Hea
d / S
ub H
ead
Dis
tirct
Adm
inis
trat
ive
App
rova
l
Type
/Len
gth
Of B
ridg
e(M
)
Agr
eem
ent A
mou
nt
Len
gth
of A
ppro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
f Sch
edul
ed c
ompl
etio
n
Rev
ised
Dat
e of
com
plet
ion
Lik
ely
date
of c
ompl
etio
n
Rem
arks
Foun
datio
n (in
%)
Sub-
Stru
ctur
e (in
%)
Supe
r-St
ruct
ure
(in %
)
App
roac
h (in
%)
Cum
ulat
ive
Dar
bhan
ga
Construction of HL RCC bridge(6x14.50M) at Shivnagar Ghat in
11.50KM of Ghanshyampur- RasiyariRoad with approach road, Diversionwork and Miscellaneous work in the
District of Darbhanga.FD
R
Dar
bhan
ga
1046
.130
000
/ 294
(s) /
12
Jan
2018
RC
C/9
0.70
7847
3694
.00
11 A
pr 2
018
10 O
ct 2
019
31 D
ec 2
019
Approach work in progress.Traffic Started
Dar
bhan
ga
Construction of HL RCCbridge(4x14.50M) Ujjan PWD Road inGhanshyampur Kathbara-Lagma KkoraMacheta-Lalpatti Road of 12.10 KM in
the District of Darbhanga.
FDR
Dar
bhan
ga
816.
7100
00 /
290(
s) /
10 Ja
n 20
18
RC
C/6
0.48
5939
5815
.00
10 O
ct 2
018
07 A
pr 2
020
31 D
ec 2
019
Approach Road work in progress.Traffic Started
Sara
n W
orks
Construction of 4x16.00 m H.L. R.C.CBridge over Saran Main Canal crossingBagauch-Kotnarahwan road Damaged
in 2017 Flood under Gopalganj District.Agency- M/s Tirupati Bala ji EarthWork Pvt. Ltd. mob.-9431011120
FDR
Gop
alga
nj
852.
1800
00 /
685(
S) /
19 Ja
n 20
18
RC
C/6
4.00
03 O
ct 2
018
02 A
pr 2
020
30 Ju
n 20
19 NOC. Received from Engineer in Chief, WRD Headquartervide Letter No. 319 Dt. 07.03.2019. Work not started due to
public complain regarding alignment.
Sara
n W
orks
Construction of 4x18.75m H.L. R.C.CBridge including Approach Road,
rotection Work & Miscellaneous workover Bashi river crossing 1st KM ofTamkuhi-chhitauni road Damaged in2017 Flood under Gopalganj Distric.
FDR
Gop
alga
nj
808.
7400
00 /
687(
s) /
19 Ja
n 20
18
RC
C/7
5.00
524.
42
03 O
ct 2
018
02 A
pr 2
020
Work in Progress Pile Completed-14/14 Pile cap - 2completed. Abument saft & cap 1 No. Completed. Pier shaft& Pier Cap 1 no. completed. Change of type of foundationform pile to well in 3 Points approved. 1 well curb sinking
complete.
10/22/2019 MPR Report :: Sep_2019
12/49
Achievement for the month / till month
Physical Financial
44 200.00 M 0.00/100.00
0.00/60.00
0.00/0.00
0.00/0.00
0.00/327.55
45 200.00 M 0.00/100.00
0.00/100.00
0.00/100.00
0.00/0.00
2.30/231.56
46 0.00 M 0.00/0.00
0.00/0.00
0.00/0.00
0.00/0.00
0.00/855.95
47 400.00 M 0.00/100.00
0.00/80.00
0.00/36.00
0.00/10.00
0.00/386.42
Sl.N
o
Div
isio
n
Nam
e O
f Wor
k
Hea
d / S
ub H
ead
Dis
tirct
Adm
inis
trat
ive
App
rova
l
Type
/Len
gth
Of B
ridg
e(M
)
Agr
eem
ent A
mou
nt
Len
gth
of A
ppro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
f Sch
edul
ed c
ompl
etio
n
Rev
ised
Dat
e of
com
plet
ion
Lik
ely
date
of c
ompl
etio
n
Rem
arks
Foun
datio
n (in
%)
Sub-
Stru
ctur
e (in
%)
Supe
r-St
ruct
ure
(in %
)
App
roac
h (in
%)
Cum
ulat
ive
Sara
n W
orks
Construction of 4x14.00 m HL R.C.CBridge over Saran Main Canal crossingGopalganj-Barhariya road Damaged in2017 Flood under Gopalganj District.
Agency- Sona Engicon Pvt. Ltd.Mob.-9431407389
FDR
Gop
alga
nj
790.
3000
00 /
686(
S) /
19 Ja
n 20
18
RC
C/5
6.00
535.
09
03 O
ct 2
018
02 A
pr 2
020
30 Ju
n 20
19
Pile Completed- 44/44 Pile cap completed- 5/5 NOC.Received from Engineer in Chief, WRD Headquarter vide
Letter No. 319 Dt. 07.03.2019. Substructure work is inprogress.
Sara
n W
orks
Construction of 2x16.00 m H.L. R.C.CBridge over Hathua Branch Canal
crossing Mirganj-Bhagipatti-Samaurroad Damaged in 2017 Flood underGopalganj District. Agency- M.K
Enterprises Mob.-9431212686
FDR
Gop
alga
nj
549.
0700
00 /
895(
S) /
30 Ja
n 20
18
RC
C/3
2.00
306.
65
03 O
ct 2
018
02 Ja
n 20
20
30 Ju
n 20
19 NOC issued. Work in progress. Pile completed- 22/22 Pilecap completed- 03/03. Sub Structure completed. Deck slab of
both spans completed.
Sara
n W
orks
Construction & Resetting of newPontoon Bridge and Maintenace of
Pontoon Bridge form Year 2016-17 to2020-21 and Dismentling of Pontoon
Bridge form the Alignment and storingthe Pontoon sets at safe place on theside of river embankment at Pahleza
Ghat inbetween Gaddipatti to Ramsapurduring rainy season. Agency- Shrishti
Developers Pvt. Ltd. Mob.-9431014606
Plan
Sara
n
1076
.720
000
/ 29
(s) /
06
Jan
2016
293.
00
1061
.37
22 A
pr 2
016
Pontoon Bridge open on dt. 11.07.2019
Sara
n W
orks Construction of 5X18.75m H.L. R.C.C
Bridge over Dabra river in betweenAhimanpatti Kanakpur to ShitalpurStation in Dighwara block in Saran
District Nab
ard
RWD
Sara
n
765.
1500
00 /
1360
/ 26
Apr
201
8
RC
C/7
3.75
553.
73
29 O
ct 2
018
28 A
pr 2
020 Work in Progress Pile Completed-42/42 Pile Cap Completed-
06/06 Substructure & Super Structure work in Progress.Girder & deck slab of 2 span completed.
10/22/2019 MPR Report :: Sep_2019
13/49
Achievement for the month / till month
Physical Financial
48 200.00 M 0.00/100.00
0.00/100.00
0.00/100.00
0.00/65.00
0.00/808.87
49 1122.00M
0.00/100.00
0.00/90.00
5.00/40.00
0.00/0.00
0.00/552.75
50 250.00 M 0.00/15.00
0.00/0.00
0.00/0.00
0.00/5.00
0.00/323.37
51 200.00 M 0.00/0.00
0.00/0.00
0.00/0.00
0.00/0.00
0.00/0.00
Sl.N
o
Div
isio
n
Nam
e O
f Wor
k
Hea
d / S
ub H
ead
Dis
tirct
Adm
inis
trat
ive
App
rova
l
Type
/Len
gth
Of B
ridg
e(M
)
Agr
eem
ent A
mou
nt
Len
gth
of A
ppro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
f Sch
edul
ed c
ompl
etio
n
Rev
ised
Dat
e of
com
plet
ion
Lik
ely
date
of c
ompl
etio
n
Rem
arks
Foun
datio
n (in
%)
Sub-
Stru
ctur
e (in
%)
Supe
r-St
ruct
ure
(in %
)
App
roac
h (in
%)
Cum
ulat
ive
Saha
rsa
"Constraction of HL RCC (6x18.00M)Bridge on tilyuga River in 1st KM of
Lalminia-simraha road under Plan HeadMarouna block in supaul distt. Raj
Construction 9430883767"Pl
an
Supa
ul
1359
.630
000
/ 300
7(S)
/ 31
Mar
201
5
RC
C/1
11.6
0
821.
36
30 D
ec 2
015
30 D
ec 2
017
Agg - 821.36 Lac Bridge Work is Complete. Approach Workin Progress Perpetual Lease is in Progress
Saha
rsa
"Construction of High Level RCCBridge (6x18.75) Marauna block of
Ganaura PWD Road to Maharaji Tola inthe district of Supaul (NABARD)
Manoj Kumar - 9470049418" Nab
ard
RWD
Supa
ul
1178
.160
000
/ 745
2 / 1
4 Ju
l 201
7
RC
C/1
30.5
0
798.
53
30 Ja
n 20
18
30 D
ec 2
020
Agg - 798.534 Lac All Well complete. Two no. Deck SlabCompleted
Saha
rsa
Construction of High Level RCC(4x18.75) Bridge at Dakra Dhar of
Mahishi Block on the Ena to KanadiyaRoad (NABARD) Shankar Sharma
9934756142 Nab
ard
RWD
Saha
rsa
1810
.680
000
/ 129
3 / 1
6 A
pr 2
018
RC
C/6
34.0
0
1418
.23 Agg - 1418.23 Lac Well Curb A1- 6 lift , P1- 9 Lift, P2 - 9
Lift, P3 - 8 Lift, P4 - 5lift and P5 - 5 lift Complete.
Saha
rsa
"Construction of High Level RCCBridge (4x24.75M) at 19th KM of
Nirmali-Marauna-Madhepur Road inthe district of Suapul including
Approach road, Protection Work, inflood effected damage year 2017.
Shashi Ranjan 7488173962"
FDR
Supa
ul
604.
0000
00 /
47(S
) / 0
2 Ja
n 20
18
RC
C/1
01.4
8
573.
64
31 M
ay 2
018
30 A
ug 2
020
30 Ju
n 20
19 Agg - 573.64 Lac For cancellation of project , written byM.D Letter No - 908 (We) Date - 29-03-2019
10/22/2019 MPR Report :: Sep_2019
14/49
Achievement for the month / till month
Physical Financial
52 200.00 M 0.00/100.00
0.00/100.00
0.00/100.00
0.00/90.00
0.00/219.04
53 200.00 M 0.00/100.00
0.00/100.00
0.00/90.00
0.00/35.00
0.00/159.05
54 200.00 M 0.00/100.00
0.00/100.00
5.00/85.00
0.00/10.00
0.00/178.30
55 200.00 M 0.00/100.00
0.00/100.00
5.00/95.00
0.00/35.00
0.00/339.53
Sl.N
o
Div
isio
n
Nam
e O
f Wor
k
Hea
d / S
ub H
ead
Dis
tirct
Adm
inis
trat
ive
App
rova
l
Type
/Len
gth
Of B
ridg
e(M
)
Agr
eem
ent A
mou
nt
Len
gth
of A
ppro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
f Sch
edul
ed c
ompl
etio
n
Rev
ised
Dat
e of
com
plet
ion
Lik
ely
date
of c
ompl
etio
n
Rem
arks
Foun
datio
n (in
%)
Sub-
Stru
ctur
e (in
%)
Supe
r-St
ruct
ure
(in %
)
App
roac
h (in
%)
Cum
ulat
ive
Saha
rsa
"Construction of High Level RCCBridge (3x16.50M) at 5th KM of Balthi
Musharniyan Road in the district ofSaharsa including Approach road,Protection Work, in flood effected
damage year 2017 Arju Construction -9304026134"
FDR
Saha
rsa
309.
7000
00 /
510(
S) /
16 Ja
n 20
18
RC
C/4
9.50
280.
12
03 A
ug 2
018
02 N
ov 2
019
30 Ju
n 20
19 Agg - 280.12 Lac Bridge work in complete. BM & SDBCwork is in progress
Saha
rsa
"Construction of High Level RCCBridge (2x16.50M) at 1st KM of
Fatehpur-Kashnagar Road in the districtof Saharsa including Approach road,
Protection Work in flood effecteddamage year 2017 Balram Singh-
9431082277"
FDR
Saha
rsa
317.
0000
00 /
482(
S) /
15 Ja
n 20
18
RC
C/3
3.50
241.
26
03 A
ug 2
017
02 A
ug 2
019
30 Ju
n 20
19 Agg - 241.26 Lac Deck Slab Completed in both Span. Earthwork progress in approach road.
Saha
rsa
Construction of High Level RCCBridge (2x16.50M) at 3rd KM of Balthi
Musharniyan viya N.H.-107 to BundRoad in the district of Saharsa including
Approach road, Protection Work, inflood effected damage year 2017
Balram Singh-9431082277
FDR
Saha
rsa
386.
7100
00 /
483(
S) /
15 Ja
n 20
18
RC
C/3
3.50
288.
06
03 A
ug 2
018
02 A
ug 2
019
30 Ju
n 20
19 Agg - 288.06 Lac All Span Deck Slab Complete. Earth Workis in progress
Saha
rsa
Construction of High Level RCCBridge (3x24.75M) at 3.85th KM ofBalthi Musharniyan viya N.H.-107
Road in the district of Saharsa includingApproach road, Protection Work,Diversion Work. Shashi Ranjan
7488173962
FDR
Saha
rsa
826.
9900
00 /
1207
5(S)
/ 27
Dec
201
7
RC
C/7
6.09
486.
46
07 A
pr 2
018
19 O
ct 2
019
Agg - 486.46 Lac All Span Deck Slab is complete. Earthwork in progress of Approach road
10/22/2019 MPR Report :: Sep_2019
15/49
Achievement for the month / till month
Physical Financial
56 400.00 M 0.00/100.00
0.00/100.00
20.00/30.00
0.00/10.00
0.00/174.76
57 0.00 M 0.00/100.00
0.00/100.00
0.00/60.00
0.00/20.00
13.93/170.22
58 200.00 M 0.00/100.00
0.00/100.00
10.00/100.00
0.00/30.00
0.00/140.65
59 300.00 M 0.00/100.00
0.00/100.00
5.00/100.00
0.00/40.00
0.00/164.21
Sl.N
o
Div
isio
n
Nam
e O
f Wor
k
Hea
d / S
ub H
ead
Dis
tirct
Adm
inis
trat
ive
App
rova
l
Type
/Len
gth
Of B
ridg
e(M
)
Agr
eem
ent A
mou
nt
Len
gth
of A
ppro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
f Sch
edul
ed c
ompl
etio
n
Rev
ised
Dat
e of
com
plet
ion
Lik
ely
date
of c
ompl
etio
n
Rem
arks
Foun
datio
n (in
%)
Sub-
Stru
ctur
e (in
%)
Supe
r-St
ruct
ure
(in %
)
App
roac
h (in
%)
Cum
ulat
ive
Saha
rsa
Construction of High Level RCCBridge (3x21.75M) at 5.40th KM ofGwalpada to Bihariganj Road at the
place of Old Scrow Pile Bridgeincluding Approach Road, Protectionwork, in the district of Madhepura, in
flood effected damage year 2017. (PileFoundation) Shiv Krishna Builders
Pvt.ltd. Mob - 9431268201
FDR
Mad
hepu
ra
482.
5500
00 /
899(
s) /
30 Ja
n 20
18
RC
C/6
7.12
350.
40
06 S
ep 2
018
05 D
ec 2
019
30 Ju
n 20
19
Agg - 350.40 Lac Work is Progress
Saha
rsa
Construction of High Level RCCBridge (3x16.50M) at 6.60th KM ofGwalpada to Bihariganj Road at the
place of Old Scrow Pile Bridge in thedistrict of Madhepura, in flood effected
damage year 2017. Manoj Kumar -9470049418
FDR
Mad
hepu
ra
419.
4300
00 /
1196
7(s)
/ 21
Dec
201
7
RC
C/5
1.37
287.
95
07 A
pr 2
018
06 A
pr 2
019
30 Ju
n 20
19 Agg - 287.95 Lac 2nd Deck slab work is Completed. 2ndDeck Slab is in Progress
Saha
rsa
"Construction of High Level RCCBridge (3x16.50M) at 2.70th KM of
Lalminiyan-Simraha Road in thedistrict of Suapul including Approach
road, Protection Work, in flood effecteddamage year 2017. Haqu Construction
Mob - 9955334076 & 7667383440"
FDR
Supa
ul
395.
5600
00 /
508(
S) /
16 Ja
n 20
18
49.5
0
282.
53
06 S
ep 2
018
05 D
ec 2
019
30 Ju
n 20
19 Agg - 282.53 Lac All Deck slab Completed. Approach Roadis in Progress.
Saha
rsa
Construction of High Level RCCBridge (3x16.50M) at 10.00th KM of
Lalminiyan-Simraha Road in thedistrict of Suapul including Approach
road, Protection Work, in flood effecteddamage year 2017. Laxman Kumar -
9431383203
FDR
Supa
ul
425.
0000
00 /
509(
s) /
18 Ja
n 20
18
49.5
0
314.
44
28 S
ep 2
018
27 D
ec 2
019
30 Ju
n 20
19 Agg - 314.44Lac All Deck slab Completed. Approach Roadis in Progress.
10/22/2019 MPR Report :: Sep_2019
16/49
Achievement for the month / till month
Physical Financial
60 100.00 M 0.00/0.00
0.00/0.00
0.00/0.00
0.00/0.00
0.00/68.38
61 200.00 M 0.00/0.00
0.00/0.00
0.00/0.00
0.00/0.00
0.00/0.00
62 480.00 M 0.00/100.00
0.00/100.00
0.00/100.00
0.00/87.00
1.02/2339.83
63 780.00 M 0.00/100.00
5.00/45.00
0.00/0.00
0.00/0.00
0.00/334.06
Sl.N
o
Div
isio
n
Nam
e O
f Wor
k
Hea
d / S
ub H
ead
Dis
tirct
Adm
inis
trat
ive
App
rova
l
Type
/Len
gth
Of B
ridg
e(M
)
Agr
eem
ent A
mou
nt
Len
gth
of A
ppro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
f Sch
edul
ed c
ompl
etio
n
Rev
ised
Dat
e of
com
plet
ion
Lik
ely
date
of c
ompl
etio
n
Rem
arks
Foun
datio
n (in
%)
Sub-
Stru
ctur
e (in
%)
Supe
r-St
ruct
ure
(in %
)
App
roac
h (in
%)
Cum
ulat
ive
Nal
anda
Construction of HL RCC bridge4x10.00m in place of old bridge over
Panchane river at 126 th kmBiharshariff-Bakhtiyarpur road in
Nalanda district.C
RF
Nal
anda
320.
8000
00 /
5679
(s) /
25
Jun
2015
RC
C/4
0.00
256.
23
18 A
pr 2
018
17 A
pr 2
019
31 M
ar 2
020
After retender work order has been issued in favour of M/SHaque Construction on dated 18.04.2018. As per telephonicdirection by diagaster Mannagement department nalanda ondate-28.09.2019 and D.M nalanda has given instruction to
remove the newly constructed Diversion on urgent basis dueto heavy flood in panchane river to save human life and vide
this office Memo no -1228 dt-28.09.2019 informationintimated to M.D BRPNNL.
Nal
anda
Construction of H.L.R.C.C Bridge3x16.00m with diversion, Protection
work , dismantling work and ApproachRoad in the 20th km of Sheikhpura –
Arha Road.
Plan
Nal
anda
601.
7500
00 /
1192
(s) /
01
Feb
2019
HL/
49.8
3
0.00
work has awarded to Kumar Piyush Construction Pvt. Ltd.Work order Issued on dated 14.08.2019. Diversion work in
Progress.
Nal
anda
construction of HL RCC bridge9x24.75M on Harohar river in
Sadaibigha village at Barahiya block inLakhisarai district. NARAYAN DAS
CONSTRUCTION Mob. - 9431815725/ 9431815726
Plan
Lakh
isar
ai
3068
.390
000
/ 182
1(s)
/ 28
Feb
201
4
RC
C/2
53.6
0
2322
.58
08 N
ov 2
014
07 N
ov 2
016
31 Ju
l 201
9
31 Ju
l 201
9 Bridge work completed. Construction of Via duct in approachroad foundation and Substructure completed. Super structurework is awaiting. Other side (A2 side) earth work completed.
GSB work is in progress.
Nal
anda
Construction of H.L.R.C.C Bridge6x14.50 m over lokine river Near
Radhil Chhilka of Ekangarsarai Blockunder Nalanda district. N
abar
d RW
D
Nal
anda
692.
0000
00 /
1761
/ 29
May
201
8
RC
C/8
7.00
519.
00
19 Ja
n 20
19
18 Ju
l 202
0
18 Ju
l 202
0
Foundation work is completed. A1, A2 shaft completed. RestSub structure work is in progress.
10/22/2019 MPR Report :: Sep_2019
17/49
Achievement for the month / till month
Physical Financial
64 585.00 M 0.00/100.00
5.00/75.00
0.00/0.00
0.00/0.00
7.13/165.12
65 0.00 M 0.00/76.00
0.00/31.00
0.00/0.00
0.00/0.00
0.00/6.76
66 300.00 M 0.00/100.00
0.00/95.00
0.00/45.00
0.00/20.00
0.00/206.21
67 300.00 M 0.00/100.00
0.00/20.00
0.00/0.00
0.00/0.00
0.00/346.67
Sl.N
o
Div
isio
n
Nam
e O
f Wor
k
Hea
d / S
ub H
ead
Dis
tirct
Adm
inis
trat
ive
App
rova
l
Type
/Len
gth
Of B
ridg
e(M
)
Agr
eem
ent A
mou
nt
Len
gth
of A
ppro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
f Sch
edul
ed c
ompl
etio
n
Rev
ised
Dat
e of
com
plet
ion
Lik
ely
date
of c
ompl
etio
n
Rem
arks
Foun
datio
n (in
%)
Sub-
Stru
ctur
e (in
%)
Supe
r-St
ruct
ure
(in %
)
App
roac
h (in
%)
Cum
ulat
ive
Nal
anda
Construction of H.L.R.C.C Bridge3x14.50 m over Mohane river Near
Sitabigha village of Parwalpur Blockunder Naward Scheme of Nalanda
district. Nab
ard
RWD
Nal
anda
366.
6500
00 /
4115
/ 07
Sep
201
8
RC
C/4
3.50
276.
32
09 F
eb 2
019
08 M
ay 2
020
08 M
ay 2
020
Foundation work completed. A1, A2, P1 P2 shaft completed.Rest Sub-structure work is in progress.
Exte
rnal
Div
isio
n-2
(Kis
hang
anj)
Construction of Karpuri hostel underKishanganj District (Chhahar Divarinirman work) Ganesh Contruction
Araria Non
-Pla
n
Kis
hang
anj
66.3
8000
0 / 2
591
/ 26
Dec
201
7
Oth
ers/
1.00
41.4
3
25 S
ep 2
018
24 Ja
n 20
19 1. work Progress is slow due to rain/flood water. 2. SPErecommended for debar of the contractor vide letter no-
441(we) dt-27.5.2019 3. Pilling- 95/128 4. wall -120/387
Exte
rnal
Div
isio
n-2
(Kis
hang
anj)
Construction of H.L. R.C.C. bridge(3x16.00m) including approach road,diversion and protection work in placeof damaged road in 9th km of Mastanchowk-Bagalbari-Rahamatpara-Alta-
Barbatta road in the district ofKishanganj. [Bidyanand Gupta]
FDR
Kis
hang
anj
570.
9100
00 /
1207
2(s)
/ 27
Dec
201
7
49.8
3
397.
06
24 M
ar 2
018
23 Ju
n 20
19 1. Work progress slow due to rainy season/flood. 2. LDimposed - Rs.- 1.99 Lacs 3. Recommended for Debar vide
this office letter no. 759 dt.- 30.08.2019
Exte
rnal
Div
isio
n-2
(Kis
hang
anj)
Construction of of H.L. RCC bridge(5X16.00 m) in 6th km. of Kishanganj-
Bahadurganj road under FDR in theDistrict of Kishanganj. [Balram Singh]
FDR
Kis
hang
anj
791.
4400
00 /
47 (S
) / 0
2 Ja
n 20
18
83.0
5
585.
10
28 M
ar 2
018
27 S
ep 2
019 1. Work progress slow due to rainy season/flood. 2. Notice to
debar issued vide this office lt. no. 466 dt.- 03.06.2019 3. LDimposed - Rs.- 2.93 Lacs
10/22/2019 MPR Report :: Sep_2019
18/49
Achievement for the month / till month
Physical Financial
68 300.00 M 0.00/100.00
0.00/100.00
0.00/100.00
0.00/100.00
0.00/631.46
69 300.00 M 0.00/100.00
0.00/100.00
0.00/100.00
5.00/40.00
0.00/201.84
70 0.00 M 0.00/0.00
0.00/0.00
0.00/0.00
0.00/0.00
0.00/0.00
71 185.00 M 0.00/100.00
0.00/100.00
0.00/100.00
0.00/50.00
0.00/166.91
Sl.N
o
Div
isio
n
Nam
e O
f Wor
k
Hea
d / S
ub H
ead
Dis
tirct
Adm
inis
trat
ive
App
rova
l
Type
/Len
gth
Of B
ridg
e(M
)
Agr
eem
ent A
mou
nt
Len
gth
of A
ppro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
f Sch
edul
ed c
ompl
etio
n
Rev
ised
Dat
e of
com
plet
ion
Lik
ely
date
of c
ompl
etio
n
Rem
arks
Foun
datio
n (in
%)
Sub-
Stru
ctur
e (in
%)
Supe
r-St
ruct
ure
(in %
)
App
roac
h (in
%)
Cum
ulat
ive
Exte
rnal
Div
isio
n-2
(Kis
hang
anj)
Construction of H.L. RCC bridge(4X16.00 m) in 11th km. of
Bahadurganj-Tedhagach road in theDistrict of Kishanganj. [Binod Kumar
Singh]FD
R
Kis
hang
anj
786.
0000
00 /
1207
3(s)
/ 27
Dec
201
7
66.4
4
643.
82
24 M
ar 2
018
23 S
ep 2
019
work completed
Exte
rnal
Div
isio
n-2
(Kis
hang
anj)
Construction of HL RCC bridge(2x16.00m) including approach road,diversion and protection work in place
of damaged road by flood in 2017 in the13th km of Mastan chowk-Bagalbari-
Rahamatpara-Alta-Barbatta road in thedistrict of Kishanganj. [Tirupati Balajee
Earth Work Pvt. Ltd.]
FDR
Kis
hang
anj
442.
7300
00 /
1196
8(s)
/ 21
Dec
201
7
33.2
2
304.
12
24 M
ar 2
018
23 Ju
n 20
19
1. Bridge work completed 2. Approach road work slow dueto rainy season/flood. 3. LD imposed Rs.- 1.52 Lacs. 4.
Recommended for Debar vide this office letter no. 760 dt.-30.08.2019
Exte
rnal
Div
isio
n-2
(Kis
hang
anj)
Repair of Pre Stress Girder Bridge (10Span) over river Mahananda in 8th kmof Kishanganj - Bahadurganj road near
Mastan Chowk in the District ofKishanganj. [Rebuild Struct Associates,
Mumbai]
Plan
Kis
hang
anj
262.
6900
00 /
347(
s) /
09 Ja
n 20
19
Oth
ers/
425.
00
269.
00
09 M
ar 2
019
08 M
ar 2
020
1. Work order issued vide lt. no. 200 dt 09.03.2019 2.Manufacturing of bearing is in Progress.
Exte
rnal
Div
isio
n-2
(Kis
hang
anj)
Construction of 2x16.50m R.C.C.Bridge over Kathliya Kochpara Dhar in
Kishanganj Block in the District ofKishanganj. [Star Construction] M
MSN
Y
Kis
hang
anj
261.
5300
00 /
6868
(s) /
23
Jul 2
014
RC
C/3
3.00
244.
23
03 O
ct 2
014
02 O
ct 2
015 1. Contractor Debared vide MD lt. No. 1015 dt 15.03.2016 2.
SPE recommended to rescind the contractor vide lt. No. 488(WE) dt 07.06.2019
10/22/2019 MPR Report :: Sep_2019
19/49
Achievement for the month / till month
Physical Financial
72 525.00 M 1.00/97.00
0.00/68.00
10.00/16.00
0.00/0.00
0.00/692.23
73 210.00 M 16.00/46.00
0.00/0.00
0.00/0.00
0.00/0.00
190.29/464.74
74 590.00 M 0.00/100.00
0.00/100.00
0.00/100.00
15.00/100.00
45.90/1310.86
75 420.00 M 0.00/100.00
0.00/100.00
0.00/100.00
0.00/5.00
0.00/248.75
Sl.N
o
Div
isio
n
Nam
e O
f Wor
k
Hea
d / S
ub H
ead
Dis
tirct
Adm
inis
trat
ive
App
rova
l
Type
/Len
gth
Of B
ridg
e(M
)
Agr
eem
ent A
mou
nt
Len
gth
of A
ppro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
f Sch
edul
ed c
ompl
etio
n
Rev
ised
Dat
e of
com
plet
ion
Lik
ely
date
of c
ompl
etio
n
Rem
arks
Foun
datio
n (in
%)
Sub-
Stru
ctur
e (in
%)
Supe
r-St
ruct
ure
(in %
)
App
roac
h (in
%)
Cum
ulat
ive
Exte
rnal
Div
isio
n-2
(Kis
hang
anj)
Construction of 6X24.00M H.L.R.C.CBridge in 11th km. of Muraligach-
Thakurganj Road over Chenga river atChenga Ghat in Kishanganj District.
[Shiv Kishore Construction]Pl
an
Kis
hang
anj
2085
.000
000
/ 129
2(s)
/ 18
Feb
201
7
RC
C/1
47.7
8
1682
.17
11 Ja
n 20
18
10 Ja
n 20
20 1. Work Progrees is slow due to rainy season / flood. 2. LDimposed - Rs.- 16.82 Lacs
Exte
rnal
Div
isio
n-2
(Kis
hang
anj)
Construction of 5X16.00M H.L.R.C.CBridge over Kankai river under
Kochadhaman Block in 15th km. ofMastan Chowk-Bagalbari-Rahmatpara-
Alta-Barbatta road in the District ofKishanganj [Navin Chandra Sarkar,
Katihar]
Plan
Kis
hang
anj
1648
.000
000
/ 120
71(s
) / 2
7 D
ec 2
017
RC
C/8
3.05
1009
.22
06 O
ct 2
018
05 A
pr 2
020
Work Progrees is slow due to rainy season / flood.
Exte
rnal
Div
isio
n-2
(Kis
hang
anj)
Construction of H.L. R.C.C. Bridge(21x24.75 m) over Koul River in Jurail
Laucha Road of RWD Road in theDistrict of Kishanganj. [Navin Chandra
Sarkar] Nab
ard
RWD
Kis
hang
anj
5205
.970
000
/ 05
/ 01
Jan
2018
RC
C/4
30.0
0
1471
.82
24 M
ar 2
018
23 S
ep 2
019
23 S
ep 2
019
work completed
Exte
rnal
Div
isio
n-2
(Kis
hang
anj)
Construction of 2x30m H.L. R.C.C.Bridge on River Pahari Local Nala of
Indo-Nepal Border Road in the Districtof Kisanganj at Ch-151.00 [Bhartiya
Infrastructure Pvt. Ltd.]
Nab
ard
Kis
hang
anj
555.
6300
00 /
7209
(s) /
09
Sep
2013
RC
C/6
0.00
423.
59
01 O
ct 2
013
30 Ju
l 201
5
Handed over/ Taken over report submitted to EE, RCDKishanganj vide Letter No- 739(we), dated- 24.08.2019
10/22/2019 MPR Report :: Sep_2019
20/49
Achievement for the month / till month
Physical Financial
76 380.00 M 0.00/100.00
0.00/100.00
0.00/100.00
0.00/5.00
0.00/276.28
77 320.00 M 0.00/100.00
0.00/100.00
0.00/100.00
0.00/70.00
0.00/279.65
78 246.00 M 0.00/100.00
0.00/100.00
0.00/100.00
0.00/0.00
0.00/2330.22
79 260.00 M 0.00/100.00
0.00/100.00
0.00/100.00
0.00/20.00
0.00/405.07
Sl.N
o
Div
isio
n
Nam
e O
f Wor
k
Hea
d / S
ub H
ead
Dis
tirct
Adm
inis
trat
ive
App
rova
l
Type
/Len
gth
Of B
ridg
e(M
)
Agr
eem
ent A
mou
nt
Len
gth
of A
ppro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
f Sch
edul
ed c
ompl
etio
n
Rev
ised
Dat
e of
com
plet
ion
Lik
ely
date
of c
ompl
etio
n
Rem
arks
Foun
datio
n (in
%)
Sub-
Stru
ctur
e (in
%)
Supe
r-St
ruct
ure
(in %
)
App
roac
h (in
%)
Cum
ulat
ive
Exte
rnal
Div
isio
n-2
(Kis
hang
anj)
Construction of 2x30m H.L. R.C.C.Bridge on River Local Nala of Indo-Nepal Border Road in the District of
Kisanganj at Ch-149.00 [BhartiyaInfrastructure Pvt. Ltd.]
Nab
ard
Kis
hang
anj
691.
7300
00 /
7209
(s) /
09
Sep
2013
RC
C/6
0.00
422.
46
01 O
ct 2
013
30 Ju
l 201
5
Handed over/ Taken over report submitted to EE, RCDKishanganj vide Letter No- 739(we), dated- 24.08.2019
Exte
rnal
Div
isio
n-2
(Kis
hang
anj)
Construction of 2x30.00m H.L. R.C.C.Bridge on River Surbhitha Local Nala
of Indo-Nepal Border Road in theDistrict of Kisanganj at Ch-146.850[Bhartiya Infrastructure Pvt. Ltd.]
Nab
ard
Kis
hang
anj
593.
6000
00 /
7209
(s) /
09
Sep
2013
RC
C/6
1.22
444.
16
01 O
ct 2
013
30 Ju
l 201
5
Handed over/ Taken over report submitted to EE, RCDKishanganj vide Letter No- 739(we), dated- 24.08.2019
Exte
rnal
Div
isio
n-2
(Kis
hang
anj)
Construction of 14x30.00m H.L. R.C.C.Bridge on River Maichi of Indo-Nepal
Border Road in the District ofKisanganj at Ch-124.00 [S.P. Singla
Const. Pvt. Ltd.]
Nab
ard
Kis
hang
anj
3729
.170
000
/ 720
9(s)
/ 09
Sep
201
3
RC
C/4
20.0
0
2530
.49
01 O
ct 2
013
30 A
pr 2
016
Handed over/ Taken over report submitted to EE, RCDKishanganj vide Letter No- 739(we), dated- 24.08.2019
Exte
rnal
Div
isio
n-2
(Kis
hang
anj)
Construction of 2x30.00m H.L. R.C.C.Bridge on River Surbhitha of Indo-
Nepal Border Road in the District ofKisanganj at Ch-123.00 [S.P. Singla
Const. Pvt. Ltd.]
Nab
ard
Kis
hang
anj
650.
8500
00 /
7209
(s) /
09
Sep
2013
RC
C/6
0.00
534.
80
01 O
ct 2
013
01 A
pr 2
016
Handed over/ Taken over report submitted to EE, RCDKishanganj vide Letter No- 739(we), dated- 24.08.2019
10/22/2019 MPR Report :: Sep_2019
21/49
Achievement for the month / till month
Physical Financial
80 300.00 M 0.00/100.00
0.00/100.00
0.00/100.00
0.00/15.00
0.00/547.05
81 537.00 M 0.00/100.00
0.00/100.00
0.00/100.00
0.00/20.00
0.00/6525.03
82 620.00 M 0.00/100.00
0.00/50.00
0.00/0.00
0.00/0.00
0.00/292.00
83 30.00 M 0.00/0.00
0.00/0.00
0.00/0.00
0.00/0.00
0.00/0.00
Sl.N
o
Div
isio
n
Nam
e O
f Wor
k
Hea
d / S
ub H
ead
Dis
tirct
Adm
inis
trat
ive
App
rova
l
Type
/Len
gth
Of B
ridg
e(M
)
Agr
eem
ent A
mou
nt
Len
gth
of A
ppro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
f Sch
edul
ed c
ompl
etio
n
Rev
ised
Dat
e of
com
plet
ion
Lik
ely
date
of c
ompl
etio
n
Rem
arks
Foun
datio
n (in
%)
Sub-
Stru
ctur
e (in
%)
Supe
r-St
ruct
ure
(in %
)
App
roac
h (in
%)
Cum
ulat
ive
Exte
rnal
Div
isio
n-2
(Kis
hang
anj)
Construction of 3x30.00m H.L. R.C.C.Bridge on River Burhi Kankai of Indo-
Nepal Border Road in the District ofKisanganj at Ch-113.640 [S.P. Singla
Const. Pvt. Ltd.]N
abar
d
Kis
hang
anj
724.
7100
00 /
7209
(S) /
09
Sep
2013
RC
C/9
0.00
650.
50
01 O
ct 2
013
30 A
pr 2
016
Handed over/ Taken over report submitted to EE, RCDKishanganj vide Letter No- 739(we), dated- 24.08.2019
Exte
rnal
Div
isio
n-2
(Kis
hang
anj)
Construction of 37x30m H.L. R.C.C.Bridge on River Burhi Kankai of IndoNepal Border Road in the District ofKisanganj at Ch- 109.65 [S.P. Singla
Pvt. Ltd.]
Nab
ard
Kis
hang
anj
6654
.940
000
/ 720
9(S)
/ 09
Sep
201
3
RC
C/1
110.
00
6696
.14
30 O
ct 2
013
30 Ju
l 201
6
Handed over/ Taken over report submitted to EE, RCDKishanganj vide Letter No- 739(we), dated- 24.08.2019
Nal
anda
Construction of H.L. Bridge 5 x14.50 mBerma-Arai Road of Karai-Parsurai
block under nalanda district. district ofNalanda N
abar
d RW
D
Nal
anda
536.
0000
00 /
1760
/ 29
May
201
8
RC
C/7
2.50
434.
83
19 Ja
n 20
19
18 A
pr 2
020
18 A
pr 2
020
Foundation work completed. A1, A2, P1,P2 P3 & P4 shaftcompleted. A1 & A2 Shaft cap is in progress.
Cha
mpa
ran(
Mot
ihar
i) Construction of High Level R.C.C.Bridge (5x18.00 Mtr.) with approachroad and Protection work on 4.05 KMof Manuapul - Yogapatti-Nawalpur-
Ratwal Road over Tirhut Canal in theDistrict of West Champaran, BridgeLength - 93.00 Mtr. Pile Foundation.
CR
F
Pach
im C
ham
parn
1324
4.54
0000
/ 12
53(S
) / 1
5 Fe
b 20
18
RC
C/9
3.00
30 Ja
n 20
19
29 Ju
l 202
0
29 Ju
l 202
0
Work order issued For NOC awaited from WRD team visitedon at site
10/22/2019 MPR Report :: Sep_2019
22/49
Achievement for the month / till month
Physical Financial
84 400.00 M 0.00/100.00
0.00/100.00
5.00/80.00
5.00/60.00
68.07/1219.44
85 150.00 M 0.00/85.00
5.00/30.00
0.00/0.00
0.00/0.00
30.96/507.83
86 120.00 M 0.00/100.00
0.00/100.00
5.00/60.00
0.00/20.00
0.00/587.25
87 240.00 M 0.00/100.00
0.00/100.00
0.00/100.00
20.00/100.00
0.00/369.37
Sl.N
o
Div
isio
n
Nam
e O
f Wor
k
Hea
d / S
ub H
ead
Dis
tirct
Adm
inis
trat
ive
App
rova
l
Type
/Len
gth
Of B
ridg
e(M
)
Agr
eem
ent A
mou
nt
Len
gth
of A
ppro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
f Sch
edul
ed c
ompl
etio
n
Rev
ised
Dat
e of
com
plet
ion
Lik
ely
date
of c
ompl
etio
n
Rem
arks
Foun
datio
n (in
%)
Sub-
Stru
ctur
e (in
%)
Supe
r-St
ruct
ure
(in %
)
App
roac
h (in
%)
Cum
ulat
ive
Cha
mpa
ran(
Mot
ihar
i)
Construction of H.L. R.C.C. Bridge(8x16.00m) over Balore River on 1st
km. of Narkatiyaganj - Binwalia Road.Pile Foundation. M/S Aditya
Construction Pvt. Ltd.Pl
an
Pach
im C
ham
parn
1759
.380
000
/ 116
12(s
) / 1
3 D
ec 2
017
RC
C/9
6.00
09 M
ay 2
018
08 M
ay 2
020
08 M
ay 2
020
Work is in progress
Cha
mpa
ran(
Mot
ihar
i)
Construction of H.L. R.C.C. Bridge(5x12.00m) on 1st Km. of Lauriya -
Sikarpur-Thori Road. Pile FoundationM/S Parmar Construction .
FDR
Pach
im C
ham
parn
862.
0000
00 /
1383
(s) /
21
Feb
2018
RC
C/6
0.00
27 S
ep 2
018
26 D
ec 2
019
26 D
ec 2
019
work restarted and Progress hampered due to heavy rain andflood
Cha
mpa
ran(
Mot
ihar
i)
Construction of H.L. R.C.C. Bridge(7x12.00m) on 1st Km. of Lauriya -
Ramnagar Road. Pile Foundation M/SHaque Construction.
FDR
Pach
im C
ham
parn
1125
.530
000
/ 292
(s) /
10
Jan
2018
RC
C/8
4.00
29 M
ay 2
018
28 N
ov 2
019
28 N
ov 2
019
work restarted and Progress hampered due to heavy rain andflood
Cha
mpa
ran(
Mot
ihar
i)
Construction Of H.L. R.C.C. Bridge(4x21.75m) over Pandai River on
Narkatiyaganj - Balthar Road in WestChamparan . Pile Foundation M/S
Rohan Construction Pvt. Ltd. Nab
ard
RWD
Pach
im C
ham
parn
524.
0600
00 /
9379
(s) /
11
Dec
201
7
RC
C/8
7.00
20 O
ct 2
018
19 Ja
n 20
20
19 Ja
n 20
20
Work Completed
10/22/2019 MPR Report :: Sep_2019
23/49
Achievement for the month / till month
Physical Financial
88 200.00 M 0.00/100.00
0.00/100.00
0.00/100.00
0.00/100.00
0.00/328.06
89 200.00 M 0.00/100.00
0.00/100.00
0.00/100.00
0.00/100.00
0.00/600.38
90 60.00 M 0.00/0.00
0.00/0.00
0.00/0.00
0.00/0.00
0.00/0.00
91 2713.13M
0.00/100.00
0.00/100.00
0.00/100.00
0.00/55.00
0.00/1027.40
Sl.N
o
Div
isio
n
Nam
e O
f Wor
k
Hea
d / S
ub H
ead
Dis
tirct
Adm
inis
trat
ive
App
rova
l
Type
/Len
gth
Of B
ridg
e(M
)
Agr
eem
ent A
mou
nt
Len
gth
of A
ppro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
f Sch
edul
ed c
ompl
etio
n
Rev
ised
Dat
e of
com
plet
ion
Lik
ely
date
of c
ompl
etio
n
Rem
arks
Foun
datio
n (in
%)
Sub-
Stru
ctur
e (in
%)
Supe
r-St
ruct
ure
(in %
)
App
roac
h (in
%)
Cum
ulat
ive
Cha
mpa
ran(
Mot
ihar
i)
Construction Of H.L. R.C.C. Bridge(3x18.75m) over Harpatbeni River onSukhlahi Path. Pile Foundation. M/SSG. Piling and Construction Pvt. Ltd. N
abar
d RW
D
Pach
im C
ham
parn
571.
2700
00 /
180
/ 16
Jan
2017
RC
C/5
6.00
19 F
eb 2
018
18 A
ug 2
019
18 A
ug 2
019
Work Completed
Cha
mpa
ran(
Mot
ihar
i)
Construction of H.L. R.C.C. Bridge(4x21.75 m) on 7th km. of Balther -
Narkatiyaganj Road over Kartaha River.Pile Foundation. M/S SG Piling and
Construction Pvt. Ltd. Nab
ard
RWD
Pach
im C
ham
parn
716.
6100
00 /
179
/ 16
Jan
2017
RC
C/8
7.00
19 F
eb 2
018
18 A
ug 2
019
18 A
ug 2
019
Work Completed
Cha
mpa
ran(
Mot
ihar
i) Construction of (3x21.00m) size H.L.R.C.C. Bridge work beside of 2nd
minor bridge in the approach road ofConstructed H.L. RCC Bridge overriver Gandak between Gopalganj-
Bettiah (Bishunpur Panchayat) PileFoundation M.K. Enterprises Ph. No.
9431212686
Nab
ard
Pach
im C
ham
parn
778.
0000
00 /
4699
(S) /
05
Jun
2014
RC
C/6
3.00
23 O
ct 2
018
22 A
pr 2
020 Work order issued But work has been stopped by villagers
and vide Letter No. 23 dated 05.01.2019 and letter No. 559dated 23.05.2019 submitted to DM, Gopalganj to resolve the
problem
Cha
mpa
ran(
Mot
ihar
i)
Construction of 5x24.75M R.C.C.brdige over Trimuhan river in
Dhankutawa village (Sikata Block)-Shivpur (Lauria or Chanpatia Block)
Road. Well foundation. Chankyaconstruction Pvt. Ltd.
Nab
ard
Pach
im C
ham
parn
1998
.200
000
/ 221
1(s)
/ 27
Feb
201
7
RC
C/1
27.0
0
24 Ja
n 20
13
23 Ju
l 201
4
31 D
ec 2
018
Bridge Completed and App. Road balance both side due toL.A. LA under Section-11 Preparation for publication.
10/22/2019 MPR Report :: Sep_2019
24/49
Achievement for the month / till month
Physical Financial
92 2340.00M
0.00/100.00
0.00/100.00
0.00/100.00
0.00/67.00
0.00/1355.00
93 20.00 M 0.00/100.00
20.00/30.00
0.00/0.00
0.00/0.00
13.74/254.79
94 40.00 M 0.00/100.00
0.00/85.00
0.00/0.00
0.00/15.00
0.00/472.08
95 240.00 M 7.00/72.00
15.00/40.00
0.00/0.00
0.00/0.00
0.00/437.15
Sl.N
o
Div
isio
n
Nam
e O
f Wor
k
Hea
d / S
ub H
ead
Dis
tirct
Adm
inis
trat
ive
App
rova
l
Type
/Len
gth
Of B
ridg
e(M
)
Agr
eem
ent A
mou
nt
Len
gth
of A
ppro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
f Sch
edul
ed c
ompl
etio
n
Rev
ised
Dat
e of
com
plet
ion
Lik
ely
date
of c
ompl
etio
n
Rem
arks
Foun
datio
n (in
%)
Sub-
Stru
ctur
e (in
%)
Supe
r-St
ruct
ure
(in %
)
App
roac
h (in
%)
Cum
ulat
ive
Cha
mpa
ran(
Mot
ihar
i)
Construction of 5x24.75M R.C.C.brdige over Sikarhana river in
Maheshara village (Sikata Block) -Sarisawa bazar (Majhaulia Block)Road. Well foundation Barhonia
Engicon Pvt. Ltd.N
abar
d
Pach
im C
ham
parn
1927
.090
000
/ 237
0(s)
/ 12
Mar
201
2
RC
C/1
27.0
0
13 S
ep 2
012
12 S
ep 2
014
31 D
ec 2
018 Bridge Completed and Sarisawa bazar side approach road
completed and Maheshara side approach uncompleted. due toL.A. but traffic movement through Kachchi road. LA under
Section-11 Preparation for publication.
Cha
mpa
ran(
Mot
ihar
i)
Construction of H.L. R.C.C. 2x30.00mtr. In the district of West Champaran
under Indo-Nepal Border Ch. 5.819 km.Near Inerwa Bazar.
Nab
ard
Pach
im C
ham
parn
990.
9700
00 /
5590
(s) /
27
May
201
7
RC
C/4
0.00
05 Ju
l 201
8
04 A
ug 2
019
31 D
ec 2
019
Work stopped due to water flowing in canal but Abutmentcap in Progress L.D. deducted, Agency debarred
Cha
mpa
ran(
Mot
ihar
i)
Construction of 7x25M size Bridge inMadanpur-Bhangha Road in Chainage43.400 Km Pakage No. 03.C.K.Infra
structure
Nab
ard
-Ind
o-N
epal
-RID
F-X
VII
I
Pach
im C
ham
parn
1402
.910
000
/ 216
0(s)
/ 14
Mar
201
3
RC
C/1
75.0
0
30 N
ov 2
016
30 Ju
l 201
8
31 D
ec 2
019
All Connectivity disturbed due to flood, but work restartedand L.D. deducted
Cha
mpa
ran(
Mot
ihar
i)
Construction of 5x21.00 m H.L. R..C.C.Bridge work in 11th km. of Motihari-
Madhubani ghat Road in EastChamparan. Well Foundation. M/S
Royal Engineers b
FDR
East
Cha
mpa
ran(
Mot
ihar
i)
1523
.870
000
/ 130
0(s)
/ 16
Feb
201
8
RC
C/1
07.0
0
15 O
ct 2
018
14 O
ct 2
020
14 O
ct 2
020
Work in progress but work stop due to water logged
10/22/2019 MPR Report :: Sep_2019
25/49
Achievement for the month / till month
Physical Financial
96 240.00 M 0.00/100.00
0.00/100.00
0.00/100.00
30.00/40.00
0.00/145.93
97 240.00 M 0.00/0.00
0.00/0.00
0.00/0.00
0.00/0.00
0.00/5.10
98 240.00 M 0.00/100.00
35.00/65.00
0.00/0.00
0.00/0.00
0.00/227.90
99 1700.00M
1.00/10.00
0.00/0.00
0.00/0.00
0.00/0.00
0.00/195.27
Sl.N
o
Div
isio
n
Nam
e O
f Wor
k
Hea
d / S
ub H
ead
Dis
tirct
Adm
inis
trat
ive
App
rova
l
Type
/Len
gth
Of B
ridg
e(M
)
Agr
eem
ent A
mou
nt
Len
gth
of A
ppro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
f Sch
edul
ed c
ompl
etio
n
Rev
ised
Dat
e of
com
plet
ion
Lik
ely
date
of c
ompl
etio
n
Rem
arks
Foun
datio
n (in
%)
Sub-
Stru
ctur
e (in
%)
Supe
r-St
ruct
ure
(in %
)
App
roac
h (in
%)
Cum
ulat
ive
Cha
mpa
ran(
Mot
ihar
i)
Construction of 2x12.50 m H.L. R..C.C.Bridge with Approach Road, Safety
work, Diversion work and Misclaneouswork in 7th km. of Dhaka - Phulwariya
Road in East Champaran. PileFoundation. M/S. Royal Engineers.
FDR
East
Cha
mpa
ran(
Mot
ihar
i)
523.
8800
00 /
1301
(s) /
16
Feb
2018
RC
C/2
5.00
27 S
ep 2
018
26 S
ep 2
019
26 S
ep 2
019
Bridge work Completed Approach work in Progress workstop due to heavy rain.
Cha
mpa
ran(
Mot
ihar
i)
Construction of 2x10.50 m H.L. R..C.C.Bridge with Approach Road, Safety
work, Diversion work and Misclaneouswork in 11th km. of Dhaka -
Phulwariya Road in East Champaran.Pile Foundation. M/S Royal Engineers
FDR
East
Cha
mpa
ran(
Mot
ihar
i)
751.
5000
00 /
689(
s) /
19 Ja
n 20
18
RC
C/6
6.00
23 M
ay 2
018
22 N
ov 2
019
22 N
ov 2
019
Agreement will be closed as per direction of higher authority.
Cha
mpa
ran(
Mot
ihar
i)
Construction of 5x21.75 m H.L. R..C.C.Bridge with Approach Road, Safety
work, Diversion work and Misclaneouswork in 5th km. of Sugauli - Piparpati
Road in East Champaran.
FDR
East
Cha
mpa
ran(
Mot
ihar
i)
1259
.860
000
/ 474
(s) /
15
Oct
201
8
RC
C/1
08.7
5
05 M
ay 2
018
04 M
ay 2
020
04 M
ay 2
020
Work in progress but work stop due to water logged
Cha
mpa
ran(
Mot
ihar
i) Construction of HL RCC Bridge (Sizes12x24.5M) over River Sikarahana withapproach road at Semara Ghat in BlockMehasi in Dist.- East Champaran underNABARD. Type of Foundation - Well,
Bridge Length - 304.32M. M/SAMBER INFRA PROJECT PVT. LTD.
Nab
ard
RWD
East
Cha
mpa
ran(
Mot
ihar
i)
4596
.000
000
/ 36
/ 03
Jan
2019
RC
C/3
04.3
2
05 M
ar 2
019
04 S
ep 2
021
04 S
ep 2
021
Work in progress but work stopped due to again flash flood atsite and L.D. deducted
10/22/2019 MPR Report :: Sep_2019
26/49
Achievement for the month / till month
Physical Financial
100 770.00 M 0.00/100.00
0.00/100.00
0.50/96.50
0.00/84.00
0.00/2482.30
101 260.00 M 0.00/0.00
0.00/0.00
0.00/0.00
0.00/0.00
0.00/2.13
102 200.00 M 0.00/100.00
0.00/100.00
0.00/100.00
0.00/70.00
0.00/616.58
103 260.00 M 0.00/100.00
0.00/100.00
0.00/100.00
10.00/80.00
16.91/236.07
Sl.N
o
Div
isio
n
Nam
e O
f Wor
k
Hea
d / S
ub H
ead
Dis
tirct
Adm
inis
trat
ive
App
rova
l
Type
/Len
gth
Of B
ridg
e(M
)
Agr
eem
ent A
mou
nt
Len
gth
of A
ppro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
f Sch
edul
ed c
ompl
etio
n
Rev
ised
Dat
e of
com
plet
ion
Lik
ely
date
of c
ompl
etio
n
Rem
arks
Foun
datio
n (in
%)
Sub-
Stru
ctur
e (in
%)
Supe
r-St
ruct
ure
(in %
)
App
roac
h (in
%)
Cum
ulat
ive
Cha
mpa
ran(
Mot
ihar
i)
Construction of HLRCC bridge withapproach road at kataha ghat in
sikrahna river under mehsi block in thedistrict of East champaran(12 x 24.750M), Well foundation. M/S Jay shankar
rai,9934867236N
abar
d
East
Cha
mpa
ran(
Mot
ihar
i)
3539
.550
000
/ 807
9(s)
/ 07
Oct
201
3
RC
C/2
97.0
0
30 M
ar 2
014
30 M
ar 2
016
30 Ju
n 20
19
31 D
ec 2
019
Bridge work Completed Approach road in progress L.A.Preparation for Section -11 is published and L.D. deducted
Kat
ihar
Construction of of H.L. RCC bridge(2X16.00 m) in Place of Damaged by
flood in 2017 in the 12th Km ofBairagachi-Banglacol road in the
District of Araria. ARZU CONST.LTD, PATNA
FDR
Ara
ria
557.
0700
00 /
286(
s) /
01 Ja
n 20
18
33.2
2
386.
42
19 A
ug 2
018
18 N
ov 2
019
31 M
ar 2
020
A joint inspection visited was done with EE RCD Araria &SPE Katihar on 27-12-2018 to located position of bridge to
start the work but due to public Hindrens work was notstarted. Second joint inspection also done by both on 24-06-2019 and decided to change it at 17th km chainage of this
road. and sent to Dy chief Engineer, work circle- 2 forapproval. After approval of change location Contractor willstart the work on 17th km. Super Structure work completed.
Approach road work in progress.
Cha
mpa
ran(
Mot
ihar
i)
Construction of HLRCC bridge in Indo-Nepal border road at channage 40.772km in the district of Purvi champaranPackage No- 7 (2 x 30M),Barhonia
engicor Pvt ltd,9431269809
Nab
ard
East
Cha
mpa
ran(
Mot
ihar
i)
693.
3000
00 /
7209
(s) /
09
Sep
2013
RC
C/6
0.00
28 F
eb 2
014
30 M
ay 2
016
30 D
ec 2
018
31 O
ct 2
019
Bridge work Completed
Kat
ihar
Construction of of H.L. RCC bridge(3X18.75 m) in Place of Damaged byflood in 2017 in the 4th km. of ArariaMeerganj Chowk Kuwari Bypass Skiti
Dhabeli road under in the DistrictAraria. RAJ KISHOR SINGH,
ARARIA
FDR
Ara
ria
604.
5000
00 /
285(
s) /
10 Ja
n 20
18
55.8
3
499.
77
19 A
ug 2
018
18 N
ov 2
019
super structure work completed. Approach road work inprogress.
10/22/2019 MPR Report :: Sep_2019
27/49
Achievement for the month / till month
Physical Financial
104 200.00 M 0.00/100.00
0.00/100.00
0.00/100.00
0.00/90.00
0.00/713.15
105 300.00 M 0.00/100.00
0.00/100.00
0.00/100.00
0.00/90.00
0.00/826.40
106 260.00 M 0.00/15.00
0.00/0.00
0.00/0.00
0.00/0.00
0.00/36.60
107 250.00 M 0.00/100.00
0.00/100.00
10.00/25.00
20.00/20.00
0.00/274.81
Sl.N
o
Div
isio
n
Nam
e O
f Wor
k
Hea
d / S
ub H
ead
Dis
tirct
Adm
inis
trat
ive
App
rova
l
Type
/Len
gth
Of B
ridg
e(M
)
Agr
eem
ent A
mou
nt
Len
gth
of A
ppro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
f Sch
edul
ed c
ompl
etio
n
Rev
ised
Dat
e of
com
plet
ion
Lik
ely
date
of c
ompl
etio
n
Rem
arks
Foun
datio
n (in
%)
Sub-
Stru
ctur
e (in
%)
Supe
r-St
ruct
ure
(in %
)
App
roac
h (in
%)
Cum
ulat
ive
Cha
mpa
ran(
Mot
ihar
i)
Construction of HLRCC bridge in Indo-Nepal border road at channage 35.650km in the district of Purvi champaranPackage No- 7 (2 x 35M),Barhonia
engicor Pvt ltd,9431269809N
abar
d
East
Cha
mpa
ran(
Mot
ihar
i)
802.
9400
00 /
7209
(s) /
09
Sep
2013
RC
C/7
0.00
28 F
eb 2
014
30 M
ay 2
016
17 D
ec 2
018
31 O
ct 2
019
Bridge work Completed
Cha
mpa
ran(
Mot
ihar
i)
Construction of HLRCC bridge in Indo-Nepal border road at channage 32.875km in the district of Purvi champaranPackage No- 7 (2 x 35M),Barhonia
engicor Pvt ltd,9431269809
Nab
ard
East
Cha
mpa
ran(
Mot
ihar
i)
849.
0600
00 /
7209
(s) /
09
Sep
2013
RC
C/6
0.00
28 F
eb 2
014
30 M
ay 2
016
17 D
ec 2
018
31 O
ct 2
019
Bridge work Completed
Kat
ihar
Construction of of H.L. RCC bridge(2X16.00 m) in Place of Damaged by
flood in 2017 in the 9th Km ofBairagachi-Banglacol road in the
District of Araria. MS SONACONSTRUCTION, SUPAUL
FDR
Ara
ria
547.
0800
00 /
287(
s) /
10 Ja
n 20
18
33.2
2
395.
50
19 A
ug 2
018
18 N
ov 2
019
31 M
ar 2
020
5/22 pile cap completed. Rest pile stop due to flood water.. ALatter has written to contractor to expedise the work other
wise. LD will be imposed. Latter No-432 dt-15.04.19.noticegive to start work otherwise you will be resigned to work. ALetter has written to contractor to speedup the works other
wise be debar vide latter no-867 dated-03-08-2019. A DebarLetter given to contractor vide letter N0- 1096 dt-28-09-2019
Kat
ihar
Construction of of H.L. RCC bridge(3X18.75 m) in 3rd km. of Araria
Meerganj Chowk Kuwari Bypass SkitiDhabeli road under FDR in the DistrictofAraria. SHIV CHANDRA KUMAR
FDR
Ara
ria
577.
4200
00 /
46(s
) / 0
2 Ja
n 20
18
58.0
8
416.
85
17 O
ct 2
018
16 Ja
n 20
20
A1 = 28/28m, P1 = 30/30m, P2=4.6/30m, P3=4.6/30m,P5=19/30m concreting & sinking work in progress. A L/Dhas imposed to contractor for Rs. 5,90,304.00 for delay ofwork vide letter No.- 238, dt. 22.02.19 & Lt. No. - 491 dt.-03.05.2019. 1st span Super Structure work completed. 2nd
spna s.s. work in progress.
10/22/2019 MPR Report :: Sep_2019
28/49
Achievement for the month / till month
Physical Financial
108 260.00 M 0.00/100.00
0.00/100.00
0.00/100.00
10.00/90.00
0.00/470.76
109 260.00 M 0.00/100.00
0.00/100.00
5.00/100.00
10.00/70.00
0.00/362.66
110 250.00 M 0.00/100.00
0.00/100.00
10.00/100.00
10.00/50.00
0.00/297.25
111 280.00 M 0.00/0.00
0.00/0.00
0.00/0.00
0.00/0.00
0.00/0.00
Sl.N
o
Div
isio
n
Nam
e O
f Wor
k
Hea
d / S
ub H
ead
Dis
tirct
Adm
inis
trat
ive
App
rova
l
Type
/Len
gth
Of B
ridg
e(M
)
Agr
eem
ent A
mou
nt
Len
gth
of A
ppro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
f Sch
edul
ed c
ompl
etio
n
Rev
ised
Dat
e of
com
plet
ion
Lik
ely
date
of c
ompl
etio
n
Rem
arks
Foun
datio
n (in
%)
Sub-
Stru
ctur
e (in
%)
Supe
r-St
ruct
ure
(in %
)
App
roac
h (in
%)
Cum
ulat
ive
Kat
ihar
Construction of of H.L. RCC bridge(3X18.00 m) including approach road,diversion and protection work in placeof damaged by flood in 2017 in the ch.
Ch. 9th Km of Meerganj-Kuwari bypass- sikti- Dhabeli road in the distric of
Araria. M/S JAI MATA DI CONST.BEGUSARAI.
FDR
Ara
ria
742.
8400
00 /
479(
s) /
15 Ja
n 20
18
55.8
3
550.
10
19 A
ug 2
018
18 N
ov 2
019
Super structure work completed. Approach work in progress.
Kat
ihar
Construction of of H.L. RCC bridge(3X12.00 m) including approach road,diversion and protection work in placeof damaged by flood in 2017 in the ch.Ch. 7th Km of Araria Kurshakatta road
in the distric of Araria. TIRUPATIBALAJI EARTH WORK PVT LTD.
PATNA
FDR
Ara
ria
584.
1200
00 /
477(
s) /
15 Ja
n 20
18
37.2
2
403.
92
17 A
ug 2
018
16 N
ov 2
019
Bridge work completed. Approach Road work in progress.
Kat
ihar
Construction of of H.L. RCC bridge(2X16.00 m) including approach road,diversion and protection work in placeof damaged by flood in 2017 in 10thKm of Meerganj chowk -Kuwari by
pass to sikti-dhabeli road in the districof Araria. SHAILESH KR. SINGH
FDR
Ara
ria
554.
5000
00 /
283(
s) /
10 Ja
n 20
18
33.2
0
481.
89
19 O
ct 2
018
18 O
ct 2
020
22/22 Pilling work completed. super structure work inprogress. A Letter has written to contractor to Expedise the
work other wise LD will be imposed. Letter No- 2080 dt- 31-12-2018. s.s. work completed. Bridge work
completed.Approach work in progress.
Kat
ihar
Construction of of H.L. RCC bridge(2X16.00 m) including approach road,diversion and protection work in placeof damaged by flood in 2017 in 7th Km
of Bairgachhi-Banglacol road in thedistrict of Araria. SAIYAD MUMTAZ
AKHTAR
FDR
Ara
ria
557.
9200
00 /
677(
s) /
19 Ja
n 20
18
33.2
0
19 O
ct 2
018
18 Ja
n 20
20
A joint inspection visited was done with EE RCD Araria &SPE Katihar on 27-12-2018 to located position of bridge to
start the work but due to public Hindrens work was notstarted. Second joint inspection also done by both on 24-06-2019 and decided to change it at 25th km chainage of this
road. and sent to Dy chief Engineer, work circle- 2 forapproval. after approval of change location tender will be
done
10/22/2019 MPR Report :: Sep_2019
29/49
Achievement for the month / till month
Physical Financial
112 300.00 M 0.00/100.00
0.00/100.00
15.00/75.00
5.00/30.00
0.00/288.88
113 65.00 M 0.00/100.00
0.00/100.00
0.00/100.00
0.00/80.00
0.00/153.16
114 280.00 M 10.00/90.00
10.00/40.00
0.00/0.00
0.00/25.00
0.00/172.50
115 300.00 M 0.00/95.00
75.00/75.00
0.00/0.00
0.00/0.00
0.00/219.89
Sl.N
o
Div
isio
n
Nam
e O
f Wor
k
Hea
d / S
ub H
ead
Dis
tirct
Adm
inis
trat
ive
App
rova
l
Type
/Len
gth
Of B
ridg
e(M
)
Agr
eem
ent A
mou
nt
Len
gth
of A
ppro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
f Sch
edul
ed c
ompl
etio
n
Rev
ised
Dat
e of
com
plet
ion
Lik
ely
date
of c
ompl
etio
n
Rem
arks
Foun
datio
n (in
%)
Sub-
Stru
ctur
e (in
%)
Supe
r-St
ruct
ure
(in %
)
App
roac
h (in
%)
Cum
ulat
ive
Kat
ihar
Construction of of H.L. RCC bridge(3X16.00 m) including approach road,diversion and protection work in placeof damaged by flood in 2017 in 8th Kmof Meerganj chowk- kuwari by pass to
sikti dhabeli road in the district ofAraria.ARJU CONST. PATNA
FDR
Ara
ria
762.
4600
00 /
678(
s) /
13 Ja
n 20
18
49.8
0
599.
75
19 O
ct 2
018
18 A
pr 2
020
28/28 Pilling work completed. super structere work inprogress.. A Letter has written to contractor to Expedise the
work other wise LD will be imposed. Letter No- 2081 dt- 31-12-2018. Approach work is started. A L/D has been imposedto contractor of amount 2,99,877/- vide letter No-580 dated-30.05.2019. 3rd span Super Structure work in progress. 3rd
span super structure work completed. Approach work inprogress.
Dar
bhan
ga
costruction of HLRCC bridge in NH-28through chand chourdih to pathan tol
before river under ujiyarpur block(2x14.50).Sri RajeshKumar,94308343626
MM
SNY
Sam
astip
ur
204.
5900
00 /
7370
(s) /
06
Aug
201
4
RC
C/3
0.26
1576
5739
.00
30 S
ep 2
014
30 S
ep 2
015
Remarks for LA: Section-7 is in progress.Expert committeeto be formed.
Kat
ihar
Construction of of H.L. RCC bridge(2X18.00 m) including approach road,diversion and protection work in placeof damaged by flood in 2017 in 82Km
of Refujee colony-Meerganj chowk(NH57A) road in the district of Araria.
ARJU CONST. PATNA
FDR
Ara
ria
557.
6900
00 /
478(
s) /
15 Ja
n 20
18
37.2
0
388.
63
19 O
ct 2
018
18 Ja
n 20
20
22/22 Pilling work in progress. Pile cap work in progress. ALetter has written to contractor to Expedise the work other
wise LD will be imposed. Letter No- 2017 dt- 17.12.2018 &Letter No- 2086 dt- 31.12.2018 & Latter No-490 dt-03.05.19.
A L/D has Imposed of 0-.5% amount 1,94,315/- vide latterNo-866 date-03-08-2019 Work is stop due to design changesand study to NIT Patna for Approval. A Letter has given tocontractor for debar vide latter N0-763 Dated-16-07-2019.
Kat
ihar
Construction of of H.L. RCC bridge(3X14.00 m) including approach road,diversion and protection work in placeof damaged by flood in 2017 in 15th
Km of Parwaha-Mirdaul PWD road inthe distrtict of Araria. AAKASH
KUMAR, PATNA
FDR
Ara
ria
685.
1500
00 /
476(
s) /
15 Ja
n 20
18
43.8
0
517.
20
19 O
ct 2
018
18 Ja
n 20
20
28/28 Pile work completed. pile cap work in progress. L/Dimposed to contractor vide Letter No- 476 dt-29.04.19 and
Rs-2,58,600/- A notice send to contrator to speedop the workotherwise 2nd L/D will be imposed.2nd L/D has been
imposed to contractor of amount 2,58,600/- vide letter No-556 dated-23.05.2019. A letter has to given for Debar Noticevide Latter No-760 Date-16-07-2019. Sub structure work in
progress.
10/22/2019 MPR Report :: Sep_2019
30/49
Achievement for the month / till month
Physical Financial
116 250.00 M 0.00/100.00
0.00/100.00
20.00/50.00
30.00/30.00
81.07/354.53
117 300.00 M 10.00/70.00
0.00/0.00
0.00/0.00
0.00/0.00
46.14/670.84
118 350.00 M 0.00/100.00
0.00/100.00
10.00/30.00
0.00/0.00
40.10/733.49
119 200.00 M 0.00/100.00
40.00/100.00
10.00/10.00
0.00/0.00
0.00/199.65
Sl.N
o
Div
isio
n
Nam
e O
f Wor
k
Hea
d / S
ub H
ead
Dis
tirct
Adm
inis
trat
ive
App
rova
l
Type
/Len
gth
Of B
ridg
e(M
)
Agr
eem
ent A
mou
nt
Len
gth
of A
ppro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
f Sch
edul
ed c
ompl
etio
n
Rev
ised
Dat
e of
com
plet
ion
Lik
ely
date
of c
ompl
etio
n
Rem
arks
Foun
datio
n (in
%)
Sub-
Stru
ctur
e (in
%)
Supe
r-St
ruct
ure
(in %
)
App
roac
h (in
%)
Cum
ulat
ive
Kat
ihar
Construction of of H.L. RCC bridge(3X18.75 m) in 2nd km. of Araria
Meerganj Chowk Kuwari Bypass SkitiDhabeli road under FDR in the DistrictAraria. SHIV CHANDRA KUMKAR
FDR
Ara
ria
573.
7200
00 /
45 (S
) / 0
2 Ja
n 20
18
58.0
8
427.
76
17 O
ct 2
018
16 Ja
n 20
20
28/28 Pilling work in completed. Pile cap work completed. ALetter has written to contractor to Expedise the work other
wise LD will be imposed. Letter No- 2015 dt- 17.12.2018. AL/D Letter has imposed to contractor 0.5% amount 2,13,881/-vide letter No-560 dated-24.05.2019. work stop due to floodwater.Debar Notice has given vide letter No-868 dated-03-08-2019. 2/3 SS Completed.Approach work in progress.
Railway/wearing coat work in prgroess.
Kat
ihar
Construction of RCC HL bridge(6x21.00m) at 28th KM of Belauri-
Shivganj-Sonaili-Salmari Bazar road inthis district of Katihar. ARJUN
PRASAD,
FDR
Kat
ihar
1471
.000
000
/ 254
1(s)
/ 28
Mar
201
8
129.
60
1180
.60
10 O
ct 2
018
17 O
ct 2
020
A2 cutting edge placed. A1-28m/28m,P1=30/30m,P2=15/30,P3=15/30,P4=12.5/30M,P5=
30/30m concreting & sinking work in progress. A L/D hasimposed to contractor for Rs. 5,90,304.00 for delay of work
vido letter No-238 Dt-22.2.19 & Letter No. 491 dt-03.05.2019. Diversion completed. Traffic on contractor given
Debar Notice vide Latter No-764 Dated- 16-07-2019.
Kat
ihar
Construction of RCC HL bridge(6x21.00m) in the 15th Km of Katihar-
Sonaili-Jhowa-salmari-Barsoi-Balrampur road including approach
road diversion, protection work in placeof damaged road by flood in 2017 in thedistric of Katihar. MUKESH KUMAR,
KATIHAR
FDR
Kat
ihar
1379
.210
000
/ 234
8(s)
/ 28
Mar
201
8
127.
22
1006
.22
24 A
ug 2
018
23 A
ug 2
020 Foundation work completed. Sub structure work in
Progress.to contractor 0.5% amount 5,03,114/- vide letter No-557 dated-23.05.2019. Super Structure work in progress.
Kat
ihar
Construction of RCC HL bridge(2x21.75m) at 9th KM of Kadwa Block
headquarter-chowki via bharriAashiyani road including approach road
diversion, protection work and roadsefty in place of dmaged road by floodin 2017 in the district of Katihar. M/SSHIV SHAKTI CONST. PURNEA
FDR
Kat
ihar
517.
1100
00 /
1390
(s) /
21
Feb
2018
44.7
2
357.
59
24 A
ug 2
018
23 A
ug 2
019
31 M
ar 2
020
22/22 Pilling work completed. Super structure work inprogress. A LD has imposed to constructor for Rs.
1,78,800.00 for Delay of work. by Letter No- 2090 dt-31.12.2018. A Debar Notice has given vide letter No-873
dated-04-08-2019. 2nd LD imposed of Rs. 1,78,800.00 videlatter No-846 dated- 01-08-2019. 3rd LD Rs 1788000 vide
letter no 1077 dt- 28-09-2019
10/22/2019 MPR Report :: Sep_2019
31/49
Achievement for the month / till month
Physical Financial
120 290.00 M 0.00/100.00
0.00/100.00
0.00/100.00
0.00/95.00
0.00/653.97
121 200.00 M 0.00/100.00
0.00/100.00
0.00/100.00
0.00/100.00
0.00/258.53
122 250.00 M 0.00/100.00
0.00/100.00
0.00/100.00
10.00/60.00
0.00/368.02
123 240.00 M 0.00/100.00
0.00/100.00
0.00/100.00
0.00/100.00
0.00/319.90
Sl.N
o
Div
isio
n
Nam
e O
f Wor
k
Hea
d / S
ub H
ead
Dis
tirct
Adm
inis
trat
ive
App
rova
l
Type
/Len
gth
Of B
ridg
e(M
)
Agr
eem
ent A
mou
nt
Len
gth
of A
ppro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
f Sch
edul
ed c
ompl
etio
n
Rev
ised
Dat
e of
com
plet
ion
Lik
ely
date
of c
ompl
etio
n
Rem
arks
Foun
datio
n (in
%)
Sub-
Stru
ctur
e (in
%)
Supe
r-St
ruct
ure
(in %
)
App
roac
h (in
%)
Cum
ulat
ive
Dar
bhan
ga
Construction of HLRCC bridge withLand acquisition ,approach road and
protection work in tilyuga river betweendwalak village and janki nagar tola
under madhepur block in the district ofmadhubani (5x18.75 m)Shreem
Construction,9470627503
BD
F
Mad
huba
ni
995.
7400
00 /
1867
(s) /
03
Mar
201
4
RC
C/9
6.84
7277
0925
.00
30 Ju
n 20
15
30 O
ct 2
014
31 D
ec 2
018 Approach upto GSB complted. B.T. work could not be done
as there is no access of Road Rollar to the Site. TrafficStarted.
Dar
bhan
ga Construction of HL RCCbridge(2x16.50M) in 1st km of
Bishanpur Atarbel Road in the Districtof Darbhanga.
FDR
Dar
bhan
ga
442.
5300
00 /
291(
s) /
13 Ja
n 20
18
RC
C/3
4.26
3329
6953
.00
10 A
ug 2
018
09 N
ov 2
019
09 N
ov 2
019
Traffic Started.
Kat
ihar
Construction of RCC HL bridge(2x21.75 m) including approach road,diversion and protection work in placeof damaged by flood in 2017 in the 4thKm of Damdama-Azamnagar-KeshariChwok via Azamnagar railway Station
road in the district of Katihar. OMCONT. KATIHAR
FDR
Kat
ihar
586.
0000
00 /
1391
(s) /
21
Feb
2018
44.7
2
382.
58
10 O
ct 2
018
17 Ja
n 20
20 Bridge work in progress. Wearing Coat & Railing workcompleted.. Approach work in progress.
Kat
ihar
Construction of RCC HL bridge(2x16.00 m) including approach road,diversion and protection work in place
of damaged by flood in 2017 in the 42thkm of Katihar-Sonali-Jhowa-Salmari-
Barsoi-Balrampur road in the district ofKatihar. M/S SHAILESH KUMAR
FDR
Kat
ihar
458.
7200
00 /
480(
s) /
15 Ja
n 20
18
49.2
2
382.
85
01 Ju
n 20
18
31 A
ug 2
019
31 D
ec 2
019
Bridge work and approach road work completed.
10/22/2019 MPR Report :: Sep_2019
32/49
Achievement for the month / till month
Physical Financial
124 230.00 M 0.00/100.00
0.00/100.00
0.00/90.00
10.00/50.00
0.00/291.41
125 240.00 M 0.00/100.00
0.00/100.00
5.00/100.00
10.00/50.00
0.00/459.39
126 300.00 M 0.00/100.00
0.00/100.00
35.00/45.00
10.00/60.00
94.93/1046.10
127 250.00 M 0.00/75.00
0.00/0.00
0.00/0.00
0.00/0.00
0.00/278.80
Sl.N
o
Div
isio
n
Nam
e O
f Wor
k
Hea
d / S
ub H
ead
Dis
tirct
Adm
inis
trat
ive
App
rova
l
Type
/Len
gth
Of B
ridg
e(M
)
Agr
eem
ent A
mou
nt
Len
gth
of A
ppro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
f Sch
edul
ed c
ompl
etio
n
Rev
ised
Dat
e of
com
plet
ion
Lik
ely
date
of c
ompl
etio
n
Rem
arks
Foun
datio
n (in
%)
Sub-
Stru
ctur
e (in
%)
Supe
r-St
ruct
ure
(in %
)
App
roac
h (in
%)
Cum
ulat
ive
Kat
ihar
Construction of H.L. RCC bridge(3X16.00 M) in Belauri-Shivganj-
Salmari Bazar 19th km. of (1st Cutting)in the district of Katihar. BABAN
KUMAR SINGHFD
R
Kat
ihar
639.
7300
00 /
294(
s) /
10 Ja
n 20
18
49.8
3
415.
50
13 Ju
n 20
18
12 S
ep 2
019
31 D
ec 2
019
3rd span super structure work completed. Approach roadwork in progress.
Kat
ihar
Construction of H.L. RCC bridge(5X16.00 M) in Belauri-Shivganj-
Salmari Bazar 19th km. of (2ndCutting) in the district of Katihar.
GOKUL HITECH INFRA PVT. LTD.
FDR
Kat
ihar
866.
8800
00 /
293(
s) /
10 Ja
n 20
18
83.0
5
605.
43
13 Ju
n 20
18
12 S
ep 2
019
31 D
ec 2
019
Bridge work completed. Approach Road work in progress.
Kat
ihar
"Construction of RCC HL bridge(5X24.00 m) including approach road,diversion and protection work in placeof damaged by flood in 2017 in the 4thKm of Plasi-Baraili road in the district
of Purnea. PRABHAT KR. "
FDR
Purn
ia
1606
.000
000
/ 167
7(S)
/ 05
Mar
201
8
123.
00
1115
.17
10 O
ct 2
018
17 A
pr 2
020
17 A
pr 2
020
Super Structure work in progress.
Kat
ihar
"Construction of RCC HL bridge(3X24.75 m) including approach road,diversion and protection work in placeof damaged by flood in 2017 in the 1st
Km of Belgachi PWD Road ViaNitendra-Macharhatta-goria road in thedistrict of Purnea. M/S SHIV SHAKTI
CONST. PURNEA"
FDR
Purn
ia
1185
.000
000
/ 138
4(S)
/ 21
Feb
201
8
76.0
8
571.
44
10 O
ct 2
018
17 A
pr 2
020
17 A
pr 2
020
A1-30/32m,P1-30/32m,P2-30/32m,A2-30/32m, concretingand sinking work in progress. A Letter has written to
contractor to Expedise the work other wise LD will beimposed. Letter No- 2097 dt- 31.12.2018. A L/D imposed to
contractor of 0.5% amount 2,85,721 dated 25.5.2019. ALatter has given to contractor for Debar vide latter No-876
dated-04-08-2019.
10/22/2019 MPR Report :: Sep_2019
33/49
Achievement for the month / till month
Physical Financial
128 500.00 M 0.00/100.00
0.00/50.00
10.00/10.00
0.00/0.00
0.00/1126.68
129 240.00 M 0.00/100.00
0.00/100.00
0.00/100.00
10.00/100.00
0.00/502.19
130 240.00 M 0.00/100.00
0.00/100.00
0.00/100.00
10.00/70.00
0.00/576.99
131 240.00 M 0.00/100.00
0.00/100.00
20.00/80.00
10.00/60.00
0.00/308.68
Sl.N
o
Div
isio
n
Nam
e O
f Wor
k
Hea
d / S
ub H
ead
Dis
tirct
Adm
inis
trat
ive
App
rova
l
Type
/Len
gth
Of B
ridg
e(M
)
Agr
eem
ent A
mou
nt
Len
gth
of A
ppro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
f Sch
edul
ed c
ompl
etio
n
Rev
ised
Dat
e of
com
plet
ion
Lik
ely
date
of c
ompl
etio
n
Rem
arks
Foun
datio
n (in
%)
Sub-
Stru
ctur
e (in
%)
Supe
r-St
ruct
ure
(in %
)
App
roac
h (in
%)
Cum
ulat
ive
Kat
ihar
"Construction of RCC HL bridgeincluding approach road, diversion andprotection work in place of damaged byflood in 2017 in 1st Km of Palsa- KaliMandir-Baraili Road (4x21.00m)span(Ch. 245m to 340m) and (5x21.00m)span in (Ch. 480m to 600m ) in the
district of Purnea. HAQUECONSTRUCTION Muzaffarpur"
FDR
Purn
ia
2791
.300
000
/ 130
7(S)
/ 16
Feb
201
8
218.
40
1953
.79
10 O
ct 2
018
17 Ja
n 20
20
17 Ja
n 20
20
1st bridge A2=30/30m, P3=30/30m, A1=30/30m, P1=30/30,P2=30/30 well cap work in progress. 2nd bridge A1=30/30,
A2=30/30, P1=30/30, P2=30/30, P3=30/30, P4=30/30 ALetter has written to contractor to Expedise the work other
wise LD will be imposed. Letter No- 2009 dt- 17.12.2018. AL/D imposed 0.5% and Rs 9,76,899/- vide latter no 858 dt-
02-08-2019
Kat
ihar
"Construction of RCC HL bridge(2X24.00 m) including approach road,diversion and protection work in place
of damaged by flood in 2017 in the 29thkm of Biasi-Amor-Bahadurganj
road(SH-99) in the district of Purnea.HAQUE CONSTRUCTION"
FDR
Purn
ia
794.
7500
00 /
690(
S) /
19 Ja
n 20
18
49.2
2
562.
65
13 Ju
n 20
18
12 D
ec 2
019
12 D
ec 2
019
Bridge work completed. Approach Road work alsocompleted.
Kat
ihar
"Construction of RCC HL bridge(4x16.00 m) including approach road,diversion and protection work in placeof damaged by flood in 2017 in the 6thkm of Jokihat-Dalmalpur-Garua road in
the district of Purnea. RAJ KISHORSINGH"
FDR
Purn
ia
877.
5300
00 /
683(
S) /
19 Ja
n 20
18
66.4
4
667.
60
13 Ju
n 20
18
12 D
ec 2
019
12 D
ec 2
019
Bridge work completed. Approach Road work in progress.
Kat
ihar
"Construction of H.L. RCC bridge(3X16.50 M) in the 9th km of
Belgachhi PWD road via Nitendra-Machharhatta-Geria road in the districtof Purnia. HAQUE CONSTRUCTION"
FDR
Purn
ia
729.
4500
00 /
295(
S) /
10 Ja
n 20
18
51.3
3
469.
61
13 Ju
n 20
18
12 S
ep 2
019
31 D
ec 2
019
3rd S.S work in progress, Approach Road work in progress.
10/22/2019 MPR Report :: Sep_2019
34/49
Achievement for the month / till month
Physical Financial
132 240.00 M 0.00/100.00
0.00/100.00
0.00/100.00
10.00/100.00
0.00/310.05
133 240.00 M 0.00/100.00
0.00/100.00
20.00/80.00
40.00/40.00
0.00/923.88
134 240.00 M 0.00/100.00
0.00/100.00
0.00/100.00
10.00/100.00
0.00/313.94
135 240.00 M 0.00/100.00
0.00/100.00
0.00/100.00
10.00/100.00
142.85/571.67
Sl.N
o
Div
isio
n
Nam
e O
f Wor
k
Hea
d / S
ub H
ead
Dis
tirct
Adm
inis
trat
ive
App
rova
l
Type
/Len
gth
Of B
ridg
e(M
)
Agr
eem
ent A
mou
nt
Len
gth
of A
ppro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
f Sch
edul
ed c
ompl
etio
n
Rev
ised
Dat
e of
com
plet
ion
Lik
ely
date
of c
ompl
etio
n
Rem
arks
Foun
datio
n (in
%)
Sub-
Stru
ctur
e (in
%)
Supe
r-St
ruct
ure
(in %
)
App
roac
h (in
%)
Cum
ulat
ive
Kat
ihar
"Construction of H.L. RCC bridge(3X16.50 M) in the 7th km of Ekba-Mahammodia-Dubouli road in thedistrict of Purnia. M/S SHAILESH
KUMAR"FD
R
Purn
ia
552.
1700
00 /
296(
S) /
10 Ja
n 20
18
51.3
3
375.
41
04 A
pr 2
018
03 Ju
l 201
9
31 D
ec 2
019
Bridge work completed. Approach work also completed.
Kat
ihar
"Construction of RCC HL bridge(8x18.00m) including approach road,diversion and protection work in the
place of 10th km of Jokihat-Dalmalpur-Gerua road in the district of Purnia.
SHANKAR SHARMA & BAIJNATHSHARMA (J.V.)"
FDR
Purn
ia
1478
.980
000
/ 120
92(s
) / 2
7 D
ec 2
017
148.
88
1113
.48
27 M
ar 2
018
23 M
ar 2
020
23 M
ar 2
020
8th span super structure work completed. Approach Roadwork in progress.
Kat
ihar
"Construction of H.L. RCC bridge(3x16.50 M) in 2nd Km. of Ekhua
mahmadodia-Bareli-Duboli road in thedistrict of Purnea. BAIJNATH
SHARMA"
FDR
Purn
ia
619.
2400
00 /
42(s
) / 0
2 Ja
n 20
18
51.3
3
404.
68
05 A
pr 2
018
04 Ju
l 201
9
31 D
ec 2
019
Superstructure & Approach Road completed.
Kat
ihar
"Construction of of H.L. RCC bridge(3X16.00 m) in (SH-99) 9th km. of
Baisi-Amour-Bahadurganj road in theDistrict of Purnea. RAJKISHOR
SINGH"
FDR
Purn
ia
739.
0000
00 /
41(s
) / 0
2 Ja
n 20
18
49.8
3
536.
33
28 M
ar 2
018
22 S
ep 2
019
Super Structure completed. Approach Road also completedupto black top. Traffic open.
10/22/2019 MPR Report :: Sep_2019
35/49
Achievement for the month / till month
Physical Financial
136 0.00/0.00
0.00/0.00
0.00/0.00
0.00/0.00
0.00/0.00
137 240.00 M 0.00/100.00
0.00/100.00
0.00/100.00
0.00/40.00
0.00/384.33
138 240.00 M 0.00/100.00
0.00/100.00
0.00/100.00
0.00/60.00
0.00/813.98
139 350.00 M 0.00/80.00
0.00/0.00
0.00/0.00
0.00/0.00
0.00/628.12
Sl.N
o
Div
isio
n
Nam
e O
f Wor
k
Hea
d / S
ub H
ead
Dis
tirct
Adm
inis
trat
ive
App
rova
l
Type
/Len
gth
Of B
ridg
e(M
)
Agr
eem
ent A
mou
nt
Len
gth
of A
ppro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
f Sch
edul
ed c
ompl
etio
n
Rev
ised
Dat
e of
com
plet
ion
Lik
ely
date
of c
ompl
etio
n
Rem
arks
Foun
datio
n (in
%)
Sub-
Stru
ctur
e (in
%)
Supe
r-St
ruct
ure
(in %
)
App
roac
h (in
%)
Cum
ulat
ive
Kha
garia Construction of HL RCC Bridge over
Bagmati River at Nawada Ghat inChautham Block of Khagaria district
Nab
ard
RWD
Kha
garia
5614
.000
000
/ 885
/ 01
Mar
201
9
RC
C/5
07.2
0
Executive Engineer, RWD, Works Division Gogri hassubmitted proposal for land acquisition in 4 copy to DLAO,Khagaria vide letter no. 1038 (Anu), dt - 16.08.2019 LOA
Issued to the Contractor from this office vide letter no. 1621dt 27.08.19
Kat
ihar
Construction of of H.L. RCC bridge(3X16.50 m) in 9th km. of Kali Mandir
to Baraily road in the District ofPurnea.SHANKAR SHARMA
FDR
Purn
ia
723.
7600
00 /
43(s
) / 0
2 Ja
n 20
18
51.3
3
523.
96
16 M
ar 2
018
15 S
ep 2
019
Super structure completed. Approach Work in Progress.
Kat
ihar
"Construction of Balance work of H.L.RCC bridge (4x21.00 m) in 9th km ofJokihat-Dalmalpur-Gerua road in the
district of Purnia BAIJNATHSHARMA"
FDR
Purn
ia
1196
.000
000
/ 44(
s) /
02 Ja
n 20
18
86.4
4
864.
94
15 A
pr 2
018
14 A
pr 2
020
Super structure completed. Approach Work in Progress.
Exte
rnal
Pro
ject
Div
isio
n Construction of H.L., R.C.C.Bridge(3X25) with its approach roadover Tilyuga river in Theho village-
Sonapur road in Dagmara Panchyat ofNirmali block in the District of Supaul.
(Devraha Construction Pvt. Ltd.,Goutam Nagar, Ward No.-12, Saharsa-
852201)(PKG-38 B)
WB
P Ph
ase-
2
Supa
ul
867.
7700
00 /
770
/ 25
Sep
2014
HL/
75.0
0
15 F
eb 2
017
14 F
eb 2
019
31 M
ar 2
021 1. Abutment A1, P2 Plugging completed. 2. A2-P2 Well Cap
completed. 3. P1 & A2 stenning work in progress. 4. Show-cause issued to contractor and LD is imposed.
10/22/2019 MPR Report :: Sep_2019
36/49
Achievement for the month / till month
Physical Financial
140 0.00 M 9.30/95.00
0.00/0.00
0.00/0.00
0.00/0.00
0.00/345.91
141 350.00 M 0.00/70.00
0.00/0.00
0.00/0.00
0.00/0.00
0.00/628.12
142 250.00 M 0.00/100.00
0.00/100.00
0.00/100.00
0.00/0.00
0.00/254.20
143 225.00 M 0.00/100.00
0.00/100.00
0.00/100.00
0.00/10.00
0.00/860.68
Sl.N
o
Div
isio
n
Nam
e O
f Wor
k
Hea
d / S
ub H
ead
Dis
tirct
Adm
inis
trat
ive
App
rova
l
Type
/Len
gth
Of B
ridg
e(M
)
Agr
eem
ent A
mou
nt
Len
gth
of A
ppro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
f Sch
edul
ed c
ompl
etio
n
Rev
ised
Dat
e of
com
plet
ion
Lik
ely
date
of c
ompl
etio
n
Rem
arks
Foun
datio
n (in
%)
Sub-
Stru
ctur
e (in
%)
Supe
r-St
ruct
ure
(in %
)
App
roac
h (in
%)
Cum
ulat
ive
Kha
garia
Construction of H.L. RCC Bridge overChanha River at Chhanch Ghat in 3rd
km. of Bishanpur-Sumbha Road ofKhagaria District St
ate
Plan
Kha
garia
1817
.490
000
/ 300
(S) /
10
Jan
2018
RC
C/1
08.0
4
1038
3277
9.00
23 O
ct 2
018
22 A
pr 2
020 Executive Engineer, RCD, Works Division Khagaria has
submitted proposal for land acquisition in 4 copy to DLAO,Khagaria vide letter no. 103, dt - 13.02.2019
Exte
rnal
Pro
ject
Div
isio
n Construction of H.L., R.C.C.Bridge(4X25)with its approach roadover Tilyuga river besides screw pilebridge in Kewtapatti-Nirmali Bazar
road in Nirmali Block in the district ofSupaul. (Devraha Construction Pvt.Ltd., Goutam Nagar, Ward No.-12,
Saharsa-852201)(PKG-38 A)
WB
P Ph
ase-
2
Supa
ul
1172
.780
000
/ 770
/ 25
Sep
201
4
HL/
100.
00
15 F
eb 2
017
14 F
eb 2
019
31 M
ar 2
021
1. Abutment A1 Plugging Completed. 2. Pier P1 in pluggingstage. 3. P2 & P3 well stenning in progress. 4. Abutment A2well curb in progress. 5. Land Acquition by perpetual lease is
under process and request has been sent to RWD forallotment. 6. So cause issued to contractor and LD is
imposed.
Kat
ihar
"Construction of 4x16.50m span H.L.R.C.C. Bridge over on BakhriKola
Dhar in Bakhrikol to Vishhariya in theDistrict of Purnea. Baba Construction."
Nab
ard
Purn
ia
421.
1400
00 /
1807
(s) /
06
Mar
201
3
RC
C/6
8.44
309.
52
30 Ju
n 20
13
30 S
ep 2
014
L/A was under Perpesual lease process.
Kha
garia
costruction of HLRCC bridge in theriver Balan at basahi ghat under
bhagwanpur block(6x21.75 m)MansaEngicom Pvt. Ltd.,9431060060 RWD M
MSN
Y
Beg
usar
ai
658.
7200
00 /
9410
(s) /
23
Jun
2010
RC
C/3
4.20
07 M
ay 2
010
05 M
ar 2
012
Possession of land received from D.L.A.O Begusarai videletter no. 295 dt 16.08.19 Estimate for revised A/A has been
sent to RCD. M/s Chhinamastika Construction andDevelopers and Developers Pvt. Ltd. been awarded work by
retndering of remaining approach road.
10/22/2019 MPR Report :: Sep_2019
37/49
Achievement for the month / till month
Physical Financial
144 420.00 M 0.00/100.00
0.00/100.00
0.00/100.00
0.00/0.00
0.00/162.40
145 350.00 M 0.00/100.00
0.00/100.00
0.00/100.00
0.00/40.00
41.93/1142.13
146 300.00 M 0.00/100.00
0.00/100.00
0.00/76.00
0.00/10.00
0.00/1689.19
147 365.00 M 0.00/100.00
0.00/100.00
0.00/100.00
0.00/90.00
0.00/1616.14
Sl.N
o
Div
isio
n
Nam
e O
f Wor
k
Hea
d / S
ub H
ead
Dis
tirct
Adm
inis
trat
ive
App
rova
l
Type
/Len
gth
Of B
ridg
e(M
)
Agr
eem
ent A
mou
nt
Len
gth
of A
ppro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
f Sch
edul
ed c
ompl
etio
n
Rev
ised
Dat
e of
com
plet
ion
Lik
ely
date
of c
ompl
etio
n
Rem
arks
Foun
datio
n (in
%)
Sub-
Stru
ctur
e (in
%)
Supe
r-St
ruct
ure
(in %
)
App
roac
h (in
%)
Cum
ulat
ive
Kat
ihar
Construction of 2x12.50m span R.C.C.Bridge over hara dhar in betweenGogra-Lalganj of Katihar District.
Ashwani Kr. Singh, Katihar. MM
SNY
Kat
ihar
251.
6400
00 /
1026
5(s)
/ 13
Sep
201
2
RC
C/3
0.00
155.
56
30 D
ec 2
012
30 D
ec 2
013 L/A was under lease process. But land owners were not
Agree. So L/A in converted in permanent L/A vide this officeletter No-1030(we) dated- 07-09-2019
Exte
rnal
Pro
ject
Div
isio
n Construction R.C.C. Bridge(7X25) withits approach road in Dubhari-Chakla
Ghat to Kosi Embankment road (NearSpur) on 57.20 R.D. of Kosi
Embankment in the district of Supaul.{Vishwanath Sharma, Vill. + P.O.-
Rahua, P.S.-Rosera, District-Samastipur-848210 (Bihar)}(PKG-34 )
WB
P Ph
ase-
2
Supa
ul
1530
.910
000
/ 404
/ 28
May
201
4
HL/
175.
00
17 O
ct 2
016
16 O
ct 2
018
31 D
ec 2
019
1. Bridge Completed. 2. Earth work in progress. 3. LandAcquition by perpetual lease is under process and Six man
committee has submitted the report and request has been sentto RWD for allotment. 4. People is asking for higher ratefrom D.M. 5. By the help of administration the work is
started. 6. Press release is published for Perpetual Lease ofLand.
Exte
rnal
Pro
ject
Div
isio
n
Construction of H.L, R.C.CBridge(7X33) with its approach road in
5th K.M. of Chhatapur-Girdharpu-Chunni road in the district of Supaul.
(Lall Construction Co., AA-105,Shalimar Bagh, Delhi-110088)(PKG-
25)
WB
P Ph
ase-
2
Supa
ul
1988
.260
000
/ 404
/ 28
May
201
4
HL/
231.
00
14 F
eb 2
017
13 F
eb 2
019
31 D
ec 2
019
1. 21/21 Girder completed. 2. 5/7 Deck Slab completed. 3.Earth work in progress. 4. By December,2019 it will be
completed. 5. EOT applied by Contractor uptoDecember,2019. 6. So cause issued to contractor and LD is
imposed.
Kat
ihar
Construction of H.L. R.C.C. Bridge onGanjan Ghat in Barsoi NeemtalaChowk to Dakaita Puja Road via
Beghour Hat to Katihar District. RajConstruction N
abar
d RW
D
Kat
ihar
1691
.510
000
/ 920
/ 11
Jun
2013
RC
C/2
01.0
0
1181
.75
30 O
ct 2
013
30 Ju
l 201
5
Bridge work completed. Traffic open L/A in under perpisuallease process. onlu SDBC work remaining.
10/22/2019 MPR Report :: Sep_2019
38/49
Achievement for the month / till month
Physical Financial
148 415.00 M 0.00/100.00
0.00/100.00
0.00/100.00
0.00/60.00
0.00/1685.33
149 300.00 M 0.00/100.00
0.00/100.00
0.00/100.00
10.00/90.00
41.13/1068.50
150 350.00 M 0.00/100.00
0.00/100.00
0.00/100.00
0.00/70.00
43.48/862.83
151 160.00 M 0.00/100.00
0.00/100.00
0.00/100.00
0.00/90.00
0.00/862.84
Sl.N
o
Div
isio
n
Nam
e O
f Wor
k
Hea
d / S
ub H
ead
Dis
tirct
Adm
inis
trat
ive
App
rova
l
Type
/Len
gth
Of B
ridg
e(M
)
Agr
eem
ent A
mou
nt
Len
gth
of A
ppro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
f Sch
edul
ed c
ompl
etio
n
Rev
ised
Dat
e of
com
plet
ion
Lik
ely
date
of c
ompl
etio
n
Rem
arks
Foun
datio
n (in
%)
Sub-
Stru
ctur
e (in
%)
Supe
r-St
ruct
ure
(in %
)
App
roac
h (in
%)
Cum
ulat
ive
Kat
ihar
Construction of H.L. R.C.C. bridge in10th Km of Barsoi Banbhui-Dhachana
Road of Katihar District. ShankarSharma
Nab
ard
Kat
ihar
1965
.650
000
/ 958
5(s)
/ 13
Dec
201
3
RC
C/1
94.0
0
1599
.75
30 M
ar 2
014
30 M
ar 2
016 Bridge work completed. one End Approach completed. other
end L/A problem. 3 Farmer registray completed 17 farmersare not read they demanding Residential price.
Kat
ihar
Construction of 6X21.75m H.L.R.C.CBridge at Kundi Tola in Mohna
Chandpur Panchayat of Barari Block ofKatihar District. Vishundev Yadav M
MK
VY
Kat
ihar
1800
.000
000
/ 145
4(s)
/ 21
Mar
201
7
83.0
5
1167
.71
30 N
ov 2
017
30 N
ov 2
019 Bridge work completed. Approach work in progress. GSB
completed. MWM work completed. B.T. Work remaining dueto rain.
Exte
rnal
Pro
ject
Div
isio
n
Construction of H.L, R.C.CBridge(2X25) with its approach road in3rd K.M. of Supaul Station to Bariya
Manch in the district of Supaul.(Tirupati Balaji Earth Work Pvt. Ltd.,
A/230, P.C. Colony, Kankarbagh,Patna-800020)(PKG-21A )
WB
P Ph
ase-
2
Supa
ul
943.
4700
00 /
404
/ 28
May
201
4
HL/
50.0
0
27 F
eb 2
016
26 F
eb 2
018
30 A
pr 2
019
31 D
ec 2
019 1. Bridge work completed. 2. WMM work completed. 3.
Show-cause issued to contractor for debarment and LD isimposed.
Exte
rnal
Pro
ject
Div
isio
n Construction of H.L, R.C.CBridge(1X33) with its approach road in
3rd K.M. Sesouni-East KoshiEmbankment (near Khakhi) in the
district of Supaul.(Tirupati Balaji EarthWork Pvt. Ltd., A/230, P.C. Colony,
Kankarbagh, Patna-800020)(PKG-21B)
WB
P Ph
ase-
2
Supa
ul
387.
2900
00 /
404
/ 28
May
201
4
HL/
33.0
0
27 F
eb 2
016
26 F
eb 2
018
30 A
pr 2
019
31 D
ec 2
019 1. Bridge work completed. 2. Earth Work in progress. 3.
Show-cause issued to contractor for debarment and LD isimposed.
10/22/2019 MPR Report :: Sep_2019
39/49
Achievement for the month / till month
Physical Financial
152 250.00 M 0.00/85.00
0.00/0.00
0.00/0.00
0.00/0.00
0.00/155.94
153 370.00 M 0.00/100.00
0.00/100.00
0.00/60.00
0.00/0.00
0.00/205.75
154 250.00 M 0.00/100.00
0.00/100.00
0.00/35.00
0.00/10.00
0.00/1363.32
155 200.00 M 0.00/100.00
0.00/100.00
30.00/130.00
0.00/15.00
0.00/1363.32
Sl.N
o
Div
isio
n
Nam
e O
f Wor
k
Hea
d / S
ub H
ead
Dis
tirct
Adm
inis
trat
ive
App
rova
l
Type
/Len
gth
Of B
ridg
e(M
)
Agr
eem
ent A
mou
nt
Len
gth
of A
ppro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
f Sch
edul
ed c
ompl
etio
n
Rev
ised
Dat
e of
com
plet
ion
Lik
ely
date
of c
ompl
etio
n
Rem
arks
Foun
datio
n (in
%)
Sub-
Stru
ctur
e (in
%)
Supe
r-St
ruct
ure
(in %
)
App
roac
h (in
%)
Cum
ulat
ive
Kat
ihar
Construction of 3x18.75m H.L R.C.Cbridge in river Barjan near Palasmani of
Kursakanta block in the District ofAraria. ARZU CONST. LTD, PATNA N
abar
d RW
D
Ara
ria
475.
0700
00 /
1095
(s) /
28
Mar
201
8
RC
C/5
8.08
374.
62
18 O
ct 2
018
17 Ja
n 20
20
30/30 pilling work completed, pile cap work in progress. ALetter has written to contractor to Expedise the work other
wise LD will be imposed. Letter No- 2014 dt- 17.12.2018 &Letter No- 2099 dt- 31.12.2018,131 dt-31.01.2019 & 486 dt-29.04.2019..notice give to start work otherwise you will be
resined to work.A L/D has impose of 0.5% amount1,87,312/- vide Latter No-860 Dated-02-08-2019. work is
slow due to flood water.
Kat
ihar
Construction of 2x30m Size of H.L.R.C.C. bridge at (Velbwa River)
Mieerganj Railway crossing to DhabeliRoad Chainage 30.75 of Indo-NepalBorder Road in the District of Araria.
Baba Const.
Nab
ard
Ara
ria
570.
8000
00 /
2160
(s) /
13
Mar
201
3
RC
C/6
0.00
509.
41
30 A
pr 2
013
30 Ju
n 20
14
A CWJC No........../2018 has filled in the Hon'ble High courtby baba contractor. A latter had written to contractor to start
the work other wise you will be resigned vide this officeLatter No-460 dt-25.04.19. A request case 52/19 to be fill on
05-08-2019 in Honerable H.C. 2nd span stagging workstarted by contractor
Exte
rnal
Pro
ject
Div
isio
n Construction of H.L, R.C.CBridge(2X28) with its approach road in
4th K.M. of Parsara-Chikni road(Bardwari Station-Simra road) in Placeof damaged Old R.C.C. Bridge in thedistrict of Supaul. (Lall ConstructionCo., AA-105, Shalimar Bagh, Delhi-
110088)(PKG-16C)
WB
P Ph
ase-
2
Supa
ul
792.
7400
00 /
609
/ 25
Jul 2
014
HL/
56.0
0
12 A
ug 2
017
11 A
ug 2
019
31 M
ar 2
020 1. 3/6 Girder completed and other Girder staging work in
progress. 2. Earth work in progress. 3. By March,2020 it willbe completed. 4. So cause issued to contractor and LD is
imposed.
Exte
rnal
Pro
ject
Div
isio
n
Construction of H.L, R.C.CBridge(1X33)with its approach road in1st K.M. of Parsarma-chinkni road in
the district of Supaul. (LallConstruction Co., AA-105, Shalimar
Bagh, Delhi-110088)(PKG-16A) WB
P Ph
ase-
2
Supa
ul
531.
8800
00 /
404
/ 28
May
201
4
HL/
33.0
0
12 A
ug 2
017
11 A
ug 2
019 1. Deck Slab Complete. 2. By March,2020 it will be
completed. 3. So cause issued to contractor and LD isimposed.
10/22/2019 MPR Report :: Sep_2019
40/49
Achievement for the month / till month
Physical Financial
156 200.00 M 0.00/100.00
0.00/100.00
0.00/15.00
0.00/0.00
141.89/1363.32
157 350.00 M 0.00/100.00
0.00/100.00
0.00/100.00
0.00/85.00
0.00/157.57
158 495.00 M 0.00/100.00
0.00/100.00
10.00/50.00
0.00/30.00
0.00/384.28
159 475.00 M 0.00/100.00
0.00/100.00
0.00/100.00
0.00/75.00
0.00/564.80
Sl.N
o
Div
isio
n
Nam
e O
f Wor
k
Hea
d / S
ub H
ead
Dis
tirct
Adm
inis
trat
ive
App
rova
l
Type
/Len
gth
Of B
ridg
e(M
)
Agr
eem
ent A
mou
nt
Len
gth
of A
ppro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
f Sch
edul
ed c
ompl
etio
n
Rev
ised
Dat
e of
com
plet
ion
Lik
ely
date
of c
ompl
etio
n
Rem
arks
Foun
datio
n (in
%)
Sub-
Stru
ctur
e (in
%)
Supe
r-St
ruct
ure
(in %
)
App
roac
h (in
%)
Cum
ulat
ive
Exte
rnal
Pro
ject
Div
isio
n
Construction of H.L, R.C.CBridge(2X25) in 4th K.M. of Perserma-
Chikni road in Palce of damaged OldS.P. Bridge (on Khardaha Dhar) in thedistrict of Supaul. (Lall ConstructionCo., AA-105, Shalimar Bagh, Delhi-
110088)(PKG-16B)
WB
P Ph
ase-
2
Supa
ul
550.
6600
00 /
404
/ 28
May
201
4
HL/
50.0
0
12 A
ug 2
017
11 A
ug 2
019
31 M
ar 2
020 1. 2/6 Girder Completed. 2. By March,2020 it will be
completed. 3. So cause issued to contractor and LD isimposed.
Exte
rnal
Pro
ject
Div
isio
n
Construction of H.L, R.C.CBridge(1X21) with its approach road in
Chandradei-Kamaldha-Paratha roadalong Laliahi Dhar in 2nd Km in the
district of Araria.(Tirupati Balaji EarthWork Pvt. Ltd., A/230, P.C. Colony,
Kankarbagh, Patna-800020)(PKG-22)
WB
P Ph
ase-
2
Ara
ria
509.
9500
00 /
404
/ 28
May
201
4
HL/
21.0
0
27 F
eb 2
016
26 M
ay 2
017
31 M
ar 2
020
1. Bridge work completed and opened for traffic. 2. WMMunder Progress (B) EOT applied by Agency to SPE office. (C
) Land dispute created by local villagers during WMMwork.Letter Written to Administration for resolving the issueand follow up being done with them to speed up in resolving
the issue.
Exte
rnal
Pro
ject
Div
isio
n Construction of H.L, R.C.CBridge(5X21) with its approach road in
11th K.m of Chandradei-Bangama-Matiyari-Mogra road in the district ofAraria.(PKG-10) {Nirman Engicons
Pvt. Ltd., At + P.O.- Mohanpur,District-Begusarai (Bihar)-851131}
(PKG-10)
WB
P Ph
ase-
2
Ara
ria
857.
6100
00 /
404
/ 28
May
201
4
HL/
105.
00
27 F
eb 2
016
26 A
ug 2
017
30 Ju
n 20
19
30 Ju
n 20
20
1. 2/5 deck slab completed. 2. P2-P3 span Girder shutteringunder progress. 3. Approach road work under progress. 4.Contractor is debarred. 5. EOT Granted upto June,2020. 6.
Due to flood work is stopped.
Exte
rnal
Pro
ject
Div
isio
n
Construction of H.L, R.C.CBridge(2x25) with its approach road in4th K.M. of Falka-Sripur-Bhawanipur-Karman Chowk road in the District of
Purnea. {Basant Vanijya Limited,Lakhibagh, Manpur, Gaya-825003
(Bihar)} (PKG- 19 A)
WB
P Ph
ase-
2
Purn
ia
685.
3300
00 /
404
/ 28
May
201
4
HL/
50.0
0
27 F
eb 2
016
26 F
eb 2
018
31 M
ay 2
019
31 D
ec 2
019 1. Bridge Completed. 2. WMM under progress. 3. By
December,2019 it will be completed. 4. So cause issued tocontractor and LD is imposed.
10/22/2019 MPR Report :: Sep_2019
41/49
Achievement for the month / till month
Physical Financial
160 320.00 M 0.00/100.00
0.00/100.00
0.00/100.00
0.00/60.00
0.00/702.68
161 320.00 M 0.00/100.00
0.00/100.00
0.00/80.00
0.00/0.00
0.00/702.69
162 300.00 M 5.00/85.00
0.00/0.00
0.00/0.00
0.00/0.00
83.18/546.17
163 300.00 M 0.00/80.00
0.00/0.00
0.00/0.00
0.00/0.00
89.82/515.00
Sl.N
o
Div
isio
n
Nam
e O
f Wor
k
Hea
d / S
ub H
ead
Dis
tirct
Adm
inis
trat
ive
App
rova
l
Type
/Len
gth
Of B
ridg
e(M
)
Agr
eem
ent A
mou
nt
Len
gth
of A
ppro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
f Sch
edul
ed c
ompl
etio
n
Rev
ised
Dat
e of
com
plet
ion
Lik
ely
date
of c
ompl
etio
n
Rem
arks
Foun
datio
n (in
%)
Sub-
Stru
ctur
e (in
%)
Supe
r-St
ruct
ure
(in %
)
App
roac
h (in
%)
Cum
ulat
ive
Exte
rnal
Pro
ject
Div
isio
n
Construction of H.L, R.C.CBridge(2X21) with its approach road in5th K.m of Alamnagar-Budhma- Mali
road in the district of Madhepura.(Haque Construction Co., Sarai SyedAli, Muzaffarpur-842001)(PKG-7B) W
BP
Phas
e-2
Mad
hepu
ra
595.
8000
00 /
404
/ 28
May
201
4
HL/
42.0
0
07 D
ec 2
016
06 D
ec 2
018
31 Ju
l 201
9
31 O
ct 2
019 1. Bridge Completed. 2. GSB completed. 3. Vehicle
movement started. 4. By July,2019 it will be completed. 5.LD is imposed and show-cause asked. 6. Debared from
Division.
Exte
rnal
Pro
ject
Div
isio
n Construction of H.L, R.C.CBridge(4x25) with its approach road in10th K.m in Khurhan-Parel-Ratwara-
Kapasia road in the district ofMadhepura (Extended part of RCD road0 to 15 k.m.) (Haque Construction Co.,Sarai Syed Ali, Muzaffarpur-842001
(PKG.7A)
WB
P Ph
ase-
2
Mad
hepu
ra
851.
6700
00 /
404
/ 28
May
201
4
HL/
100.
00
07 D
ec 2
016
06 D
ec 2
018
31 Ju
l 201
9
31 O
ct 2
019 1. All Deck Slab Completed & Crash Barrier work in
progress. 2. By October,2019 it will be completed. 3. LD isimposed and show-cause asked. 4. Debared from Division.
Exte
rnal
Pro
ject
Div
isio
n
Construction of H.L. R.C.C.-P.S.C.Bridge with its approach road in 9thK.m of Sour-Patarghat road in the
district of Saharsa.(PKG-29 ) (M/s JaiMata Di Construction, Shri Krishnapuri
(South), Begusarai (Bihar)-851101) WB
P Ph
ase-
2
Saha
rsa
1265
.510
000
/ 404
/ 28
May
201
4
HL/
99.0
0
08 M
ar 2
019
07 M
ar 2
021
07 M
ar 2
021 1. New Scheme started in March 19. 2. A2 Shaft Completed.
3. P2 Shaft under Progress. 4. A1 Well Cap reinforcementcompleted. 5. P1 Stenning Under Progress.
Exte
rnal
Pro
ject
Div
isio
n Construction of H.L. R.C.C.-P.S.CBridge with its approach road in 3rd
Km of Baluwahat Kosibandh viaAghori-Sakra-Paharpur-Baghwa road inthe district of Saharsa.(PKG-13 ) (M/s
Jai Mata Di Construction, ShriKrishnapuri (South), Begusarai
(Bihar)-851101)
WB
P Ph
ase-
2
Saha
rsa
1031
.430
000
/ 404
/ 28
May
201
4
HL/
112.
00
08 M
ar 2
019
07 M
ar 2
021
07 M
ar 2
021 1. New Scheme started in March 19. 2. A2 Abutment shaft
casted. 3. P3 Well Cap Casted. 4. P1, P2, A1 Well Stenningunder progress.
10/22/2019 MPR Report :: Sep_2019
42/49
Achievement for the month / till month
Physical Financial
164 350.00 M 0.00/100.00
0.00/100.00
5.00/45.00
0.00/25.00
0.00/333.21
165 300.00 M 0.00/100.00
0.00/30.00
0.00/0.00
0.00/0.00
0.00/1481.28
166 300.00 M 0.00/100.00
0.00/100.00
0.00/90.00
0.00/30.00
0.00/1444.76
167 300.00 M 0.00/100.00
0.00/100.00
0.00/100.00
0.00/40.00
0.00/1444.76
Sl.N
o
Div
isio
n
Nam
e O
f Wor
k
Hea
d / S
ub H
ead
Dis
tirct
Adm
inis
trat
ive
App
rova
l
Type
/Len
gth
Of B
ridg
e(M
)
Agr
eem
ent A
mou
nt
Len
gth
of A
ppro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
f Sch
edul
ed c
ompl
etio
n
Rev
ised
Dat
e of
com
plet
ion
Lik
ely
date
of c
ompl
etio
n
Rem
arks
Foun
datio
n (in
%)
Sub-
Stru
ctur
e (in
%)
Supe
r-St
ruct
ure
(in %
)
App
roac
h (in
%)
Cum
ulat
ive
Exte
rnal
Pro
ject
Div
isio
n Construction of H.L, R.C.CBridge(2X28)with its approach road in14th K.M. of Chaudhara-Amha-Lokha-Saharsa road in Place of damaged OldR.C.C Bridge in the district of Saharsa.
(Sincon Infrastructure Pvt. Ltd., S.KPuri, LG-1 & 2, Majestic Plaza, WestBoring Canal Road, Patna-800001)
(PKG-32)
WB
P Ph
ase-
2
Saha
rsa
870.
0000
00 /
609
/ 25
Jul 2
014
HL/
56.0
0
27 F
eb 2
016
26 A
ug 2
017
30 Ju
n 20
19
30 D
ec 2
019 1. 1/2 Deck Slab Casted. 2. 4/6 Girder Casted 3. P1-A2
Girder Reinforcement under Progress. 4. Approach roadwork in Progress. 5. By December,2019 it will be completed.
6. So cause issued to contractor and LD is imposed.
Exte
rnal
Pro
ject
Div
isio
n
Construction of H.L, R.C.CBridge(4X33) with its approach road in15th K.M. of Ranginiya-Sonbarsa Road
in Palce of Old S.P. Bridge in thedistrict of Saharsa. (Lall ConstructionCo., AA-105, Shalimar Bagh, Delhi-
110088) (PKG-24)
WB
P Ph
ase-
2
Saha
rsa
1549
.360
000
/ 404
/ 28
May
201
4
HL/
132.
00
29 Ju
n 20
17
28 Ju
n 20
19
30 Ju
n 20
20
30 Ju
n 20
20
1. Foundation completed progress. 2. A2 and P3 Shaft CapCompleted. 3. P2 Shaft Completed. 4. Due to encroachment
at site in Bridge alignment work started in the month ofMarch 2018 starting. Encroachment was removed with the
help of administration in Feb.2018 and work started inmarch. 5. Due to raised water level in river work stopped. ByJune,2020 it will be completed. 6. EOT applied by Contractor
upto March,2020.
Exte
rnal
Pro
ject
Div
isio
n
Construction of H.L, R.C.CBridge(2X25) with its approach road in
7th K.m of Panchgachhiya-Nauhattaroad in Palce of damaged Old R.C.CBridge in the district of Saharsa. (LallConstruction Co., AA-105, ShalimarBagh, Delhi-110088)(Package- 3 B)
WB
P Ph
ase-
2
Saha
rsa
764.
6700
00 /
609
/ 25
Jul 2
014
HL/
50.0
0
21 D
ec 2
016
20 D
ec 2
018
30 Ju
n 20
19
30 D
ec 2
019
1. 2/2 Deck Slab Complete. 2. Crash Barrier under progress.3. Approach Road under progress. 4. Due to local hindrancein fixing alignment work delayed. 5. By December,2019 it
will be completed. 6. So cause issued to contractor and LD isimposed.
Exte
rnal
Pro
ject
Div
isio
n
Construction of H.L, R.C.CBridge(2X33) with its approach road in3rd K.M. of Panchgachhiya - NauhattaRoad in Palce of Old S.P. Bridge in thedistrict of Saharsa. (Lall ConstructionCo., AA-105, Shalimar Bagh, Delhi-
110088)( Package- 3 A)
WB
P Ph
ase-
2
Saha
rsa
1018
.280
000
/ 404
/ 28
May
201
4
HL/
66.0
0
21 D
ec 2
016
20 D
ec 2
018
30 Ju
n 20
19
30 D
ec 2
019 1. Bridge completed. 2. Approach road under Progress. 3. By
December,2019 it will be completed 4. So cause issued tocontractor and LD is imposed.
10/22/2019 MPR Report :: Sep_2019
43/49
Achievement for the month / till month
Physical Financial
168 1306.00M
0.00/100.00
0.00/100.00
0.00/73.00
0.00/0.00
12.04/2384.18
169 2030.00M
0.00/100.00
0.00/100.00
0.00/95.00
0.00/60.00
1.64/2975.50
170 60.00 M 0.00/100.00
0.00/100.00
0.00/100.00
0.00/90.00
19.32/126.02
171 1100.00M
0.00/95.00
0.00/85.00
0.00/35.00
0.00/0.00
0.00/3352.29
Sl.N
o
Div
isio
n
Nam
e O
f Wor
k
Hea
d / S
ub H
ead
Dis
tirct
Adm
inis
trat
ive
App
rova
l
Type
/Len
gth
Of B
ridg
e(M
)
Agr
eem
ent A
mou
nt
Len
gth
of A
ppro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
f Sch
edul
ed c
ompl
etio
n
Rev
ised
Dat
e of
com
plet
ion
Lik
ely
date
of c
ompl
etio
n
Rem
arks
Foun
datio
n (in
%)
Sub-
Stru
ctur
e (in
%)
Supe
r-St
ruct
ure
(in %
)
App
roac
h (in
%)
Cum
ulat
ive
Muz
affa
rpur
"Construction of 12x24.00 mH.L.R.C.C. Bridge in Dr JagarnathMishra College in between Soda
Godaun to Ahiyapur with approachroad in the district of Muzaffarpur.
(Nabard). Ganesh Ram Dokania, Mob-9471637819"
Nab
ard
Muz
affa
rpur
4329
.610
000
/ 788
9(S)
/ 03
Jan
2013
RC
C/3
00.0
0
3107
1017
1.00
19 F
eb 2
014
18 F
eb 2
016
30 Ju
n 20
20
30 Ju
n 20
20
Work in Progress.
Remarks for LA: LA Issue for approach road. ChaqmohabbatMauja-2.547acres,Nazirpur Mauja- 2.43 acres, ChandrawaraMauja- 8.043 acres, Total Land- 13.02 acres, Total Raiyat-
38, Documents are being prepared for registry.
Muz
affa
rpur
"Construction of 12x24.00 mH.L.R.C.C. Bridge in Athar Ghat overBhudhi Gandak river under BochahaBlock in the district of Muzaffapur.(Plan) Ganesh Ram Dokania, Mob-
9471637819"
Plan
Muz
affa
rpur
3554
.810
000
/ 181
7(S)
/ 28
Feb
201
4
RC
C/2
97.0
0
2815
5918
6.00
22 N
ov 2
014
21 N
ov 2
016
31 M
ar 2
020
31 M
ar 2
020
Work in Progress.
Remarks for LA: Athar banshman Mauja-5.485 acres.Bishunpur Jagdish Mauja-2.605 acres. Binda Mauja-
10.615acres.Total land- 18.705 acres. Total Raiyat- 66 LPC,received from DM,Muzaffarpur Registred, LPC- 34
Registred Area- 6.07 Acres. Corrected LPC awaited fromD.M.Muzaffarpur.
Muz
affa
rpur Construction of 2x10.37M size Bridge
over Canal to Siman chakjamal SimanRoad in ward No. 33 of Vaishali
District MM
SNY
Vais
hali
169.
0400
00 /
6066
(S) /
08
Jul 2
014
RC
C/2
2.00
1297
4000
.00
21 N
ov 2
014
20 N
ov 2
015
Work in Progress.
Remarks for LA: L.A issue in approach road under P/L. 2.Total Area:- 0.1375 Acre. 3.Formalities of News Paper
publication has been completed. 4. 02 LPC has beenreceived, but 01 LPC is Legal objection. Registered Area-
0.07 Dismal.
Muz
affa
rpur
Construction of R.C.C H.L BridgeChandauli Ghat in Bagmati River
District of Sitamarhi.
Plan
Sita
mar
hi
7089
.380
000
/ 739
4(S)
/ 10
Aug
201
6
RC
C/4
32.0
0
4443
6794
3.00
10 F
eb 2
016
09 A
pr 2
019
30 Ju
n 20
20
30 Ju
n 20
20
Work in Progress.
Remarks for LA: It was decided to execute the LandAcquisition by perpetual Lease process by the feasibility
committee in the meeting held on 24.01.2019. A request hasbeen sent to D.M, Sitamarhi to certify the ownership of Land
awards (Rayaits) Vide letter no 419 dated 30.04.2019 (i)Mauja Chandauli Timaha - 7.285 Acres, Raiyat-59 No. (ii)Mauja Bharwari - 5.540 Acres Raiyat- 58 No. (iii) Mauja
Bharwari Nankar- 1.548Acres, Raiyat- 09 No. Total Area tobe acquired- 14.365, Total No. of Raiyat- 126 A camp was
organised with C.O. Belsand at site on06.06.2019.Verification of Rayatee Land ownership is under
process.
10/22/2019 MPR Report :: Sep_2019
44/49
Achievement for the month / till month
Physical Financial
172 240.00 M 0.00/100.00
0.00/100.00
0.00/100.00
0.00/0.00
0.00/823.65
173 240.00 M 0.00/100.00
0.00/100.00
0.00/100.00
0.00/60.00
0.00/338.33
174 240.00 M 0.00/100.00
0.00/100.00
0.00/95.00
0.00/60.00
0.00/329.85
175 700.00 M 0.00/100.00
0.00/75.00
10.00/20.00
0.00/20.00
0.00/489.68
Sl.N
o
Div
isio
n
Nam
e O
f Wor
k
Hea
d / S
ub H
ead
Dis
tirct
Adm
inis
trat
ive
App
rova
l
Type
/Len
gth
Of B
ridg
e(M
)
Agr
eem
ent A
mou
nt
Len
gth
of A
ppro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
f Sch
edul
ed c
ompl
etio
n
Rev
ised
Dat
e of
com
plet
ion
Lik
ely
date
of c
ompl
etio
n
Rem
arks
Foun
datio
n (in
%)
Sub-
Stru
ctur
e (in
%)
Supe
r-St
ruct
ure
(in %
)
App
roac
h (in
%)
Cum
ulat
ive
Muz
affa
rpur
Construction of R.C.C H.L BridgeBelsand-chhitauni-Tariyani Road in 2nd
Km. 4x21.00M District of Sitamarhi.N
abar
d R
CD
Sita
mar
hi
851.
4600
00 /
1012
5 / 1
0 Se
p 20
12
RC
C/8
4.00
7562
9157
.00
30 D
ec 2
012
30 Ju
n 20
14
30 Ju
n 20
20
Bridge work has been completed & Agreement Closed.
Remarks for LA: LPC & Classification for registration ofland acquisition have been received. Objections against
classification of land from land owners (Rayatee) have beensubmitted said objections have been forwarded to DLAO
Sitamarhi vide this office letter 989 (WE) dated 16.08.2019fo the redressal of objections.
Muz
affa
rpur "Construction of 3x18.75m H.L.R.C.C.
Bridge in 3rd km of Aurai- Jale Road inthe district of Muzaffarpur. Ram Swarth
Rai, Mob- 9471091378"
FDR
Muz
affa
rpur
590.
4000
00 /
277(
S) /
10 Ja
n 20
18
RC
C/5
8.12
4350
3004
.00
24 M
ay 2
018
23 A
ug 2
019
31 O
ct 2
019
Work in Progress.
Muz
affa
rpur "Construction of 3x18.75m H.L.R.C.C.
Bridge in 7th km of Aurai- Jale Road inthe district of Muzaffarpur. Ram Swarth
Rai, Mob- 9471091378"
FDR
Muz
affa
rpur
588.
4700
00 /
152(
S) /
05 Ja
n 20
18
RC
C/5
8.12
4415
5189
.00
24 M
ay 2
018
23 A
ug 2
019
31 O
ct 2
019
Work in Progress.
Muz
affa
rpur "Construction of 4x24.00m H.L.R.C.C.
Bridge in 1st km of Meenapur BelsandRoad in the district of Muzaffarpur. Jay
Shankar Kumar, Mob-9431006580 "
Plan
Muz
affa
rpur
1246
.610
000
/ 842
8(S)
/ 22
Sep
201
7
RC
C/9
6.00
9642
9600
.00
24 M
ay 2
018
23 M
ay 2
020
31 M
ar 2
020
Work in Progress.
10/22/2019 MPR Report :: Sep_2019
45/49
Achievement for the month / till month
Physical Financial
176 200.00 M 0.00/100.00
0.00/100.00
0.00/100.00
0.00/30.00
0.00/305.32
177 200.00 M 0.00/100.00
0.00/100.00
0.00/100.00
0.00/90.00
0.00/394.94
178 1500.00M
0.00/84.00
0.00/67.00
0.00/65.00
0.00/12.00
0.00/3947.28
179 650.00 M 0.00/100.00
0.00/100.00
0.00/100.00
0.00/85.00
0.00/2997.49
Sl.N
o
Div
isio
n
Nam
e O
f Wor
k
Hea
d / S
ub H
ead
Dis
tirct
Adm
inis
trat
ive
App
rova
l
Type
/Len
gth
Of B
ridg
e(M
)
Agr
eem
ent A
mou
nt
Len
gth
of A
ppro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
f Sch
edul
ed c
ompl
etio
n
Rev
ised
Dat
e of
com
plet
ion
Lik
ely
date
of c
ompl
etio
n
Rem
arks
Foun
datio
n (in
%)
Sub-
Stru
ctur
e (in
%)
Supe
r-St
ruct
ure
(in %
)
App
roac
h (in
%)
Cum
ulat
ive
Dar
bhan
ga Construction of HL RCC bridge in 3rdkm of (5x16.50M) Bindha gamaChaksaho Road in the District of
Samastipur.FD
R
Sam
astip
ur
760.
7100
00 /
1676
(s) /
05
Mar
201
8
RC
C/8
2.50
5937
3268
.00
10 O
ct 2
018
31 D
ec 2
019
31 D
ec 2
019
Approach Road work in progress.
Dar
bhan
ga Construction of HL RCC bridge inTajpur-Halai Road in 14th KM of Noon
River (5x21.75M) in the District ofSamastipur
Plan
Sam
astip
ur
879.
1000
00 /
1207
7(s)
/ 27
Dec
201
7
RC
C/1
08.7
5
5056
7152
.00
11 A
pr 2
018
10 O
ct 2
019
10 O
ct 2
019
Work Completed .Trffic Started
Dar
bhan
ga
Construction of HLRCC bridge withLand acquisition ,approach road and
protection work in kareh river betweenhasanpur to soharwa sati ghat in
samastipur distrcit(21x24.00 m)RamKripal Singh Constructon Pvt Ltd.,
RCD
Plan
Sam
astip
ur
6813
.400
000
/ 717
1(s)
/ 05
Aug
201
5
RC
C/5
16.6
4
5917
3775
9.00
01 A
ug 2
015
30 O
ct 2
018
30 Ju
n 20
20
30 Ju
n 20
20 Work in progress.
Remarks for LA: Sec.-37 Completed and payments beingmade to Raiyats.
Dar
bhan
ga Construction of HLRCC bridge at kakarghat in rosra morwara road in kareh
river(16x24.75 m) Shiv KishoreConstruction Pvt. Ltd.,9431858543 N
abar
d R
CD
Sam
astip
ur
3009
.420
000
/ 780
2(s)
/ 13
Jul 2
012
RC
C/4
05.8
0
2199
2700
5.00
30 D
ec 2
012
30 M
ar 2
015
Traffic Started
Remarks for LA: Rs.171.92 Lacs has been deposited toDLAO Samastipur vide letter no.-949 dated-02.09.2013.
Rs.-5.93 Lacs has been Deposited to DLAO Samastipur forPayment of SIA Work Vide Letter No-40(WE) date-
10.01.2019 . SIA work completed. Public Hearing done.Section- 07 is in Progress.
10/22/2019 MPR Report :: Sep_2019
46/49
Achievement for the month / till month
Physical Financial
180 780.00 M 0.00/100.00
0.00/100.00
0.00/100.00
0.00/80.00
0.00/1469.39
181 1620.00M
0.00/78.00
0.00/55.00
0.00/40.00
0.00/0.00
0.00/1300.56
182 350.00 M 0.00/90.00
0.00/0.00
0.00/0.00
0.00/0.00
0.00/246.32
183 440.00 M 0.00/0.00
0.00/0.00
0.00/0.00
0.00/0.00
0.00/0.00
Sl.N
o
Div
isio
n
Nam
e O
f Wor
k
Hea
d / S
ub H
ead
Dis
tirct
Adm
inis
trat
ive
App
rova
l
Type
/Len
gth
Of B
ridg
e(M
)
Agr
eem
ent A
mou
nt
Len
gth
of A
ppro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
f Sch
edul
ed c
ompl
etio
n
Rev
ised
Dat
e of
com
plet
ion
Lik
ely
date
of c
ompl
etio
n
Rem
arks
Foun
datio
n (in
%)
Sub-
Stru
ctur
e (in
%)
Supe
r-St
ruct
ure
(in %
)
App
roac
h (in
%)
Cum
ulat
ive
Dar
bhan
ga Construction of HLRCC bridge at angarghat in the budhi gandak river
(10x24.75 m) Braj KishorRai,9430800861 N
abar
d R
CD
Sam
astip
ur
2096
.720
000
/ 158
3(s)
/ 09
Feb
201
2
RC
C/2
53.6
4
1385
3592
1.00
30 M
ar 2
012
30 Ju
l 201
4
Traffic Started
Remarks for LA: Rs. 231.65 Lacs has been Deposited toDLAO Samastipur vide letter No 487 dated 06.06.2015.
Rs.-3.7 Lacs has been Deposited to DLAO Samastipur forPayment of SIA Work Vide letter no-29 Date-04.01.2019 SIA
work completed. Public Hearing done. Section- 07 is inProgress.
Dar
bhan
ga
Construction of HLRCC bridge withLand acquisition ,approach road and
protection work near jhanjharpur at oldNH-57 in kamala balan river in
madhubani distrcit(9x24.00 m)TusharConstruction Company, Gaziabad.,
RCD
Plan
Mad
huba
ni
4197
.050
000
/ 622
0(S)
/ 09
Jul 2
015
RC
C/2
21.4
4
2772
8170
7.00
27 A
pr 2
016
27 D
ec 2
018
30 Ju
n 20
20
30 Ju
n 20
20 Work in progress.
Remarks for LA: In LA Sec-19 is in Progress.
Ara
Construction of High Level RCCbridge(3x14.50m) over river Gangi inlieu of Damaged Balbatra Lakri pul at
Ward No-03 in Ara Block in the Districtof Bhojpur (Ara)
Plan Ara
639.
3400
00 /
7459
(S) /
26
Sep
2018
RC
C/4
3.50
05 F
eb 2
019
04 A
ug 2
020
Foundation almost completed. Flooding at site due to rise inwater level in river Gangi
Ara
Construction of High Level RCCBridge (4x18.0)m in 40th K.M. ofBhabhua Adhaura Road (At Tala
Village) across Suara River in Kaimur(Bhabhua) District
Plan
Kai
mur
(Bha
bua)
560.
0000
00 /
9156
(S) /
03
Dec
201
8
RC
C/7
2.00
04 Ju
n 20
19
03 S
ep 2
020
Diversion Completed. Flooding at site due to rise in waterlevel in river Suara.
10/22/2019 MPR Report :: Sep_2019
47/49
Achievement for the month / till month
Physical Financial
184 150.00 M 0.00/100.00
0.00/100.00
0.00/100.00
0.00/65.00
0.00/129.83
185 360.00 M 0.00/65.00
0.00/5.00
0.00/0.00
0.00/0.00
0.00/547.21
186 1690.00M
0.00/100.00
0.00/100.00
0.00/100.00
0.00/95.00
0.00/6942.84
187 360.00 M 0.00/100.00
0.00/100.00
0.00/100.00
0.00/90.00
122.39/1699.19
Sl.N
o
Div
isio
n
Nam
e O
f Wor
k
Hea
d / S
ub H
ead
Dis
tirct
Adm
inis
trat
ive
App
rova
l
Type
/Len
gth
Of B
ridg
e(M
)
Agr
eem
ent A
mou
nt
Len
gth
of A
ppro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
f Sch
edul
ed c
ompl
etio
n
Rev
ised
Dat
e of
com
plet
ion
Lik
ely
date
of c
ompl
etio
n
Rem
arks
Foun
datio
n (in
%)
Sub-
Stru
ctur
e (in
%)
Supe
r-St
ruct
ure
(in %
)
App
roac
h (in
%)
Cum
ulat
ive
Ara
Construction of H.L. R.C.C. BridgerOver Kauw river in samta Bigha -
Dhasadih at Sambhal bigha-Semaradihin Sasaram Block in the District of
Rohtas under MMSNY. (Brajesh KumarSingh)
MM
SNY
Roh
tas
214.
5000
00 /
1949
(s) /
04
Mar
201
4
RC
C/2
2.40
18 Ju
n 20
16
17 Ju
n 20
17
30 N
ov 2
019
30 N
ov 2
019
Contractor debarred for delay. Warning letter for Rescindinghas been issued.
Ara
Construction of H.L.RCC Bridge at19th K.M. of Mohania-Ramgarh road
across Durgawati River in KaimurDistrict. Jai Mata Dee Maa SitaConstruction. Mob-9934462616
Plan
Kai
mur
(Bha
bua)
1751
.040
000
/ 902
6(s)
/ 13
Oct
201
7
RC
C/1
40.0
0
21 A
ug 2
018
20 A
ug 2
020
Flooding at site due to rise in water level in river Durgawati.
Kat
ihar
Construction of 27x30m Size of H.L.R.C.C. bridge at (Saidabad) Mieerganj
Railway crossing to Dhabeli RoadChainage 50.80 of Indo-Nepal Border
Road in the District of Araria. D2SInfra Structures Pvt. Ltd.
Nab
ard
Ara
ria
7896
.720
000
/ 216
0(s)
/ 14
Mar
201
3
RC
C/8
10.0
0
6160
.18
30 Ju
l 201
3
30 Ju
l 201
6
Bridge work completed 1620 m Approach B.T. completed 70m left which is transfer to RCD Araria.
Kat
ihar
Construction of 7x21.75M Bridge overPaharia Ghat of Bakra River in
Kursakanta to Teera Road of DomSadak Road in the District of Araria.
M/S Raj Construction Nab
ard
RWD
Ara
ria
1915
.810
000
/ 318
/ 19
Jan
2018
RC
C/1
57.0
0
1744
.65
28 F
eb 2
012
30 D
ec 2
019 Bridge work completed. Approach work in progress. 150m
work approach washed out due to heavy flood during11.07.2019 to 14.07.2019 high officials visit required. work
is in progress.
10/22/2019 MPR Report :: Sep_2019
48/49
Achievement for the month / till month
Physical Financial
188 3107.00M
0.00/100.00
0.00/100.00
0.00/100.00
0.00/95.00
95.87/3602.55
189 300.00 M 0.00/95.00
15.00/30.00
0.00/0.00
0.00/0.00
0.00/773.34
190 200.00 M 0.00/100.00
0.00/100.00
0.00/100.00
0.00/40.00
0.00/188.55
191 295.00 M 0.00/100.00
0.00/95.00
0.00/90.00
0.00/50.00
0.00/482.09
Sl.N
o
Div
isio
n
Nam
e O
f Wor
k
Hea
d / S
ub H
ead
Dis
tirct
Adm
inis
trat
ive
App
rova
l
Type
/Len
gth
Of B
ridg
e(M
)
Agr
eem
ent A
mou
nt
Len
gth
of A
ppro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
f Sch
edul
ed c
ompl
etio
n
Rev
ised
Dat
e of
com
plet
ion
Lik
ely
date
of c
ompl
etio
n
Rem
arks
Foun
datio
n (in
%)
Sub-
Stru
ctur
e (in
%)
Supe
r-St
ruct
ure
(in %
)
App
roac
h (in
%)
Cum
ulat
ive
Kat
ihar
Const. of 11x18.75m H.L.R.C.C Bridgeover Parmar river on Diyari Ghat inbetween Dumariya to Diyari in the
district of Araria Braj KishorConstruction.
Plan
Ara
ria
4244
.200
000
/ 708
1(s)
/ 30
Jul 2
015
RC
C/2
06.2
5
2974
.63
03 Ja
n 20
16
02 Ja
n 20
18
31 M
ar 2
020
Bridge work completed. Approach work in progress.
Kat
ihar
Construction of 6X24.00m H.L. R.C.C.Bridge over Bakra river at 1st km. of
Udahat Tekni road under PLAN in theDistrict of Araria. Tirupati Balajee
Earth Work Pvt. Ltd.
Plan
Ara
ria
2211
.730
000
/ 129
3(s)
/ 16
Feb
201
7
RC
C/1
47.8
5
1487
.67
01 Ja
n 20
18
01 Ja
n 20
20
A1=30m/30m, P1=27m/27m, P2=25m/25m, A2=15m/30mP3=25/25,P4=25/25m, P5=27/27m well staining ,L/D has
imposed to contructor for Rs. 7,43,838.00 for Delay of work.by letter no- 1991 dt- 15-12-2018. work slow due to flood
water. 2nd LD has imposed 0.5% Rs. 7,43,838.00 vide LetterNo.- 859 dt. 02.08.2019.
Kat
ihar
Construction of 3x16.50m H.L. R.C.C.Bridge including approach Road in 3rdKm. of Saifganj Road in the District of
Araria. Shivdani Engineers Patna. Non
-Pla
n
Ara
ria
317.
2200
00 /
1435
3(s)
/ 28
Dec
201
1
RC
C/5
0.00
244.
61
30 Ju
n 20
12
30 Ju
n 20
13
Bridge work completed. LA work is in progress. A latter sentto contractor to start the work vide latter no-852 dated 02-08-2019. Land owner demanding residantial cost but sanctioned
in two times for agriculture land
Kat
ihar
Construction of 4x22.00m span H.L.R.C.C. Bridge over Retva River in
P.W.D. Nehru Chowk to DharamganjRoad of Araria District. S.K.
Construction
MM
SNY
Ara
ria
415.
2200
00 /
6776
(s) /
21
Jul 2
014
RC
C/6
8.00
326.
00
30 Ja
n 20
14
30 O
ct 2
015
30 D
ec 2
019 28/28 pole cap completed. super sturcture work in progress.
A latter has to written to contractor to expedise the work.Other wise LD will be imposed vide latter no 2068 dt-28-12-
2018 & latter no-492 dt-03-05-2019
10/22/2019 MPR Report :: Sep_2019
49/49
Achievement for the month / till month
Physical Financial
192 320.00 M 0.00/100.00
0.00/100.00
0.00/0.00
0.00/0.00
0.00/216.51
193 320.00 M 0.00/100.00
0.00/100.00
0.00/100.00
0.00/100.00
0.00/362.80
194 320.00 M 0.00/100.00
0.00/100.00
0.00/85.00
0.00/90.00
0.00/385.60
Sl.N
o
Div
isio
n
Nam
e O
f Wor
k
Hea
d / S
ub H
ead
Dis
tirct
Adm
inis
trat
ive
App
rova
l
Type
/Len
gth
Of B
ridg
e(M
)
Agr
eem
ent A
mou
nt
Len
gth
of A
ppro
ach
(in M
)
Dat
e of
Com
men
cem
ent
Dat
e O
f Sch
edul
ed c
ompl
etio
n
Rev
ised
Dat
e of
com
plet
ion
Lik
ely
date
of c
ompl
etio
n
Rem
arks
Foun
datio
n (in
%)
Sub-
Stru
ctur
e (in
%)
Supe
r-St
ruct
ure
(in %
)
App
roac
h (in
%)
Cum
ulat
ive
Kat
ihar
Construction of 3x21.75m span R.C.C.Bridge over Dhiwha (Chakka) dhar in
front of Yogipur in farhi to kanholiRoad of Narpatganj block in the District
of Araria District. Pankaj KumarM
MSN
Y
Ara
ria
331.
9400
00 /
9346
(s) /
24
Aug
201
2
RC
C/6
5.00
338.
76
30 D
ec 2
012
28 F
eb 2
014
1st span super structure work in progress. A letter has writtento contractor to Expedise the work. Other wise LD will beimposed vide this office letter No- 2039 Dt- 21-12-2018 .
Rescind Reminder Letter No-494 dt-03.05.19, Letter No-683dt-29.06.2019.
Kat
ihar
Construction of 4x21.75m span R.C.C.Bridge over Adiwashi Tola in Dumariyato Rampur Road of Palasi Panchayat inthe District of Araria District. Pankaj
Kumar
MM
SNY
Ara
ria
410.
6500
00 /
9348
(s) /
24
Aug
201
2
RC
C/8
7.00
390.
01
30 D
ec 2
012
28 F
eb 2
014
Bridge and approach road work completed.
Kat
ihar
Construction of 3x21.75m span R.C.C.Bridge over Jahanpur Ghat in theDistrict of Araria District. Pankaj
Kumar MM
SNY
Ara
ria
420.
6600
00 /
9272
(s) /
23
Aug
201
2
RC
C/7
0.00
357.
37
30 O
ct 2
012
30 Ja
n 20
14
1st and 2nd deck slab work completed. Stagging work inprogress in 3rd span. A letter has writtern to contractor to
Expedise the work. Other wise LD will be imposed vide thisoffice letter No- 2041 Dt- 21-12-2018.Rescind Reminder
Latter No-494 dt-03.05.19. Wearing coat & Railing work inprogress in 1st and 2nd span.