Concrete Technology
Harza Engineering Company
Special Construction Methods
Special construction methods and materials Tunnel lining Horizontal slipform paving Canal lining Vertical slipform construction Roller-compacted concrete Controlled Low Strength Material
(CLSM) Pervious concrete
Concrete tunnel lining
Types Circular tunnels Horseshoe Shaped
Lining types Full-circle (Smaller diameters) Multiple placements (Large diameter)
Invert Sidewalls Crown
Placement methods
Invert and sidewalls Conveyors Pumping Invert slipform
Arch or crown section Pumping
Types of placement
Bulkhead sections dependent on length of form
Continuous placement Telescoping forms
Important items Rock cleanup and control of water Cleaning of construction joints Equipment capable of placing the
required concrete mixture Segregation during handling and
placement Proper consolidation (limited access)
- form and immersion vibrators Filling upper most reaches of the
crown
Horizontal slipform paving
Paving machines Slabs Curbs Barriers
All horizontal paving requires low slump concrete and good vibration
Consistent concrete is essential
Slope paving
Canal lining machine Slipform screed
Alternating panels
Vertical slipform construction
Jacking system on vertical rods Suitable for silos and shafts
Pervious concrete
Controlled Low Strength Material (CLSM)
CLSM is a self-compacted, cementitious material used primarily as a backfill in lieu of compacted fill. (ACI 229R)
Most current CLSM applications require unconfined compressive strengths of 300 psi or less. This strength requirement is necessary to allow for future excavation of CLSM.
Applications
Backfill Structural fills Insulating fills Pavement bases Conduit bedding Erosion control Void filling
Materials Cement Fly ash
Class C Class F
Fine aggregate ASTM C 33 Silty sand (up to 20% minus #200)
Coarse aggregate (occasionally) Air-entraining admixture
Mixture proportions
Slump range - 6 to 8 inches Cement content - 50 to 200 pcy Fly ash content - none to 2000 pcy Water contents - typically 325 to
580 pcy Air content as high as 20% Balance of mixture is aggregate