Public Kickoff Meeting Hudson River and Harlem River Manhattan College – Leo Engineering Building January 31, 2018 Citywide/Open Waters CSO Long Term Control Plan

Upload: others

Post on 27-May-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CSO-LTCP Harlem Hudson River Kick Off Meeting FINAL2Meeting TBD Final Plan Review Meeting TBD. 8 Harlem & Hudson River in Phase 1 Sampling Phase 1 Sampling Hudson & Harlem River Phase

Public Kickoff Meeting Hudson River and Harlem River

Manhattan College – Leo Engineering BuildingJanuary 31, 2018

Citywide/Open WatersCSO Long Term Control Plan

Page 2: CSO-LTCP Harlem Hudson River Kick Off Meeting FINAL2Meeting TBD Final Plan Review Meeting TBD. 8 Harlem & Hudson River in Phase 1 Sampling Phase 1 Sampling Hudson & Harlem River Phase

2

Agenda

Topic Speaker

1 Welcome & Introduction Mikelle Adgate

2 Waterbody & Watershed Characteristics and Water Quality Sampling Keith Mahoney

3 Water Quality Improvement Projects• Grey Infrastructure • Green Infrastructure

Keith MahoneyMelissa Enoch

4 LTCP Modeling & Alternative Development Process Keith Mahoney

5 Next Steps Mikelle Adgate

6 Discussion and Q&A Session All

Page 3: CSO-LTCP Harlem Hudson River Kick Off Meeting FINAL2Meeting TBD Final Plan Review Meeting TBD. 8 Harlem & Hudson River in Phase 1 Sampling Phase 1 Sampling Hudson & Harlem River Phase

3

Welcome & Introduction

Mikelle AdgateSenior Policy Advisor

DEP

Page 4: CSO-LTCP Harlem Hudson River Kick Off Meeting FINAL2Meeting TBD Final Plan Review Meeting TBD. 8 Harlem & Hudson River in Phase 1 Sampling Phase 1 Sampling Hudson & Harlem River Phase

4

What is a Combined Sewer Overflow (CSO)?

NYC’s sewer system is approximately 60% combined, which means it is used to convey both sanitary and storm flows.

65% to 90% of combined sanitary & storm flow is captured at treatment plants.

When the sewer system is at full capacity, a diluted mixture of rain water and sewage may be released into local waterways. This is called a combined sewer overflow (CSO).

DownSpout

Catch Basin

CombinedSewer Outfall

Sewer Regulator

Dry Weather Conditions

City Sewer Main

Building SewerConnection

DownSpout

Catch Basin

Stormy Weather Conditions

CombinedSewer Outfall

SewerRegulator

City Sewer Main

Building SewerConnection

Page 5: CSO-LTCP Harlem Hudson River Kick Off Meeting FINAL2Meeting TBD Final Plan Review Meeting TBD. 8 Harlem & Hudson River in Phase 1 Sampling Phase 1 Sampling Hudson & Harlem River Phase

5

How does rainfall affect CSOs?

Rainfall characteristics that trigger a CSO event at Hudson River and Harlem River: Constant rainfall over a period

of 2 to 10 hours totaling 0.4 to 1 inch

Not every rainfall causes a CSO event: Approximately 25% of the

average rainfall events per year may trigger a CSO at Hudson River and Harlem River

Photo Credit: Baptisete Ponshttps://www.flickr.com/photos/bpt/2882285636/

Page 6: CSO-LTCP Harlem Hudson River Kick Off Meeting FINAL2Meeting TBD Final Plan Review Meeting TBD. 8 Harlem & Hudson River in Phase 1 Sampling Phase 1 Sampling Hudson & Harlem River Phase

6

What is a LTCP and CSO Consent Order?

Long Term Control Plan (LTCP)

identifies appropriate CSO controls to achieve applicable water quality standards

consistent with the Federal CSO Policy and Clean Water Act

CSO Consent Order

an agreement between NYC and DEC that settles past legal disputes without prolonged litigation

DEC requires DEP to develop LTCPs and mitigate CSOs

Page 7: CSO-LTCP Harlem Hudson River Kick Off Meeting FINAL2Meeting TBD Final Plan Review Meeting TBD. 8 Harlem & Hudson River in Phase 1 Sampling Phase 1 Sampling Hudson & Harlem River Phase

7

LTCP Process and Public Involvement

ONGOING PUBLIC/STAKEHOLDER INPUT

Existing Information

Review

Data Collection &

AnalysisModeling

Alternatives Development & Evaluation

PrepareLTCP

Submit to DEC

Kickoff MeetingTODAY

Alternatives Meeting

TBD

Final Plan Review Meeting

TBD

Page 8: CSO-LTCP Harlem Hudson River Kick Off Meeting FINAL2Meeting TBD Final Plan Review Meeting TBD. 8 Harlem & Hudson River in Phase 1 Sampling Phase 1 Sampling Hudson & Harlem River Phase

8

Harlem & Hudson River in Phase 1 Sampling

Phase 1 SamplingHudson & Harlem River

Phase 3 SamplingNY Harbor Phase 2 Sampling

East River

WI-060

WI-056

CSO Outfalls to be MonitoredShorelineOpen Water

LTCP-02 Proposed Sampling Locations

NR-043

NC-076

The Citywide/Open Waters Sampling Program was divided into 3 Phases

Harlem and Hudson River were covered under Phase 1

Page 9: CSO-LTCP Harlem Hudson River Kick Off Meeting FINAL2Meeting TBD Final Plan Review Meeting TBD. 8 Harlem & Hudson River in Phase 1 Sampling Phase 1 Sampling Hudson & Harlem River Phase

9

Public Comments Received1) Consider Green Infrastructure as Preferred

Alternative

2) Fund maintenance for all GI projects being built

3) Keep to Harlem/Hudson River LTCP Planning Schedule

4) Begin EAS process concurrent with LTCP

5) Host Separate Meetings for Harlem/Hudson Rivers

6) Adopt new Design Criteria to achieve zero discharge to local pipes

7) Consider Specific Alternatives:1) Recognize Tibbetts Brook Daylighting and

Brook Park Wetland Projects as GI Projects2) Assess for Rain Gardens in vicinity of

Hudson/Harlem Rivers3) Consider Private Sector for GI Projects4) Consider Waterfront Development/GI

123

4567

Page 10: CSO-LTCP Harlem Hudson River Kick Off Meeting FINAL2Meeting TBD Final Plan Review Meeting TBD. 8 Harlem & Hudson River in Phase 1 Sampling Phase 1 Sampling Hudson & Harlem River Phase

10

Waterbody & Watershed Characteristics and

Water Quality SamplingKeith Mahoney, PE

Director of Water Quality PlanningDEP

Page 11: CSO-LTCP Harlem Hudson River Kick Off Meeting FINAL2Meeting TBD Final Plan Review Meeting TBD. 8 Harlem & Hudson River in Phase 1 Sampling Phase 1 Sampling Hudson & Harlem River Phase

11

Drainage Areas

Harlem River

HudsonRiver

WWTP Hudson(acres)

Harlem(acres)

Wards Island 487 6,833

North River 4,921 571

Hunts Point - 1,006

Newtown Creek 1,158 -

TOTAL 6,566(82% combined sewers)

8,410(90% combined sewers)

Page 12: CSO-LTCP Harlem Hudson River Kick Off Meeting FINAL2Meeting TBD Final Plan Review Meeting TBD. 8 Harlem & Hudson River in Phase 1 Sampling Phase 1 Sampling Hudson & Harlem River Phase

12

Land Use

Harlem River

HudsonRiver

Residential

Mixed Residential

Commercial and Office

Industrial and Manufacturing

Transportation and Utility

Public Facilities and Institutions

Open Space and Outdoor Recreation

Parking Facilities

Vacant Land

Hudson River

Harlem River

Land Use Hudson River

Harlem River

Residential 28% 33%

Mixed Residential & Commercial 14% 7%

Commercial 14% 4%

Transportation & Utility 9% 7%

Public Facilities 13% 12%

Park & Open Space 17% 31%

Other 5% 6%

Page 13: CSO-LTCP Harlem Hudson River Kick Off Meeting FINAL2Meeting TBD Final Plan Review Meeting TBD. 8 Harlem & Hudson River in Phase 1 Sampling Phase 1 Sampling Hudson & Harlem River Phase

13NCM-628

NCM-634

Hudson River CSO Outfalls

NR‐027

61%

21%

10%8%

61%

(52 Outfalls)CSO

MS4

Other* 588

174

917

1(2 Outfalls)

MGY

MGY

MGY

*Includes direct drainage and other non-DEP stormwater

Page 14: CSO-LTCP Harlem Hudson River Kick Off Meeting FINAL2Meeting TBD Final Plan Review Meeting TBD. 8 Harlem & Hudson River in Phase 1 Sampling Phase 1 Sampling Hudson & Harlem River Phase

14

Harlem River CSO Outfalls

31%28%

21%20%

(43 Outfalls)CSO

MS4

Other*

(0 Outfalls) MGY

MGY

695

0

2,076

1

MGY

MGY

*Includes direct drainage and other non-DEP stormwater

Page 15: CSO-LTCP Harlem Hudson River Kick Off Meeting FINAL2Meeting TBD Final Plan Review Meeting TBD. 8 Harlem & Hudson River in Phase 1 Sampling Phase 1 Sampling Hudson & Harlem River Phase

15

Location Class Dissolved Oxygen (mg/L)

Fecal Coliform(col/100 mL)

Total Coliform(col/100 mL)

Hudson River(North of Harlem River)

SB ≥ 4.8 (daily average)≥ 3.0 (acute, never less than)

Monthly Geometric Mean≤ 200

Monthly Median

≤ 2,400and

80% ≤ 5,000

Hudson River (South of Harlem River)

I ≥ 4.0 (acute, never less than)

Harlem River

Reference• New York Codes, Rules and

Regulations• (NYCRR Part 703.3)

• New York Codes, Rules and Regulations

• (NYCRR Part 703.4)

• New York Codes, Rules and Regulations

• (NYCRR Part 703.4)

Water Quality Standards and LTCP Goals

CSO LTCP Goals and Targets: Seasonal Bacteria Compliance Annual Dissolved Oxygen Compliance Time to Recovery for Bacteria of ≤ 24 hours Floatables Control Assessing against Recreational Water Quality Criteria

CLASS SBB a t h i n g

The best usage of Class SB water are primary and secondary contact recreation and fishing. These

waters shall be suitable for fish, shellfish and wildlife propagation and survival.

CLASS SBB a t h i n g

The best usage of Class SB water are primary and secondary contact recreation and fishing. These

waters shall be suitable for fish, shellfish and wildlife propagation and survival.

CLASS IB o a t i n g / F i s h i n g

The best usage of Class I water is secondary contact recreation and fishing. These waters shall be suitable for fish, shellfish and wildlife propagation and survival. In addition, the water quality shall be suitable for primary contact recreation,

although other factors may limit the use for this purpose.

CLASS IB o a t i n g / F i s h i n g

The best usage of Class I water is secondary contact recreation and fishing. These waters shall be suitable for fish, shellfish and wildlife propagation and survival. In addition, the water quality shall be suitable for primary contact recreation,

although other factors may limit the use for this purpose.

Page 16: CSO-LTCP Harlem Hudson River Kick Off Meeting FINAL2Meeting TBD Final Plan Review Meeting TBD. 8 Harlem & Hudson River in Phase 1 Sampling Phase 1 Sampling Hudson & Harlem River Phase

16

Ongoing Receiving Water Sampling ProgramsProgram Harbor

Survey Monitoring

Sentinel Monitoring

RiverkeeperSampling

CitizenSampling

Sampling Frequency

Monthly (Oct – May)

Weekly (Jun – Sept)

Quarterly Monthly(May – Oct)

Weekly(May – Oct)

HUDSON RIVER# of Sampling Locations 6 7 9 12

Para

met

ers Fecal

Entero

*YSI

HARLEM RIVER# of Sampling Locations 1 4 2 5

Para

met

ers Fecal

Entero

*YSI

*YSI Parameters: Dissolved Oxygen, Temperature, Conductivity, and Salinity.

Data is available here: http://www.nyc.gov/html/dep/html/harborwater/harbor_water_sampling_results.shtmlhttps://www.riverkeeper.org/water-quality/hudson-river/nyc-hudson-bergen/

Page 17: CSO-LTCP Harlem Hudson River Kick Off Meeting FINAL2Meeting TBD Final Plan Review Meeting TBD. 8 Harlem & Hudson River in Phase 1 Sampling Phase 1 Sampling Hudson & Harlem River Phase

17

LTCP Sampling & Monitoring Programs

Flow Monitoring• 3/2/2016 – 12/5/2016• 2 locations in Hudson River• 2 locations in Harlem River• Continuously monitored• Depth & Velocity measurements

Receiving Water • 10 locations in Hudson River• 6 locations in Harlem River• Three 4-day events• Fecal, Entero, YSI

CSO / MS4 Sampling• 2 CSO, 2 MS4 locations in Hudson River• 2 CSO locations in Harlem River• 5 wet weather events• Fecal, Entero, YSI, TSS, CBOD,

Nitrogen

Sampling Period: 4/27/2016 – 11/19/2016

Page 18: CSO-LTCP Harlem Hudson River Kick Off Meeting FINAL2Meeting TBD Final Plan Review Meeting TBD. 8 Harlem & Hudson River in Phase 1 Sampling Phase 1 Sampling Hudson & Harlem River Phase

18

Hudson River – Fecal Coliform

Sampling Period(2016)

# Locations

# SamplesDry Wet

LTCP Apr 27 – Jun 9Nov 16 – Nov 19 10 8 38

HSM Jan 4 – Dec 12 6 12 15

SM Mar 8 – Oct 19 7 3 1

Sampling DetailsSampling Results at a Glance

All Weather Wet Weather

1744

1635

18 1710 15 14 21

8 9 8 8

51

8

60 42 61 83 61 54 4922

39 5735

1

10

100

1,000

10,000

HUD‐1/N1

S47 HUD‐2/S48

NR1/S49

HUD‐3/N3B

HUD‐4

HUD‐5/S50

HUD‐6

HUD‐7/N4/S51

S52 HUD‐8

HUD‐9

HUD‐10/N5/S53

Fecal Colifo

rm, cfu/100mL

Dry Weather DataWet Weather DataDry Weather GeomeanWet Weather Geomean

200 ------

Page 19: CSO-LTCP Harlem Hudson River Kick Off Meeting FINAL2Meeting TBD Final Plan Review Meeting TBD. 8 Harlem & Hudson River in Phase 1 Sampling Phase 1 Sampling Hudson & Harlem River Phase

19

Hudson River – Enterococcus

Sampling Period(2016)

# Locations

# SamplesDry Wet

LTCP Apr 27 – Jun 9Nov 16 – Nov 19 10 8 38

HSM Jan 4 – Dec 12 6 12 15

Riverkeeper May 1 – Oct 31 9 3 3

Citizen May 1 – Oct 31 12 14 10

Sampling DetailsSampling Results at a Glance

58

5 5

11

4

10

4 45

3

1925

8

1724 20

2616 15 16

10

1

10

100

1,000

HUD‐1/N1/

R‐ Yonkers STP Outfall

HUD‐2/R‐ GW Bridge

NR1 HUD‐3/N3B

HUD‐4R‐ 125th St Pier/

C‐ West Harlem Piers

HUD‐5/79th St

HUD‐6/R‐ Pier 96/C‐ Pier 96

HUD‐7/N4/

C‐ Pier 84

HUD‐8 HUD‐9/C‐ Pier 40 dock

HUD‐10/N5/

R‐ The Battery

Enterococci, cfu/10

0mL

Dry Weather LTCP/HSM/SM Data Wet Weather LTCP/HSM/SM DataDry Weather Third PartyWet Weather Third PartyDry Weather GeomeanWet Weather Geomean

30 -----–

All Weather Wet Weather

Page 20: CSO-LTCP Harlem Hudson River Kick Off Meeting FINAL2Meeting TBD Final Plan Review Meeting TBD. 8 Harlem & Hudson River in Phase 1 Sampling Phase 1 Sampling Hudson & Harlem River Phase

20

Hudson River – Dissolved Oxygen

7.78.3

7.6 7.78.1 8.1 8.2

7.8 7.8 7.77.2

7.87.4

6.9 7.17.5

7.1 7.1 7.0 7.1 7.1 7.0

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

HUD‐1/N1

HUD‐2 NR1 HUD‐3/N3B

HUD‐4 HUD‐5 HUD‐6 HUD‐7/N4

HUD‐8 HUD‐9 HUD‐10/N5

Dissolved Oxygen, mg/L

4.8 --

3.0 --

4.0 --

Dry Weather DataWet Weather DataDry Weather AverageWet Weather Average

Sampling Period(2016)

# Locations

# SamplesDry Wet

LTCP Apr 27 – Jun 9Nov 16 – Nov 19 10 8 38

HSM Jan 4 – Dec 12 6 20 30

Sampling DetailsSampling Results at a GlanceAll Weather Wet Weather

Page 21: CSO-LTCP Harlem Hudson River Kick Off Meeting FINAL2Meeting TBD Final Plan Review Meeting TBD. 8 Harlem & Hudson River in Phase 1 Sampling Phase 1 Sampling Hudson & Harlem River Phase

21

Hudson River Projected % Attainment

Station

Baseline Fecal Coliform Baseline Enterococcus

AnnualMonthly GM

≤ 200cfu/100mL

Recreational Season Monthly GM

≤ 200cfu/100mL

Recreational Season Monthly GM

< 30cfu/100mL

Recreational Season Monthly STV

< 110cfu/100mL

HUD-1

HUD-2 82%

HUD-3 92% 94%

HUD-4

HUD-5

HUD-6

HUD-7

HUD-8

HUD-9

HUD-10

≥ 95% Attainment

Note: Preliminary Gap Analysis; Model does not yet include loads from NJ CSOs. Attainment based on modeled 10-year averages.

Hudson River has a total of 51 CSO outfalls; almost 40% of the annual CSO volume occurs in 3 outfalls

Sampling has shown a wet weather impact on bacteria concentrations Models predict attainment of existing WQS criteria

Page 22: CSO-LTCP Harlem Hudson River Kick Off Meeting FINAL2Meeting TBD Final Plan Review Meeting TBD. 8 Harlem & Hudson River in Phase 1 Sampling Phase 1 Sampling Hudson & Harlem River Phase

22

Harlem River – Fecal Coliform

Note: Sampling conducted when Wards Island WWTP was not at 2xDDWF capacity

Sampling Period(2016)

# Locations

# SamplesDry Wet

LTCP Apr 27 – Jun 9Nov 16 – Nov 19 6 8 38

HSM Jan 4 – Nov 9 1 12 15

SM Mar 8 – Oct 19 4 3 1

Sampling DetailsSampling Results at a GlanceAll Weather Wet Weather

1929 32 44 31 21 22

71 101 117 125253

84 77

1

10

100

1,000

10,000

HAR‐1 HAR‐2/SM54

HAR‐3/SM55

HAR‐4/SM56

H3 HAR‐5/SM57

HAR‐6

Fecal Colifo

rm, cfu/100mL

200 ------

Dry Weather DataWet Weather DataDry Weather GeomeanWet Weather Geomean

Page 23: CSO-LTCP Harlem Hudson River Kick Off Meeting FINAL2Meeting TBD Final Plan Review Meeting TBD. 8 Harlem & Hudson River in Phase 1 Sampling Phase 1 Sampling Hudson & Harlem River Phase

23

Harlem River – Enterococcus

Note: Sampling conducted when Wards Island WWTP was not at 2xDDWF capacity

Sampling Period(2016)

# Locations

# SamplesDry Wet

LTCP Apr 27 – Jun 9Nov 16 – Nov 19 6 8 38

HSM Jan 4 – Nov 9 1 12 15

Riverkeeper May 1 – Oct 31 2 5 1

Citizen May 1 – Oct 31 5 7 13

Sampling DetailsSampling Results at a Glance

10 12 14 127 8 7

38 52 55 51 6030 26

1

10

100

1,000

10,000

HAR‐1/C‐Swindler's Cove

HAR‐2 HAR‐3/C‐Muscota Marsh

HAR‐4 H3 HAR‐5/R‐ Washington Ave Bridge

HAR‐6 HAR‐6

Enterococci, cfu/100m

L

30 -----–

Dry Weather DataWet Weather DataDry Weather GeomeanWet Weather Geomean

All Weather Wet Weather

Page 24: CSO-LTCP Harlem Hudson River Kick Off Meeting FINAL2Meeting TBD Final Plan Review Meeting TBD. 8 Harlem & Hudson River in Phase 1 Sampling Phase 1 Sampling Hudson & Harlem River Phase

24

Harlem River – Dissolved Oxygen

Note: Sampling conducted when Wards Island WWTP was not at 2xDDWF capacity

Sampling Period(2016)

# Locations

# SamplesDry Wet

LTCP Apr 27 – Jun 9Nov 16 – Nov 19 6 8 38

HSM Jan 4 – Nov 9 1 20 30

Sampling DetailsSampling Results at a Glance

Dry Weather DataWet Weather DataDry Weather GeomeanWet Weather Geomean

8.3 8.2 8.2 7.96.8

7.7 7.87.5 7.2 7.2 6.86.3 6.5 6.4

0.0

2.0

4.0

6.0

8.0

10.0

12.0

HAR‐1 HAR‐2 HAR‐3 HAR‐4 H3 HAR‐5 HAR‐6

Dissolved Oxygen, m

g/L

All Weather Wet Weather

Page 25: CSO-LTCP Harlem Hudson River Kick Off Meeting FINAL2Meeting TBD Final Plan Review Meeting TBD. 8 Harlem & Hudson River in Phase 1 Sampling Phase 1 Sampling Hudson & Harlem River Phase

25

Harlem River Projected %Attainment

Station

Baseline Fecal Coliform Baseline Enterococcus

AnnualMonthly GM

≤ 200cfu/100mL

Recreational Season Monthly GM

≤ 200cfu/100mL

Recreational Season Monthly GM

< 30cfu/100mL

Recreational Season Monthly STV

< 110cfu/100mL

HAR-1

HAR-2 93%

HAR-3 76%

HAR-4 74%

HAR-5 74%

HAR-6 75%

≥ 95% Attainment

Note: Preliminary Gap Analysis; Model does not yet include loads from NJ CSOs. Attainment based on modeled 10-year averages.

Harlem River has a total of 43 CSO outfalls; almost 72% of the annual CSO volume occurs in 5 outfalls

Sampling has shown a wet weather impact on bacteria concentrations Models predict attainment of existing WQS criteria

Page 26: CSO-LTCP Harlem Hudson River Kick Off Meeting FINAL2Meeting TBD Final Plan Review Meeting TBD. 8 Harlem & Hudson River in Phase 1 Sampling Phase 1 Sampling Hudson & Harlem River Phase

26

Water Quality Improvement ProjectsGrey Infrastructure

Keith Mahoney, PEDirector of Water Quality Planning

DEP

Page 27: CSO-LTCP Harlem Hudson River Kick Off Meeting FINAL2Meeting TBD Final Plan Review Meeting TBD. 8 Harlem & Hudson River in Phase 1 Sampling Phase 1 Sampling Hudson & Harlem River Phase

27

Existing Grey Infrastructure Projects

Wards Island WWTP Upgrades

$5.3 M Reconstruction of Six (6) Main Sewage Pumps

$13.7 M Replace Bar Screens at Bronx and Manhattan Grit Chambers

North River WWTP Upgrades

$177 M Replacement of existing pumps and blower engines with new dual fuel cogeneration engines and electric motors

Benefits: Reduction of GHG, NOx, CO,

VOCs Reduction of truck traffic from

fuel deliveries Elimination of fuel oil use Use of digester gas as renewable

fuel to power the engines Increase reliability and flexibility

Page 28: CSO-LTCP Harlem Hudson River Kick Off Meeting FINAL2Meeting TBD Final Plan Review Meeting TBD. 8 Harlem & Hudson River in Phase 1 Sampling Phase 1 Sampling Hudson & Harlem River Phase

28

Water Quality Improvement ProjectsGreen Infrastructure

Melissa Enoch Program Manager

DEP

Page 29: CSO-LTCP Harlem Hudson River Kick Off Meeting FINAL2Meeting TBD Final Plan Review Meeting TBD. 8 Harlem & Hudson River in Phase 1 Sampling Phase 1 Sampling Hudson & Harlem River Phase

29

Private Property GI ProgramsGreen Infrastructure Grant Program

• More than $15 million committed to date to 34 private property owners

• 4 projects completed, 2 projects started in 2016

NYC Housing and Preservation Department Partnership• Establishing on-going funding source for GI as part of HPD new

affordable housing development• 1 project in FY18, up to 5 projects in FY19 as initial investment

Ballet Tech The New School

Page 30: CSO-LTCP Harlem Hudson River Kick Off Meeting FINAL2Meeting TBD Final Plan Review Meeting TBD. 8 Harlem & Hudson River in Phase 1 Sampling Phase 1 Sampling Hudson & Harlem River Phase

30

Private Property GI ProgramsNew Private Property Retrofit Program

• Phase One Goal: retrofit 200 Greened Acres* in Tier 1 and Tier 2 sites

• RFP to select Program Administrator anticipated release date: Q2 2018

• DEP will jumpstart outreach to Tier 1 and Tier 2 property owners and community organizations in 2018

*a Greened Acre is defined as 1” of rainfall on one acre of impervious surfaces or 1.5” on 0.67 acre of impervious surfaces, etc.

Privately Owned Sites in Combined Sewer AreaTier 1 – Over 100,000 sf 693

Tier 2 – 50,000-99,999 sf 896

Page 31: CSO-LTCP Harlem Hudson River Kick Off Meeting FINAL2Meeting TBD Final Plan Review Meeting TBD. 8 Harlem & Hudson River in Phase 1 Sampling Phase 1 Sampling Hudson & Harlem River Phase

31

Other Private Property GI Opportunities

Green Roof Tax Abatement:The City provides a one-year property tax abatement for private properties that install green roofs. The abatement value is $5.23 per square foot (up to the lesser of $200,000 or the building’s tax liability) and is available through March 15, 2018.

2012 Stormwater Rule:In 2012, DEP amended the allowable flow rate of stormwater to the City’s combined sewer system for new and existing development. Site Connection Proposals may include green infrastructure technologies to meet the new allowable rate.

Page 32: CSO-LTCP Harlem Hudson River Kick Off Meeting FINAL2Meeting TBD Final Plan Review Meeting TBD. 8 Harlem & Hudson River in Phase 1 Sampling Phase 1 Sampling Hudson & Harlem River Phase

32

LTCP Modeling and Alternatives Development Process

Keith Mahoney, PEDirector of Water Quality Planning

DEP

Page 33: CSO-LTCP Harlem Hudson River Kick Off Meeting FINAL2Meeting TBD Final Plan Review Meeting TBD. 8 Harlem & Hudson River in Phase 1 Sampling Phase 1 Sampling Hudson & Harlem River Phase

33

Model Inputs and Assumptions Landside Model calibrated based on flow monitoring data, gauge adjusted

radar rainfall data, and satellite flyover impervious data

Water Quality Model calibrated with Harbor Survey and LTCP sampling data

Calibrated modeling inputs and assumptions include:• Committed CSO and BNR projects• 2040 sanitary flows and loads• JFK 2008 “Typical Year Rainfall” for Alternative Analysis• JFK 10-yr data (2001 to 2011) for baseline and selected alternatives

5-YearMoving Average

Standard for WWFP(JFK 1988 – 40.7 inches)

LTCP Typical Year Rainfall(JFK 2008 – 46.3 inches)

2002-201110-Year

Water Quality Period for

Selected Plan

Page 34: CSO-LTCP Harlem Hudson River Kick Off Meeting FINAL2Meeting TBD Final Plan Review Meeting TBD. 8 Harlem & Hudson River in Phase 1 Sampling Phase 1 Sampling Hudson & Harlem River Phase

34

CSO Control Evaluation Process

1. Bacteria Source Component Analysis CSO, stormwater and direct drainage

2. Gap Analysis for Water Quality Standard (WQS) Attainment Calculate bacteria and dissolved oxygen for: Baseline Conditions 100% CSO Control Conditions

3. Assess Levels of CSO Control Necessary to Achieve WQS

4. Identify Technologies to Cost-Effectively Achieve the Required Level of CSO Control

Increasing CSO

Reduction Potential

Storage

Treatment

System Optimization

Source Control

Sample Technologies:

Page 35: CSO-LTCP Harlem Hudson River Kick Off Meeting FINAL2Meeting TBD Final Plan Review Meeting TBD. 8 Harlem & Hudson River in Phase 1 Sampling Phase 1 Sampling Hudson & Harlem River Phase

35

Source Control Green Infrastructure Storm Sewers

System Optimization Fixed Weir

ParallelInterceptor /

Sewer

Bending WeirsControl Gates

Pump Station

Optimization

Pump Station

Expansion

CSO Relocation

Gravity Flow Tipping to Other

Watersheds

Pumping Station Modification

Flow Tipping withConduit/Tunnel and Pumping

Water Quality / Ecological

Enhancement

FloatablesControl

Environmental Dredging

Wetland Restoration Daylighting

Treatment Satellite:

Centralized:

OutfallDisinfection

Retention Treatment Basin (RTB)High Rate

Clarification (HRC)

WWTP Expansion

Storage In-System Shaft Tank Tunnel

CSO Mitigation Toolbox

INC

REA

SING

CO

ST

INCREASING COMPLEXITY

Page 36: CSO-LTCP Harlem Hudson River Kick Off Meeting FINAL2Meeting TBD Final Plan Review Meeting TBD. 8 Harlem & Hudson River in Phase 1 Sampling Phase 1 Sampling Hudson & Harlem River Phase

36

Next StepsMikelle Adgate

Senior Policy Advisor DEP

Page 37: CSO-LTCP Harlem Hudson River Kick Off Meeting FINAL2Meeting TBD Final Plan Review Meeting TBD. 8 Harlem & Hudson River in Phase 1 Sampling Phase 1 Sampling Hudson & Harlem River Phase

37

Next Steps

Kick-off Meetings for remaining 2 Citywide/Open Waters LTCP Areas (East River/Staten Island) – March 2018

Alternatives Meetings #2, TBD

Final Plan Meetings #3, TBD

Public opportunity to review and comment on DEP’s selected alternative before the LTCP is submitted to DEC

Comments can be submitted to:• New York City DEP at: [email protected]

Page 38: CSO-LTCP Harlem Hudson River Kick Off Meeting FINAL2Meeting TBD Final Plan Review Meeting TBD. 8 Harlem & Hudson River in Phase 1 Sampling Phase 1 Sampling Hudson & Harlem River Phase

38

Additional Information & Resources

Visit the informational tables tonight for handouts and poster boards with detailed information

Go to www.nyc.gov/dep/ltcp to access:• LTCP Public Participation Plan• Presentation, handouts and poster boards from this meeting• Links to Waterbody/Watershed Facility Plans• CSO Order including LTCP Goal Statement• NYC’s Green Infrastructure Plan • Green Infrastructure Pilots 2011 and 2012 Monitoring Results• NYC Waterbody Advisory Program• Upcoming meeting announcements• Other LTCP updates