Page 1: CSO 10 Public Meeting Presentation

3/31/2014

1

City of Lebanon, NHCSO Contract 10Public Meeting

April 1, 2014

Page 2: CSO 10 Public Meeting Presentation

3/31/2014

2

Contract 10 Locations

• North Main Street1,000 FeetDana to Estabrook Cir.

• Dana Street250 FeetMain to Prospect

• Highland Avenue925 FeetProspect to Green West

• Prospect Street West600 Feet

• Pearl Street600 Feet

• Winter Street West675 Feet

• Green Street West960 Feet

• Timothy Avenue500 Feet

June 15, 2013Walkabout

• Conducted site walkabout on June 15, 2013

• Discussed resident concerns

• City willing to meet resident at property in the future to discuss concerns

Page 3: CSO 10 Public Meeting Presentation

3/31/2014

3

October 23, 2013First Public Meeting

• Discussed project design and schedule

• Discussed protection of trees

• Reviewed design drawings

• Discussed resident concerns

Protection of Trees

• Walkabout with arborist will be conducted.

• Invites via mailing will be forthcoming.

• Contact City staff if you have a concern about a particular tree or planting.

Page 4: CSO 10 Public Meeting Presentation

3/31/2014

4

Schedule

• 50% Design – December 2013

• 90% Design – March 2014

• Final Construction Documents – May 2014*

• Bid Period – June 2014

• Start Construction – July 2014

• End Construction – September 2015

* Final Public Meeting

Project Contacts

• Christina Hall, City [email protected]

603.448.3112

• Mike Lavalla, Director of Public [email protected]

603.448.3112

• Ryan Wingard, Wright-Pierce Project [email protected]

603.430.3728

Page 5: CSO 10 Public Meeting Presentation

3/31/2014

5

Small Group Sessions

North Main Street

Component Existing Proposed

Width 28’ 28’

Esplanade 2’-4’ (west) no change (west) 4’-9’ (east) no change (east)

Sidewalk 3.5’-5.5’ (both) no change (both)

Drainage Vert. Curb/CBs Vert. Curb/CBs

Page 6: CSO 10 Public Meeting Presentation

3/31/2014

6

Page 7: CSO 10 Public Meeting Presentation

3/31/2014

7

Highland AvenueProspect to MapleComponent Existing Proposed

Width 20’-22’ 22’

Esplanade None None

Sidewalk None 5’ (south)

Drainage None Vert. Curb/CBs

Page 8: CSO 10 Public Meeting Presentation

3/31/2014

8

HIGHLAND AVE

Page 9: CSO 10 Public Meeting Presentation

3/31/2014

9

Highland AvenueMaple to Green Street WestComponent Existing Proposed

Width 22’-24’ 24’

Esplanade 1’-2’ (south) 2’ (south)

Sidewalk 3.5’-5.0’ (south) 5’ (south)

Drainage Vert. Curb/CBs Vert. Curb/CBs

Page 10: CSO 10 Public Meeting Presentation

3/31/2014

10

HIGHLAND AVE

Prospect Street West

Component Existing Proposed

Width 18’-29’ 22’

Esplanade 1’-5’ (east) 4’ (east)

Sidewalk 4.5’-5.5’ (east) 5’ (east)

Drainage None Vert. Curb/CBs

Page 11: CSO 10 Public Meeting Presentation

3/31/2014

11

Page 12: CSO 10 Public Meeting Presentation

3/31/2014

12

Page 13: CSO 10 Public Meeting Presentation

3/31/2014

13

Pearl Street

Component Existing Proposed

Width 21’-25’ 22’

Esplanade 1’-4’ (east) 3’ (east) 2’-4’ (west)

Sidewalk 4’-6’ (east) 5’ (east)4’-5.5’ (west)

Drainage CBs Curb/CBs

Pervious Pavement

Page 14: CSO 10 Public Meeting Presentation

3/31/2014

14

Page 15: CSO 10 Public Meeting Presentation

3/31/2014

15

Timothy Avenue

Component Existing Proposed

Width 22’-30’ 22’

Esplanade None None

Sidewalk None None

Drainage Curb/CBs Sloped Curb/CBs

TIMOTHY AVE/WINTER ST WEST

Page 16: CSO 10 Public Meeting Presentation

3/31/2014

16

TIMOTHY AVE

Winter Street West

Component Existing Proposed

Width 22’-24’ 22’

Esplanade None None

Sidewalk None None

Drainage None Sloped Curb/CBs

Pervious Pavement

Page 17: CSO 10 Public Meeting Presentation

3/31/2014

17

TIMOTHY AVE/WINTER ST WEST

WINTER ST WEST

Page 18: CSO 10 Public Meeting Presentation

3/31/2014

18

Green Street West

Component Existing Proposed

Width 19’-23’ 22’

Esplanade None None

Sidewalk None None

Drainage None Sloped Curb/CBs

Page 19: CSO 10 Public Meeting Presentation

3/31/2014

19