csj: 0196˜03˜268 ˜dallas county˚ dallas district i35e...
TRANSCRIPT
0584
-TCL
_061
620
D A L L A S D I S T R I C T
I-35E PROJECT (LOWEST STEMMONS)CSJ: 0196-03-268 (DALLAS COUNTY)
TEXAS DEPARTMENT OF TRANSPORTATION
5, 8, 21, 26, 52TOP 100 CONGESTED RANKING:
SUMMER • Q3 2020
Connecting You With Texas
Collector-Distributor
Collector-Distributor
Existing Frontage Road
Existing Mainlanes
Existing MainlanesExisting Frontage Road
Existing Mainlanes
Existing Mainlanes
NOTE: Additional capacity shown in purple.SOURCE: Texas Department of Transportation.
PROPOSED CONSTRUCTIONPRESENT CONDITION
TxDOT graphic TxDOT graphic
PROJECT TIMELINE
SOURCE: TxDOT TxDOT graphic
2016
2017 2021
Summer 2021 – Construction Complete
June 2016 – Public Meeting
June 2017 – Project Let
Fall 2017 – Construction Begins
May 2017 – Environmental Clearance
PROJECT COSTConstruction Cost $71.5 M
Utility Relocations Cost $7 M
Design/QA/QC Cost $5 M
Total Construction Cost* $83.5 M
*Subject to change. Note: Project costs are current as of 2019
FUNDING STATUSCongestion Relief $71.5 M
Strategy 102 $7 M
Strategy 111 $5 M
Estimated Total Funding* $83.5 M
*Subject to change. Note: Project costs are current as of 2019
PURPOSE AND NEEDLowest Stemmons project is a break-out project from Project Pegasus. The goal of the Lowest Stemmons project is to leverage existing funding to provide interim operational improvements to the congested I-35E corridor. The project will tie-in with the Horseshoe project to the south and will be constructed inside the ultimate Project Pegasus Right-of-Way.
PROJECT DETAILSLimits: I-35E: I-30 to N of Oak Lawn Ave. in Dallas Co.
CSJ: 0196-03-268
Description: Interim operational improvements consist-ing of collector-distributor roads (north and south-bound), direct connectors, and reconstructed ramps and bridge structures as necessary to accommodate the interim improvements.
Total Length: 2.2 miles
PROJECT STATUS • Public meeting held in summer 2016
• Environmental clearance was received in May 2017
• Construction began Fall 2017
• Construction completion estimated for Summer 2021
Website: www.TexasClearLanes.com
#txclearlanes
CONTACT INFORMATIONJohn Hudspeth, P.E. TxDOT Dallas District –Director of Transportation, Planning and Development(214) 320-6231 [email protected]
Dallas District Office4777 E. Highway 80Mesquite, TX 75150
NOTE: Highlighted areas are not drawn to exact scale. TxDOT graphic
Trinity RiverGreenbelt Park
W Commerce St.
Margaret Hunt Hill Bridge
N
1000 feet
N
1000 feet
35E
35E
35E
345
75
77
77
77
67
30
30
30
67
30
45
30
366
366
366
366 DOWNTOWNDALLAS
REUNION DISTRICT CONVENTION
CENTER
GOVERNMENTDISTRICT
FARMERS MARKET DISTRICT
BRYANPLACE
ReverchonPark
Turtle CreekGreenbelt Park
BaylorUniversity
Medical Center
American Airlines Center
GreenwoodCemetery
GriggsPark
BucknerPark
DallasHeritageVillage
Trinity RiverGreenbelt Park
ExallPark
S Ceasar Chavez Blvd.
Ross Ave.
Elm St.
Parry
Ave.
Pearl St.
Gri�n St.
Gri�
n St.
Commerce St.
Grand Ave.
Martin Lu
ther King Jr. Blvd
.
Columbia Ave.
Main St.
W Main St.
N Haskell Ave.
N Peak St.
S Peak St.S Haskell Ave.
Gaston Ave.
McKin
ney A
ve.McKinnon St.
Harry Hines Blvd.
N Good Latimer Expy.
Cedar Springs Rd.
E RL Thorton Fwy.
N Be
ckley
Ave.
W Commerce St.
S Lamar St.
Ross Ave.
Bryan St.
Woodall Rodgers F
rwy.
Elm St.
Main St.Commerce St.
Market Center Blvd.
N Riverfront Blvd.
Irving Blvd.
77
S Ervay St.
Trinity River
DNT
Malcolm X Blvd.
BRYANPLACE
OLDEAST DALLAS
DEEP ELLUMDEEP ELLUM
CEDARS
OLDEAST DALLAS
Singleton Blvd. Margaret Hunt Hill Bridge
Martin Lu
ther King Jr. Blvd
.
DOWNTOWNDALLAS
REUNION DISTRICT CONVENTION
CENTER
GOVERNMENTDISTRICT
FARMERS MARKET DISTRICT
CEDARS
Oak L
awn A
ve.
Project Limits