Page 1: CRT/N  Introduction - RTKC Milestones

Centre for Rural Technology, Nepal (CRT/N)

An Introduction www.crtnepal.org

Page 2: CRT/N  Introduction - RTKC Milestones

CRT/N Introduction

• Establishment– Initiated as a private sector organisation in 1989– Registered as a national NGO in 1998

• Aim– Develop, promote and disseminate environmentally sound

rural/appropriate technologies• Staff Strength

– Around 60+ (Engineers, Environmentalists, Technicians; Management Experts; Socio-economists; Gender Experts)

• Office Units– 3 Regional Unit covering 40+ districts under various programs/projects

Page 3: CRT/N  Introduction - RTKC Milestones

Introduction (contd.)

• Major Areas of Operation– Renewable energy technologies for increasing access to modern

energy– Renewable energy based micro-enterprises– Gender mainstreaming and social inclusion

Page 4: CRT/N  Introduction - RTKC Milestones

Technologies of CRT/NBiomass-based technologies• Household/ Institutional Improved Cooking Stoves (ICS/IICS),

rocket stove• Bio-briquette/Charcoal Hydro-based technologies• Improved Water Mill (IWM), electrification• Hydraulic Ram PumpSolar-based technologies• Solar cookers • Solar dryers

Page 5: CRT/N  Introduction - RTKC Milestones

Ongoing Activities

• Biomass Energy Support Programme (since 2000) – AEPC/ESAP• Improved Water Mill Programme (since 2003) – AEPC/ESAP• Terai ICS Carbon Project – registered CDM project ref. no. 4530

(since 2009) - Egluro• Pilot Project on Hydraulic Ram Pump (since 2010) –RW• Promoting Renewable Energy Technologies for Enhanced Rural

Livelihoods, Nepal (since 2011) – NORDIC• School Education on Energy and Environment (SEEE) Project

(since 2011)-CRT/N

Page 6: CRT/N  Introduction - RTKC Milestones

New Initiatives• Improving Gender-Inclusive Access to Clean and Renewable

Energy in Bhutan, Nepal, and Sri Lanka – ADB/ENERGIA• TA: Electricity Transmission Expansion and Supply

Improvement Project - ADB• Improved Cookstoves Programme with Carbon Finance (Sep

2012) – SNV/N• Regional Cookstove Testing and Knowledge Centre– GACC• National Alliance Affiliate for Nepal-GACC• Study of Appropriate Stoves with Smoke Hoods for Hills

Areas in Nepal- Practical Action

Page 7: CRT/N  Introduction - RTKC Milestones

RTKC, Nepal Milestones

Nov 2012 onwards..

Page 8: CRT/N  Introduction - RTKC Milestones

RTKC Milestones• Recruitments, lab equipment identification/location – Nov- Dec

2012• RTKC Staffs Recruitments completed – January 2013• Formed RTKC Advisory Group – February 2013• Lab Construction completed – March 2013• LEMS Arrived, Lab setup and WBT training – April 2013• Testing started – May 2013• RTKC Lab Formally Inaugurated – June 2013• Training and Capacity Building Workshop on Cookstoves

Programme Effectiveness 22-24 July 2013• National Workshop on Standards and Testing of Cookstoves in

Nepal 25 July 2013

Page 9: CRT/N  Introduction - RTKC Milestones

RTKC Staffs

Supervisor: Mr. Hari Gopal GorkhaliCoordinator: Mr. Basudev UpadhyayLab Officer: Ms. Shovana MaharjanResearch Officer: Ms. Nisha JaishwalKnowledge Management Associates: Ms. Kaushila Rai and Lab Technician: Ms Cheeza Adhikari

Advisory Group: Dr. Krishna Raj Shrestha, Biomass Expert, RECAST; Dr. Ramesh Man Singh, VC CEE-N; Dr. Bim Prasad Shrestha, HOD Dept. of Mechanical Engineering, KU (extension on process…)

Page 10: CRT/N  Introduction - RTKC Milestones

Lab Construction

Before Now

Page 11: CRT/N  Introduction - RTKC Milestones

RTKC Advisory Group Formation

Page 12: CRT/N  Introduction - RTKC Milestones

Lab setup and WBT training8-18 April 2013

- 8 CRT/N staffs and 2 RETS staffsResource Person: Mr. Alex Seidel, Emission Engineer Aprovecho

Research Centre, Oregon USATraining Module- LEMS Set up- Conducting WBT using LEMS- Trouble shooting/Maintainence/Calibration (Theoretical portion)

Page 13: CRT/N  Introduction - RTKC Milestones

RTKC Lab Inauguration

6 June 2013

Page 14: CRT/N  Introduction - RTKC Milestones

Testing Service

– RS 1.1, RS2.1, RS3.1 (SNV)– RS4.1, Two pothole RS with Chimney (Hariyo Ban, WWF

Nepal)– KU-JICA Model (Kathmandu University)

Page 15: CRT/N  Introduction - RTKC Milestones

Participation in Clean Cooking Market Place 2013

10-12 July 2013

Page 16: CRT/N  Introduction - RTKC Milestones

Trade Tower• Seminars• Expo (CRT/N)• Field Visit (CRT/N)

Participation in Clean Cooking Market Place n 2013

10-12 July 2013

Page 17: CRT/N  Introduction - RTKC Milestones

Training and Capacity Building Workshop on Cookstoves Testing for Programme Effectiveness

23-24 July 2013

Page 18: CRT/N  Introduction - RTKC Milestones

• 17 Core trainees were trained (13 CRT/N- 3 from field offices, 3 AEPC, 1 RETS)

• Basic Training Module on Programme Effectiveness- RTKC as a Centre of Excellence- Preference of Testing Methods

CCT/KPT/WBT - Issues related to field/lab tests

Training and Capacity Building Workshop on Cookstoves Testing for Programme Effectiveness

23-24 July 2013

Page 19: CRT/N  Introduction - RTKC Milestones

National Workshop on Standards and Testing of Cookstoves25 July 2013

Page 20: CRT/N  Introduction - RTKC Milestones

Participated by over 80 delegates• Technical Session- Testing/related organizations –

presented on their goals/activities/ related to testing• Policy Session- Cookstoves stakeholders including Govt. body/

NGOs/ INGOs and biomass experts

National Workshop on Standards and Testing of Cookstoves25 July 2013

Page 21: CRT/N  Introduction - RTKC Milestones

Next…

• USEPA/WI/CRTN/AEPC - CCT/WBT Training (9-24 Sept 2013..)• KPT Training/Conduction (yet to fix date..)• ICS Regional Network Building Workshop (Nov 1st week..)• WI field WBT (3rd week of August)• RTKC Newsletter..

Page 22: CRT/N  Introduction - RTKC Milestones

FUTURE Activities on Proposal TimeLine

Major activities of Year 1 (Remaining)• ICS Network Building Workshop• Seasonal KPT • NewsletterYear 2 Activities• Adaptive Research on design modification• One time KPT• Need and Impact Assessment through Social Survey• ICS Network Building Workshop 2

Page 23: CRT/N  Introduction - RTKC Milestones

Future Plan

RTKC’s 5 year roadmap has been in progress with very ambitious mission of proving itself as a center of excellence. For which the collaboration have been considered a vital approach. Some of the important components of the road map are:- Improved Testing Service – Additional equipments, well-trained staffs- Knowledge development and Sharing – Demonstration plots, newsletters, publications- Enhanced Research and Development on Cookstoves – student support programmes- Promoting cooking/heating solution – promotional workshops, awareness campaigns, designing projects

Page 24: CRT/N  Introduction - RTKC Milestones

Thank You