CRP No Module BPML-ID Description
MM-CRP_01 MM MM02-03 Process for purchase up to Rs 5000/-
MM-CRP_02 MM MM02-04 Process for purchase above 5,000 and less than Rs 1,00,000
MM-CRP_03 MM MM02-05 Process for purchase above Rs 1,00,000
MM-CRP_04 MM MM02-07 Tendering Process – Single Tender
MM-CRP_05 MM MM02-08 Tendering Process – Limited Tender
MM-CRP_06 MM MM02-09 Tendering Process – Open Tender
MM-CRP_07 MM MM02-13 Procurement by branch for the warehouse
MM-CRP_08 MM MM02-14 Procurement of capital items
MM-CRP_09 MM MM03-01 Create and Maintain Purchase Requisition
MM-CRP_10 MM MM04-01 Spares and Consumables Purchase
MM-CRP_11 MM MM04-02 Stationary Purchase
MM-CRP_12 MM MM04-03 Furniture, fixtures, office equipment purchase
MM-CRP_13 MM MM05-03 Decoiling Contract Within the Warehouse
MM-CRP_14 MM MM05-04 Process for decoiling outside the warehouse
MM-CRP_15 MM MM05-05 Decoiling Contract contiguous to the Warehouse
MM-CRP_16 MM MM05-07 AMCs
MM-CRP_17 MM SD12: S01 Stock receipt from manufacturing plant through rail \ road
MM-CRP_18 MM SD12: S05 Diversion from Public Siding
MM-CRP_19 MM SD12: S09 Receipt of export surplus material at warehouse (from port)
MM-CRP_20 MM SD12: S10 Receipt of material from manufacturing plant at departmental warehouse for land exports
MM-CRP_21 MM SD12:B: S02Tendering process of transport contractor
MM-CRP_22 MM T&S01_01 Contract to Receipt of Materials at Berth
MM-CRP_23 MM T&S01_02 Stock Transfer from Berth to Stacking Area
MM-CRP_24 MM T&S01_03 Dispatch of the Material to Manufacturing Plant
MM-CRP_25 MM T&S01_04 Coastal Movement
MM-CRP_26 MM T&S01_06 Blending of Different Grade of Coals at Port
MM-CRP_27 MM T&S01_09 Manage Stock Accuracy
MM-CRP_28 MM T&S02_01 Contract to Receipt of Materials at port/airport/CFS
MM-CRP_29 MM T&S02_02 Dispatch of the Material to Manufacturing Plant
MM-CRP_02
MM02-04
Created By Created On
Changed By Changed On
Step No. Description of the Step SAP T-Code Input Data
1 Creation of Contract ME31K • Vendor : ser004 •
Agreement type :MK ( Quantity
Contract) •
Agreement Date: enter the start date of
contract. • Purch Org :
central org. (0005) • Purchasing
group : 003 • Item catagory :
Standard • Accnt assignment :
K • Plant : H001
• Storage Loc. 0001 • Mat
Group : Rep & Mnt Buliding (
ZSER01)
Press Enter •
Validity End : Enter the last date of the
contract PRESS
ENTER • Material:
spare007 • Target
Quantity : Enter the quantity of products
to be delivered in the time period of
contract. • Oun: Unit of
measurement. •Net price : price
per unit • PER: 1( per 1 unit)
• Mat. grp : ZSER01 (Rep & Mnt
Buliding)
• Plnt Loc : H001
•Stor Loc : 001
PRESS ENTER
• Cost Centre : H001030
Press Enter •
Save Document.
Scenario No.
Scenario Name Process for purchase above 5,000 and less than Rs 1,00,000
Brief Description of the Scenario This segment will cover the activity of contract creation, purchase order creation, goods receipt, and invoice verification.
The materials purchased under this section will be above Rs.5000 and below Rs 1,00,000. The process for
purchase can be divided into 3 categories value wise:
For process up to Rs 1, 00,000 the vendor is finalized through Limited Tender process. If the requirement is of proprietary
item or OEM purchase then the tendering process may not be required. The process for tendering is to be tested in a
different section.
Kaustav Pal / Shauvik Das
2 Purchase Order Creation ME21N • Press Document overview on.
•Click on selection variant: choose
contracts.
•Purchasing Document : enter the
contract no. ( 4600000004)
•Press F8 (Execute)
•Select the Contract. •It
appears under hierarchy. •Drag
and drop it in the BIN beside NB
Standard PO. • Enter
the required Quantity.
Header:
• Document Type: Standard PO
• Vendor selection:SER004 stationery
supplies • Material:
SPARE007(interior fittings)
• Account Assignment Category: K •
Quantity : Input quantity required
•Oun: Order unit should tally as
mentioned while creating material
• Pricing Conditions: Enter the price per
unit quantity. •Plant :
Select plant for which the material is
required.(H001)
•Storage Location : Choose the location
where the goods are to be
stored.(H001)
Press Enter
• Cost centre : enter reqd. Cost centre
for proper G/L accnt
assignment.(H001030)
•Purchase org :select appropriate
purchase org for which the material is
purchased.(0005)
•Purchase group : select group under
which the material is listed.(003)
•Company Code : SAIL CMO (9000)
3 Goods Receipt MIGO •Header : Select Goods Reciept and
Purchase Order from the drop downat
the lfet most of the screen below the
HOLD tab
•Enter the PO number in the adjacent
field.(4500000033) Press Enter.
•The items are listed in the table. Check
OK for all the items. •Check
Item OK at the bottom of the page.
•Press Check if no messages delivered
then POST the document. •The
Accounting document generated will be
posted with the above Cost center as
the Account Assignment. The Profit
Center will be picked up from the Cost
Center. The Segment will be picked up
from the Profit Center.
4 Invoice Verification MIR7 &
MIRO &
MRBR
•Invoice Date: Should be prior to Posting
Date
• Reference:
• enter PO no. (4500000032)
• Under the Tab-BASIC DATA: Enter the
amount billed BLANACE at the right
hand corner.
Check Calculate Tax if the same is
taxable.The Taxes are required to be
maintained in the Vendor Master Data.
• Input tax Codein the table and Tab-
BASIC DATA. Please give V0
•Tab-TAX : Check calculate tax to
calcualte tax. •
SIMULATE : Check for any error
messages. If not then POST. •
There is no TDS as purchases of goods
does not attract TDS.
• The T-code MIR7 will be used to Verify
the invoice and Park the same.This will
be done by Warehouse Department
which will represent passing of invoice
at Warehouse.
• The T-code MIRO will be used to Post
the same after checking aty Finance
Department. This document posted will
be Blocked for Payment.
• The T-code MRBR will be used to free
the document for payment by Finance.
This addresses the scenario FI05-02 :
Creditors Management
Output/Actual Result Remarks
Process for purchase above 5,000 and less than Rs 1,00,000
This segment will cover the activity of contract creation, purchase order creation, goods receipt, and invoice verification.
The materials purchased under this section will be above Rs.5000 and below Rs 1,00,000. The process for
purchase can be divided into 3 categories value wise:
For process up to Rs 1, 00,000 the vendor is finalized through Limited Tender process. If the requirement is of proprietary
item or OEM purchase then the tendering process may not be required. The process for tendering is to be tested in a
different section.
27/09/10
MM-CRP_03
MM-CRP_03
MM02-05
Created By Created On
Changed By Changed On
Step No. Description of the Step SAP T-Code Input Data
1 Creation of Contract ME31K • Vendor :SER002 •
Agreement type :MK ( Quantity Contract)
• Agreement Date: enter the start date of
contract. • Purch Org :
central org. (0005) • Purchasing group
: 003 • Item catagory :
Standard • Accnt assignment : K
• Plant : H001 •
Storage Loc. 0001 • Mat
Group : Rep & Mnt Buliding ( ZSER01)
Press Enter •
Validity End : Enter the last date of the
contract PRESS
ENTER • Material:
SPARE003 • Target
Quantity : Enter the quantity of products to
be delivered in the time period of contract.
• Oun: Unit of measurement. •Net
price : price per unit • PER: 1(
per 1 unit) • Mat. grp :
ZSER01 (Rep & Mnt Buliding)
• Plnt Loc : H001
•Stor Loc : 001
PRESS ENTER
• Cost Centre : H001030
Press Enter •
Save Document.
Scenario No.
Scenario Name Process for purchase above Rs 1,00,000
Brief Description of the Scenario This segment will cover the activity of contract creation, purchase order creation, goods receipt, and invoice verification. The
materials purchased under this section will be above Rs.5000 and below Rs 1,00,000. The process for purchase
can be divided into 3 categories value wise:
For the process above Rs. 1, 00,000 Open Tender methodology may be obtained depending upon the availability of the
vendors. Tendering process is not required in case of proprietary item purchase, spot purchase, small
administrative purchase, or repeat orders. The process for tendering is to be tested in a different section.
Kaustav Pal / Shauvik Das
Page 9
MM-CRP_03
2 Purchase Order Creation ME21N • Press Document overview on. •Click
on selection variant: choose contracts.
•Purchasing Document : enter the contract
no. ( 4600000005) •Press F8
(Execute) •Select the
Contract. •It appears under
hierarchy. •Drag and drop it in the
BIN beside NB Standard PO.
• Enter the required Quantity. Header:
• Document Type: Standard PO
• Vendor selection: Select Vendor
(SER002 Service vendor for AMC)
Material: SPARE003
• Account Assignment Category: K •
Quantity : Input quantity required
•Oun: Order unit should tally as mentioned
while creating material
• Pricing Conditions: Enter the price per
unit quantity. •Plant :
Select plant for which the material is
required.(H001) •Storage
Location : Choose the location where the
goods are to be stored. (H001)
Press Enter
• Cost centre : enter reqd. Cost centre for
proper G/L accnt assignment. (H001030)
•Purchase org :select appropriate
purchase org for which the material is
purchased. (0005)
•Purchase group : select group under
which the material is listed. (003)
•Company Code : SAIL CMO
Page 10
MM-CRP_03
3 Goods Receipt MIGO •Header : Select Goods Reciept and
Purchase Order from the drop downat the
lfet most of the screen below the HOLD
tab •Enter the
PO number in the adjacent
field.(4500000033) Press Enter.
•The items are listed in the table. Check
OK for all the items. •Check
Item OK at the bottom of the page.
•Press Check if no messages delivered
then POST the document. •The
Accounting document generated will be
posted with the above Cost center as the
Account Assignment. The Profit Center
will be picked up from the Cost Center.
The Segment will be picked up from the
Profit Center.
4 Invoice Verification MIR7 &
MIRO &
MRBR
•Invoice Date: Should be prior to Posting
Date
• Reference:
• enter PO no. (4500000033)
• Under the Tab-BASIC DATA: Enter the
amount billed BLANACE at the right hand
corner.
• Check Calculate Tax if the same is
taxable.The Taxes are required to be
maintained in the Vendor Master Data.
• Input tax Codein the table and Tab-
BASIC DATA. Please give V0
•Tab-TAX : Check calculate tax to
calcualte tax. •
SIMULATE : Check for any error
messages. If not then POST. •
There is no TDS as purchases of goods
does not attract TDS.
• The T-code MIR7 will be used to Verify
the invoice and Park the same.This will be
done by Warehouse Department which will
represent passing of invoice at
Warehouse.
• The T-code MIRO will be used to Post
the same after checking aty Finance
Department. This document posted will be
Blocked for Payment.
• The T-code MRBR will be used to free
the document for payment by Finance.
This addresses the scenario FI05-02 :
Creditors Management
Page 11
MM-CRP_03
Output/Actual Result Remarks
Process for purchase above Rs 1,00,000
This segment will cover the activity of contract creation, purchase order creation, goods receipt, and invoice verification. The
materials purchased under this section will be above Rs.5000 and below Rs 1,00,000. The process for purchase
can be divided into 3 categories value wise:
For the process above Rs. 1, 00,000 Open Tender methodology may be obtained depending upon the availability of the
vendors. Tendering process is not required in case of proprietary item purchase, spot purchase, small
administrative purchase, or repeat orders. The process for tendering is to be tested in a different section.
27/09/10
Page 12
MM-CRP_10
MM-CRP_10
MM04-01
Created By Created On
Changed By Changed On
Step No. Description of the Step SAP T-Code Input Data
1 Creation of Contract ME31K • Vendor : SER003 •
Agreement type :MK ( Quantity Contract)
• Agreement Date: enter the start date of
contract. • Purch Org :
central org. (0005) • Purchasing
group : 003 • Item catagory :
Standard • Accnt assignment : K
• Plant : H001 •
Storage Loc. 0001 • Mat
Group : Rep & Mnt Buliding ( ZSER01)
Press Enter •
Validity End : Enter the last date of the
contract PRESS
ENTER • Material:
spare005,spare008 •
Target Quantity : Enter the quantity of
products to be delivered in the time
period of contract. • Oun: Unit
of measurement. •Net price :
price per unit • PER: 1( per 1
unit) • Mat. grp : ZSER01
(Rep & Mnt Buliding)
• Plnt Loc : H001
•Stor Loc : 001
PRESS ENTER •
Cost Centre : H001030
Press Enter •
Save Document.
Scenario No.
Scenario Name Spares and Consumables Purchase
Brief Description of the Scenario This segment will cover the activity of contract creation, purchase order creation, goods receipt, and invoice verification. The
materials purchased will be of type Spares and Consummables Purchase.This process includes the purchasing activity for
spares & consumables. The scenareo would be same as per the prcess for purchase up to 1 Lack and process for purchase
above 1 Lack.
Kaustav Pal / Shauvik Das
Page 15
MM-CRP_10
2 Purchase Order Creation ME21N • Press Document overview on.
•Click on selection variant: choose
contracts.
•Purchasing Document : enter the
contract no. ( 4600000006)
•Press F8 (Execute)
•Select the Contract. •It
appears under hierarchy. •Drag
and drop it in the BIN beside NB
Standard PO. • Enter
the required Quantity. Header:
• Document Type: Standard PO
• Vendor selection: Select
Vendor(SER003 Consumables provider)
Material : spare005,spare008.
• Account Assignment Category: K •
Quantity : Input quantity required
•Oun: Order unit should tally as
mentioned while creating material
• Pricing Conditions: Enter the price per
unit quantity. •Plant :
Select plant for which the material is
required. (H001)
•Storage Location : Choose the location
where the goods are to be stored. (H001)
Press Enter
• Cost centre : enter reqd. Cost centre for
proper G/L accnt assignment.(H001030)
•Purchase org :select appropriate
purchase org for which the material is
purchased. (0005)
•Purchase group : select group under
which the material is listed. (003)
•Company Code : SAIL CMO(9000)
Page 16
MM-CRP_10
3 Goods Receipt MIGO •Header : Select Goods Reciept and
Purchase Order from the drop downat
the lfet most of the screen below the
HOLD tab
•Enter the PO number in the adjacent
field.(4500000034) Press Enter.
•The items are listed in the table. Check
OK for all the items. •Check
Item OK at the bottom of the page.
•Press Check if no messages delivered
then POST the document. •The
Accounting document generated will be
posted with the above Cost center as the
Account Assignment. The Profit Center
will be picked up from the Cost Center.
The Segment will be picked up from the
Profit Center.
4 Invoice Verification MIR7 &
MIRO &
MRBR
•Invoice Date: Should be prior to Posting
Date
• Reference:
• enter PO no.(4500000034)
• Under the Tab-BASIC DATA: Enter the
amount billed BLANACE at the right
hand corner.
• Check Calculate Tax if the same is
taxable.The Taxes are required to be
maintained in the Vendor Master Data.
• Input tax Codein the table and Tab-
BASIC DATA. Please give V0
•Tab-TAX : Check calculate tax to
calcualte tax. •
SIMULATE : Check for any error
messages. If not then POST. •
There is no TDS as purchases of goods
does not attract TDS.
• The T-code MIR7 will be used to Verify
the invoice and Park the same.This will
be done by Warehouse Department
which will represent passing of invoice at
Warehouse.
• The T-code MIRO will be used to Post
the same after checking aty Finance
Department. This document posted will
be Blocked for Payment.
• The T-code MRBR will be used to free
the document for payment by Finance.
This addresses the scenario FI05-02 :
Creditors Management
Page 17
MM-CRP_10
Output/Actual Result Remarks
Spares and Consumables Purchase
This segment will cover the activity of contract creation, purchase order creation, goods receipt, and invoice verification. The
materials purchased will be of type Spares and Consummables Purchase.This process includes the purchasing activity for
spares & consumables. The scenareo would be same as per the prcess for purchase up to 1 Lack and process for purchase
above 1 Lack.
27/09/10
Page 18
MM-CRP_11
MM-CRP_11
MM04-02
Created By Created On
Changed By Changed On
Step No. Description of the Step SAP T-Code Input Data
1 Creation of Contract ME31K • Vendor : ser004 •
Agreement type :MK ( Quantity Contract)
• Agreement Date: enter the start date of
contract. • Purch Org :
central org. (0005) • Purchasing
group : 003 • Item catagory :
Standard • Accnt assignment :
K • Plant : H001
• Storage Loc. 0001 • Mat
Group : Rep & Mnt Buliding (
ZSER01)
Press Enter •
Validity End : Enter the last date of the
contract PRESS
ENTER • Material:
SPARE010 • Target
Quantity : Enter the quantity of products
to be delivered in the time period of
contract. • Oun: Unit of
measurement. •Net price : price
per unit • PER: 1( per 1 unit)
• Mat. grp : ZSER01 (Rep & Mnt
Buliding)
• Plnt Loc : H001
•Stor Loc : 001
PRESS ENTER
• Cost Centre : H001030
Press Enter •
Save Document.
Scenario No.
Scenario Name Stationary Purchase
Brief Description of the Scenario This segment will cover the activity of contract creation, purchase order creation, goods receipt, and invoice verification. The
materials purchased will be of type Spares and Consummables Purchase.This process includes the purchasing activity for
stationary items. The scenareo would be same as per the prcess for purchase up to 1 Lack and process for purchase above
1 Lack.
Kaustav Pal / Shauvik Das
Page 21
MM-CRP_11
2 Purchase Order Creation ME21N • Press Document overview on.
•Click on selection variant: choose
contracts.
•Purchasing Document : enter the
contract no. ( 4600000007)
•Press F8 (Execute)
•Select the Contract. •It
appears under hierarchy. •Drag
and drop it in the BIN beside NB
Standard PO. • Enter
the required Quantity. Header:
• Document Type: Standard PO
• Vendor selection: Select Vendor
(SER004 stationery supplies)
Materials : SPARE010
• Account Assignment Category: K •
Quantity : Input quantity required
•Oun: Order unit should tally as
mentioned while creating material
• Pricing Conditions: Enter the price per
unit quantity. •Plant :
Select plant for which the material is
required. (H001)
•Storage Location : Choose the location
where the goods are to be stored.
(H001)
Press Enter
• Cost centre : enter reqd. Cost centre
for proper G/L accnt assignment.
(H001030) •Purchase org :select
appropriate purchase org for which the
material is purchased. (0005)
•Purchase group : select group under
which the material is listed.(003)
•Company Code : SAIL CMO (9000)
Page 22
MM-CRP_11
3 Goods Receipt MIGO •Header : Select Goods Reciept and
Purchase Order from the drop downat
the lfet most of the screen below the
HOLD tab
•Enter the PO number in the adjacent
field.(4500000035) Press Enter.
•The items are listed in the table. Check
OK for all the items. •Check
Item OK at the bottom of the page.
•Press Check if no messages delivered
then POST the document. •The
Accounting document generated will be
posted with the above Cost center as the
Account Assignment. The Profit Center
will be picked up from the Cost Center.
The Segment will be picked up from the
Profit Center.
4 Invoice Verification MIR7 &
MIRO &
MRBR
•Invoice Date: Should be prior to Posting
Date
• Reference:
• enter PO no. (4500000035)
• Under the Tab-BASIC DATA: Enter the
amount billed BALANCE at the right
hand corner.
• Check Calculate Tax if the same is
taxable.The Taxes are required to be
maintained in the Vendor Master Data.
• Input tax Codein the table and Tab-
BASIC DATA. Please give V0
•Tab-TAX : Check calculate tax to
calcualte tax. •
SIMULATE : Check for any error
messages. If not then POST. •
There is no TDS as purchases of goods
does not attract TDS.
• The T-code MIR7 will be used to Verify
the invoice and Park the same.This will
be done by Warehouse Department
which will represent passing of invoice at
Warehouse.
• The T-code MIRO will be used to Post
the same after checking aty Finance
Department. This document posted will
be Blocked for Payment.
• The T-code MRBR will be used to free
the document for payment by Finance.
This addresses the scenario FI05-02 :
Creditors Management
Page 23
MM-CRP_11
Output/Actual Result Remarks
Stationary Purchase
This segment will cover the activity of contract creation, purchase order creation, goods receipt, and invoice verification. The
materials purchased will be of type Spares and Consummables Purchase.This process includes the purchasing activity for
stationary items. The scenareo would be same as per the prcess for purchase up to 1 Lack and process for purchase above
1 Lack.
27/09/10
Page 24
MM-CRP_16
MM05-07
Created By Created On
Changed By Changed On
Step No. Description of the Step SAP T-Code Input Data
1 Creation of Contract ME31K • Vendor : SER001 •
Agreement type :MK ( Quantity Contract)
• Agreement Date: enter the start date of
contract. • Purch Org :
central org. (0005) • Purchasing group :
013 • Item catagory : Standard
• Accnt assignment : K • Plant :
H001 •
Mat Group : Rep & Mnt Buliding (
ZSER01)
Press Enter •
Validity End : Enter the last date of the
contract PRESS
ENTER • Servive code
: 3000000 • Target
Quantity : Enter the quantity of products to
be delivered in the time period of contract.
• Oun: Unit of measurement. •Net
price : price per unit • PER: 1(
per 1 unit) • Mat. grp :
ZSER01 (Rep & Mnt Buliding)
• Plnt Loc : H001
• Cost Centre : H001030
Press Enter • Save
Document.
Scenario No.
Scenario Name AMCs
Brief Description of the Scenario AMC (Annual Maintenance Contract) is done in most of the cases with OEM (Original Equipment Manufacturer) or the
listed/reputed service provider for any particular product/service.
Normally these types of contract are done for a year and can be extended to another year. In some AMCs the advance
payment is required to be given.
Kaustav Pal / Shauvik Das
2 Purchase Order Creation ME21N • Press Document overview on. •Click
on selection variant: choose contracts.
•Purchasing Document : enter the contract
no. •Press F8 (Execute)
•Select the Contract. •It
appears under hierarchy. •Drag
and drop it in the BIN beside NB Standard
PO. • Enter the required
Quantity. Header:
• Document Type: Standard PO
• Account Assignment Category: K •
Quantity : Input quantity required •
Oun: Order unit should tally as mentioned
while creating material
• Pricing Conditions: Enter the price per
unit quantity. •Plant :
Select plant for which the material is
required. (H001)
• Cost centre : enter reqd. Cost centre for
proper G/L accnt assignment. (H001030)
•Purchase org :select appropriate
purchase org for which the material is
purchased. (0005) •Tax Code
: S1
•Company Code : SAIL CMO (9000)
3 Service Entry Sheet ML81N •Click on "other purchase order" and put
the purchase order number.
•Click on "create entry sheet" or press
"Shift + F1". •Click on
"Service Selection". •On the
next page select the line item for services
and click "adopt services or F9"
•Click "Accept" or "ctrl + F1"
•Save the entrty sheet •The
Accounting document generated will be
posted with the above Cost center as the
Account Assignment. The Profit Center will
be picked up from the Cost Center. The
Segment will be picked up from the Profit
Center.
4 Invoice Verification MIR7 &
MIRO &
MRBR
•Invoice Date: Should be prior to Posting
Date
• Reference: Bill number of the vendor
• enter PO no. or service entry sheet
number • Under
the Tab-BASIC DATA: Enter the amount
billed BALANCE at the right hand corner.
• Check Calculate Tax if the same is
taxable.The Taxes are required to be
maintained in the Vendor Master Data.
• Input tax Codein the table and Tab-
BASIC DATA. Please give V0
•Tab-TAX : Check calculate tax to
calcualte tax. •
SIMULATE : Check for any error
messages. If not then POST. • TDS
would be deductd as per the tax code
maintained at the vendor master
• The T-code MIR7 will be used to Verify
the invoice and Park the same.This will be
done by Warehouse Department which will
represent passing of invoice at
Warehouse.
• The T-code MIRO will be used to Post
the same after checking aty Finance
Department. This document posted will be
Blocked for Payment.
• The T-code MRBR will be used to free
the document for payment by Finance.
This addresses the scenario FI05-02 :
Creditors Management
Output/Actual Result Remarks
AMCs
AMC (Annual Maintenance Contract) is done in most of the cases with OEM (Original Equipment Manufacturer) or the
listed/reputed service provider for any particular product/service.
Normally these types of contract are done for a year and can be extended to another year. In some AMCs the advance
payment is required to be given.
27/09/10
MM-CRP_07
MM02-13
Created By Created On
Changed By Changed On
Step No. Description of the Step SAP T-Code Input Data
1 Creation of Contract ME31K • Vendor :SER006 •
Agreement type :MK ( Quantity
Contract) •
Agreement Date: enter the start date
of contract. • Purch
Org : central org. (0005) •
Purchasing group : 005 •
Item catagory : Standard •
Accnt assignment : K •
Plant : B003 •
Storage Loc. 0001 •
Mat Group : Rep & Mnt Buliding (
ZSER01)
Press Enter •
Validity End : Enter the last date of
the contract
PRESS ENTER •
Material: MAT02 •
Target Quantity : Enter the quantity
of products to be delivered in the time
period of contract. • Oun:
Unit of measurement. •Net
price : price per unit •
PER: 1( per 1 unit) •
Mat. grp : ZSER01 (Rep & Mnt
Buliding)
• Plnt Loc :B003
•Stor Loc :0001
PRESS ENTER
• Cost Centre :The cost center for
warehouse needs to be provided here
Press Enter •
Save Document.
Scenario No.
Scenario Name Procurement by branch for the warehouse
Brief Description of the Scenario In some cases the procurement of material for the warehouse is executed by the branch and the stock
is received at branch. After some period of time some of the materials are transferred to warehouse
according to the requirement.
Kaustav Pal / Shauvik Das
2 Purchase Order Creation ME21N • Press Document overview on.
•Click on selection variant: choose
contracts.
•Purchasing Document : enter the
contract no. (4600000012)
•Press F8 (Execute)
•Select the Contract.
•It appears under hierarchy.
•Drag and drop it in the BIN beside
NB Standard PO. •
Enter the required Quantity. Header:
• Document Type: Standard PO
• Vendor selection: Select Vendor
(SER006)
Material :MAT02
• Account Assignment Category: K
• Quantity : Input quantity required
•Oun: Order unit should tally as
mentioned while creating material
• Pricing Conditions: Enter the price
per unit quantity.
•Plant : Select plant for which the
material is required. (B003)
•Storage Location : Choose the
location where the goods are to be
stored. (0001)
Press Enter
• Cost centre : enter reqd. Cost
centre for proper G/L accnt
assignment.(B003030)
•Purchase org :select appropriate
purchase org for which the material is
purchased. (0005)
•Purchase group : select group under
which the material is listed. (005)
•Company Code : SAIL CMO
3 Goods Receipt MIGO •Header : Select Goods Reciept and
Purchase Order from the drop
downat the lfet most of the screen
below the HOLD tab
•Enter the PO number in the adjacent
field.(4500000069) Press Enter.
•The items are listed in the table.
Check OK for all the items.
•Check Item OK at the bottom of the
page.
•Press Check if no messages
delivered then POST the document.
•The Accounting document generated
will be posted with the above Cost
center as the Account Assignment.
The Profit Center will be picked up
from the Cost Center. The Segment
will be picked up from the Profit
Center.
4 Invoice Verification MIRO •Invoice Date: Should be prior to
Posting Date
• Reference:
• Enter PO no. (4500000069)
• Under the Tab-BASIC DATA: Enter
the amount billed BALANCE at the
right hand corner.
• Check Calculate Tax if the same is
taxable.The Taxes are required to be
maintained in the Vendor Master
Data.
• Input tax Code in the table and Tab-
BASIC DATA. Please give V0
•Tab-TAX : Check calculate tax to
calcualte tax.
• SIMULATE : Check for any error
messages. If not then POST.
• There is no TDS as purchases of
goods does not attract TDS.
Output/Actual Result Remarks
Procurement by branch for the warehouse
In some cases the procurement of material for the warehouse is executed by the branch and the stock
is received at branch. After some period of time some of the materials are transferred to warehouse
according to the requirement.
27/09/10
MM-CRP_01
MM02-03
Created By Created On
Changed By Changed On
Step No. Description of the Step SAP T-Code Input Data
1 Enter incoming invoice FB60 • Vendor :SER002 •
Document Date : The date at vendor
invoice •
Posting date: The date at which the
posting needs to be done.
• Business place / Section :
B003/B003 •
G/L account : 71402000 •
Debit/ Credit Indicator : Debit
• Amount : The amount at invoice
document •
Cost Center : B003030 •
Baseline date: The date for due date
calculation. •
Simulate and post
2 Cash Journal FBCJ • Choose "Cash Payments" . •
Business Transaction: VENDOR.
• Amount : The amount to be posted.
• Profit Center : 9001 •
Business Area : B003
• Select the line item; Choose "Save
selection" and Post. • This
addresses scenario CO05-09 : Cash
Expanse Payment.
Scenario No.
Scenario Name Process for purchase up to Rs 5000/-
Brief Description of the Scenario The process for purchase up to Rs 5000/- is known as imprest purchase. Here no purchase order will
be created. The first entry in this process will be finance invoice.
Kaustav Pal / Shauvik Das
Output/Actual Result Remarks
Process for purchase up to Rs 5000/-
The process for purchase up to Rs 5000/- is known as imprest purchase. Here no purchase order will
be created. The first entry in this process will be finance invoice.
28/09/10
MM-CRP_09
MM03-01
Created By
Changed By
Step No. Description of the Step SAP T-Code
1 Creation of Purchase
Requisition
ME51N
Scenario No.
Scenario Name Create and Maintain Purchase Requisition
Brief Description of the Scenario The purchase requisitions will be created at pre tendering stage as written in the section MM02-01:
Process for Pre tendering.
A purchase requisition is a request or instruction to Purchasing to procure a certain quantity of a
material or a service so that it is available at a certain point in time.
Kaustav Pal / Shauvik Das
Created On
Changed On
Input Data Output/Actual Result Remarks
• Material : Spare010 •
Quantity : Mention the quantity of
goods to be procured. •
Oun : Order unit of measurement (
EA)
•Delivery Date : Date of delivery. •
Press Enter. •
Cost Centre :Enter Cost Centre
(H001030) •
SAVE Document.
•Under the Tab- Valutaion,Valuation
Price: Per unit Price.
Create and Maintain Purchase Requisition
The purchase requisitions will be created at pre tendering stage as written in the section MM02-01:
Process for Pre tendering.
A purchase requisition is a request or instruction to Purchasing to procure a certain quantity of a
material or a service so that it is available at a certain point in time.
28/09/10
MM-CRP_20
Created By Created On
Changed By Changed On
Step No. Description of the
Step
SAP T-Code Input Data
1 Creation of LOI
(Quotation in SAP)
VA21 Header
• Quotation Type: ZELI
• Sales Org: 9100 (Flat)
• Distribution Channel: 09
• Division: F0 (Flat Cross Division)
• Sales Office : B017 (Kanpur)
• Sold to party : 1005
• Ship to party : 1005
• PO Number : T00002 D22
• PO Date : 22/09/2010
• Delivering Plant : W016
• Incoterm and Location : FCA Nepal
• Payment Terms : 0001
• Quotation Valid from and Valid to Dates
• Material Code: 101070002700005278 (PLATE PM
SAILMA 550 32)
• Quantity : 100 To
• Storage Location : XP10
• Base Price : 1000 USD
2 Creation of Letter of
Credit in the system
VX11N • This step is not need to be executed here as this is
already included in the export scenarion number
T&S04-01. This document is more delibarated on
the receipt part.
3 Creation of Sales
Contract
VA01 • Document Type: ZEXP
• Use Quotation Number as reference : Number
generated in step 1
• Valuation price : INR 1
4 Creation of Work
Order on plant
ME21N • Creation of PO in reference to the Purchase
Requisition
• Vendor : 1000
• Purchase Org : 0005
• Tick the free goods check box • Put
confirmation control as inbound delivery
• Save
Shauvik Das
Scenario No. SD12: S10
Scenario Name Receipt of material from manufacturing plant at departmental warehouse for land exports
Brief Description of the Scenario This scenario includes the steps for receipt of material from manufacturing plant to warehouse for land export purpose
5 Creation of inbound
delivery
VL31N • Put the purchase order number for which the IBD
needs to be created
• Vendor : 1000
• Enter the quantity for IBD
• Save the document •
This step would be faciliated through development.
So the transaction would run at background.
6 Goods Receipt MIGO • Put the Inbound delivery number for which the
material needs to be received
• Quantity : Quantity to be received
• Batch number : The CA number to be inserted
here. •
Vendor Batch : The ARE number to be inserted
here.
• Save the document •
This step would be faciliated through development.
So the transaction would run at background.This
would be done to receive the materials.
7 Create Transfer
Order
LT06 • GRN number for which the TO needs to be
created.
• Warehouse Number : Z01
• Bin Number : A-01.
• Save the document •
This step would be faciliated through development.
So the transaction would run at background.
8 Create Transfer
Order
LT12 •TO number created at step 7
• Click "confirm internally".
• Save the document •
This step would be faciliated through development.
So the transaction would run at background.
Output/Actual Result Remarks
Export LOI is saved and a
number is generated
1) Sales order is saved and a
number is generated
2) Purchase Requsition is
raised and a number is
generated
Purchase Order saved and
number generated
29/09/2010
SD12: S10
Receipt of material from manufacturing plant at departmental warehouse for land exports
This scenario includes the steps for receipt of material from manufacturing plant to warehouse for land export purpose
MM-CRP_19
Created By Created On
Changed By Changed On
Step No. Description of the
Step
SAP T-Code Input Data
1 Transfer Posting to
release the contract
specific stock
MB1B • Movement Type: 411
• Special Stock : E
• Plant : P001
• Storage Location : WARF
• Sales Order & Item: Sales order no and item no
• Recvng Location : WARF
• Recvng Material : 101070002700005275
• Material : 101070002700005275
• Quantity : 10
• Batch : Select The Batch Number
2 Create Stock
transfer Order
ME21N • PO Type: UB
• Supplying Plant : P001
• Purch Org : 0005
• Purch Grp : 004
• Company Code : 9000
• Material : 101070002700005275
• Quantity : Qtty in Tonnes
• Batch : Batch No. to be transferred
• Plant : W054 (Dankuni)
• Storage Location : XP10 (Export Mat - Bhillai)
• Issuing Storage Location : Yard
• Save
3 Outbound Delivery Vl10B • Purchase Order NO : Stock Transfer Order No
generated in Step 3
• Select the item and quantity to be delivered and
click on the background button
• Use the back arrow and come out of the
transaction
5 Post Goods Issue Vl02N • Using the delivery numbers generated in the
previous step, perform the GI after providing the
picking Quantity
6 GR at Receiving
Plant
MIGO • Purchase order no : Stock Transfer order no
generated in step 3
• Movement Type: 101
• Select the Item and check the checkbox "Item OK"
• Post and Save
Shauvik Das
Scenario No. SD12: S09
Scenario Name Receipt of export surplus material at warehouse (from port)
Brief Description of the Scenario This scenario will cover the process of transferring export surplus material from port to a stockyard.
7 Create Transfer
Order
LT06 • GRN number for which the TO needs to be
created.
• Warehouse Number : Z01
• Bin Number : A-01.
• Save the document •
This step would be faciliated through development.
So the transaction would run at background.
8 Create Transfer
Order
LT12 •TO number created at step 7
• Click "confirm internally".
• Save the document •
This step would be faciliated through development.
So the transaction would run at background.
9 Excise Entry J1IG • Excise Group E1
• Material Document No : Generated in step 6
• Select Item and Provide following excise details:
•• Excise inv no : TR6 Number
•• Challan Qtty : GI Qtty
•• Excise Base : Base in TR6
•• BED % : 10%
•• Cess % : 2 %
•• Tax 1 % : 1% (Used for Higher Education Cess)
•• Save
Output/Actual Result Remarks
29/09/2010
SD12: S09
Receipt of export surplus material at warehouse (from port)
This scenario will cover the process of transferring export surplus material from port to a stockyard.