The following includes samples info Use Application or Proximity Notific and notifications. AltaLink may requ process if necessary. Type of Work Underground pipeline crossing Above ground pipeline crossing Underground cable crossing Above ground cable crossing Road crossing Underground power line crossing Aboveground power line crossing Fence crossing Pathway crossing Any other crossing Pumping station/metering station/r encroachment Power line proximity Well site proximity Pipeline/cable proximity Any road proximity Log deck proximity Traffic light/signal proximity Riser site/metering station proximit Building/house proximity Traffic light/signal encroachment Temporary workspace proximity Road widening Any other proximity CROSSINGS, ENCROACHMEN SAMPLE INF ormation that AltaLink suggests that you include as p cation. These samples were gathered based on prev uire additional information, and will follow-up durin Suggested Sections A, B A, B, C A, B A, B, C A, B A, B A, B, D A, B, C A, B A, B riser site B, C D E F,G (required if AltaLink’s minimum requirements are not fulfilled) H I J, K ty L M,N (required if house is proposed within AltaLink’s power line setback box) J, K O P Plan NTS & PROXIMITIES FORMATION GUIDE part of your ROW vious applications ng the review

Upload: vandien

Post on 03-Feb-2018

229 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Crossings Encroachments Proximities Sample Information ... · PDF fileunderground pipeline crossing ... crossings, encroachments & proximities sample information guide ... encroachments

The following includes samples information that AltaLink suggests that youUse Application or Proximity Notification. Theseand notifications. AltaLink may require additionalprocess if necessary.

Type of Work

Underground pipeline crossing

Above ground pipeline crossing

Underground cable crossing

Above ground cable crossing

Road crossing

Underground power line crossing

Aboveground power line crossing

Fence crossing

Pathway crossing

Any other crossing

Pumping station/metering station/riser siteencroachment

Power line proximity

Well site proximity

Pipeline/cable proximity

Any road proximity

Log deck proximity

Traffic light/signal proximity

Riser site/metering station proximity

Building/house proximity

Traffic light/signal encroachment

Temporary workspace proximity

Road widening

Any other proximity

CROSSINGS, ENCROACHMENTS & PROXIMITIESSAMPLE INFORMATION GUIDE

information that AltaLink suggests that you include as part of your ROWUse Application or Proximity Notification. These samples were gathered based on previous application

AltaLink may require additional information, and will follow-up during the review

Suggested Sections

A, B

A, B, C

A, B

A, B, C

A, B

A, B

A, B, D

A, B, C

A, B

A, B

station/riser siteB, C

D

E

F, G (required if AltaLink’s minimum

requirements are not fulfilled)

H

I

J, K

site/metering station proximity L

M, N (required if house is proposed

within AltaLink’s power line setback box)

J, K

O

P

Plan

CROSSINGS, ENCROACHMENTS & PROXIMITIESSAMPLE INFORMATION GUIDE

as part of your ROWwere gathered based on previous applications

up during the review

Page 2: Crossings Encroachments Proximities Sample Information ... · PDF fileunderground pipeline crossing ... crossings, encroachments & proximities sample information guide ... encroachments

SECTION A

This section shows a sample crossing plan whichcrossing plan should have clear identification of proposed facility in relation to the location of theexisting AltaLink facility. We request thatand distances to the crossing location.

POWER POLE/TOWER (1) TAG# (e.g.904L76)POWER POLE/TOWER (1) DIRECTION:POWER POLE/TOWER (2) TAG# (e.g.904L76)POWER POLE/TOWER (2) DIRECTION: East/West/North/SouthDISTANCES FROM POWER POLE/TOWER TO EDGE OF

CROSSINGS, ENCROACHMENTS & PROXIMITIESSAMPLE INFORMATION GUIDE

This section shows a sample crossing plan which should be submitted for each crossing request. Thecrossing plan should have clear identification of proposed facility in relation to the location of the

We request that the applicant provide tag numbers of AltaLinkcrossing location.

POWER POLE/TOWER (1) TAG# (e.g.904L76)POWER POLE/TOWER (1) DIRECTION: East/West/North/SouthPOWER POLE/TOWER (2) TAG# (e.g.904L76)POWER POLE/TOWER (2) DIRECTION: East/West/North/South

POLE/TOWER TO EDGE OF PROPOSED RIGHT OF WAY:

CROSSINGS, ENCROACHMENTS & PROXIMITIESSAMPLE INFORMATION GUIDE

submitted for each crossing request. Thecrossing plan should have clear identification of proposed facility in relation to the location of the

AltaLink’s power pole

metres

Page 3: Crossings Encroachments Proximities Sample Information ... · PDF fileunderground pipeline crossing ... crossings, encroachments & proximities sample information guide ... encroachments

NOTE:- A minimum separation of 5 metresdisturbance.- A minimum separation of 10 metresdisturbance.

CROSSINGS, ENCROACHMENTS & PROXIMITIESSAMPLE INFORMATION GUIDE

metres is required between all AltaLink's power poles, anchors and any soil

metres is required between all AltaLink's towers, anchors and any soil

CROSSINGS, ENCROACHMENTS & PROXIMITIESSAMPLE INFORMATION GUIDE

's power poles, anchors and any soil

's towers, anchors and any soil

Page 4: Crossings Encroachments Proximities Sample Information ... · PDF fileunderground pipeline crossing ... crossings, encroachments & proximities sample information guide ... encroachments

SECTION B

This section shows a sample survey data sheet whichBlank copies of survey data sheets are available

CROSSINGS, ENCROACHMENTS & PROXIMITIESSAMPLE INFORMATION GUIDE

This section shows a sample survey data sheet which we suggest to submit with each crossing request.Blank copies of survey data sheets are available at www.AltaLink.ca/right-of-way.

CROSSINGS, ENCROACHMENTS & PROXIMITIESSAMPLE INFORMATION GUIDE

with each crossing request.

Page 5: Crossings Encroachments Proximities Sample Information ... · PDF fileunderground pipeline crossing ... crossings, encroachments & proximities sample information guide ... encroachments

SECTION C

This section is required when an above ground facility is proposed.

Please provide the following information:

Description on above ground facility

o What is it?

o How it will be installed above ground?

o What it is made of?

Will any ground elevation change be required?

Distance from existing ground to highest point of proposed facility:

Height of above ground facility:

Is the facility permanent/temporary?

Drawings of proposed facility

CROSSINGS, ENCROACHMENTS & PROXIMITIESSAMPLE INFORMATION GUIDE

an above ground facility is proposed.

Please provide the following information:

Description on above ground facility:

How it will be installed above ground?

What it is made of?

Will any ground elevation change be required?

Distance from existing ground to highest point of proposed facility: metres

Height of above ground facility: metres (if applicable)

permanent/temporary?

Drawings of proposed facility

CROSSINGS, ENCROACHMENTS & PROXIMITIESSAMPLE INFORMATION GUIDE

metres (if applicable)

Page 6: Crossings Encroachments Proximities Sample Information ... · PDF fileunderground pipeline crossing ... crossings, encroachments & proximities sample information guide ... encroachments

SECTION D

This section is required when an above ground power line facility is proposed.

Please provide the following information:

Voltages of upcoming power line:

Upcoming power line conductor type:

Ruling span of upcoming power line:

Span length of crossing span (distance from first power pole to second power pole):

metres

Number of insulators:

Distance between AltaLink’s power pole and closest phase of upcoming

metres

Permanent/temporary :

AEUC and CSA clearance requirement between two circuits at crossing location:

Calculated clearance between line of sight of upcoming power line and lowest wire of

power line sagging at 100⁰C

Drawings of power pole that will be located on either side of

Ground elevation change occurring at crossing location?

If answered “yes” to above question then specify following details:

Cut: metres

Fill: metres

Height/distance from existing ground to upcoming power line’s line of sight at crossing location:

metres

CROSSINGS, ENCROACHMENTS & PROXIMITIESSAMPLE INFORMATION GUIDE

This section is required when an above ground power line facility is proposed.

Please provide the following information:

Voltages of upcoming power line: kV

conductor type:

Ruling span of upcoming power line: metres

Span length of crossing span (distance from first power pole to second power pole):

’s power pole and closest phase of upcoming power line:

AEUC and CSA clearance requirement between two circuits at crossing location:

Calculated clearance between line of sight of upcoming power line and lowest wire of

⁰C at crossing location: metres (if available)

Drawings of power pole that will be located on either side of AltaLink power line

Ground elevation change occurring at crossing location?

If answered “yes” to above question then specify following details:

metres

metres

Height/distance from existing ground to upcoming power line’s line of sight at crossing location:

CROSSINGS, ENCROACHMENTS & PROXIMITIESSAMPLE INFORMATION GUIDE

Span length of crossing span (distance from first power pole to second power pole):

power line:

AEUC and CSA clearance requirement between two circuits at crossing location: metres

Calculated clearance between line of sight of upcoming power line and lowest wire of AltaLink’s

power line

Height/distance from existing ground to upcoming power line’s line of sight at crossing location:

Page 7: Crossings Encroachments Proximities Sample Information ... · PDF fileunderground pipeline crossing ... crossings, encroachments & proximities sample information guide ... encroachments

SECTION E

This section shows a sample well site plan whichplan should show distances between

Please provide the following information on the drawing:

1) The distance between AltaLink’s closest right of way

2) The distance between AltaLink’s closest power line (wire) and well

3) The distance between AltaLink’s closest

4) The distance between AltaLink’s clo

CROSSINGS, ENCROACHMENTS & PROXIMITIESSAMPLE INFORMATION GUIDE

This section shows a sample well site plan which is required for each well site proximity request. Thisplan should show distances between AltaLink’s power lines and well site as shown in the plan below.

Please provide the following information on the drawing:

’s closest right of way boundary and wellsite:

’s closest power line (wire) and wellsite: metres

’s closest right of way boundary and wellhead:

’s closest power line (wire) and wellhead: metr

CROSSINGS, ENCROACHMENTS & PROXIMITIESSAMPLE INFORMATION GUIDE

for each well site proximity request. This’s power lines and well site as shown in the plan below.

metres

metres

metres

metres

Page 8: Crossings Encroachments Proximities Sample Information ... · PDF fileunderground pipeline crossing ... crossings, encroachments & proximities sample information guide ... encroachments

CROSSINGS, ENCROACHMENTS & PROXIMITIESSAMPLE INFORMATION GUIDE

*Courtesy of Boundary Technical*Courtesy of Boundary Technical Group Inc.

Page 9: Crossings Encroachments Proximities Sample Information ... · PDF fileunderground pipeline crossing ... crossings, encroachments & proximities sample information guide ... encroachments

SECTION F

This section shows a sample plan of a pipeline proximity request, which iscable proximity request.

CROSSINGS, ENCROACHMENTS & PROXIMITIESSAMPLE INFORMATION GUIDE

This section shows a sample plan of a pipeline proximity request, which is suggested for each pipeline or

CROSSINGS, ENCROACHMENTS & PROXIMITIESSAMPLE INFORMATION GUIDE

for each pipeline or

Page 10: Crossings Encroachments Proximities Sample Information ... · PDF fileunderground pipeline crossing ... crossings, encroachments & proximities sample information guide ... encroachments

SECTION G

This section details AltaLink requirements for pipelines or other excavations which are paralleling anAltaLink power line. This type of drawing is required when the following separation requirements arenot fulfilled:

5 metres of distance between any s

10 metres of distance between any soil disturbance and steel tower

The details in this section must reflect the smallest separation between the power pole/tower and theedge of trench and the steepest slope of trench to allow for an accurate assessment of the proposedfacility’s effect on the AltaLink line.

CROSSINGS, ENCROACHMENTS & PROXIMITIESSAMPLE INFORMATION GUIDE

requirements for pipelines or other excavations which are paralleling anpower line. This type of drawing is required when the following separation requirements are

between any soil disturbance and wood pole;

between any soil disturbance and steel tower.

The details in this section must reflect the smallest separation between the power pole/tower and thed the steepest slope of trench to allow for an accurate assessment of the proposed

ink line.

CROSSINGS, ENCROACHMENTS & PROXIMITIESSAMPLE INFORMATION GUIDE

requirements for pipelines or other excavations which are paralleling anpower line. This type of drawing is required when the following separation requirements are

The details in this section must reflect the smallest separation between the power pole/tower and thed the steepest slope of trench to allow for an accurate assessment of the proposed

Page 11: Crossings Encroachments Proximities Sample Information ... · PDF fileunderground pipeline crossing ... crossings, encroachments & proximities sample information guide ... encroachments

X1: metres

X2: metres

Y1: metres

Y2: metres

Z (Ratio):

Type of pipeline:

Method of pipeline installation:

Pipeline material:

CROSSINGS, ENCROACHMENTS & PROXIMITIESSAMPLE INFORMATION GUIDE

Engineer stamp

CROSSINGS, ENCROACHMENTS & PROXIMITIESSAMPLE INFORMATION GUIDE

Engineer stamp

Page 12: Crossings Encroachments Proximities Sample Information ... · PDF fileunderground pipeline crossing ... crossings, encroachments & proximities sample information guide ... encroachments

SECTION H

This section shows a sample plan which is

CROSSINGS, ENCROACHMENTS & PROXIMITIESSAMPLE INFORMATION GUIDE

This section shows a sample plan which is suggested for each road proximity request.

*Courtesy of Boundary Technical Group Inc.

CROSSINGS, ENCROACHMENTS & PROXIMITIESSAMPLE INFORMATION GUIDE

*Courtesy of Boundary Technical Group Inc.

Page 13: Crossings Encroachments Proximities Sample Information ... · PDF fileunderground pipeline crossing ... crossings, encroachments & proximities sample information guide ... encroachments

SECTION I

This section shows a sample plan which is

CROSSINGS, ENCROACHMENTS & PROXIMITIESSAMPLE INFORMATION GUIDE

This section shows a sample plan which is suggested for each log deck proximity request.

CROSSINGS, ENCROACHMENTS & PROXIMITIESSAMPLE INFORMATION GUIDE

each log deck proximity request.

Page 14: Crossings Encroachments Proximities Sample Information ... · PDF fileunderground pipeline crossing ... crossings, encroachments & proximities sample information guide ... encroachments

SECTION J

This section shows a sample plan which isencroachment request. On this plan the distance between each light/traffic signal and power linebe shown clearly. If the lights or traffic signals have devit arms, the distancenearest edge of light pole/traffic signal to the power line and the power line itself.

CROSSINGS, ENCROACHMENTS & PROXIMITIESSAMPLE INFORMATION GUIDE

This section shows a sample plan which is suggested for each traffic signal/light pole proximity and/orencroachment request. On this plan the distance between each light/traffic signal and power linebe shown clearly. If the lights or traffic signals have devit arms, the distance should be shown betweennearest edge of light pole/traffic signal to the power line and the power line itself.

CROSSINGS, ENCROACHMENTS & PROXIMITIESSAMPLE INFORMATION GUIDE

for each traffic signal/light pole proximity and/orencroachment request. On this plan the distance between each light/traffic signal and power line should

be shown between

Page 15: Crossings Encroachments Proximities Sample Information ... · PDF fileunderground pipeline crossing ... crossings, encroachments & proximities sample information guide ... encroachments

SECTION K

This section shows a sample specification drawing which isthat is being used in the proposed project. This type of drawingsignal/light encroachment and/or proximity

CROSSINGS, ENCROACHMENTS & PROXIMITIESSAMPLE INFORMATION GUIDE

This section shows a sample specification drawing which is suggested for each type of light/traffic signalproposed project. This type of drawing should be submitted with traffic

encroachment and/or proximity.

CROSSINGS, ENCROACHMENTS & PROXIMITIESSAMPLE INFORMATION GUIDE

for each type of light/traffic signalbe submitted with traffic

Page 16: Crossings Encroachments Proximities Sample Information ... · PDF fileunderground pipeline crossing ... crossings, encroachments & proximities sample information guide ... encroachments

SECTION L

This section shows a sample plan of which isproximity notification.

The distance between the edge of thesite/pumping station/metering station:

CROSSINGS, ENCROACHMENTS & PROXIMITIESSAMPLE INFORMATION GUIDE

This section shows a sample plan of which is suggested for each pipeline riser site/metering site

The distance between the edge of the AltaLink right of way/VCE/LOC/EZE and closest edge of risersite/pumping station/metering station: metres

CROSSINGS, ENCROACHMENTS & PROXIMITIESSAMPLE INFORMATION GUIDE

each pipeline riser site/metering site

right of way/VCE/LOC/EZE and closest edge of riser

Page 17: Crossings Encroachments Proximities Sample Information ... · PDF fileunderground pipeline crossing ... crossings, encroachments & proximities sample information guide ... encroachments

SECTION M

This section shows a sample plan for houses proposed in proximity toof plan is suggested for each house proximity

CROSSINGS, ENCROACHMENTS & PROXIMITIESSAMPLE INFORMATION GUIDE

This section shows a sample plan for houses proposed in proximity to AltaLink’s right of way. This typeeach house proximity notification.

CROSSINGS, ENCROACHMENTS & PROXIMITIESSAMPLE INFORMATION GUIDE

’s right of way. This type

Page 18: Crossings Encroachments Proximities Sample Information ... · PDF fileunderground pipeline crossing ... crossings, encroachments & proximities sample information guide ... encroachments

SECTION N

If a house is proposed within the horizontal setback distanceshould be submitted with the notificationfacilities to be located in the lot.

CROSSINGS, ENCROACHMENTS & PROXIMITIESSAMPLE INFORMATION GUIDE

If a house is proposed within the horizontal setback distance AltaLink provided, then this type of plannotification. This plan should detail the house’s maximum height, and

CROSSINGS, ENCROACHMENTS & PROXIMITIESSAMPLE INFORMATION GUIDE

provided, then this type of plan. This plan should detail the house’s maximum height, and all

Page 19: Crossings Encroachments Proximities Sample Information ... · PDF fileunderground pipeline crossing ... crossings, encroachments & proximities sample information guide ... encroachments

SECTION O

This section shows a sample plan which isnotification.

CROSSINGS, ENCROACHMENTS & PROXIMITIESSAMPLE INFORMATION GUIDE

This section shows a sample plan which is suggested for each temporary workspace proximity

CROSSINGS, ENCROACHMENTS & PROXIMITIESSAMPLE INFORMATION GUIDE

for each temporary workspace proximity

Page 20: Crossings Encroachments Proximities Sample Information ... · PDF fileunderground pipeline crossing ... crossings, encroachments & proximities sample information guide ... encroachments

SECTION P

This section shows a sample plan which is suggestedutilities clearly and any extra right of way that is purchased for road widening (if applicable).

CROSSINGS, ENCROACHMENTS & PROXIMITIESSAMPLE INFORMATION GUIDE

suggested for each road widening request in proximity to AltaLink lines. This plan should show allutilities clearly and any extra right of way that is purchased for road widening (if applicable).

lines. This plan should show all