H PItemDescripcinUnd.MetradoPrecio (S/.)Parcial (S/.)Falso01COMPONENTE PAVIMENTACION DE VIAS84,727.58Falso01.01TRABAJOS PRELIMINARES2,062.16Falso01.01.01ALQUILER DE LOCAL PARA ALAMACEN Y OFICINAmes4.00200.00800.00Falso01.01.02CARTEL DE OBRAund1.00500.00500.00Falso01.01.03TRAZO, NIVELACION Y REPLANTEOM.L148.281.84274.32Falso01.01.04TRAZO, NIVELACION Y REPLANTEO DURANTE EL PROCESOM.L296.561.65501.19Falso01.02DEMOLISION DE PAVIMENTOSFalso01.02.01DEMOLISION DE PAVIMENTOS ANTIGUOS CON EQUIPOm3197.6912.852,562.06Falso01.03EXPLANACIONESFalso01.03.01CORTE EN MATERIAL SUELTOm3274.996.171,702.19Falso01.04SUB BASES Y BASESFalso01.04.01SUB - BASE GRANULARm3246.7036.018,883.67Falso01.05PAVIMENTO HIDRAULICOFalso01.05.01ENCOFRADO Y DESENCOFRADO DE LOSASm223.2226.98636.23Falso01.05.02CONCRETO FC=210 KG/CM2 EN LOSA H=0.20 MTSm3107.26338.2836,644.31Falso01.05.03ACERO DE REFUERZO TRANSVERSAL DE 1/2"kg293.766.751,988.76Falso01.05.04ACABADO Y FROTACHADO DE LOSASm2531.975.502,984.35Falso01.05.05JUNTA DE DILATACINm142.634.90713.15Falso01.06SARDINEL Y CUNETA DE CONCRETOFalso01.06.01SARDINELES TIPO I, H=0.20m293.1326.997,911.58Falso01.06.02CUNETAS DE CONCRETO TIPO Im144.5245.756,611.79Falso01.06.03RAMPAS DE CONCRETO F'C=175 KG/CM2m215.9147.65769.09Falso01.07TRANSPORTEFalso01.07.01TRANSPORTE DE ELIMINACION DE MATERIAL A DME para d 1 kmm31,931.921.893,651.33Falso01.08SEALIZACIONFalso01.08.01SEALIZACION VERTICALund7.00304.622,146.76Falso01.08.02PINTURA EN SARDINELm287.947.44669.22Falso01.09ENSAYOS DE CONTROL DE CALIDADFalso01.09.01DISEO DE MEZCLAund3.00250.00750.00Falso01.09.02ENSAYO DE COMPACTACION DE BASE Y SUB BASEund8.0036.02288.16Falso01.09.03ROTURA DE PROBETAS CILINDRICAS DE CONCRETOund37.0015.00555.00Falso01.09.04ENSAYO DE PROCTOR MODIFICADOund2.0075.12150.24Falso01.10VARIOSFalso01.10.01REPARACION DE SISTEMAS DE RED DE DESAGUEGLB1.00800.00800.00Falso01.10.02REPARACION DE SISTEMAS DE RED DE AGUA POTABLEGLB1.00400.00400.00Falso01.10.03LIMPIEZA GENERAL DE LA OBRAGLB1.00545.60625.60Falso01.10.04PLACA RECORDATORIAund1.00359.38359.38Falso02DRENAJE PLUVIALFalso02.01TRABAJOS PRELIMINARESFalso02.01.01TRAZO Y REPLANTEO PRELIMINARm38.641.2147.91Falso02.01.02TRAZO Y REPLANTEO DURANTE PROCESO DE CONSTRUCCIONm77.291.57124.44Falso02.01.03DEMOLICION DE ELEMENTOS DE CONCRETO SIMPLEm38.1058.27476.12Falso02.02MOVIMIENTO DE TIERRASFalso02.02.01EXCAVACION DE ZANJA EN TERRENO NORMALm367.1911.34856.67Falso02.02.02EXCAVACION DE ZANJA MANUAL EN TERRENO COMPACTO PARA TUBERIAm39.615.8363.62Falso02.02.03REFINE Y PERFILADO EN TERRENO NORMALm2200.380.50114.22Falso02.02.04RIEGO Y COMPACTACION DE TERRENOm25.243.0016.61Falso02.02.05CAMA DE ARENA MANUALP/ZANJA TUBO DN 400 MMm38.6414.99584.24Falso02.02.06RELLENO COMPACTADO FINAL DE ZANJAS TUB. 15" H= VARIABLEm357.6516.09988.12Falso02.02.07ELIMINACION DE MATERIAL EXCED. +25% DE ESPONJ.m323.956.13166.93Falso02.02.08TABLESCADO DE ZANJA EN TERRENOS INESTABLESm280.0021.511,775.20Falso02.03OBRAS DE CONCRETO SIMPLEFalso02.03.01SOLADO DE BASE E= 3"m23.9717.2769.79Falso02.03.02CONCRETO F'C= 140 KG/CM2m31.54285.11443.29Falso02.04OBRAS DE CONCRETO ARMADOFalso02.04.01ENCOFRADO Y DESENCOFRADO DE MUROSm210.3927.65295.80Falso02.04.02CONCRETO FC=210 KG/CM2m30.99361.67361.3802.04.03ACERO F'Y=4200 KG/CM2kg58.934.66275.2002.04.04BUZON TIPO I (DI=1.20)/TN/H=2.50und1.002,107.362,140.9602.05INSTALACION DE TUBERAS02.05.01SUMINISTRO E INSTALACION TUBERIA PERFILADA DE PVC DN 250 mmm38.6459.272,290.9702.05.02SUMINISTRO E INSTALACION DE TAPAS METALICAS S/DISEOund1.00170.21171.2403VEREDAS PEATONALES03.01TRABAJOS PRELIMINARES03.01.01TRAZO, NIVELACION Y REPLANTEOm2382.121.09424.1503.01.02TRAZO, NIVELACION Y REPLANTEO DURANTE EJECUCION DE PROYECTOm2764.230.87687.8103.02MOVIMIENTO DE TIERRAS03.02.01EXCAVACION A NIVEL DE SUB RAZANTEm376.4211.12955.2503.02.02ELIMINACION DE MATERIAL EXCEDENTE EXCED. +25%, MANUAL L=40Mm395.536.13665.8403.03BASE GRANULAR03.03.01BASE GRANULAR EN VEREDASm395.5319.551,867.6103.04VEREDAS PEATONALES03.04.01ENCOFRADO Y DESENCOFRADO DE VEREDAS H=.10Mm210.8917.34192.3203.04.02CONCRETO F'C=175 KG/CM2m322.09321.527,164.0103.04.03ENCHAPADO DE PIEDRA LAJA NATURAL Emax=2"m2353.5164.9223,529.6303.04.04TUBERIA DE PVC SAL EN VEREDAS 2"pto33.0010.72359.0403.04.05JUNTAS DE DILATACIN EN VEREDASm108.903.04339.7704RED DE DISTRIBUCION DE AGUA POTABLE (SUSTITUCION) UF04.01TRABAJOS PRELIMINARES04.01.01TRAZO Y REPLANTEO INICIALm229.061.63380.2404.01.02CINTA PLSTICA SEALIZADOTA P/LIMITE SEGURIDAD DE OBRAML351.322.19783.4404.01.03PUENTE DE MADERA PASE PEATONAL SOBRE ZANJA PROVISIONALund4.0032.16128.6404.02MOVIMIENTO DE TIERRAS04.02.01EXCAVACION DE ZANJA EN TERRENO NORMALm3208.8411.342,662.7104.02.02REFINE Y NIVELACION ZANJA TUB. 3-4"m229.060.57146.6004.02.03CAMA DE APOYO PARA TUBERIAS 3-4"ML229.0610.432,428.0404.02.04RELLENO COMP. INICIAL C/MAT. ZARANDEADO TUB. 3-4"ML229.062.74657.4004.02.05RELLENO CON MATERIAL PROPIOm3162.2210.051,714.6704.02.06ELIMINACION DE MATERIAL EXCED. +25% DE ESPONJ.m358.276.13406.1404.03OBRAS DE CONCRETO SIMPLE04.03.01CONCRETO F'C= 140 KG/CM2, PARA ANCLAJES Y/O DADOSm30.45285.11129.5304.04INSTALACION Y PROVISION DE TUBERIAS04.04.01INST. Y PROV. TUBERIA PVC UF PN 10 DN 110 MMML58.2222.271,297.1404.04.02INST. Y PROV. TUBERIA PVC UF PN 7.5 DN 90 MM 3"ML135.0016.232,192.4004.05INSTALACION Y PROVISION DE ACCESORIOS04.05.01INST. Y PROV. DE TEE PVC SAP UF DN 110 MM(4")und2.0073.75147.9004.05.02INST. Y PROV. DE REDUCCION HM PVC SAP UF DN 110-90 MM (4-3")und2.0039.8380.0004.05.03INST. Y PROV. DE VALVULA MAZZA ISO DN 110 MM (4")und1.00391.37392.4004.05.04INST. Y PROV. DE VALVULA MAZZA ISO DN 90 (3")und1.00368.37369.4004.05.05INST. Y PROV. DE CODO 22.50 PVC SAP UF DN 110 MM(4")und1.0034.8335.0004.05.06INST. Y PROV. DE TAPON PVC SAP UF DN 90 MM(3")und2.0024.1248.6404.05.07INST. Y PROV. DE VALVULA DE PURGAund1.002,262.762,271.4004.06CONEXIONES DOMICILIARIAS04.06.01INSTALACION DOMICILIARIA DE AGUA POTABLE RED MATRIZ 110 MMund6.00172.911,037.4604.06.02INSTALACION DOMICILIARIA DE AGUA POTABLE RED MATRIZ 90 MMund16.00164.412,630.5604.06.03RED DE DISTRIBUCION TUBERIA DE 1/2" PVC SAP PARA CONEXIONES DOMICILIARIASm53.409.44512.6404.07PRUEBAS Y ENSAYOS04.07.01PRUEBA HIDRAULICA Y DESINFECCION EN RED TUB. 4-6" ZANJA TAPADAML351.321.30470.7704.08VARIOS04.08.01DESMONTAJE Y RETIRO DE TUBERIA DE FFM.L58.221.0065.7904.08.02DESMONTAJE Y RETIRO DE CONEXIONES DOMICILIARIAS DE AGUA POTABLEund20.007.40159.2005RED DE DESAGUE 200mm (CONSTRUCCION)05.01OBRAS PROVISIONALES05.01.01TRAZO, NIVELACION Y REPLANTEOM.L275.541.84509.7505.01.02CINTA SEALIZADORA P/LIMITE SEGURIDAD DE OBRAm429.361.21523.8205.01.03TRANQUERA MADERA 2.40 X 1.20 ML PARA SEALIZACINund2.0099.83208.0605.01.04TRAZO, NIVELACION Y REPLANTEO PARA ALCANTARILLADOM.L429.871.01442.7705.02MOVIMIENTO DE TIERRAS05.02.01EXCAVACION DE ZANJA MANUAL EN TERRENO COMPACTO PARA TUBERIAm3356.435.832,359.5705.02.02EXCAVACION DE ZANJAS PARA BUZONESm324.7210.00281.8105.02.03REFINE Y NIVELACION DE FONDO DE ZANJA P/TUBO DN 200 MMM.L266.500.35106.6005.02.04REFINE Y PERFILADO DE BUZONESm272.000.4738.8805.02.05CAMA DE ARENA MANUALP/ZANJA TUBO DN 200 MMM.L266.5013.243,563.1105.02.06RELLENO COMPACTADO FINAL DE ZANJAS TUB. 8-10" H= VARIABLEm3292.3010.053,089.6105.02.07ELIMINACION DE MATERIAL EXCED. +25% DE ESPONJ.m380.166.13558.7205.02.08TABLESCADO DE ZANJA EN TERRENOS INESTABLESm240.0021.51887.6005.03TUBERIAS05.03.01TUBERIA UPVC 200 mmM.L204.9034.357,050.6105.04OBRAS DE CONCRETO SIMPLE05.04.01CONCRETO F'C= 140 KG/CM2m31.69285.11486.4705.05BUZONES DE CONCRETO05.05.01BUZON TIPO I (DI=1.20)/TN/H=2.00und6.001,696.4310,279.3805.05.02BUZON TIPO I (DI=1.20)/TN/H=4.00und1.002,869.572,903.1705.06ENSAYOS DE CONTROL DE CALIDAD05.06.01PRUEBAS DE COMPACTACION DE BASEund6.0045.24271.4405.06.02PRUEBA HIDRAULICA + ESCORRENTIA TUBERIA DN 200 MM ZANJA TAPADAM.L204.902.44499.9605.07CONEXION DOMICILIARIA - DESAGUE05.07.01INSTALACION DOMICILIARIA DE ALCANTARILLADOund24.00159.863,902.4005.07.02SUMINISTRO E INSTALACION TUBERIA DESAGUE S20 U.F. DN 160 MMM.L61.6025.021,543.08
Cronograma valorizadoFORMATO 10 - CRONOGRAMA DE AVANCE DE OBRA VALORIZADOPROYECTOMEJORAMIENTO JR. AYACUCHO DE PUEBLO VIEJO - LIRCAY, PROVINCIA DE ANGARAES HUANCAVELICACOMPONENTE01 DEFENSA RIBEREACONSULTORING. HOOVER HUERTA DEXTREUBICACINLUGAR : PUEBLO VIEJO DISTRITO: LIRCAY PROVINCIA: ANGARAES DEPARTAMENTO DE HUANCAVELICAFECHA6/22/10ItemP A R T I D A SUnidadMetradoCUPrecioP E R I O D O DE E J E C U C I O NTOTALJUNIOJULIOAGOSTO1ERA SEM2DA SEM3ra SEM4ta SEM5ta SEM6ta SEM7ma SEM8va SEM9na SEM10ma SEM11ma SEM12ma SEM13ra SEM14ta SEM01COMPONENTE PAVIMENTACION DE VIAS001.01TRABAJOS PRELIMINARES01.01.01ALQUILER DE LOCAL PARA ALAMACEN Y OFICINAmes4.00200.00800.0073.4791.8491.8491.8491.8491.8491.8491.8483.65800800.00001.01.02CARTEL DE OBRAund1.00500.00500.00500500500.00001.01.03TRAZO, NIVELACION Y REPLANTEOM.L148.281.84274.32274.32274.32274.32001.01.04TRAZO, NIVELACION Y REPLANTEO DURANTE EL PROCESOM.L296.561.65501.19469.8731.32501.19501.19001.02DEMOLISION DE PAVIMENTOS00.00001.02.01DEMOLISION DE PAVIMENTOS ANTIGUOS CON EQUIPOm3197.6912.852,562.06427.012,135.052562.062562.06001.03EXPLANACIONES00.00001.03.01CORTE EN MATERIAL SUELTOm3274.996.171,702.19904.29797.91702.191702.19001.04SUB BASES Y BASES00.000.000.000.00001.04.01SUB - BASE GRANULARm3246.7036.018,883.671,110.464,997.062,776.158883.678883.67001.05PAVIMENTO HIDRAULICO00.00001.05.01ENCOFRADO Y DESENCOFRADO DE LOSASm223.2226.98636.23636.23636.23636.23001.05.02CONCRETO FC=210 KG/CM2 EN LOSA H=0.20 MTSm3107.26338.2836,644.3118,322.1618,322.1536644.3136644.31001.05.03ACERO DE REFUERZO TRANSVERSAL DE 1/2"kg293.766.751,988.761,988.761988.761988.76001.05.04ACABADO Y FROTACHADO DE LOSASm2531.975.502,984.351,492.181,492.172984.352984.35001.05.05JUNTA DE DILATACINm142.634.90713.15178.29534.86713.15713.15001.06SARDINEL Y CUNETA DE CONCRETO00.00001.06.01SARDINELES TIPO I, H=0.20m293.1326.997,911.58847.673,178.763,178.76706.397911.587911.58001.06.02CUNETAS DE CONCRETO TIPO Im144.5245.756,611.793,305.903,305.896611.796611.79001.06.03RAMPAS DE CONCRETO F'C=175 KG/CM2m215.9147.65769.09769.09769.09769.09001.07TRANSPORTE00.00001.07.01TRANSPORTE DE ELIMINACION DE MATERIAL A DME para d 1 kmm31931.921.893,651.333,651.333651.333651.33001.08SEALIZACION00.00001.08.01SEALIZACION VERTICALund7.00304.622,146.762,146.762146.762146.76001.08.02PINTURA EN SARDINELm287.947.44669.22501.92167.3669.22669.22001.09ENSAYOS DE CONTROL DE CALIDAD00.00001.09.01DISEO DE MEZCLAund3.00250.00750.00750750750.00001.09.02ENSAYO DE COMPACTACION DE BASE Y SUB BASEund8.0036.02288.16288.16288.16288.16001.09.03ROTURA DE PROBETAS CILINDRICAS DE CONCRETOund37.0015.00555.00312.19242.81555555.00001.09.04ENSAYO DE PROCTOR MODIFICADOund2.0075.12150.24150.24150.24150.24001.10VARIOS00.00001.10.01REPARACION DE SISTEMAS DE RED DE DESAGUEGLB1.00800.00800.00800800800.00001.10.02REPARACION DE SISTEMAS DE RED DE AGUA POTABLEGLB1.00400.00400.00400400400.00001.10.03LIMPIEZA GENERAL DE LA OBRAGLB1.00545.60625.60469.2156.40625.6625.60001.10.04PLACA RECORDATORIAund1.00359.38359.38359.38359.38359.38002DRENAJE PLUVIAL00.00002.01TRABAJOS PRELIMINARES00.00002.01.01TRAZO Y REPLANTEO PRELIMINARm38.641.2147.9147.9147.9147.91002.01.02TRAZO Y REPLANTEO DURANTE PROCESO DE CONSTRUCCIONm77.291.57124.44124.44124.44124.44002.01.03DEMOLICION DE ELEMENTOS DE CONCRETO SIMPLEm38.1058.27476.12476.12476.12476.12002.02MOVIMIENTO DE TIERRAS00.00002.02.01EXCAVACION DE ZANJA EN TERRENO NORMALm367.1911.34856.67455.11401.56856.67856.67002.02.02EXCAVACION DE ZANJA MANUAL EN TERRENO COMPACTO PARA TUBERIAm39.615.8363.6263.6263.6263.62002.02.03REFINE Y PERFILADO EN TERRENO NORMALm2200.380.50114.22114.22114.22114.22002.02.04RIEGO Y COMPACTACION DE TERRENOm25.243.0016.6116.6116.6116.61002.02.05CAMA DE ARENA MANUALP/ZANJA TUBO DN 400 MMm38.6414.99584.24584.24584.24584.24002.02.06RELLENO COMPACTADO FINAL DE ZANJAS TUB. 15" H= VARIABLEm357.6516.09988.12988.12988.12988.12002.02.07ELIMINACION DE MATERIAL EXCED. +25% DE ESPONJ.m323.956.13166.93125.241.73166.93166.93002.02.08TABLESCADO DE ZANJA EN TERRENOS INESTABLESm280.0021.511,775.201,775.201775.21775.20002.03OBRAS DE CONCRETO SIMPLE00.00002.03.01SOLADO DE BASE E= 3"m23.9717.2769.7969.7969.7969.79002.03.02CONCRETO F'C= 140 KG/CM2m31.54285.11443.29443.29443.29443.29002.04OBRAS DE CONCRETO ARMADO00.00002.04.01ENCOFRADO Y DESENCOFRADO DE MUROSm210.3927.65295.80295.8295.8295.80002.04.02CONCRETO FC=210 KG/CM2m30.99361.67361.38361.38361.38361.38002.04.03ACERO F'Y=4200 KG/CM2kg58.934.66275.20275.2275.2275.20002.04.04BUZON TIPO I (DI=1.20)/TN/H=2.50und1.002107.362,140.96802.861,338.102140.962140.96002.05INSTALACION DE TUBERAS00.00002.05.01SUMINISTRO E INSTALACION TUBERIA PERFILADA DE PVC DN 250 mmm38.6459.272,290.972,290.972290.972290.97002.05.02SUMINISTRO E INSTALACION DE TAPAS METALICAS S/DISEOund1.00170.21171.24171.24171.24171.24003VEREDAS PEATONALES0.00003.01TRABAJOS PRELIMINARES0.00003.01.01TRAZO, NIVELACION Y REPLANTEOm2382.121.09424.15424.15424.15424.15003.01.02TRAZO, NIVELACION Y REPLANTEO DURANTE EJECUCION DE PROYECTOm2764.230.87687.81573.18114.63687.81687.81003.02MOVIMIENTO DE TIERRAS0.00003.02.01EXCAVACION A NIVEL DE SUB RAZANTEm376.4211.12955.25358.22597.03955.25955.25003.02.02ELIMINACION DE MATERIAL EXCEDENTE EXCED. +25%, MANUAL L=40Mm395.536.13665.84332.92332.92665.84665.84003.03BASE GRANULAR0.00003.03.01BASE GRANULAR EN VEREDASm395.5319.551,867.611,867.611867.611867.61003.04VEREDAS PEATONALES0.00003.04.01ENCOFRADO Y DESENCOFRADO DE VEREDAS H=.10Mm210.8917.34192.32144.2448.08192.32192.32003.04.02CONCRETO F'C=175 KG/CM2m322.09321.527,164.017,164.017164.017164.01003.04.03ENCHAPADO DE PIEDRA LAJA NATURAL Emax=2"m2353.5164.9223,529.631,604.2912,032.209,893.1423529.6323529.63003.04.04TUBERIA DE PVC SAL EN VEREDAS 2"pto33.0010.72359.04359.04359.04359.04003.04.05JUNTAS DE DILATACIN EN VEREDASm108.903.04339.77339.77339.77339.77004RED DE DISTRIBUCION DE AGUA POTABLE (SUSTITUCION) UF0.00004.01TRABAJOS PRELIMINARES0.00004.01.01TRAZO Y REPLANTEO INICIALm229.061.63380.24380.24380.24380.24004.01.02CINTA PLSTICA SEALIZADOTA P/LIMITE SEGURIDAD DE OBRAML351.322.19783.44734.4848.96783.44783.44004.01.03PUENTE DE MADERA PASE PEATONAL SOBRE ZANJA PROVISIONALund4.0032.16128.64128.64128.64128.64004.02MOVIMIENTO DE TIERRAS0.00004.02.01EXCAVACION DE ZANJA EN TERRENO NORMALm3208.8411.342,662.711,248.151,414.562662.712662.71004.02.02REFINE Y NIVELACION ZANJA TUB. 3-4"m229.060.57146.6091.6354.97146.6146.60004.02.03CAMA DE APOYO PARA TUBERIAS 3-4"ML229.0610.432,428.042,428.042428.042428.04004.02.04RELLENO COMP. INICIAL C/MAT. ZARANDEADO TUB. 3-4"ML229.062.74657.40575.2282.18657.4657.40004.02.05RELLENO CON MATERIAL PROPIOm3162.2210.051,714.671,500.34214.331714.671714.67004.02.06ELIMINACION DE MATERIAL EXCED. +25% DE ESPONJ.m358.276.13406.14406.14406.14406.14004.03OBRAS DE CONCRETO SIMPLE0.00004.03.01CONCRETO F'C= 140 KG/CM2, PARA ANCLAJES Y/O DADOSm30.45285.11129.53129.53129.53129.53004.04INSTALACION Y PROVISION DE TUBERIAS0.00004.04.01INST. Y PROV. TUBERIA PVC UF PN 10 DN 110 MMML58.2222.271,297.14324.29972.851297.141297.14004.04.02INST. Y PROV. TUBERIA PVC UF PN 7.5 DN 90 MM 3"ML135.0016.232,192.402,192.402192.42192.40004.05INSTALACION Y PROVISION DE ACCESORIOS0.00004.05.01INST. Y PROV. DE TEE PVC SAP UF DN 110 MM(4")und2.0073.75147.90147.9147.9147.90004.05.02INST. Y PROV. DE REDUCCION HM PVC SAP UF DN 110-90 MM (4-3")und2.0039.8380.00808080.00004.05.03INST. Y PROV. DE VALVULA MAZZA ISO DN 110 MM (4")und1.00391.37392.40392.4392.4392.40004.05.04INST. Y PROV. DE VALVULA MAZZA ISO DN 90 (3")und1.00368.37369.40369.4369.4369.40004.05.05INST. Y PROV. DE CODO 22.50 PVC SAP UF DN 110 MM(4")und1.0034.8335.00353535.00004.05.06INST. Y PROV. DE TAPON PVC SAP UF DN 90 MM(3")und2.0024.1248.6448.6448.6448.64004.05.07INST. Y PROV. DE VALVULA DE PURGAund1.002262.762,271.402,271.402271.42271.40004.06CONEXIONES DOMICILIARIAS0.00004.06.01INSTALACION DOMICILIARIA DE AGUA POTABLE RED MATRIZ 110 MMund6.00172.911,037.461,037.461037.461037.46004.06.02INSTALACION DOMICILIARIA DE AGUA POTABLE RED MATRIZ 90 MMund16.00164.412,630.562,630.562630.562630.56004.06.03RED DE DISTRIBUCION TUBERIA DE 1/2" PVC SAP PARA CONEXIONES DOMICILIARIASm53.409.44512.64512.64512.64512.64004.07PRUEBAS Y ENSAYOS0.00004.07.01PRUEBA HIDRAULICA Y DESINFECCION EN RED TUB. 4-6" ZANJA TAPADAML351.321.30470.77470.77470.77470.77004.08VARIOS0.00004.08.01DESMONTAJE Y RETIRO DE TUBERIA DE FFM.L58.221.0065.7965.7965.7965.79004.08.02DESMONTAJE Y RETIRO DE CONEXIONES DOMICILIARIAS DE AGUA POTABLEund20.007.40159.20159.2159.2159.20005RED DE DESAGUE 200mm (CONSTRUCCION)0.00005.01OBRAS PROVISIONALES0.00005.01.01TRAZO, NIVELACION Y REPLANTEOM.L275.541.84509.75509.75509.75509.75005.01.02CINTA SEALIZADORA P/LIMITE SEGURIDAD DE OBRAm429.361.21523.82523.82523.82523.82005.01.03TRANQUERA MADERA 2.40 X 1.20 ML PARA SEALIZACINund2.0099.83208.06208.06208.06208.06005.01.04TRAZO, NIVELACION Y REPLANTEO PARA ALCANTARILLADOM.L429.871.01442.77442.77442.77442.77005.02MOVIMIENTO DE TIERRAS0.00005.02.01EXCAVACION DE ZANJA MANUAL EN TERRENO COMPACTO PARA TUBERIAm3356.435.832,359.57516.161,659.07184.342359.572359.57005.02.02EXCAVACION DE ZANJAS PARA BUZONESm324.7210.00281.81140.91140.9281.81281.81005.02.03REFINE Y NIVELACION DE FONDO DE ZANJA P/TUBO DN 200 MMM.L266.500.35106.6039.9866.62106.6106.60005.02.04REFINE Y PERFILADO DE BUZONESm272.000.4738.8838.8838.8838.88005.02.05CAMA DE ARENA MANUALP/ZANJA TUBO DN 200 MMM.L266.5013.243,563.112,850.49712.623563.113563.11005.02.06RELLENO COMPACTADO FINAL DE ZANJAS TUB. 8-10" H= VARIABLEm3292.3010.053,089.613,089.613089.613089.61005.02.07ELIMINACION DE MATERIAL EXCED. +25% DE ESPONJ.m380.166.13558.72558.72558.72558.72005.02.08TABLESCADO DE ZANJA EN TERRENOS INESTABLESm240.0021.51887.60665.7221.9887.6887.60005.03TUBERIAS0.00005.03.01TUBERIA UPVC 200 mmM.L204.9034.357,050.617,050.617050.617050.61005.04OBRAS DE CONCRETO SIMPLE00.000.000.000.00005.04.01CONCRETO F'C= 140 KG/CM2m31.69285.11486.47486.47486.47486.47005.05BUZONES DE CONCRETO00.00005.05.01BUZON TIPO I (DI=1.20)/TN/H=2.00und6.001696.4310,279.38513.975,782.153,983.2610279.3810279.38005.05.02BUZON TIPO I (DI=1.20)/TN/H=4.00und1.002869.572,903.172,177.38725.792903.172903.17005.06ENSAYOS DE CONTROL DE CALIDAD0.00005.06.01PRUEBAS DE COMPACTACION DE BASEund6.0045.24271.44271.44271.44271.44005.06.02PRUEBA HIDRAULICA + ESCORRENTIA TUBERIA DN 200 MM ZANJA TAPADAM.L204.902.44499.96499.96499.96499.96005.07CONEXION DOMICILIARIA - DESAGUE0.00005.07.01INSTALACION DOMICILIARIA DE ALCANTARILLADOund24.00159.863,902.403,902.403902.43902.40005.07.02SUMINISTRO E INSTALACION TUBERIA DESAGUE S20 U.F. DN 160 MMM.L61.6025.021,543.081,543.081543.081543.080COSTO DIRECTO193,452.581,274.808,820.7617,694.8614,998.2222,519.4415,883.525,170.908,267.6613,302.6129,750.8528,630.7012,210.4914,264.30663.47193452.58193452.580GASTOS GENERALES12.88%24,924.00164.241,136.452,279.771,932.342,901.352,046.40666.211,065.191,713.883,833.033,688.721,573.171,837.7885.482492424924.0000.000COSTO TOTAL218,376.581,439.049,957.2119,974.6316,930.5625,420.7917,929.925,837.119,332.8515,016.4933,583.8832,319.4213,783.6616,102.08748.95218376.58218376.580COSTO EXPEDIENTE TECNICOPROCENTAJE DE AVANCE FISICO FINANCIERO SEMANAL100.000%0.659%4.560%9.147%7.753%11.641%8.211%2.673%4.274%6.876%15.379%14.800%6.312%7.374%0.343%PROCENTAJE DE AVANCE FISICO FINANCIERO ACUMULADO100.000%0.659%5.219%14.365%22.118%33.759%41.970%44.643%48.916%55.793%71.172%85.972%92.283%99.657%100.000%