CROFTON AREA HIGH SCHOOL ADDENDUM NO. 002 2291 DAVIDSONVILLE ROAD DATE: JULY 17, 2017 GAMBRILLS, MD 21114 PAGE 1 OF 7

GWWO, INC./ARCHITECTS 800 WYMAN PARK DRIVE, SUITE 300 BALTIMORE, MARYLAND 21211 410-332-1009 GWWO PROJECT NO. 16014 GENERAL INFORMATION: This Addendum forms a part of the Contract Documents and modifies the original Bidding Documents dated June 5, 2017, as noted below. Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to acknowledge addendum may disqualify Bidder. Changes to Specifications: All revisions are noted below. Where a change to a specification is limited, it is described as text only in the document below. Where a change to a specification is extensive, the section is reissued. Reissued sections are noted as such in the document below. Changes to Drawings: Revisions which modify scope and/or provide additional information to the contractor are clouded, marked with delta 2 on the drawing, and additionally noted in the document below. CHANGES TO SPECIFICATIONS:

Addendum Item No.

Description

AD2.001 SECTION: 01 1010 – SCOPES OF WORK, Part 3, BP 2A, New Scope Item #2A-98 Please refer to 2A Addendum #1, item AD1.019, add the following scope paragraph to specification 01 10 10: ADD: 2A scope item #2A-98: BP 2B will furnish and install the grandstand/bleacher systems in their entirety, including but not limited to the Home & Visitor grandstands at the football stadium, the bleachers at the softball, baseball, and MP5 fields. BP 2B will furnish and install all footings shown on drawing C3.6; BP 2A will provide all concrete/asphalt flat work under the bleachers shown on drawings C3.7 and C6.4 that BP 2B will anchor their bleachers into. BP 2B will furnish & install all fencing and gates that is/are connected directly to the grandstand/bleacher structure or makes up the guardrail system of the grandstand/bleachers as shown on drawings C3.6, C3.7 & C3.8; BP 2A will provide all fencing that is adjacent to the grandstands/bleachers and will make any final connections/tie-in of 2A fencing into the 2B grandstand/bleacher fencing.

AD2.002 SECTION: 01 1010 – SCOPES OF WORK, Part 3, BP 2A, Scope Item #2A-64 REVISE the fifth sentence of the paragraph as follows: “The Owners turf vendor will also provide the concrete/asphalt subbase for the track & field events in the artificial turf field that require rubber track surfacing (high jump, long jump, & pole vault, etc), BP 2A will install the rubber surfacing/stripping for these track & field events. BP 2A will coordinate this effort with the Owners turf vendor. BP 2A will install the asphalt running track and rubber track surfacing and stripping in its entirety”.

Page 3: CROFTON AREA HIGH SCHOOL ADDENDUM NO. 002bids.urbanzink.com/croftonhs/Addendum 2/18CN-008-001_Addendum_… · CROFTON AREA HIGH SCHOOL ADDENDUM NO. 002 ... REVISE the fifth sentence

CROFTON AREA HIGH SCHOOL ADDENDUM NO. 002 2291 DAVIDSONVILLE ROAD DATE: JULY 17, 2017 GAMBRILLS, MD 21114 PAGE 2 OF 7

AD2.003 SECTION: 01 1010 – SCOPES OF WORK, Part 3, BP 2A, Scope Item #2A-01 DELETE the reference #14 for specification 23 1123 “Natural Gas Piping”.

AD2.004 SECTION: 01 1010 – SCOPES OF WORK, Part 3, BP 2A, Scope Item #2A-19 REVISE replace the last sentence of this paragraph with the following sentence: “Any additional SCE’s required by the AHJ/SCI shall be compensated for via the unit rate Allowance Specification Section 01 2100”.

AD2.005 SECTION: 01 2100 – ALLOWANCES, Item #2A-08 DELETE the last sentence of this paragraph. “If materials are still suitable as required by contract, Contractor may re-use SCE materials from previously removed SCE’s associated with this allowance, but Contractor must assume for bidding purposes that a minimum of four (4) SCE’s of these eight additional SCE’s could be installed simultaneously at any given time throughout the duration of the Work”.

AD2.006 SECTION: 01 1010 – SCOPES OF WORK, Part 3, BP 2A, Scope Item #2A-35 ADD the following sentence to the end of the paragraph: “2A contractors are advised that the site has three (3) phases as per the Sequence of Construction on drawings C1.0 and Contract Schedule per Specification 01 3213, thus 2A must establish their own cut/fill and import/export quantities per each phase and cannot assume that they will use fill material from Phases B or C to complete fills in Phase A or vice versa”.

AD2.007 SECTION: 01 1010 – SCOPES OF WORK, Part 3, BP 2A, Scope Item #2A-37 REVISE the last sentence of the paragraph to read as follows: “In addition to any test pits 2A performs for proctor samples, 2A may be required to perform exploratory test pits by the CM at locations where proof rolling tests fail to determine the cause & extent of the problem, and 2A will backfill the pits upon completion of the testing; 2A will be compensated for these exploratory test pits via the Unit Rate Allowance # 2A-01”.

AD2.008 SECTION: 01 1010 – SCOPES OF WORK, Part 3, BP 2A, Scope Item #2A-36 ADD the following second bullet to this paragraph: “As regards to moisture conditioning by chemical means (addition of soil additives such as lime, calciment, Portland cement, kiln dust, etc.) only, of soils at or below design subgrade only, if the T&I PE, CM & Owner determine that the subgrade soils have excessive moisture content through no fault of the 2A prime and that the only option remaining to 2A to dry soils at or below design subgrade, after more standard methods of mechanical drying (scarifying/loosening, disking, aeration, etc.) have been investigated & exhausted, is chemical drying, then the 2A prime shall be compensated via contract allowance or change order, based on a negotiated unit rate or on a time and materials basis. As with any compensable change work, the 2A prime may only proceed with chemical drying of soils at or below design subgrade if directed by the Owner & CM via written Field Work Directive. The 2A prime will not be compensated for chemical drying if soils at or below design subgrade at specific locations have been obviously mistreated by the 2A prime (i.e. subgrade soils have been left at grades that allow ponding, have not been compacted/sealed off/sloped to drain, have not been covered by stone roads & lots as per the Construction Schedule where required by the Site Access Plan, have been used as 2A site access/transport lanes by the 2A prime without protective stone,

Page 4: CROFTON AREA HIGH SCHOOL ADDENDUM NO. 002bids.urbanzink.com/croftonhs/Addendum 2/18CN-008-001_Addendum_… · CROFTON AREA HIGH SCHOOL ADDENDUM NO. 002 ... REVISE the fifth sentence

CROFTON AREA HIGH SCHOOL ADDENDUM NO. 002 2291 DAVIDSONVILLE ROAD DATE: JULY 17, 2017 GAMBRILLS, MD 21114 PAGE 3 OF 7

etc.). All cut soils remain wholly unclassified; all moisture conditioning of any kind required in order to utilize any cut soils as structural fill remains work by the 2A prime, whether that cut is being used as on-site fill or exported to be used as fill on any other site; the 2A prime will not be compensated for any moisture conditioning of any soils that have previously been placed as fill by the 2A prime”.

AD2.009 SECTION: 01 1010 – SCOPES OF WORK, Part 3, BP 2A, Scope Item #2A-30 ADD drawing numbers “E0.2 and E0.4” to the list of drawings in the first sentence of this paragraph.

AD2.010 SECTION: 32 8400 – IRRIGATION SYSTEMS DELETE, in paragraph 1.9.A.4, the following text “football field and softball field”. DELETE, in paragraph 3.10.A.2, the following text “When requested by the Owner,”.

AD2.011 SECTION: 01 2100 – ALTERNATES, ALT #3B REVISE the second sentence of the base bid description to read as follows: “Provide a control valve, valve box, and backflow preventer at the end of the pipe ……”.

CHANGES TO DRAWINGS:

Addendum

Item No.

Sheet Description

AD2.012 C-2.1 REVISE: Location of outfall as shown on SKC.007.

AD2.013 C-2.6 REVISE: Grading at edge of multi-purpose field as shown on SKC.006

AD2.014 C3.3 ADD: Detail of artificial field mow table with fence post footing as shown on SKC.012.

AD2.015 C4.5 REVISE: Revise location of ES-11 as shown on SKC.009.

AD2.016 C6.4 ADD: Fence as shown on SKC.013.

AD2.017 C7.1 ADD: Additional no parking fire land signs and striping as shown on revised sheet C7.1. ADD: Crofton High School directional sign as shown on revised sheet C7.1. ADD: Anne Arundel County Parks Access Only sign as shown on revised sheet C7.1.

AD2.018 C7.3 ADD: Additional no parking fire lane signs and striping as shown on revised sheet C7.3.

AD2.019 C7.4 ADD: Additional no parking fire lane signs and striping as shown on revised sheet C7.4.

Page 5: CROFTON AREA HIGH SCHOOL ADDENDUM NO. 002bids.urbanzink.com/croftonhs/Addendum 2/18CN-008-001_Addendum_… · CROFTON AREA HIGH SCHOOL ADDENDUM NO. 002 ... REVISE the fifth sentence

CROFTON AREA HIGH SCHOOL ADDENDUM NO. 002 2291 DAVIDSONVILLE ROAD DATE: JULY 17, 2017 GAMBRILLS, MD 21114 PAGE 4 OF 7

AD2.020 C7.6 ADD: Additional no parking fire lane signs and striping as shown on revised sheet C7.6. ADD: School Access Only No Thru Traffic sign as shown on revised sheet C7.6.

AD2.021 C8.16 REVISE: Profile as shown on SKC.010.

AD2.022 C8.16 REVISE: Profile as shown on SKC.011.

AD2.023 C10.15 ADD: Bio-swale check dam detail as shown on SKC.008.

AD2.024 C12.1 ADD: New sheet C12.1 to set.

AD2.025 L-3.2 REVISE: TW/BW elevations along walls as shown in attached sketch SKL.003.

AD2.026 L-3.5 REVISE: TW/BW elevations along walls as shown in attached sketch SKL.003.

AD2.027 L-3.8 REVISE: TW/BW elevations along walls as shown in attached sketch SKL.003. REVISE: Length of wall as shown in attached sketch SKL.003.

AD2.028 L-3.15, L3.16

REVISE: Location of bike rack by crosswalk as shown in attached sketch SKL.005.

AD2.029 L-5.7 REVISE: Wall detail C as shown in attached sketch SKL.004

RESPONSES TO BIDDERS’ QUESTIONS: Addendum

Item No. Description

AD2.030 Question:

The scope of work descriptions are confusing. Will the low bidder be entitled to a scope review before contract and start of work?

Response:

While the Project Team does their best to clearly scope inclusions and exclusions as well as coordination of several specific activities for each bid package, pre-award meetings are held with each Prime apparent low bidder prior to award of Contract to ensure that the bidders' understanding and the intent of the scope of work are synchronous. No bid pricing adjustments will be allowed after bid opening. The apparent low bidder may, withdraw their bid should they believe their understanding of a scope item at time of bid differs from the intent reiterated during scope review. However, there is a Bid Bond on the project, should the apparent low bidder withdraw their Bid, they are subject to the Owner enforcing the Bid Bond penalty.

Page 6: CROFTON AREA HIGH SCHOOL ADDENDUM NO. 002bids.urbanzink.com/croftonhs/Addendum 2/18CN-008-001_Addendum_… · CROFTON AREA HIGH SCHOOL ADDENDUM NO. 002 ... REVISE the fifth sentence

CROFTON AREA HIGH SCHOOL ADDENDUM NO. 002 2291 DAVIDSONVILLE ROAD DATE: JULY 17, 2017 GAMBRILLS, MD 21114 PAGE 5 OF 7

Addendum Item No. Description

AD2.031

Question:

Please clarify scope of work item 2A-50. Drawing M0.2 and P-series

drawings are not provided.

Response:

All the drawings are included in the Contract Documents, see Specification 00 0115 - List of Drawings.

AD2.032 Question: Can existing sewer main and manholes (1600') be abandoned rather than removed as stated on the demolition plan sheets?

Response:

The existing sewer may be properly abandoned in place per the project specifications in areas where it does not conflict with proposed construction.

AD2.033

Question:

Alternate 3A existing irrigation system to be removed is not shown at all. Please provide as-built and limits of irrigation system to be removed. Please provide more clear limits, size, etc. for the irrigation system that is to be installed.

Response:

Proposed irrigation system requirements are outlined specification section 32 8400. In regards to the existing irrigation system on the baseball field, to the best of our knowledge, there are 12 valves and 11 zones.

AD2.034 Question: Alternate 3B is also not clear. Please provide more information. Plan indicates that the 2" water main is part of the Alternate however alternate description on Solicitation Sheet 00300-3 indicates that it is. Please clarify. Please provide detail of 2" Irrigation Vault w/Backflow Preventer.

Response:

The verbiage of the Alternate is correct, the 2" pipe and associated control valve, vault, & backflow are part of the basebid. See also Specification revision item #AD2.011 above. The irrigation vault shall be Lok Box LB2T as manufactured by Hubbell Power Systems, Inc. or approved equal. The backflow preventer sizing shall be in accordance with specification section 32 8400.

Page 7: CROFTON AREA HIGH SCHOOL ADDENDUM NO. 002bids.urbanzink.com/croftonhs/Addendum 2/18CN-008-001_Addendum_… · CROFTON AREA HIGH SCHOOL ADDENDUM NO. 002 ... REVISE the fifth sentence

CROFTON AREA HIGH SCHOOL ADDENDUM NO. 002 2291 DAVIDSONVILLE ROAD DATE: JULY 17, 2017 GAMBRILLS, MD 21114 PAGE 6 OF 7

Addendum Item No. Description

AD2.035

Question:

Plan Sheet C3.4 - Pursuant to discussion at Pre-Bid Meeting, it was stated that the 2A contract does not include the artificial turf. Can you please provide a more detailed description of "Artificial Turf"?

Response:

See Specification 01 10 10, 2A scope items 2A-64 (revised by 2A Addendum #2, item AD2.002) and 2A-65.

AD2.036

Question:

Plan Sheet C3.4 - Is the 2A contractor responsible for the entire Track section and curbing?

Response:

See Specification 01 10 10, 2A scope items 2A-63 and revise 2A scope item #2A-64 (see item AD2.002 above) as follows, replace the fifth sentence of the paragraph with “The Owners turf vendor will also provide the concrete/asphalt subbase for the track & field events in the artificial turf field that require rubber track surfacing (high jump, long jump, & pole vault, etc), BP 2A will install the rubber surfacing/stripping for these track & field events. BP 2A will coordinate this effort with the Owners turf vendor. BP 2A will install the asphalt running track and rubber track surfacing and stripping in its entirety”.

AD2.037 Question:

Plan Sheet C3.5 - is the 2A contractor responsible for the entire Tennis Court section?

Response: See scope item 2A-74.

AD2.038 Question: Plan Sheet C3.6 and C3.7 - Who is responsible for the Grandstand foundations ad slab?

Response:

BP 2B provides the grandstand foundations/footings, 2A provides the slabs under the grandstands and bleachers, see 2A Addendum #1, item AD1.019 & 2A Addendum #2, item AD2.001.

AD2.039 Question:

Plan Sheet C10.11 - Please provide a detail for the Bio Swale Check Dams. None provided.

Response:

Refer to addendum #2 sketch SKC-008 (Drawing Revision item #AD2.023)

AD1.040 Question:

Addendum Item AD1.015 did not provide information on the type of geo fabric. Please provide a manufacturer and model number.

Response:

Refer to Specification 32 1200, 2.3.C

Page 8: CROFTON AREA HIGH SCHOOL ADDENDUM NO. 002bids.urbanzink.com/croftonhs/Addendum 2/18CN-008-001_Addendum_… · CROFTON AREA HIGH SCHOOL ADDENDUM NO. 002 ... REVISE the fifth sentence

CROFTON AREA HIGH SCHOOL ADDENDUM NO. 002 2291 DAVIDSONVILLE ROAD DATE: JULY 17, 2017 GAMBRILLS, MD 21114 PAGE 7 OF 7

Addendum Item No. Description

AD1.041 Question: Response:

Has any testing been done for the onsite topsoil? Due to the 5-10% organic requirement, the onsite topsoil will need an exorbitant amount of compost to achieve this requirement. If testing has not occurred, can the amendments to the topsoil be considered extra work? No testing of the onsite topsoil has been performed. Refer to specification 01 10 10, 2A scope item 2A-77 for 2A responsibilities in regards to testing and amending of onsite topsoil to meet the project specification sections 32 9200 & 32 9300 at no additional cost to the Owner; in addition if required, all imported topsoil must also comply with the project specifications. Bidders may visit the site in accordance with specification 00010 to take your own topsoil samples for analysis in order for you to attempt to quantify the amount of organic amendments that will be required, however the Bid opening date will not be extended while awaiting topsoil analysis results; nor will the A/E review your topsoil results prior to the Bid.

AD1.042 Question: Response:

The detail for the artificial turf on L5.0 shows a concrete curb. This is not shown on the plan view on L3.5. Please revise A on L3.5 to show the limits of the curb. See detail A/L5.2, the concrete seat walls and concrete sidewalk (to the plan north and south) of the astroturf will act as the curb, also the nailer board is shown attached to the seat walls.

AD1.043 Question: Response:

Scope Item 2A-44 and the scope access plans show laydown areas for approximately 25 acres. The cost to install and maintain these areas will be extremely costly. With the tough requirements that AACPS has in regards to their subsoil, topsoil, and grass operations, the cost will be substantial to remove this material. Please confirm that the Site Access Plans are correct and these areas will need to be stoned. Yes, install the stone as shown on the Site Access plans. As this is a green field site, the stone will server to minimize sediment control maintenance, allow for contractor laydown and access to the building. Also, refer to 2A Scope item #2A-44, the majority of the stone is located under future paved areas and the temporary stone roads may be left in place, as long as there is no conflict with any permanent finishes and the pavement subgrade still meets all geotechnical requirements.

Page 9: CROFTON AREA HIGH SCHOOL ADDENDUM NO. 002bids.urbanzink.com/croftonhs/Addendum 2/18CN-008-001_Addendum_… · CROFTON AREA HIGH SCHOOL ADDENDUM NO. 002 ... REVISE the fifth sentence
nwilson
Text Box
07/17/2017
Page 10: CROFTON AREA HIGH SCHOOL ADDENDUM NO. 002bids.urbanzink.com/croftonhs/Addendum 2/18CN-008-001_Addendum_… · CROFTON AREA HIGH SCHOOL ADDENDUM NO. 002 ... REVISE the fifth sentence
nwilson
Text Box
SKC.007
nwilson
Text Box
07/17/2017
Page 11: CROFTON AREA HIGH SCHOOL ADDENDUM NO. 002bids.urbanzink.com/croftonhs/Addendum 2/18CN-008-001_Addendum_… · CROFTON AREA HIGH SCHOOL ADDENDUM NO. 002 ... REVISE the fifth sentence
nwilson
Text Box
07/17/2017
Page 12: CROFTON AREA HIGH SCHOOL ADDENDUM NO. 002bids.urbanzink.com/croftonhs/Addendum 2/18CN-008-001_Addendum_… · CROFTON AREA HIGH SCHOOL ADDENDUM NO. 002 ... REVISE the fifth sentence
nwilson
Text Box
07/17/2017
Page 13: CROFTON AREA HIGH SCHOOL ADDENDUM NO. 002bids.urbanzink.com/croftonhs/Addendum 2/18CN-008-001_Addendum_… · CROFTON AREA HIGH SCHOOL ADDENDUM NO. 002 ... REVISE the fifth sentence
Page 14: CROFTON AREA HIGH SCHOOL ADDENDUM NO. 002bids.urbanzink.com/croftonhs/Addendum 2/18CN-008-001_Addendum_… · CROFTON AREA HIGH SCHOOL ADDENDUM NO. 002 ... REVISE the fifth sentence
Page 15: CROFTON AREA HIGH SCHOOL ADDENDUM NO. 002bids.urbanzink.com/croftonhs/Addendum 2/18CN-008-001_Addendum_… · CROFTON AREA HIGH SCHOOL ADDENDUM NO. 002 ... REVISE the fifth sentence
Page 16: CROFTON AREA HIGH SCHOOL ADDENDUM NO. 002bids.urbanzink.com/croftonhs/Addendum 2/18CN-008-001_Addendum_… · CROFTON AREA HIGH SCHOOL ADDENDUM NO. 002 ... REVISE the fifth sentence
GEW
Text Box
07/17/17
Page 17: CROFTON AREA HIGH SCHOOL ADDENDUM NO. 002bids.urbanzink.com/croftonhs/Addendum 2/18CN-008-001_Addendum_… · CROFTON AREA HIGH SCHOOL ADDENDUM NO. 002 ... REVISE the fifth sentence

D

D

FDC10'-0"

30' 10'

C:\Users\jml\Desktop\[email protected]

DRAWING:

PROJECT: SCALE:

JOB NO.

SKETCH NO.

GWWO INC.

800 WYMAN PARK DRIVE, SUITE 300

BALTIMORE, MARYLAND 21211, 410-332-1009

C 2017 GWWO INC.

ADDENDUM NO.

SKL.001

16014

CROFTON AREA HIGH SCHOOL

2

REV # DATE

2

SKL.003

1"=30'-0"

2

1

BW(NORTH)

TW BW(SOUTH)

1 130.0 130.0 130.0

2 130.0 131.3 131.0

3 130.0 131.3 131.0

4 130.0 130.0 130.0

5 132.0 132.0 132.0

6 132.0 133.3 133.0

7 132.0 133.3 133.0

8 132.0 132.0 132.0

9 132.5 132.5 132.5

10 132.5 133.8 133.5

11 132.5 133.8 133.5

12 132.5 132.5 132.5

13 129.5 129.5 129.5

14 129.5 130.7 130.7

15 131.0 131.0 131.0

16 131.0 132.2 131.0

17 132.5 132.5 132.5

18 132.5 133.7 133.0

19 133.5 133.5 133.5

20 133.5 134.7 134.5

21 129.5 130.7 130.7

22 129.5 129.5 129.5

23 131.0 132.2 132.0

24 131.0 131.0 131.0

25 132.5 133.7 133.5

26 132.5 132.5 132.5

27 133.5 134.7 134.7

28 133.5 133.5 133.5

29 131.0 131.0 131.0

30 131.0 132.3 132.0

31 131.0 132.3 132.0

32 131.0 131.0 131.0

33 135.0 135.0 135.0

34 135.0 136.3 135.2

35 135.0 136.3 135.2

36 135.0 135.0 135.0

37 136.0 136.0 136.0

38 136.0 137.3 136.2

39 136.0 137.3 136.2

40 136.0 136.0 136.0

2

5

6

73

49

10

8

11

12

13

14

15

16

17

18

19

20

2122

23

24 25

26

27

28

29

30

31

32

33

34

35 36

37

3839

40

North Arrow

NOTES:

1. WALL HAS BEEN SHORTENED AT SPOT ELEVATION 32 AS SHOWN.2.SEE L3.2, L3.5, & L3.8 FOR LAYOUT OF SPOT ELEVATIONS IF NOT NOTED HERE.

POB

135

135

130

140

135

135

130

130

07/17/17MODIFICATION TO DRAWINGS L3.2,L3.5, & L3.8

Page 18: CROFTON AREA HIGH SCHOOL ADDENDUM NO. 002bids.urbanzink.com/croftonhs/Addendum 2/18CN-008-001_Addendum_… · CROFTON AREA HIGH SCHOOL ADDENDUM NO. 002 ... REVISE the fifth sentence

C:\Users\jml\Desktop\[email protected]

DRAWING:

PROJECT: SCALE:

JOB NO.

SKETCH NO.

GWWO INC.

800 WYMAN PARK DRIVE, SUITE 300

BALTIMORE, MARYLAND 21211, 410-332-1009

C 2017 GWWO INC.

ADDENDUM NO.

SKL.001

16014

CROFTON AREA HIGH SCHOOL

2

REV # DATE

2

CO

NC

RET

E W

ALL

AT

CO

URTY

ARD

CSC

ALE

: 3

/8" =

1'-0

"1

01

2

1%

-TY

P.

SEE L3.2 & L3.8FOR TW/BW

ELEVATIONS- TYP.

CO

NCRET

E FO

OTI

NG

;SEE

CIV

IL D

RAW

ING

S F

OR F

OO

TING

AND

REI

NFO

RCEM

ENT

DET

AIL

S

6" D

EEP

CO

MPA

CTE

D, VO

ID F

REE

AG

GREG

ATE

BASE

4" Ø

(M

IN) PE

RFO

RATE

D P

VC D

RAIN

PIP

E W

RAPP

ED IN

FILT

ER F

ABRIC

TO

BE

DAYL

IGHTE

D -

TYP

.;SEE

CIV

IL D

RAW

ING

S F

OR D

ETAIL

S

DRAIN

GRAVEL

WRAPP

ED IN

GEO

TEXT

ILE

FABRIC

WATE

R P

RO

OFI

NG

CO

MPA

CTE

D S

UBG

RAD

E

LOW

-MO

W F

ESCUE

ARCHIT

ECTU

RAL

CO

NCRET

E W

ALL

.SM

OO

TH, RUBBED

FIN

ISH-

TYP.

NO

PARG

ING

.1 2

" CHAM

FERED

ED

GES

.SLO

PE F

OR D

RAIN

AG

E.

TOP

SO

IL

SEE L3.2 & L3.8FOR TW/BW

ELEVATIONS- TYP.

FINIS

HED

GRAD

E;SEE

CIV

IL D

RAW

ING

S F

OR G

RAD

ING

PLA

N

SEC

TIO

N

2

SKL.004

07/17/17MODIFICATION TO DRAWING L5.7

Page 19: CROFTON AREA HIGH SCHOOL ADDENDUM NO. 002bids.urbanzink.com/croftonhs/Addendum 2/18CN-008-001_Addendum_… · CROFTON AREA HIGH SCHOOL ADDENDUM NO. 002 ... REVISE the fifth sentence

H

7'-3

"

C:\Users\jml\Desktop\[email protected]

DRAWING:

PROJECT: SCALE:

JOB NO.

SKETCH NO.

GWWO INC.

800 WYMAN PARK DRIVE, SUITE 300

BALTIMORE, MARYLAND 21211, 410-332-1009

C 2017 GWWO INC.

ADDENDUM NO.

SKL.001

16014

CROFTON AREA HIGH SCHOOL

2

REV # DATE

2

SKL.005

1"=20'-0"

2

(4) BIKE RACKS, 44 SPACES;SEE D/L5.6

5' x 48' BIKE RACK CLEARANCE

07/17/17MODIFICATION TO DRAWINGS L3.15AND L3.16

Page 20: CROFTON AREA HIGH SCHOOL ADDENDUM NO. 002bids.urbanzink.com/croftonhs/Addendum 2/18CN-008-001_Addendum_… · CROFTON AREA HIGH SCHOOL ADDENDUM NO. 002 ... REVISE the fifth sentence
Page 21: CROFTON AREA HIGH SCHOOL ADDENDUM NO. 002bids.urbanzink.com/croftonhs/Addendum 2/18CN-008-001_Addendum_… · CROFTON AREA HIGH SCHOOL ADDENDUM NO. 002 ... REVISE the fifth sentence
Page 22: CROFTON AREA HIGH SCHOOL ADDENDUM NO. 002bids.urbanzink.com/croftonhs/Addendum 2/18CN-008-001_Addendum_… · CROFTON AREA HIGH SCHOOL ADDENDUM NO. 002 ... REVISE the fifth sentence
Page 23: CROFTON AREA HIGH SCHOOL ADDENDUM NO. 002bids.urbanzink.com/croftonhs/Addendum 2/18CN-008-001_Addendum_… · CROFTON AREA HIGH SCHOOL ADDENDUM NO. 002 ... REVISE the fifth sentence
Page 24: CROFTON AREA HIGH SCHOOL ADDENDUM NO. 002bids.urbanzink.com/croftonhs/Addendum 2/18CN-008-001_Addendum_… · CROFTON AREA HIGH SCHOOL ADDENDUM NO. 002 ... REVISE the fifth sentence