crisp (cycle route implementation & stakeholder plan)

71
Engineering Landscape Architecture Project Management Australian Cycling Conference Adelaide 2010

Upload: richard-jones

Post on 14-Jun-2015

359 views

Category:

Sports


0 download

DESCRIPTION

Presentation at the Australian Bicycle Conference in Adelaide 18-19 January 2010.

TRANSCRIPT

Page 1: CRISP (Cycle Route Implementation & Stakeholder Plan)

Engineering

LandscapeArchitecture

Project Management

Australian Cycling Conference

Adelaide 2010

Page 2: CRISP (Cycle Route Implementation & Stakeholder Plan)

CRISP (Cycle Route Implementation and Stakeholder Plan)

Examples in the UK and Australia and Lessons Learned

Richard V JonesCOMPLETE Urban, QLD

Nathan ParishCOMPLETE Urban, NSW

Nigel CoatesLaunceston City Council, TAS

Page 3: CRISP (Cycle Route Implementation & Stakeholder Plan)

Introduction to CRISP

The UK Experience & lessons learnt

The Australian Experience & lessons learnt

Page 4: CRISP (Cycle Route Implementation & Stakeholder Plan)

Cycling Popularity

London 500,000 cyclists / day (2006)

Sydney 120,000 cyclists / day (2005)

London - 23% increase in 1 year (2003-2004)

Sydney - 23% increase in 4 years (2001–2005)

Cycling in the UK!

Page 5: CRISP (Cycle Route Implementation & Stakeholder Plan)
Page 6: CRISP (Cycle Route Implementation & Stakeholder Plan)

Introduction

Mayor of London’s Transport Strategy 2001

Task Force established in 2002 → London Cycle Network Plus (LCN+) Program

Cycle Route Implementation and Stakeholder Plan (CRISP) → to satisfy these objectives

2004 → London Cycling Action Plan (LCAP) formalised

Total of 286 CRISP Reports

950km of Cycle Routes

Lengths between 0.5km and 15km

Page 7: CRISP (Cycle Route Implementation & Stakeholder Plan)

What is a CRISP?(Cycle Route Implementation and Stakeholder Plan)

The Purpose of a CRISP Study

Main aims of the CRISP process are to: Raise the profile of cycling Substantially increase levels of cycling Improve the quality of the network Provide a cohesive network and a coherent approach to

implementation Provide the optimal route for cyclists Include stakeholders at an early stage Provide a costed program and encourage long term project planning Prioritise work along the Link Tackle the tough issues along the Link

Page 8: CRISP (Cycle Route Implementation & Stakeholder Plan)

CRISP Team

Consultant – guidance and engineering experience

Council Cycling Officer – Strategic viewpoint of local authority

Local Stakeholder – local knowledge

Transport for London – Viewpoint of TLRN

LCN+ - strategic view of entire network

Page 9: CRISP (Cycle Route Implementation & Stakeholder Plan)

The CRISP Process

1. Pre-CRIM Report

2. Cycle Route Inspection Meeting (CRIM)

3. CRISP Report – DRAFT for consultation with the CRISP Team

4. CRISP Report - FINAL

Page 10: CRISP (Cycle Route Implementation & Stakeholder Plan)
Page 11: CRISP (Cycle Route Implementation & Stakeholder Plan)

Nathan Parish – UK Example

Page 12: CRISP (Cycle Route Implementation & Stakeholder Plan)

Nathan Parish – UK Example A406 CRISP Study

Page 13: CRISP (Cycle Route Implementation & Stakeholder Plan)

Nathan Parish – UK Example A406 CRISP Study CRISP Process

Page 14: CRISP (Cycle Route Implementation & Stakeholder Plan)

Nathan Parish – UK Example A406 CRISP Study CRISP Process

Stage 1 : Pre-CRIM Report

Page 15: CRISP (Cycle Route Implementation & Stakeholder Plan)

Nathan Parish – UK Example A406 CRISP Study CRISP Process

Stage 1 : Pre-CRIM ReportIntroduces studyDescribes routeQuestionnaire resultsIdentifies stakeholders

Page 16: CRISP (Cycle Route Implementation & Stakeholder Plan)

Nathan Parish – UK Example A406 CRISP Study CRISP Process

Stage 1 : Pre-CRIM ReportIntroduces studyDescribes routeQuestionnaire resultsIdentifies stakeholdersLessons Learned

Questionnaire response rate

Page 17: CRISP (Cycle Route Implementation & Stakeholder Plan)

Nathan Parish – UK Example A406 CRISP Study CRISP Process

Stage 1 : Pre-CRIM ReportStage 2 : CRIM

Page 18: CRISP (Cycle Route Implementation & Stakeholder Plan)

Nathan Parish – UK Example A406 CRISP Study CRISP Process

Stage 1 : Pre-CRIM ReportStage 2 : CRIM

Pre-CRIM meetingCRIMRecord of CRIM

Page 19: CRISP (Cycle Route Implementation & Stakeholder Plan)

Nathan Parish – UK Example A406 CRISP Study CRISP Process

Stage 1 : Pre-CRIM ReportStage 2 : CRIM

Pre-CRIM meetingCRIMRecord of CRIMLessons Learned

Stakeholder attendance

Page 20: CRISP (Cycle Route Implementation & Stakeholder Plan)

Nathan Parish – UK Example A406 CRISP Study CRISP Process

Stage 1 : Pre-CRIM ReportStage 2 : CRIMStage 3 : Draft CRISP Report

Page 21: CRISP (Cycle Route Implementation & Stakeholder Plan)

Nathan Parish – UK Example A406 CRISP Study CRISP Process

Stage 1 : Pre-CRIM ReportStage 2 : CRIMStage 3 : Draft CRISP Report

Data sheetsBudget construction costsProposed programme

Page 22: CRISP (Cycle Route Implementation & Stakeholder Plan)

Nathan Parish – UK Example A406 CRISP Study CRISP Process

Stage 1 : Pre-CRIM ReportStage 2 : CRIMStage 3 : Draft CRISP Report

Data sheets

Page 23: CRISP (Cycle Route Implementation & Stakeholder Plan)

Nathan Parish – UK Example A406 CRISP Study CRISP Process

Stage 1 : Pre-CRIM ReportStage 2 : CRIMStage 3 : Draft CRISP Report

Page 24: CRISP (Cycle Route Implementation & Stakeholder Plan)

Nathan Parish – UK Example A406 CRISP Study CRISP Process

Stage 1 : Pre-CRIM ReportStage 2 : CRIMStage 3 : Draft CRISP Report

Data sheetsBudget construction costsProposed programmeLessons learned

Minute taker Proposed programme

Page 25: CRISP (Cycle Route Implementation & Stakeholder Plan)

Nathan Parish – UK Example A406 CRISP Study CRISP Process

Stage 1 : Pre-CRIM ReportStage 2 : CRIMStage 3 : Draft CRISP ReportStage 4 : Final CRISP Report

Page 26: CRISP (Cycle Route Implementation & Stakeholder Plan)

Nathan Parish – UK Example A406 CRISP Study CRISP Process

Stage 1 : Pre-CRIM ReportStage 2 : CRIMStage 3 : Draft CRISP ReportStage 4 : Final CRISP Report

Review meetingIssue Final CRISP Report

Page 27: CRISP (Cycle Route Implementation & Stakeholder Plan)

Nathan Parish – UK Example A406 CRISP Study CRISP Process

Stage 1 : Pre-CRIM ReportStage 2 : CRIMStage 3 : Draft CRISP ReportStage 4 : Final CRISP Report

Summary

Page 28: CRISP (Cycle Route Implementation & Stakeholder Plan)

Nigel Coates – AUS Example

Page 29: CRISP (Cycle Route Implementation & Stakeholder Plan)

Nigel Coates – AUS Example Launceston Bike Plan 2004

Page 30: CRISP (Cycle Route Implementation & Stakeholder Plan)

Nigel Coates – AUS Example Launceston Bike Plan 2004

To create safe commuting routes and improve the safety of streets for cycling

Page 31: CRISP (Cycle Route Implementation & Stakeholder Plan)

Nigel Coates – AUS Example Launceston Bike Plan 2004 Launceston Cycling Infrastructure Strategy 2009

Page 32: CRISP (Cycle Route Implementation & Stakeholder Plan)

Nigel Coates – AUS Example Launceston Bike Plan 2004 Launceston Cycling Infrastructure Strategy 2009

Hierarchy of Solutions

Page 33: CRISP (Cycle Route Implementation & Stakeholder Plan)

Nigel Coates – AUS Example Launceston Bike Plan 2004 Launceston Cycling Infrastructure Strategy 2009

Hierarchy of Solutions Traffic reduction

Page 34: CRISP (Cycle Route Implementation & Stakeholder Plan)

Nigel Coates – AUS Example Launceston Bike Plan 2004 Launceston Cycling Infrastructure Strategy 2009

Hierarchy of Solutions Traffic reduction Speed reduction

Page 35: CRISP (Cycle Route Implementation & Stakeholder Plan)

Nigel Coates – AUS Example Launceston Bike Plan 2004 Launceston Cycling Infrastructure Strategy 2009

Hierarchy of Solutions Traffic reduction Speed reduction Dealing with junctions

Page 36: CRISP (Cycle Route Implementation & Stakeholder Plan)

Nigel Coates – AUS Example Launceston Bike Plan 2004 Launceston Cycling Infrastructure Strategy 2009

Hierarchy of Solutions Traffic reduction Speed reduction Dealing with junctions Road space redistribution

Page 37: CRISP (Cycle Route Implementation & Stakeholder Plan)

Nigel Coates – AUS Example Launceston Bike Plan 2004 Launceston Cycling Infrastructure Strategy 2009

Hierarchy of Solutions Traffic reduction Speed reduction Dealing with junctions Road space redistribution Off road provision

Page 38: CRISP (Cycle Route Implementation & Stakeholder Plan)

Nigel Coates – AUS Example Launceston Bike Plan 2004 Launceston Cycling Infrastructure Strategy 2009 Launceston Arterial Bike Route Network (50 km)

Page 39: CRISP (Cycle Route Implementation & Stakeholder Plan)

Nigel Coates – AUS Example Launceston Bike Plan 2004 Launceston Cycling Infrastructure Strategy 2009 Launceston Arterial Bike Route Network

Page 40: CRISP (Cycle Route Implementation & Stakeholder Plan)

Nigel Coates – AUS Example Launceston Bike Plan 2004 Launceston Cycling Infrastructure Strategy 2009 Launceston Arterial Bike Route Network$ State Bike Route Funding

Page 41: CRISP (Cycle Route Implementation & Stakeholder Plan)

Nigel Coates – AUS Example Launceston Bike Plan 2004 Launceston Cycling Infrastructure Strategy 2009 Launceston Arterial Bike Route Network$ State Bike Route Funding$ Federal Bike Route Funding (Jobs Fund)

Page 42: CRISP (Cycle Route Implementation & Stakeholder Plan)

Nigel Coates – AUS Example Launceston Bike Plan 2004 Launceston Cycling Infrastructure Strategy 2009 Launceston Arterial Bike Route Network$ State Bike Route Funding$ Federal Bike Route Funding (Jobs Fund)

$ 576,000

Page 43: CRISP (Cycle Route Implementation & Stakeholder Plan)

Nigel Coates – AUS Example Launceston Bike Plan 2004 Launceston Cycling Infrastructure Strategy 2009 Launceston Arterial Bike Route Network$ State Bike Route Funding$ Federal Bike Route Funding (Jobs Fund)

$ 576,000To spend by June 2010 (8 months!)

Page 44: CRISP (Cycle Route Implementation & Stakeholder Plan)

Nigel Coates – AUS Example Fast track CRISP reports

Page 45: CRISP (Cycle Route Implementation & Stakeholder Plan)

Nigel Coates – AUS Example Location of Route

Page 46: CRISP (Cycle Route Implementation & Stakeholder Plan)

Nigel Coates – AUS Example Location of Route Constraints/Barriers

Page 47: CRISP (Cycle Route Implementation & Stakeholder Plan)

Nigel Coates – AUS Example Location of Route Constraints/Barriers

Route 1

Page 48: CRISP (Cycle Route Implementation & Stakeholder Plan)

Nigel Coates – AUS Example Location of Route Constraints/Barriers

Route 1

Page 49: CRISP (Cycle Route Implementation & Stakeholder Plan)

Nigel Coates – AUS Example Location of Route Constraints/Barriers

Route 1 – Bridge

Page 50: CRISP (Cycle Route Implementation & Stakeholder Plan)

Nigel Coates – AUS Example Location of Route Constraints/Barriers

Route 3

Page 51: CRISP (Cycle Route Implementation & Stakeholder Plan)

Nigel Coates – AUS Example Location of Route Constraints/Barriers

Route 3 – Separate Up & Down hill routes

Page 52: CRISP (Cycle Route Implementation & Stakeholder Plan)

Nigel Coates – AUS Example Location of Route Constraints/Barriers

Route 6

Page 53: CRISP (Cycle Route Implementation & Stakeholder Plan)

Nigel Coates – AUS Example Location of Route Constraints/Barriers

Route 6 – Waverley Street

Page 54: CRISP (Cycle Route Implementation & Stakeholder Plan)

Nigel Coates – AUS Example Location of Route Constraints / Barriers Stakeholder Feedback

Page 55: CRISP (Cycle Route Implementation & Stakeholder Plan)

Nigel Coates – AUS Example Location of Route Constraints / Barriers Stakeholder Feedback

Route 1 – Holbrook Street

Page 56: CRISP (Cycle Route Implementation & Stakeholder Plan)

Nigel Coates – AUS Example Location of Route Constraints / Barriers Stakeholder Feedback

All routes – Gully Gratings

Page 57: CRISP (Cycle Route Implementation & Stakeholder Plan)

Nigel Coates – AUS Example Location of Route Constraints / Barriers Stakeholder Feedback Priority of Schemes Costs and program

Page 58: CRISP (Cycle Route Implementation & Stakeholder Plan)

Nigel Coates – AUS Example Location of Route Constraints / Barriers Stakeholder Feedback Priority of Schemes Costs and program

Black spot schemes

Page 59: CRISP (Cycle Route Implementation & Stakeholder Plan)

Nigel Coates – AUS Example Location of Route Constraints / Barriers Stakeholder Feedback Priority of Schemes Costs and program

Black spot schemes Asset upgrades

Page 60: CRISP (Cycle Route Implementation & Stakeholder Plan)

Nigel Coates – AUS Example Location of Route Constraints / Barriers Stakeholder Feedback Priority of Schemes Costs and program

Black spot schemes Asset upgrades Jobs fund deadline

Page 61: CRISP (Cycle Route Implementation & Stakeholder Plan)

Nigel Coates – AUS Example Location of Route Constraints / Barriers Stakeholder Feedback Priority of Schemes Costs and program Lessons Learned

Page 62: CRISP (Cycle Route Implementation & Stakeholder Plan)

Nigel Coates – AUS Example Location of Route Constraints / Barriers Stakeholder Feedback Priority of Schemes Costs and program Lessons Learned

Not included

Page 63: CRISP (Cycle Route Implementation & Stakeholder Plan)

Nigel Coates – AUS Example Location of Route Constraints / Barriers Stakeholder Feedback Priority of Schemes Costs and program Lessons Learned

Not included Pre CRIM report/meeting

Page 64: CRISP (Cycle Route Implementation & Stakeholder Plan)

Nigel Coates – AUS Example Location of Route Constraints / Barriers Stakeholder Feedback Priority of Schemes Costs and program Lessons Learned

Not included Pre CRIM report/meeting Other stakeholders

Page 65: CRISP (Cycle Route Implementation & Stakeholder Plan)

Nigel Coates – AUS Example Location of Route Constraints / Barriers Stakeholder Feedback Priority of Schemes Costs and program Lessons Learned

Not included Pre CRIM report/meeting Other stakeholders Options costing

Page 66: CRISP (Cycle Route Implementation & Stakeholder Plan)

Nigel Coates – AUS Example Location of Route Constraints / Barriers Stakeholder Feedback Priority of Schemes Costs and program Lessons Learned

Not included Pre CRIM report/meeting Other stakeholders Options costing Large route maps

Page 67: CRISP (Cycle Route Implementation & Stakeholder Plan)

Nigel Coates – AUS Example Location of Route Constraints / Barriers Stakeholder Feedback Priority of Schemes Costs and program Lessons Learned

Added

Page 68: CRISP (Cycle Route Implementation & Stakeholder Plan)

Nigel Coates – AUS Example Location of Route Constraints / Barriers Stakeholder Feedback Priority of Schemes Costs and program Lessons Learned

Added Hierarchy of solutions on data sheet

Page 69: CRISP (Cycle Route Implementation & Stakeholder Plan)

Nigel Coates – AUS Example Location of Route Constraints / Barriers Stakeholder Feedback Priority of Schemes Costs and program Lessons Learned

CRISP report presented to Council

Page 70: CRISP (Cycle Route Implementation & Stakeholder Plan)
Page 71: CRISP (Cycle Route Implementation & Stakeholder Plan)

ArchitectureLandscape

EngineeringManagement COMPLETE Sydney

10 Regent StreetChippendale

NSW 2008

P: +61 (02) 9282 9900F: +61 (02) 9282 9277

COMPLETE Gold Coast

Suite 106 Lakeside Bermuda Point

20 Lake Orr Drive Varsity LakesQLD 4227

P: +61 (07) 5553 5555F: +61 (07) 5580 8088

Launceston City Council

www.completeurban.com.au

Thank youSee you next year?

Town Hall St John Street

LauncestonTasmania 7250

P: +61 (03) 6323 3442F: +61 (03) 6323 3396