Overview
Templates are Project Configuration files
Templates can be shared between APEA and ACCE
Templates can contain configuration information from bothAPEA and ACCE
Templates can be created for use by Integrated Economicsin Aspen Plus and Aspen HYSYS
-
8/11/2019 Creating and Using Templates
3/39
2010 Aspen Technology, Inc. All rights reserved | 3
Templates
Templates stored in a Template LibraryOne template library for all productsTemplates created can be used for Integrated EconomicsAny Project Level selection can be stored in Template
Template Library
Using Templates
-
8/11/2019 Creating and Using Templates
4/39
2010 Aspen Technology, Inc. All rights reserved | 4
Creating APEA Templates
-
8/11/2019 Creating and Using Templates
5/39
2010 Aspen Technology, Inc. All rights reserved | 5
APEA Templates set Economic Parameters
Location,Process type,Design Codes
Wage rates,Material pricing,Investment
-
8/11/2019 Creating and Using Templates
6/39
2010 Aspen Technology, Inc. All rights reserved | 6
APEA Templates set Operating Costs
Electric utility fromsimulation case will takeprecedence.
-
8/11/2019 Creating and Using Templates
7/39 2010 Aspen Technology, Inc. All rights reserved | 7
APEA Templates set Design Parameters
Location,Process type,Design Codes
Default sizes,factors, and
rules of thumb
-
8/11/2019 Creating and Using Templates
8/39 2010 Aspen Technology, Inc. All rights reserved | 8
APEA Templates set Default Process UtilitySpecifications
Process utilitiesdefined in thesimulation caseare added
-
8/11/2019 Creating and Using Templates
9/39
-
8/11/2019 Creating and Using Templates
10/39 2010 Aspen Technology, Inc. All rights reserved | 10
APEA Templates set Sizing Methods for EachEquipment Type
Custom models
are created forcustomer sizingor costing
-
8/11/2019 Creating and Using Templates
11/39 2010 Aspen Technology, Inc. All rights reserved | 11
Creating Custom Sizingor Costing Models
-
8/11/2019 Creating and Using Templates
12/39 2010 Aspen Technology, Inc. All rights reserved | 12
Custom Models for Costing or Sizing
User created Excel Workbooks for customizing system
Integrated with Economics data for equipment and streams
Create custom costing models for specialized equipment
Integrate custom sizing into workflow
Use stream data to size components
Size reactors or extractors
Incorporate company specific sizing rules
-
8/11/2019 Creating and Using Templates
13/39 2010 Aspen Technology, Inc. All rights reserved | 13
Custom Model Tool: Input
Input tab displays dataimported from simulation
Stream data importedfor equipment item
-
8/11/2019 Creating and Using Templates
14/39
2010 Aspen Technology, Inc. All rights reserved | 14
Custom Model Tool: Workflow
Intermediate worksheet for custom model
-
8/11/2019 Creating and Using Templates
15/39
2010 Aspen Technology, Inc. All rights reserved | 15
Custom Model Tool: Custom Rules
Custom Rules tab displays details of custom sizing algorithm
-
8/11/2019 Creating and Using Templates
16/39
2010 Aspen Technology, Inc. All rights reserved | 16
Custom Model Tool: Custom Rules (cont.)
Custom Rules tab displays details of custom sizing algorithm
-
8/11/2019 Creating and Using Templates
17/39
2010 Aspen Technology, Inc. All rights reserved | 17
Custom Model Tool: Results
Output tab displays resultingdesign data to be exported backto equipment form
-
8/11/2019 Creating and Using Templates
18/39
2010 Aspen Technology, Inc. All rights reserved | 18
Creating ACCE Templates
-
8/11/2019 Creating and Using Templates
19/39
2010 Aspen Technology, Inc. All rights reserved | 19
ACCE Templates
Create complete specifications for Project Estimate
Discipline Leads input for Design Basis and Customer Files
Template file can be shared by Project Teams whether insame company or between companies (Megaprojects)
More extensive than previous Standard Basis files
Examples are on following four slides
-
8/11/2019 Creating and Using Templates
20/39
2010 Aspen Technology, Inc. All rights reserved | 20
Set Design Basis Details
ACCE can setall Design BasisDetails
-
8/11/2019 Creating and Using Templates
21/39
2010 Aspen Technology, Inc. All rights reserved | 21
Set Craft Rates, Productivities and Indexing
-
8/11/2019 Creating and Using Templates
22/39
2010 Aspen Technology, Inc. All rights reserved | 22
Set Power Distribution and Contractors
-
8/11/2019 Creating and Using Templates
23/39
2010 Aspen Technology, Inc. All rights reserved | 23
Select External Files
Example of Customer File
-
8/11/2019 Creating and Using Templates
24/39
2010 Aspen Technology, Inc. All rights reserved | 24
Creating Combined Configuration(APEA/ACCE) Templates
-
8/11/2019 Creating and Using Templates
25/39
2010 Aspen Technology, Inc. All rights reserved | 25
Setting Up Combined ConfigurationTemplates
APEA Creates Basic Template in Template Library (V7.3) Country Basis
Units of Measure
Process Design and Investment Analysis
ACCE Opens Template and Additionally Creates Following
Design Basis
Wage Rates and Productivities
Indexing
Contracts and Scope (APEA supports one contractor)
Process Control (APEA supports one Control Center) Power Distribution (APEA supports one Unit Substation)
APEA Setup shown on following Slides
-
8/11/2019 Creating and Using Templates
26/39
2010 Aspen Technology, Inc. All rights reserved | 26
APEA Project Basis View
Process Engineer in APEA
Process Engineer in APEA
Estimator advises APEA
Estimator in ACCE
See Later Screen
See Later Screen
-
8/11/2019 Creating and Using Templates
27/39
2010 Aspen Technology, Inc. All rights reserved | 27
General Project Data
Initial Setup
Set by ProcessEngineer in APEA
may be reset byEstimator in ACCE
-
8/11/2019 Creating and Using Templates
28/39
2010 Aspen Technology, Inc. All rights reserved | 28
General Specs
Set by Estimator in ACCE
Set by Estimator in ACCE
Set by Process Engr. in APEA
Set by Process Engr. in APEA
Set by Process Engr. in APEA
Set by Process Engr. in APEA
Note:Applying this form will overwrite fields thatmay have been set by ACCE
Set by APEA or ACCE
-
8/11/2019 Creating and Using Templates
29/39
2010 Aspen Technology, Inc. All rights reserved | 29
Creating a Consolidated Template File
Work Process
1. APEA Creates New Project Template
Country Basis and Currency set
Units of Measure set
Project Properties
General Project Data info as indicated
General Spec info as indicated Process Engineer sets Process Design (Sizing & Mapping)
Investment Parameters Set as desired
2. Estimating Lead opens Template in ACCE to Update
General Project Data updated as needed
General Spec info overridden as necessary
Design Basis
Currency
Construction Workforce
Code of Accounts and Indexing
-
8/11/2019 Creating and Using Templates
30/39
2010 Aspen Technology, Inc. All rights reserved | 30
Creating a Consolidated Template File
3. ACCE Should be Aware of Following Limitations
APEA Supports One Contractor
APEA Supports One Unit Substation
APEA Supports One Control Center
4. Saved Template Used by Process Engineer in IntegratedEconomics (Aspen Plus or HYSYS) or APEA
Template Library is shared between ACCE and APEA Aspen Plus and HYSYS use same Template Library in V7.3
5. APEA Should be Aware of Following Limitations
Changing and Applying General Specs forms will Overwrite thefollowing created by ACCE:
Contractor (ALL)
Power Distribution and Process Control
Design Code and Civil Specs
Design Allowance, Rotating Equipment Spares and Contingency
-
8/11/2019 Creating and Using Templates
31/39
2010 Aspen Technology, Inc. All rights reserved | 31
Using Templates
-
8/11/2019 Creating and Using Templates
32/39
2010 Aspen Technology, Inc. All rights reserved | 32
Using Templates in Aspen Plus
Open Costing Options Dialogue from either theCosting|Costing Options selector or from the CostingOptions Icon
In the Setup|Costing Options select Browse
Browse the Template Library to select the Template to beused for Integrated Economics
Templates can only be modified by using APEA
-
8/11/2019 Creating and Using Templates
33/39
2010 Aspen Technology, Inc. All rights reserved | 33
Using Templates in Aspen Plus
-
8/11/2019 Creating and Using Templates
34/39
2010 Aspen Technology, Inc. All rights reserved | 34
Using Templates in Aspen HYSYS
Open Costing Options Dialogue from either theSimulation|Costing Options selector or from the CostingOptions Icon
Browse the Template Library to select the Template to beused for Integrated Economics
Templates can only be modified by using APEA
-
8/11/2019 Creating and Using Templates
35/39
2010 Aspen Technology, Inc. All rights reserved | 35
Using Templates in Aspen HYSYS
-
8/11/2019 Creating and Using Templates
36/39
2010 Aspen Technology, Inc. All rights reserved | 36
Using Templates in Economic Evaluation
Templates can only be selected when Starting a Project
Create New Project
Enter Project Name and Scenario Name
Select Template
Select the Template from the Template Library
Selecting a Template will lock in the Country Basis and theUnits of Measure
All other Template settings can be overwritten by user if
necessary
-
8/11/2019 Creating and Using Templates
37/39
2010 Aspen Technology, Inc. All rights reserved | 37
Using Templates in Economic Evaluation
-
8/11/2019 Creating and Using Templates
38/39
2010 Aspen Technology, Inc. All rights reserved | 38
Using Templates in Economic Evaluation
Units of Measurechoice not availabledue to Template
Choices not changeabledue to Template.Currency is changeable.
-
8/11/2019 Creating and Using Templates
39/39
Questions ??