Begin filling out the record by entering the Project and Client information. While filling out this record, make sure to take advantage of the drop-down menus and databases to select your data rather than typing the information manually. On the Tool Bar, click on the small drop-down arrow next to the “New” icon. Select . Ultrasonic Report 1 2 3 4 5 6 7 When entering the , make sure to enter the welder that performed the welding, the length of the examined area, length of rejectable welding, and the process used. Tracking this data will enable the use of Performance Reports which determine reject rates and helps to monitor production weld quality. Examination results The and Disontinuity details sections on this form are “never ending”. Continue adding as many line items as needed and will automatically span your report over as many pages as necessary. Examination results WeldOffice N ® DE Based on the number of techniques specified in the Examination results section (A,B,C,D), provides the proper number of sections. WeldOffice N Equipment and Technique details ® DE To draw a DAC curve, click inside the box. This will bring you into the Sketch Selection Manager. Double-click on at the top of the list of files. This will bring you into your Default Drawing program with a new blank DAC graph. Draw the desired curve on the graph and then close the drawing program. This will place the new DAC Curve onto your record. For more information on the drawings, See section on: Distance Amplitude Correction Curve Blank drawing Drawings & Sketches To sign the record, simply click your cursor in the appropriate Signature box. This will input the name and signature of the person currently logged in, as well as the current date. For more information on electronic signatures, see the Security Settings section. (c) Copyright C-spec 1985 - 2006. All rights reserved worldwide. C-spec WeldOffice Software ® Creating a UT Report Ultrasonic Examination Report

Upload: others

Post on 26-May-2022

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Create a UT Report - weldoffice.com

Begin filling out the record by entering theProject and Client information. While filling outthis record, make sure to take advantage of thedrop-down menus and databases toselect your data rather than typing theinformation manually.

On the Tool Bar, click on the small drop-downarrow next to the “New” icon.Select .Ultrasonic Report

1

2

3

4

5

6

7

When entering the , makesure to enter the welder that performed thewelding, the length of the examined area, lengthof rejectable welding, and the process used.Tracking this data will enable the use ofPerformance Reports which determine rejectrates and helps to monitor production weldquality.

Examination results

The and Disontinuitydetails sections on this form are “never ending”.Continue adding as many line items as neededand will automatically spanyour report over as many pages as necessary.

Examination results

WeldOffice N® DE

Based on the number of techniques specified inthe Examination results section (A,B,C,D),

provides the proper number ofsections.

WeldOffice NEquipment and Technique details

® DE

To draw a DAC curve, click inside thebox. This will

bring you into the Sketch Selection Manager.Double-click on at the top of thelist of files. This will bring you into your DefaultDrawing program with a new blank DAC graph.Draw the desired curve on the graph and thenclose the drawing program. This will place thenew DAC Curve onto your record.For more information on the drawings,See section on:

DistanceAmplitude Correction Curve

Blank drawing

Drawings & Sketches

To sign the record, simply click your cursor inthe appropriate Signature box. This will inputthe name and signature of the person currentlylogged in, as well as the current date.For more information on electronic signatures,see the Security Settings section.

(c) Copyright C-spec 1985 - 2006. All rights reserved worldwide.

C-spec WeldOffice Software®

Creating a UT ReportUltrasonic Examination Report

Page 2: Create a UT Report - weldoffice.com

C-specP.O. Box 27604, Concord, California 94527, (888) 673-9777

Ultrasonic Examination Report (UT)C-spec WeldOffice Software®

WeldOffice 2005.01.001®

NDE Technician NameDateLevel

Signature

Client NameDate

Signature

Certifying Authority NameDate

Signature

We, the undersigned, certify that the statements in this record are correct and that the welds and/or pieces were examined in accordance with the requirements of the abovespecified project specification and acceptance standard.

ClientProjectLocationProject specificationAcceptance standards

NDE procedure number

Exam dateProject ID numberJob/serial numberDrawing numberNDE reference number

Power Plant CompanyABC Power PlantBoonyville, USAABCPP-001ASME Section 1

UT 001

3/14/01Project 001Job # 001Drawing 001N/A

Examination results

Weld pieceID

Area Result Discontinuity Comments Tech. Welder ID WeldArea

Defectlength

Process

Weld 001 All ACC A 5555 10 0 FCAWWeld 002 All ACC A 5555 10 0 FCAWWeld 003 All ACC A 5555 10 0 FCAWWeld 004 All ACC A 5555 10 0 FCAWWeld 005 All ACC A 5555 10 0 FCAWWeld 006 All REJ Incomplete penetration A 5555 10 .75 FCAWWeld 007 All REJ Incomplete penetration A 5555 10 .25 FCAWWeld 008 All ACC A 5555 10 0 FCAWWeld 009 All ACC B 7777 10 0 FCAWWeld 010 All ACC B 7777 10 0 FCAWWeld 011 All ACC B 7777 10 0 FCAWWeld 012 All ACC B 7777 10 0 FCAW

Discontinuity details

Weld piece ID 50% DACor 1/2 Max. amplitude

Discontinuity

Weld 006 1 70 Up 100 2.25 2.00 18" 2.00 1.80 2.50 2.30 .75 .25 .75 RejWeld 007 1 70 Up 90 2.25 2.00 3.5" 2.1 1.88 2.35 2.20 .25 .20 .75 Rej

Equipment and Technique details - Technique "A"

Instrument makeModel/Serial numberTransducer angle/freq.Transducer sizeCal. block-typeCal. block-materialExam material typeExam material thicknessSurface conditionScr. height linearity cal. dateAmpl. control linearity cal. dateBeam spread meas. cal. date

Reference dBScanning dBDelayRangeFrequencyDampingRejectFilterZeroVelocityEnergyMemory

Epoch IIIEIII/00170/2.25.5x.5IIWSSC-Fe1As welded2/14/012/14/012/14/01

55750102.25NoneOffOff.150.323Hi#1

Equipment and Technique details - Technique "B"

Instrument makeModel/Serial numberTransducer angle/freq.Transducer sizeCal. block-typeCal. block-materialExam material typeExam material thicknessSurface conditionScr. height linearity cal. dateAmpl. control linearity cal. dateBeam spread meas. cal. date

Reference dBScanning dBDelayRangeFrequencyDampingRejectFilterZeroVelocityEnergyMemory

Epoch IIIEIII/00145.5x.5IIWSSC-Fe1As welded2/14/012/14/012/14/01

50680102.25NoneOffOff.240.323Hi#2