crcsd boe presentation 080910

25
CEDAR RAPIDS COMMUNITY SCHOOL DISTRICT SERVICES CAMPUS

Upload: cedar-rapids-community-schools

Post on 04-Jul-2015

528 views

Category:

Documents


0 download

DESCRIPTION

Building Plans for the new Educational Leadership and Support (ELS) Center.

TRANSCRIPT

Page 1: Crcsd boe presentation 080910

CEDAR RAPIDS COMMUNITY

SCHOOL DISTRICT SERVICES CAMPUS

Page 2: Crcsd boe presentation 080910

Site Design & Construction

Buildings Design & Construction

CRCSD FLOOD RECOVERY TIMELINE

CRCSD, State, FEMA Design Reviews and Approvals – Target Dates

Decommissioning ESC @ Kingston

May

27,

201

2

Nov

9, 2

009

2010 2011 2012

JAN

MAR

NO

V

DEC

FEB

APR

MAY

JUN

JUL

AU

G

SEP

OC

T

NO

V

DEC

JAN

MAR

FEB

APR

MAY

JUN

JUL

AU

G

SEP

OC

T

NO

V

DEC

JAN

MAR

FEB

APR

MAY

DESIGN BID CONSTRUCTION

DESIGN BID CONSTRUCTION

DESIGN BID CONSTR

End of Design Development – April 2010

Schedule is contingent on timely governing authority approvals and weather

Completion of Construction Documents – August 2010

Completion of Construction – March 2012

Completion of Project – May 2012

TODAY

Substantial Completion of Construction – January 2012

Page 3: Crcsd boe presentation 080910

CRCSD CORE TEAM MEMBERSCRCSDDr. Dave BensonDr. Gary O’MalleyLaurel DaySteve GrahamMarcia HughesDave DvorakTom DayJeff RowrayRuth CallahanLori BruzekDenny SchreckengastMatt DunbarJenna Gardner

SHIVE-HATTERYGeorge KanzMichael GummJim WignallMike HessmanJake HinkleJon FitchTom Bosch

FEMAJim Waller

AIMarty CalabroRobert Wright

IHSEmilie Shipley

CITIZENSMike DawsonLindsay Schumacher

Page 4: Crcsd boe presentation 080910

PROJECT STATUSDESIGN IS ON COURSE TO MEETESTABLISHED TIMELINE

BID PACKAGES

DEMOLITION & ROUGH GRADING

F&F, STEEL AND CONCRETE

BUILDING, SITE IMPROVEMENTS, LANDSCAPING

B.O.E. APPROVAL – MAY 2010BIDDING – JUNE 2010CONSTRUCTION – AUGUST 2010

B.O.E. APPROVAL – JUNE 2010BIDDING – AUGUST 2010CONSTRUCTION – SEPTEMBER 2010

B.O.E. APPROVAL – AUGUST 2010BIDDING – SEPTEMBER 2010CONSTRUCTION – OCTOBER 2010

Page 5: Crcsd boe presentation 080910

SUSTAINABILITY

ENERGY MODELING – WHOLE BUILDING CONCEPTThe Weidt Group

DESIGN STRATEGIES

GEOTHERMAL HEATING & COOLING

OCCUPANCY SENSORSHIGH PERFORMANCE CURTAINWALL AND WINDOWSR-20 WALL INSULATIONR-30 ROOF INSULATION

WATER USE REDUCTION

DAYLIGHTING

STORMWATER QUALITY CONTROLLIGHT POLLUTION REDUCTION

ENERGY OPTIMIZATION

ENHANCED REFRIGERATION MANAGEMENTRECYCLINGCONSTRUCTION WASTE MANAGEMENTMATERIAL REUSERECYCLED CONTENT IN NEW MATERIALSRAPIDLY RENEWABLE MATERIALSINDOOR AIR QUALITYLOW-EMITTING MATERIALSRAPIDLY RENEWABLE MATERIALS

INDOOR POLLUTANT CONTROLLIGHTING CONTROLS

THERMAL COMFORT CONTROLS

TOTAL HEAT RECOVERY SYSTEMSCO2 SENSORS

VARIABLE FREQUENCY DRIVE PUMPS

HEATING & COOLING ZONES

HVAC COMMISSIONING ENVELOPE COMMISSIONING

GOAL – 50% ENERGY SAVINGS

Page 6: Crcsd boe presentation 080910

SUSTAINABILITY

COMPARISON TO LEED CHECKLIST

49 POINTS TARGETED

ACHIEVE GOLD RATING

Page 7: Crcsd boe presentation 080910

SITE PLAN

EDGEWOOD RD

ELL

IS R

D

VIS

ITO

R

PA

RK

ING

EMPLOYEE

PARKING

PARKING

PARKING

DISTRICT

VAN

DOCK

PARKING

BUS

BUS DRIVER

Page 8: Crcsd boe presentation 080910

EXTERIOR WAYFINDING

Page 9: Crcsd boe presentation 080910

EXTERIOR WAYFINDING

Page 10: Crcsd boe presentation 080910

EXTERIOR WAYFINDING

Page 11: Crcsd boe presentation 080910

EXTERIOR WAYFINDING

Page 12: Crcsd boe presentation 080910

PROJECT PLANS

LOWER LEVEL FLOOR PLAN

Page 13: Crcsd boe presentation 080910

PROJECT PLANS

FIRST LEVEL FLOOR PLAN

Page 14: Crcsd boe presentation 080910

PROJECT PLANS

SECOND LEVEL FLOOR PLAN

Page 15: Crcsd boe presentation 080910

INTERIOR WAYFINDING

LOWER LEVEL

MAIN LEVEL

SECOND LEVEL

Page 16: Crcsd boe presentation 080910

EXTERIOR ELEVATIONS

Page 17: Crcsd boe presentation 080910

EXTERIOR ELEVATIONS

Page 18: Crcsd boe presentation 080910

ENTRANCE RENDERING

Page 19: Crcsd boe presentation 080910

BUDGET

810,353TRANSPORTATION RELOCATION

CURRENT BUDGET

$915,647

$5,233,818

$29,142,293

$35,897,2524,957,361

2,440,528

$44,500,000

PREVIOUS BUDGET

$915,647BID PACKAGE I

BID PACKAGE 2$5,233,818

BID PACKAGE 3

$28,579,985

FOOTINGS, FOUNDATIONS& STEEL

BUILDING, FF&ESITE LANDSCAPINGAND FINISH GRADING

$35,729,450CONSTRUCTION TOTALA/E FEES 4,957,361

CONTINGENCY 3,002,836

$44,500,000PROJECT TOTAL

810,353

PROJECT SF TOTAL 169,419COST SF (BUILDING) $202.90COST SF (TOTAL PROJECT) $262.66

$1,000,000OFF-SITE IMPROVEMENTS $1,000,000

Page 20: Crcsd boe presentation 080910

TRANSPORTATION RELOCATION

CONSTRUCTION

BUS PARKING ATWESTDALE MALL

Page 21: Crcsd boe presentation 080910

TRANSPORTATION RELOCATION

CONSTRUCTION

TRANSPORTATIONOFFICES ATWESTDALE MALL

Page 22: Crcsd boe presentation 080910

TRANSPORTATION RELOCATION

CONSTRUCTION

BUS REPAIR SHOPAT 27TH AVE SW

Page 23: Crcsd boe presentation 080910

ARCHAEOLOGICAL SURVEYS

SURVEY COSTS

PHASE I $21,254PHASE II $49,774

MAY 24 JUNE 3JUNE 7JUNE 18JUNE 25JUNE 29JULY 6JULY 16JULY 22

JULY 28

ALL COSTS ARE REIMBURSED BY FEMA

FEMA NOTIFICATION OF PHASE ICONTRACT OSAOSA BEGINS PHASE IFIELD WORK COMPLETEDFINDINGS BY OSA & SHPOOSA CONTRACT AMENDMENT OSA BEGINS PHASE IIOSA COMPLETES FIELDWORKOSA & SHPO FINDINGSNO SIGNIFICANT IMPACT

FEMA LETTER TO PROCEED

SCHEDULE IMPACT – CONSTRUCTION DELAY OF 2 WEEKS

SHIVE-HATTERY $12,000

Page 24: Crcsd boe presentation 080910

CONSTRUCTION - SUSTAINABILITYSALVAGED

BENCHESBUS WASH SYSTEMO.H. DOORS

RECYCLEDTREES & STUMPSFUEL TANKSUSED OIL TANKBATTERIESUSED OIL FILTERSCHAIN LINK FENCINGOH ELECTRICAL WIREHYDRAULIC SYSTEMWIRINGCOPPERCONDUIT

STEELALUMINUMDUCTILE IRONPRECAST WALL PANELSASPHALTCONCRETEBLOCK WALLSSIGNSHAND RAILSLIGHT FIXTURESSAND

Page 25: Crcsd boe presentation 080910

QUESTIONSAND

COMMENTS

NEXT REVIEW