BIG TEE BRIDGE REPLACEMENT County Route 14 over Leading Creek Randolph County, WV State Project No. S342-14-0.06

Upload: dgonano

Post on 07-Aug-2015

15 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CR14 over Leading Creek - Big Tee Bridge Replacement, Randolph County, WV (03-21-12)

BIG TEE BRIDGE REPLACEMENT

County Route 14 over Leading CreekRandolph County, WVState Project No. S342-14-0.06

Page 2: CR14 over Leading Creek - Big Tee Bridge Replacement, Randolph County, WV (03-21-12)

Project Sponsor

West Virginia DOT, Division of Highways District 8

West Virginia DOTDivision of Highways District 8US 219 North Elkins, WV 26241-1516

Page 3: CR14 over Leading Creek - Big Tee Bridge Replacement, Randolph County, WV (03-21-12)

Purpose of the Project

To replace the existing structure with a bridge that meets the requirements set forth by the West Virginia Bridge Design Manual and the Design Directives.

… and in a hurry

Page 4: CR14 over Leading Creek - Big Tee Bridge Replacement, Randolph County, WV (03-21-12)

Project Site

Project Site

flow

flow

Page 5: CR14 over Leading Creek - Big Tee Bridge Replacement, Randolph County, WV (03-21-12)

CR14 looking upstation (north)

Page 6: CR14 over Leading Creek - Big Tee Bridge Replacement, Randolph County, WV (03-21-12)

West Elevation (looking downstream)

Page 7: CR14 over Leading Creek - Big Tee Bridge Replacement, Randolph County, WV (03-21-12)

•Dave Scott•Ron Klavuhn•Stanford Mills•Lora Freeman

•Dave Morgan •Chad Mann•OBEC Consultants Salem, Oregon

Project Team

Owner Agency

WVDOH District 8

Contractor

C.L. Belt Construction

Substructure & Foundation Engineer

WVDOH District 8

Superstructure Designer/ Fabricator

U.S. Bridge

Page 8: CR14 over Leading Creek - Big Tee Bridge Replacement, Randolph County, WV (03-21-12)

Project Timeline

Originally Programmed

1999

Funding Approved

Early 2009

Begin 07/09End 09/10

Adv 09/29/10Let 10/26/10Awd 10/28/10

Begin 02/11 End 11/11

Design Phase

Programming Phase

Bid Phase

ConstructPhase

13 months 1 month 9 months10 years

programmed as an ASAP project

Page 9: CR14 over Leading Creek - Big Tee Bridge Replacement, Randolph County, WV (03-21-12)

ASAP Project

An ASAP Project is a fast-track project with limited details that is bid as lump sum. The contractor is responsible to apply for permits, to arrange for utility relocations, to make the material selections with the suppliers, and construct the project meeting the requirements, such as waterway opening, design loading, and general geometry.

Page 10: CR14 over Leading Creek - Big Tee Bridge Replacement, Randolph County, WV (03-21-12)

Funding