8/14/2019 CR Library-02!04!10 Reduced
1/6
Cedar Rapids Public LibraryFebruary 4, 2010 *Environmental and historical survey required for any site acquisition
0 150 300N
Emerald Knights Block
Site Availability Two Property Owners St. Martin Land Co. (approximately 85% of block)
Used Car Dealer (approximately 15% of Block)Schedule Constraints
None
Cost Comparison $3.375 million for site purchase Total projec t cost approximately $46.3 million
Demolition Costs $50,000: Current land owner will cover demolition costs up to $150,000
Impact on Tax Base Linn County Treasurers Office, 2008: $44,574
Parking Dedicated, structured parking for approximately 315 cars. (315 recommended)
Flood Impact No effect in 2008
Other Observations Pros -Relationship to Grant Wood Studio,History Center, and Masonic Library-Gateway presence off of interstateand 1st Avenue.-Little to no risk of future flood damage
Cons -More costly geothermal-Potential traffic challenge (one-waystreets/congestion)-traffic studyrecommended-Expensive parking-Steeply sloped site
Approximate Site
Development Costs1. Total Cost of Land . . . .
2. Demolition Costs. . . . . .
3. Cost of Parking . . . . . . .
Total. . . . . . . . . . . . . . . . . . .
Arcade
1st Avenue
A Avenue
1-380
2nd Avenue
3rd Avenue
7thS
treet 8
thS
treet
Parking ramp: 125 spacesper level
Library: 42,000 sf. footprint
Book drop
-
8/14/2019 CR Library-02!04!10 Reduced
2/6
Cedar Rapids Public LibraryFebruary 4, 2010 *Environmental and historical survey required for any site acquisition
0 150 300N
Gazette Block
Site Availability Two Property Owners Gazette/KCRG-Willing Seller
Peoples Church-currently for sale
Schedule Constraints Gazette Property available in 6 months. KCRG Property available in 18 months.
Cost Comparison $8.25 million for site acquisition Total projec t cost approximately $47.0 million
Demolition Costs $275,000 to remove KCRG & Gazette Buildings $75,000 to remove Parking Ramp
Impact on Tax Base Linn County Treasurers Office, 2008: $116,324
Parking Three potential parking scenarios. The version shown provides a total of 225 dedicated s
off-street spaces and 40 staff spaces in an existing ramp). A potential additiona l 40 spacavailable if Peoples Church is removed.
Additional street parking available around Greene Square Park.
Flood Impact 2008: no water on site Outside of 500 yearflood plain
Other Observations Pros -Relationship to CRMA-Geothermal capability-Book drop access-Moderate relationship toGreene Square Park-diagonal
Cons -Higher cost to demolish existing buildings-No lower level space (flood concern)-Ramp will need to be replaced
Approximate Site
Development Costs1. Total Cost of Land . . . .
2. Demolition Costs. . . . . .
3. Cost of Parking . . . . . . .
4. Gazette Pledge . . . . . .
Total. . . . . . . . . . . . . . . . . . .
2nd Avenue
1st Avenue
3rd Avenue
4th Avenue
Entry Plaza
Library:42,000 sf. footprint
Surface parking-105
Surfac e parking-80
Potential add itional40 surfac e pa rking
spaces, with removalof Peoples church
40 staff memberparking spacesat C ity Ramp
Bookdrop
5thS
treet 6
thStree
t
-
8/14/2019 CR Library-02!04!10 Reduced
3/6
Cedar Rapids Public LibraryFebruary 4, 2010 *Environmental and historical survey required for any site acquisition
0 150 300N
TrueNorth Block
Site Availability Three Property Owners TrueNorth (approximately 75% of block)-Willing Sellers at replacement cost Guaranty Realty owns remaining property. Willing Seller as long as replacement parking Proposed surface parking site currently owned by PepsiAmerica, contingent upon city pu
property for redevelopment
Schedule Constraints Refer to TrueNorth term sheet.
Cost Comparison $8.5 million for site acquisition (Estimated acquisition cost- actual price to be determined)
-Availability of land for parking unknown-Guaranty Bank replacement parking solution unknown
-Contingent upon TrueNorth successfully purchasing relocation property for $2,00 Total Project cost approximately $46.9 million
Demolition Costs $200,000 to remove TrueNorth building.
Impact on Tax Base Linn County Treasurers Office, 2008: $73,820
Parking Approximately 120 dedicated surface parking spots located ac ross 5th Avenue (315 reco
Access to an additional 195 parking spaces required in adjacent parkades (currently 60%
Flood Impact 2008: No water on N.E. corner/approximately 2 feet of water in S.W. corner Believed to be outside of the current 500 yearflood plain (confirmation of proposed flood
location to be verified).
Other Observations Pros -Potential connection to skywalk system
-Relationship to Greene Square park and CRMA
-Landscaped plaza at entrance-Geothermal capability-Adjacent to bike trail-Book drop/service access off of 5th Avenue
Cons -Train noise/vibration-No lower level space (flood)-No direct on-site parking
Additional Parking inramps
Potential skywalkconnection
Entry Plaza
Library: 42,000 sf. footprint
Surface parking-120
Book drop
2nd Avenue
3rd Avenue
4th Avenue
5th Avenue
5thStreet
6thStreet
-
8/14/2019 CR Library-02!04!10 Reduced
4/6
SSMID Map
Cedar Rapids Public LibraryFebruary 4, 2010
SSMID data from Cedar Rapids Downtown Districthttp://www.downtowncr.org/ Content/Our-Story/Our-Boards.aspx
Banjo Block
Greene Square Park
Gazette Block
Emerald Knights Block
TrueNorth Block
Existing Library Site
-
8/14/2019 CR Library-02!04!10 Reduced
5/6
2008 Flood Extents
Cedar Rapids Public LibraryFebruary 4, 2010
Author: Chad Markin
Updated: 16 J uly 2009
Banjo Block
Greene Square Park
Gazette Block
Emerald Knights Block
TrueNorth Block
Existing Library Site
-
8/14/2019 CR Library-02!04!10 Reduced
6/6
Flood Insurance Rate Map
Cedar Rapids Public LibraryFebruary 4, 2010
Flood Insurance Rate Map from FEMA Preliminary, December 1, 2008
Banjo Block
Greene Square Park
500 Year Floodplain
100 Year Floodplain
Gazette Block
Emerald Knights Block
TrueNorth Block
Existing Library Site