Courthouse Erosion and Sediment problems

January 16, 2013

April 19, 2013

February22, 2013

February23, 2013

December 26, 2012

March 24, 2013

Failing or Absent BMPS

Failing inlet protection No inlet protection

No silt fence

No BMP

Failing or Absent BMPS

Failing inlet protection

No inlet protection

Today – June 17, 2013

Failing or Absent BMPS

Failing inlet protection

No inlet protection

Today – June 17, 2013

Concentrated Flow

Rill erosion

Head cut

Results

Results

Outfall

Water Quality ViolationsSec. 26-82. Best management practices—Generally.A discharge of stormwater runoff from disturbed areas where best management practices have not been properly

designed, installed and maintained shall constitute a separate violation of any land disturbing permit issued by a local issuing authority or by the division or of any general permit for construction activities issued by the division pursuant to O.C.G.A.

§ 12-5-30(f) for each day on which

such discharge results in the

turbidity of receiving waters being

increased by more than 25

nephelometric turbidity units for

waters supporting warm water

fisheries or by more than ten

nephelometric turbidity units for waters classified as trout waters.

Outfall

Water Quality Violations

Costs - Silt accumulation

Costs - Silt accumulation

Costs - Silt accumulation

Control Stream Impacted Stream

Costs - Silt accumulation

Control Stream Impacted Stream

Photos taken within 20 minutes of each otherJune 17, 2013

Original Goalsfrom December 2011

SRWA offer to photograph installation of stormwater features and

implementation of a model erosion and sediment control plan.

Because the stormwater practices implemented at this site are extremely novel and will be the first time they are installed at a facility in Habersham County we would like to take advantage of the opportunity to educate the public on exactly what is behind the design, engineering and installation of these systems, why they are important, and

what they will accomplish. The SRWA would like to volunteer to photograph, shoot video and create other documentation of the installation that would enhance our ability to educate the general public on the value of these specific practices.

This project also creates a great opportunity to demonstrate well-

designed sediment and erosion control practices. By highlighting

these designed practices from the outset it may provide a proactive

way to hold up the contractor as a model for best practices,

ensuring minimal short-term erosion losses, and raising the bar for

land disturbance practices in the county. A record of these practices will

likewise provide an educational resource for future projects, and for grading contractors in general.

Responsible Parties

• Habersham County Commissioners

• Pond and Co. (contractors)

• NOVA (E&S reporting contractor)

• City of Clarkesville (inspection staff)

• GA EPD

• Soque River Watershed Association

• County Planning Office?

• Others?

Proposed Solution

Unfortunately we have to admit we’re not

very good at Erosion and Sediment Control

Management

Invite experts in E&S (UGA and UNC

Extension) to help us host a Public Workshop

on

• what went wrong

• how to fix it and

• how to avoid it in the future

Sign Up to Attend