Page 1: Country Club Creek Trail Preliminary Engineering Report Public Outreach Jessica V. Salinas COA Project Manager December 9, 2014

Country Club Creek TrailPreliminary Engineering Report

Public Outreach

Jessica V. SalinasCOA Project Manager

December 9, 2014

Page 2: Country Club Creek Trail Preliminary Engineering Report Public Outreach Jessica V. Salinas COA Project Manager December 9, 2014

Country Club Creek Trail Agenda

Introduction of Project Team Overall Program Goals for Urban Trails Country Club Creek Trail Summary Preliminary Engineering Report Overview

– Outline of PER– Evaluation Criteria– Recommended Route

Next Steps Questions

12/9/14 jvsalinas2

Page 3: Country Club Creek Trail Preliminary Engineering Report Public Outreach Jessica V. Salinas COA Project Manager December 9, 2014

Project Team

City Project Sponsor – Nadia Barrera, PWD City Project Manager – Jessica Salinas, PWD Project Consultant & Subconsultants:

– Civil Engineering Consultants – Gary Martin & Ken Thomas– CAS Consulting, Inc. – Cost Estimating and Utility Coordination– Harutunian Engineering, Inc. – Lighting Options– Hicks & Company – Environmental Investigation– HVJ – Geotechnical Investigation– Jaster Quintanilla San Antonio, LLP – Preliminary Structural Design– Macias & Associates, L.P. – Surveying and Parcel Information

12/9/14 jvsalinas3

Page 4: Country Club Creek Trail Preliminary Engineering Report Public Outreach Jessica V. Salinas COA Project Manager December 9, 2014

12/9/14 nbarrera4

Program Goals for Urban Trails

Easy access for transportation & recreation users. Link to bicycle & sidewalk network. Adequate size to accommodate recreation & transportation

uses. Incorporate amenities & features that transform them into

unique greenways that reflect the City around them. Provide adequate resources to maintain & operate. Ensure context-sensitivity & environmentally sustainability as

well as preservation and improvement upon wildlife habitat.

Page 5: Country Club Creek Trail Preliminary Engineering Report Public Outreach Jessica V. Salinas COA Project Manager December 9, 2014

12/9/14 jvsalinas5

Country Club Creek Trail Project Summary

Project Funded by 2010 Prop 1 & 2012 Prop 12 Preliminary Engineering Report: April 2014 – February 2015 Design Phase: Spring 2015 – Spring 2016

– Construction Estimate (w/20% Contingency) - $4,519,892

Construction – Pending Project Funding– Anticipated start Fall 2016

Project website: http://www.austintexas.gov/urbantrails

Page 6: Country Club Creek Trail Preliminary Engineering Report Public Outreach Jessica V. Salinas COA Project Manager December 9, 2014

Trail Vicinity Map

12/9/2014 jvsalinas6

Page 7: Country Club Creek Trail Preliminary Engineering Report Public Outreach Jessica V. Salinas COA Project Manager December 9, 2014

Country Club Creek Trail

12/9/14 jvsalinas7

• Approximately 3-mile multi-use path generally running along Country Club Creek connecting Lady Bird Lake to Mabel Davis Park in southeast Austin.

• Two segments of the trail that need to be constructed

• 0.5 mile trail section - from Ventura Drive to Burleson Road through an existing City of Austin electric easement.

• Note: Existing segment along Pleasant Valley from Burleson Road to East Oltorf.

• 1 mile section - from East Oltorf to the existing gravel trail just north of Elmont Drive.

Page 8: Country Club Creek Trail Preliminary Engineering Report Public Outreach Jessica V. Salinas COA Project Manager December 9, 2014

Preliminary Engineering Report

The Preliminary Engineering Report consists of the following sections:Executive Summary Environmental Issues

Introduction Utilities Impact

Preliminary Trail Routes Structural Preliminary Design

Evaluation Criteria Lighting Options

Critical Water Quality Zone Opinion Of Probable Cost

Erosion Hazard Zone Route Evaluation

Drainage and Floodplain Recommended Option

Right-of-Way Summary & Next Steps

Trees12/9/14 cec8

Page 9: Country Club Creek Trail Preliminary Engineering Report Public Outreach Jessica V. Salinas COA Project Manager December 9, 2014

Evaluation Factors

The following factors were used to evaluate the different trail segments:Accessibility Right-of-Way

Connectivity Obstructions

Critical Water Quality Zone Tree Impacts

Erosion Hazard Zone Environmental

Floodplain/Drainage Impacts Cost

12/9/14 cec9

Page 10: Country Club Creek Trail Preliminary Engineering Report Public Outreach Jessica V. Salinas COA Project Manager December 9, 2014

TRAIL ROUTE

12/8/14 cec10

Page 11: Country Club Creek Trail Preliminary Engineering Report Public Outreach Jessica V. Salinas COA Project Manager December 9, 2014

12/9/14 jvsalinas11

Existing Austin Energy Easement

SEGMENT 1 Austin Energy right-of-way (ROW) from Ventura Drive to Burleson Rd

Page 12: Country Club Creek Trail Preliminary Engineering Report Public Outreach Jessica V. Salinas COA Project Manager December 9, 2014

12/9/14 jvsalinas12

Electric power ROW looking north from Ventura.

SEGMENT 1 Austin Energy right-of-way (ROW) from Ventura Drive to Burleson Rd

Page 13: Country Club Creek Trail Preliminary Engineering Report Public Outreach Jessica V. Salinas COA Project Manager December 9, 2014

Segment 2 – Existing Route along S. Pleasant Valley from Burleson to Oltorf

12/9/14 jvsalinas13

Page 14: Country Club Creek Trail Preliminary Engineering Report Public Outreach Jessica V. Salinas COA Project Manager December 9, 2014

SEGMENT 3 starting at S. Pleasant Valley Rd & E. Oltorf to Riverside Dr.

12/9/14 jvsalinas14

Page 15: Country Club Creek Trail Preliminary Engineering Report Public Outreach Jessica V. Salinas COA Project Manager December 9, 2014

SEGMENT 3 starting at S. Pleasant Valley Rd & E. Oltorf to Riverside Dr.

12/9/14 jvsalinas15

Oltorf facing west towards Pleasant Valley Looking south towards Riverside Dr.

Page 16: Country Club Creek Trail Preliminary Engineering Report Public Outreach Jessica V. Salinas COA Project Manager December 9, 2014

SEGMENT 3B Segment near Sheringham Dr

12/9/14 jvsalinas16

Page 17: Country Club Creek Trail Preliminary Engineering Report Public Outreach Jessica V. Salinas COA Project Manager December 9, 2014

SEGMENT 4 Riverside Dr. & Wickersham Intersection

12/9/14 jvsalinas17

Page 18: Country Club Creek Trail Preliminary Engineering Report Public Outreach Jessica V. Salinas COA Project Manager December 9, 2014

SEGMENT 4 starting at Riverside Dr. to Elmont Dr.

12/9/14 jvsalinas18

Wickersham Dr lookingnorth from E. Riverside Dr.

Northern Bridge of E. Riverside Dr from Wickersham Lane.

Page 19: Country Club Creek Trail Preliminary Engineering Report Public Outreach Jessica V. Salinas COA Project Manager December 9, 2014

SEGMENT 4 Riverside Dr. to Elmont Dr.

12/9/14 jvsalinas19

Page 20: Country Club Creek Trail Preliminary Engineering Report Public Outreach Jessica V. Salinas COA Project Manager December 9, 2014

SEGMENT 4 Riverside Dr. to Elmont Dr.

12/9/14 jvsalinas20

Page 21: Country Club Creek Trail Preliminary Engineering Report Public Outreach Jessica V. Salinas COA Project Manager December 9, 2014

SEGMENT 4 Wickersham Pavement Markings (West Side)

12/9/14 jvsalinas21

Page 22: Country Club Creek Trail Preliminary Engineering Report Public Outreach Jessica V. Salinas COA Project Manager December 9, 2014

SEGMENT 4 Wickersham Pavement Markings (West Side)

12/9/14 jvsalinas22

Page 23: Country Club Creek Trail Preliminary Engineering Report Public Outreach Jessica V. Salinas COA Project Manager December 9, 2014

SEGMENT 4 Wickersham Pavement Markings (East Side)

12/9/14 jvsalinas23

Page 24: Country Club Creek Trail Preliminary Engineering Report Public Outreach Jessica V. Salinas COA Project Manager December 9, 2014

12/9/14 jvsalinas24

Construction Estimate Section 1 & 2

Section                 Base Estimate                    20% Contingency           w/Lighting1                              $371,575                              $445,890                  $692,6442                              $35,362                 $42,435            $352,345

Page 25: Country Club Creek Trail Preliminary Engineering Report Public Outreach Jessica V. Salinas COA Project Manager December 9, 2014

12/9/14 jvsalinas25

Construction Estimate Section 3 & 4

Section                 Base Estimate                    20% Contingency            w/Lighting3B1                         $1,166,366                           $1,399,640                $1,840,3363C                           $1,406,156                           $1,687,387                $1,834,2864B1                         $787,116                              $944,539                   $1,549,733

TOTAL                   $3,766,575                           $4,519,891                   $6,269,344

Page 26: Country Club Creek Trail Preliminary Engineering Report Public Outreach Jessica V. Salinas COA Project Manager December 9, 2014

Next Steps

Dec 2014: Collect Public Input to PER– Open House– City Website

Jan 2015: Project Team to incorporate Feedback and update PER Jan 2015: City Stakeholder Final Review of PER Feb 2015: Follow-up Open House to present Final PER Spring 2015: Design Phase

12/9/14 jvsalinas26

Page 27: Country Club Creek Trail Preliminary Engineering Report Public Outreach Jessica V. Salinas COA Project Manager December 9, 2014

12/9/14 jvsalinas27

QUESTIONS

Page 28: Country Club Creek Trail Preliminary Engineering Report Public Outreach Jessica V. Salinas COA Project Manager December 9, 2014

TRAIL ROUTE

12/8/14 cec28

Page 29: Country Club Creek Trail Preliminary Engineering Report Public Outreach Jessica V. Salinas COA Project Manager December 9, 2014

12/9/14 jvsalinas29

BACK-UP

Page 30: Country Club Creek Trail Preliminary Engineering Report Public Outreach Jessica V. Salinas COA Project Manager December 9, 2014

Evaluation Factors (continued)

Accessibility – Primarily deciding how easy it is to comply with ADA requirements in a segment.

Connectivity – The ease of reaching destinations from the proposed trail. Critical Water Zone (CWQZ) – Indicates whether or not the trail segment is located in this

zone. Erosion Hazard Zone (EHZ) – Indicates whether the trail segment is in the EHZ or not. Floodplain/Drainage Impacts – Indicates whether or not the trail segment is located in the

floodplain and if there are any negative impacts to drainage. Right-of-Way – Indicates if a new easement is required in a trail segment. Obstructions – Indicates if there are features that would impact the location of the trail. Tree Impact – Indicates the impact to trees in a trail segment. Environmental – Indicates the whether or not environmental permits would be required. Cost – Indicates the relative cost in relation to the other options.

12/9/14 cec30