University of Southern California Center for Systems and Software Engineering
COSYSMO Workshop
Jared Fortune, [email protected]
USC ARR 2010Los Angeles, CA
![Page 2: COSYSMO Workshop Jared Fortune, USC fortune@usc.edu USC ARR 2010 Los Angeles, CA](https://reader036.vdocuments.site/reader036/viewer/2022081519/56649d395503460f94a12b43/html5/thumbnails/2.jpg)
University of Southern California Center for Systems and Software Engineering
Agenda8:00 - 8:15am Introduction Fortune
8:15 - 10:00am HSI Requirements Exercise Liu (MIT)
10:00 - 10:30am Break
10:30 - 11:30am Leading Indicators / Volatility Pena
11:30 - 12:00pm Affiliate Feedback and Discussion Fortune
12:00 - 1:00pm Lunch
2
![Page 3: COSYSMO Workshop Jared Fortune, USC fortune@usc.edu USC ARR 2010 Los Angeles, CA](https://reader036.vdocuments.site/reader036/viewer/2022081519/56649d395503460f94a12b43/html5/thumbnails/3.jpg)
University of Southern California Center for Systems and Software Engineering
Introduction
3
![Page 4: COSYSMO Workshop Jared Fortune, USC fortune@usc.edu USC ARR 2010 Los Angeles, CA](https://reader036.vdocuments.site/reader036/viewer/2022081519/56649d395503460f94a12b43/html5/thumbnails/4.jpg)
University of Southern California Center for Systems and Software Engineering
4
COSYSMO
SizeDrivers
EffortMultipliers
Effort
Calibration
# Requirements# Interfaces# Scenarios# Algorithms
- Application factors-8 factors
- Team factors-6 factors
COSYSMO Operational Concept
![Page 5: COSYSMO Workshop Jared Fortune, USC fortune@usc.edu USC ARR 2010 Los Angeles, CA](https://reader036.vdocuments.site/reader036/viewer/2022081519/56649d395503460f94a12b43/html5/thumbnails/5.jpg)
University of Southern California Center for Systems and Software Engineering
COSYSMO 2.0 Operational Concept
5
![Page 6: COSYSMO Workshop Jared Fortune, USC fortune@usc.edu USC ARR 2010 Los Angeles, CA](https://reader036.vdocuments.site/reader036/viewer/2022081519/56649d395503460f94a12b43/html5/thumbnails/6.jpg)
University of Southern California Center for Systems and Software Engineering
Model Form
6
![Page 7: COSYSMO Workshop Jared Fortune, USC fortune@usc.edu USC ARR 2010 Los Angeles, CA](https://reader036.vdocuments.site/reader036/viewer/2022081519/56649d395503460f94a12b43/html5/thumbnails/7.jpg)
University of Southern California Center for Systems and Software Engineering
Reuse CategoriesCategory Sub-Category Definition
I) New Products that are completely new
i) Design for Reuse
Products that require an additional upfront investment to improve the potential reusability
II) Modified Products that are inherited, but are tailored
ii) Deleted Products that are removed from the system
III) Adopted Products that are incorporated unmodified (a.k.a. “black box” reuse)
iii) Managed Products that are incorporated unmodified and with minimal testing
7
![Page 8: COSYSMO Workshop Jared Fortune, USC fortune@usc.edu USC ARR 2010 Los Angeles, CA](https://reader036.vdocuments.site/reader036/viewer/2022081519/56649d395503460f94a12b43/html5/thumbnails/8.jpg)
University of Southern California Center for Systems and Software Engineering
Reuse Category Weights
8
![Page 9: COSYSMO Workshop Jared Fortune, USC fortune@usc.edu USC ARR 2010 Los Angeles, CA](https://reader036.vdocuments.site/reader036/viewer/2022081519/56649d395503460f94a12b43/html5/thumbnails/9.jpg)
University of Southern California Center for Systems and Software Engineering
COSYSMO 2.0 Implementation Results• Across 44 projects at 1
diversified organization• Using COSYSMO:
– PRED(.30) = 14%– PRED(.40) = 20%– PRED(.50) = 20%– R2 = 0.50
• Using COSYSMO 2.0:– PRED(.30) = 34%– PRED(.40) = 50%– PRED(.50) = 57%– R2 = 0.72
• Result: 36 of 44 (82%) estimates improved
September 10, 2009 9
![Page 10: COSYSMO Workshop Jared Fortune, USC fortune@usc.edu USC ARR 2010 Los Angeles, CA](https://reader036.vdocuments.site/reader036/viewer/2022081519/56649d395503460f94a12b43/html5/thumbnails/10.jpg)
University of Southern California Center for Systems and Software Engineering
Reuse Framework
10
![Page 11: COSYSMO Workshop Jared Fortune, USC fortune@usc.edu USC ARR 2010 Los Angeles, CA](https://reader036.vdocuments.site/reader036/viewer/2022081519/56649d395503460f94a12b43/html5/thumbnails/11.jpg)
University of Southern California Center for Systems and Software Engineering
11
Academic COSYSMO 2.0(without reuse)
ISE 650
![Page 12: COSYSMO Workshop Jared Fortune, USC fortune@usc.edu USC ARR 2010 Los Angeles, CA](https://reader036.vdocuments.site/reader036/viewer/2022081519/56649d395503460f94a12b43/html5/thumbnails/12.jpg)
University of Southern California Center for Systems and Software Engineering
September 10, 2009 12
Academic COSYSMO 2.0(with reuse)
![Page 13: COSYSMO Workshop Jared Fortune, USC fortune@usc.edu USC ARR 2010 Los Angeles, CA](https://reader036.vdocuments.site/reader036/viewer/2022081519/56649d395503460f94a12b43/html5/thumbnails/13.jpg)
University of Southern California Center for Systems and Software Engineering
Agenda8:00 - 8:15am Introduction Fortune
8:15 - 10:00am HSI Requirements Exercise Liu (MIT)
10:00 - 10:30am Break
10:30 - 11:30am Leading Indicators / Volatility Pena
11:30 - 12:00pm Affiliate Feedback and Discussion Fortune
12:00 - 1:00pm Lunch
13