costs and constraints in meeting ambitious scale...
TRANSCRIPT
Identification Linkage Treatment
Ages 15-19
Ages 2-14
Ages 0-2
$- $20 $40 $60 $80 $100 $120 $140 $160
$3$10 $68
$3 $12 $75
$7 $33 $108
2015 US$
Costs and Constraints in Meeting Ambitious Scale-up Targets for Pediatric and
Adolescent Antiretroviral Treatment in Kenya
INTRODUCTION• The PEPFAR and Children’s Investment Fund Foundation
(CIFF)-supported Accelerating Children’s HIV/AIDS Treatment (ACT) Initiative is a two-year effort to double the number of children and adolescents on antiretroviral treatment (ART) in nine sub-Saharan African countries, including Kenya.
• In Kenya, 12% of people living with HIV are children ages 0-14 years and 7% are adolescents, ages 15-19 years. The Government of Kenya (GOK) has set ambitious targets for children and adolescents living with HIV in the Kenya AIDS Strategic Framework. The GOK aims to increase ART coverage among children ages 0-14 and adolescents ages 15-19 from 25% and 36%, respectively, to 90% by 2019.
• There are losses along each stage of the pediatric treatment cascade in Kenya (Figure 1). To identify key barriers to ART scale-up among children and adolescents in Kenya, the USAID- and PEPFAR-funded Health Policy Project (HPP) conducted a qualitative analysis of the ART cascade from identification to retention, and estimated the financial resources needed to meet GOK and ACT targets for these age groups.
Health Policy Plus (HP+) is a five-year cooperative agreement funded by the U.S. Agency for International Development under Agreement No. AID-OAA-A-15-00051, beginning August 28, 2015. HP+ is implemented by Palladium, in collaboration with Avenir Health, Futures Group Global Outreach, Plan International USA, Population Reference Bureau, RTI International, the White Ribbon Alliance for Safe Motherhood (WRA), and ThinkWell.
The information provided in this document is not official U.S. Government information and does not necessarily represent the views or positions of the U.S. Agency for International Development.
METHODS• HPP conducted group interviews with 19 of the
28ACT implementing partners (IPs) in Kenya to better understand challenges and how to address them along the pediatric treatment cascade. Partners considered children ages 0-23 months, children ages 2-14 years, and adolescents ages 15-19 years separately.
• HPP estimated weighted average unit costs by age, stage along the cascade, and cost category. Disaggregated future targets by cascade stage and age group were projected using Spectrum and program data, and were multiplied by the unit costs per person, per year to estimate the total resource requirements.
• The unit cost analysis involved collecting outputs and financial data on ART service delivery and health systems strengthening activities from seven IPs and the prices of commodities for identification (including early infant diagnosis), laboratory monitoring, and antiretroviral drugs (ARVs) under local Global Fund grants.
RESULTS
Qualitative barrier analysis
• IPs cited case identification as the most critical challenge to ART scale-up, followed by failure of treatment initiation for newly-diagnosed, eligible pediatric patients.
• The primary cause of suboptimal identification rates is the lack of rapid test kits, along with the lack of an active case finding strategy.
• Poor connections between facilities and between departments within the same facility result in the loss of many eligible pediatric patients when they are tested in one location then referred to another for treatment.
• Stigma and discrimination also pose risks to treatment initiation, adherence, and retention among children and adolescents.
• IPs face many of the same bottlenecks, representing systemic challenges impeding progress toward ACT targets if left unaddressed.
Government of Kenya. Unpublished. 2015 National Spectrum Estimates and Projections. Nairobi: Government of Kenya.
National AIDS & STI Control Programme. 2012. Kenya AIDS Indicator Survey. Nairobi: Ministry of Health.
PEPFAR. 2014. Acceleration of Children’s Treatment (ACT) – Kenya Technical Strategy (Final draft, Dec. 18, 2014). Nairobi: PEPFAR.
Centers for Disease Control and Prevention (CDC). 2013. The Cost of Comprehensive HIV Treatment in Kenya: Report of a Cost Study of HIV Treatment Programs in Kenya. Atlanta and Nairobi: CDC and Kenya Ministry of Health.
• The unit costs of ARVs and laboratory reagents vary by age group. While commodity costs for identification are highest for children ages 0-2 years, costs of antiretroviral regimens increase with age, from US$104 per patient-year in patients ages 0-2 years to US$140 for those 15-19 years (Table 1).
Cost analysis
• The unit costs for essential treatment cascade activities funded by development partners are US$148, US$90, and US$81 per person for ages 0-23 months, 2-14 years, and 15-19 years, respectively (Figure 3). These costs include the cost of human resources, equipment, facility expenses, overhead, and other activities, such as trainings and meetings; they do not include the cost of ARVs and laboratory reagents.
Source: Authors’ analysis based on budget data for FYs 2014 and 2015. Data represents funding across PEPFAR and CIFF, and seven implementers. Costs include some supplies and essential laboratory consumables (if reported), but exclude ARVs and laboratory reagents.
Table 1. Unit Costs of Commodities for Pediatric and Adolescent ART Cascades, FY 2015
2015 US$
Step Type of Commodity Cost 0-2 years 2-14 years 15-19
years
Identification
Cost per test (EID: DNA PCR) $14 - -
Cost per test (HIV rapid test kit) - $0.81 $0.81
Cost per confirmed diagnosis $28 $2.77 $2.77
Treatment: ARVs
First line ART, per patient year $103.7 $110.1 $133.4
Second line ART, per patient year - $195.2 $258.5
Overall, per patient year $103.7 $114.4 $139.8
Treatment: Laboratory Monitoring
New patients, per patient year $21.1 $21.1 $20
Established patients, per patient year $19.3 $19.3 $19.3
Source: Authors’ analysis; CDC, 2013.Note: Data represents funding across PEPFAR and CIFF, and seven implementers.
• The total cost of commodities,2015-2020, is US$139 million, 65% for pediatric and 35% for adolescent ART (Figure 4). In addition, US$79 million will be required for essential support activities, assuming there are no scale efficiencies and that unit costs for these support activities also remain stable due to consistent design and delivery approaches.
Figure 4. Total Costs for Essential Support Activities and Key Commodities, 2015-2020
2020
2019
2018
2017
2016
2015
$0 $5 $10 $15 $20 $25 $30 $35 $40
Commodities 0-23 months
Commodities 15-19 yearsEssential support activities 2-14 years
Commodities 2-14 monthsEssential support activities 0-23 monthsEssential support activities 15-19 years
2015 US$, millions
$1.1
$1.6
$1.8
$2.4
$5.1
$3.9
$12.1
$12.5
$12.7
$13.2
$12.5
$12
$11.7
$10.1
$8.6
$7.2
$5.9
$4.4
$1
$1.4
$1.6
$1.8
$2.6
$1.9
$6.9
$7.1
$7.2
$7.8
$7.6
$7.7
$5.4
$4.7
$4.2
$3.7
$3.4
$3
CONCLUSIONS• Kenya must address implementation bottlenecks along
the ART cascade. Specific recommendations for the government include:
• Review rapid test kit quantification and consumption and increase purchasing and distribution of rapid test kits, to meet current and projected needs
• Implement an active case finding strategy
• Explore community-based strategies with strong links to facilities and improve clinical outcomes
• Develop guidelines to manage inter-facility transfers
• Conduct further research around sources of stigma and risks of disclosure, followed by an implementation plan to address related needs
• Improve laboratory infrastructure for viral load monitoring
• Develop guidelines for treating students in boarding school settings
• Though ACT contributes significant supplemental funding above regular PEPFAR support, the costs of increasing identification and linkage to care are significant to meet expanded ART targets in children and adolescents. These costs outstrip forecasted resources in future years after the ACT initiative ends, indicating the need for Kenya to raise significant additional resources.
• Further analysis is required of the sustainability implications of the costs projected in this study, as the costs faced by the GOK under a scenario of increased country ownership were not considered.
Source: Government of Kenya, Unpublished; NASCOP, 2012; PEPFAR, 2014.Note: Eligibility as per Kenya 2014 guidelines*Estimated
180,000160,000140,000120,000100,00080,00060,00040,00020,000
0
Children 0-14 living
with HIV
Eligible for Art
Diagnosed On ART Retained, Dec. 2015*
Virallysuppressed
Dec. 2015*
159,775
79%
54%
66,070
37%25%
41%
Figure 1. Children with HIV and the Pediatric (ages 0-14 years) ART Cascade, Kenya, 2014-2015
Late or missing identificationDelays in testing and resultsreportingLack of home-based testingCase finding targets lacking
Linkage with other child orsocial services
Lack of treatment quality andnon-standard care
Lack of timely enrollmentMonitoring and trackingof linage
Lack of adherence andcommunity treatment support
Identification
Linkage to care and treatment initiation
Treatment and retention
Cross-cutting issues: Stigma and discrimination, lack of community programming, weak supply chain, insufficient human resources, insufficient funding, lack of policies and standard operating procedures
Source: Authors.
Figure 2. Failure Points and Bottlenecks Along Pediatric Treatment Cascade Identified by IPs
Figure 3. Unit Costs of Essential Activities to Strengthen Pediatric and Adolescent ART Cascades
Source: Authors’ calculations using Spectrum and assumptions.
Figure 4. Total Costs for Essential Support Activities and Key Commodities, 2015-2020
PRESENTED BY:
Arin Dutta1
Sara Bowsky1
Daniel Mwai1 Catherine Barker1
Institution: 1Palladium, Washington, DC,
United States
21st International AIDS Conference
Durban, South AfricaJuly 18-22, 2016
Health Policy Plus 1331 Pennsylvania Ave NW,
Suite 600 Washington, DC 20004
www.healthpolicyplus.com [email protected]