costruction of 400feet amochu bailey suspension … · (art. 5.10 aashto lrfd 2007)...
TRANSCRIPT
COSTRUCTION OF 400feet AMOCHU BAILEY
SUSPENSION BRIDGE OVER AMOCHU ON
DOROKHA-DENCHUKHA FARM ROAD
UNDER SAMTSE DZONGKHAG.
DRAWING LIST
COVER PAGE
DRAWING NO.DESCRIPTION
LIST OF DRAWINGS
GENERAL NOTES(1)
SL.NO.
01
02
03
04
05
06
07
08
09
10
11
12
13
GENERAL PLAN(1)
RIGHT ABUTMENT DRAWINGS(1)
AM-DL-01
AM-NOT-02
AM-GP-04
AM-GE-06
AM-RABT-08
14
15
16
GENERAL NOTES(2) AM-NOT-03
GENERAL PLAN(2)
GENERAL ELEVATION(1)
GENERAL ELEVATION(2)
AM-GP-05
AM-GE-07
RIGHT ABUTMENT DRAWINGS(2)
RIGHT ABUTMENT DRAWINGS(3)
RIGHT ABUTMENT DRAWINGS(4)
RIGHT ABUTMENT DRAWINGS(5)
RIGHT ABUTMENT DRAWINGS(6)
RIGHT ABUTMENT DRAWINGS(7)
AM-RABT-09
AM-RABT-10
AM-RABT-11
AM-RABT-12
AM-RABT-13
AM-RABT-14
17
18
19
20
21
22
23
RIGHT ABUTMENT DRAWINGS(8)
RIGHT ABUTMENT DRAWINGS(9)-(REINF. LISTS)
AM-RABT-15
AM-RABT-16
AM-RABT-17
AM-RABT-18
RIGHT ABUTMENT DRAWINGS(10)-(REINF. LISTS)
RIGHT ABUTMENT DRAWINGS(11)-(REINF. LISTS)
RIGHT ANCHORAGE BLOCK DETAILS (1) AM-RAB-19
RIGHT ANCHORAGE BLOCK DETAILS (2)
RIGHT ANCHORAGE BLOCK DETAILS (3)
AM-RAB-20
AM-RAB-21
RIGHT ANCHORAGE BLOCK REINF. LISTS (1) AM-RAB-22
23
24
25
DRAWING NO.DESCRIPTIONSL.NO.
26
27
28
29
30
31
32
33
34
35
36
LEFT ABUTMENT DRAWINGS(1) AM-LABT-23
LEFT ABUTMENT DRAWINGS(2) AM-LABT-24
LEFT ABUTMENT DRAWINGS(3) AM-LABT-25
LEFT ABUTMENT DRAWINGS(4) AM-LABT-26
LEFT ABUTMENT DRAWINGS(5) AM-LABT-27
LEFT ABUTMENT DRAWINGS(6) AM-LABT-28
LEFT ABUTMENT DRAWINGS(7) AM-LABT-29
LEFT ABUTMENT DRAWINGS(8) AM-LABT-30
LEFT ABUTMENT REINF. LISTS (1) AM-LABT-31
AM-LABT-32
AM-LABT-33
LEFT ABUTMENT REINF. LISTS (2)
LEFT ABUTMENT REINF. LISTS (3)
AM-LAB-34LEFT ANCHORAGE BLOCK DETAILS
AM-LAB-35
AM-LAB-36
37
38
AM-LRC-37LEFT REPLACEMENT CONCRETE DETAILS
AM-LBW-38BREST WALL DETAILS
LEFT ANCHORAGE BLOCK DETAILS
LEFT ANCHORAGE BLOCK REINF. LISTS
SHEET CONTENTS :
ROYAL GOVERNMENT OF BHUTANMinistry of Works & Human settlement
Department of Roads, Bridge DivisionThimphu, Bhutan
DRAWING LIST
REVISION DATE DRAWING NO.
SCALE:
FIRST ISSUE
NAME & SIGNATURE
(as Sheet A3 size)
NTS
AM-DL-01DESIGN
M.N.LAMICHANEY (CE,BD)
DRAWN
CHECKED
APPROVED
PROJECT:
400 Feet BAILEY SUSPENSIONBRIDGE OVER AMOCHU ONDOROKHA-DENCHUKHA FARM ROAD
RINCHEN KHANDU (Dy. EE)CONSTRUCTION OFAMOCHU BAILEYSUSPENSION BRIDGE
August, 2012 KARMA WANGDI(EE, BD)
M.N.LAMICHANEY (CE,BD)
C. REINFORCEMENT1. ALL REINFORCING STEEL SHALL BE OF HIGHYIELD STRENGTH DEFORMED BARS (MIN fy = 500 MPa) CONFORMING TO IS 17862. BENDING OF REINFORCEMENT BARS SHALL BE AS PER ARTICLE 5.10.2 OFAASHTO / 2007.3. LAPS IN REINFORCEMENT BARS IN TENSION ZONE SHALL BE AVOIDED AS
FAR AS POSSIBLE. LAPS MAY BE PROVIDED, IF UNAVOIDABLE. HOWEVER,IN SUCH CASES:
(A) FOR 50 % OF REINFORCEMENT BARS LAP, LAP SPLICE OFCLLSS "B" SHALL BE USED AND FOR 100% LAP, LAP SPLICE OFCLASS "C" SHALL BE USED AS MENTION IN THE TABLE BELOW.
(B) FOR CLOSELY SPACED BARS LAPPING MAY BE AVOIDED BYPROVIDING SUITABLE TYPE OF MECHANICAL ANCHORAGE (WITH PRIOR APPROVAL).
(C) MINIMUM LAP LENGTH OF REINFORCEMENT SHALL CONFORM TO ARTICLE 5.11.2 AND 5.11.5 OF AASHTO / 2007SPECIFIED LENGTH OF THE LAP SPLICE SHALL BE
4. CLEAR CONCRETE COVER TO REINFORCING STEEL SHALL BE MAINTAINED AS FOLLOWS UNLESS OTHERWISE SHOWN IN THE DRAWINGS OR DIRECTED BY THE ENGINEER.
A. REINFORCED CONCRETE STRUCTURES
● FOOTING, ABUTMENT & RETURN WALLS - 75mm
5. SPECIALLY MADE COVER BLOCKS OF SAME STRENGTH AS THATOF CONCRETE SHALL ONLY BE USED.
6. WELDING OF REINFORCEMENT BARS SHALL NOT BE PERMITTED, UNLESS APPROVED BY THE ENGINEER.
7. SUPPORTING CHAIRS OF REQUIRED DIAMETER FOR MAIN REINFORCEMENT SHALL BE PROVIDED AT SUITABLE INTERVALS
AS PER DIRECTION OF THE ENGINER.
8. FULL COVER SHALL BE MAINTAINED AT GROOVES AND OTHERWISE ARCHITECTURAL FINISHES TO THE CONCRETE SURFACES.
D. WATERWATER TO BE USED IN CONCRETING AND CURING SHALL BE POTABLEWATER TO BE TESTED AS PER AASHTO T26-79.
E. MATERIAL SPECIFICATIONMATERIAL SPECIFICATIONS AND WORKMANSHIP SHALL BE IN ACCORDANCEWITH THE TECHNICAL SPECIFICATION AS SPELT OUT IN THE CONTRACTDOCUMENT.
F. WORKMANSHIP / DETAILING1. ALL SHARP EDGES OF CONCRETE SHALL BE CHAMFERED
(10mm x 10mm). OR AS PER DIRECTED BY THE ENGINEER
2. FORM WORK DETAILS SHALL BE SUBMITTED BY THE CONTRACTOR FOR THE APPROVAL AND SHALL BE TESTED IN ACCORDANCE WITH THE SPECIFICATION.
3. CONSTRUCTION JOINT : THE LOCATIONS AND PROVISION OF CONSTRUCTION JOINTS SHALL BE APPROVED BY THEENGINEER-IN-CHARGE. THE CONCRETING OPERATION SHALLBE CARRIED CONTINUOUSLY UP TO THE CONSTRUCTION JOINT.
B. CONCRETE;UNLESS OTHERWISE SPECIFICALLY MENTIONED IN THE DRAWING OR DIRECTEDBY THE ENGINEER, CONCRETE GRADE SHALL BE AS PER RELATED SECTION OFCONTRACT DOCUMENT PARTLY REPRODUCED BELOW:
APPLICATION LOCATION SPECIFIED COMPRESSIVE STRENGTH IN CUBE (28 DAYS) IN MPa
REINFORCED CONCRETE (RCC)
1. FOOTING SLAB, ABUTMENT & RETURN WALLS AND ANCHORAGE BLOCK M25 as per IS 456
PCC FOR LEVELING/BLINDING CONCRETEAND CONCRETE BLOCKS M10 as per IS 456
*** UNLESS OTHERWISE MENTIONED IN THE SPECIFICATION, THE TRIALMIX DESIGN STRENGTH SHALL BE ATLEAST 32Mpa for M25..
A. GENERAL1. THE NOTES IN THIS DRAWING SHALL BE READ INCONJUNCTION WITH ALL RELEVANT DRAWINGS PERTAINING TO THE BRIDGE.
2. UNLESS OTHERWISE SPECIFIED, ALL DIMENSIONS ARE IN MILLIMETER (mm) AND ALL LEVELS ARE IN m. DIMENSIONS ARE NOT TO BE SCALED AND ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED.
3. THE CONTRACTOR SHALL VERIFY ALL CHAINAGES, REDUCED LEVELS, COORDINATES AND DIMENSIONS BEFORE START OF THE WORK. IN CASEOF ANY DISCREPANCY, THE MATTER SHALL BE BROUGHT TO THE NOTICE OF THE ENGINEER BEFORE EXECUTION.
G. SUPERVISION1. THE CONSTRUCTION WORK MUST BE SUPERVISED BY A
COMPETENT SUPERVISION ENGINEER.2. THE BEARING CAPCITY OF THE SOIL IS ASSUMED AS 450KN/MM2 AT HE DEPTH OF 4.5M FROM THE EXISTING GROUND.(TO BE VERIFIED AT SITE BEFORE THE CONSTRUCTION)3. THE BACKFILLING BEHIND THE ABUTMENTS SHOULD BE DONE AFTER CASTING THE DECK SLAB. BACKFILLING BEFORE CASTING THE DECK SLAB IS STRICTLY PROHIBITED, SINCE IT IS DESGNED AS FRAME STRUCTURE.
GENERAL NOTES FOR RCC CONSTRUCTION
10 30012 41216 732
20 114422 138425 178728 2241
18 926
32 2927
BAR DIA,mmLAP SPLICE,mm(Class B)
LAP SPLICE,mm(Class C)
374538957
1495180923372931
1211
3828
220317563
880106413741724
713
2252
Dev. Length,mm(Ld)
SHEET CONTENTS :
ROYAL GOVERNMENT OF BHUTANMinistry of Works & Human settlement
Department of Roads, Bridge DivisionThimphu, Bhutan
GENERAL NOTES-1
REVISION DATE DRAWING NO.
SCALE:
FIRST ISSUE
NAME & SIGNATURE
(as Sheet A3 size)
NTS
AM-NOT-02DESIGN
DRAWN
CHECKED
APPROVED
PROJECT:
M.N.LAMICHANEY (CE,BD)
400 Feet BAILEY SUSPENSIONBRIDGE OVER AMOCHU ONDOROKHA-DENCHUKHA FARM ROAD
RINCHEN KHANDU (Dy. EE)CONSTRUCTION OFAMOCHU BAILEYSUSPENSION BRIDGE
August, 2012 KARMA WANGDI(EE, BD)
M.N.LAMICHANEY (CE,BD)
SHAPE CODE
SHPAE
00
a
11
b
Total Length :a
a
Total Length :
r
a
bd
c51
Total Length :2(a+b)+16d
21
b
a c
Total Length :a+b+c-r-2d
SHAPE CODE AS PER ISO 4066 : 2000
LEGEND :
r = BENDING RADIUS AS PER TABLE 4d = DIAMETER OF BARa/b/c/d = AS SHOWN
a+b - İ r-d
45Á HOOK
90Á HOOK
135Á HOOK
180Á HOOK
REBAR HOOK SPECIFICATION REBAR DESIGNATION DIA, mm
AREA, mm2
UNIT WT., kg/m REBAR TYPE
T10 10 79 0.617 IS : 1786 GRADE Fe 500T12 12 113 0.888T16 16 201 1.578T20 20 314 2.466T25 25 491 3.853T28 28 616 4.834T32 32 804 6.313
IS : 1786 GRADE Fe 500IS : 1786 GRADE Fe 500IS : 1786 GRADE Fe 500IS : 1786 GRADE Fe 500IS : 1786 GRADE Fe 500
TABLE 3 : STANDARD RE-BAR PROPERTIES(UNIT WT. 0.00785 kg / mmĮ /m)
IS : 1786 GRADE Fe 500
1(ART. 5.10 AASHTO LRFD 2007)
TIE/STIRRUPS OTHER 900 1350 900 1800
T10 40 60 60 75 120 65T12 48 72 72 75 144 65T16 64 96 96 96 192 65T20 - 120 240 120 240 80T25 - 150 300 150 300 100T28 - 168 168 336 112T32 - 256 192 384 128
1 ALL REINFORCEMENT SHALL BE COLD BEND
REBAR DESIGNATION
BENDING DIAMETER
TIE/STIRRUPS
STANDARD HOOK EXTENSION, mm
OTHER
TABLE 4 : STANDARD HOOK AND BEND REQUIREMENT
SHEET CONTENTS :
ROYAL GOVERNMENT OF BHUTANMinistry of Works & Human settlement
Department of Roads, Bridge DivisionThimphu, Bhutan
GENERAL NOTES -2
REVISION DATE DRAWING NO.
SCALE:
FIRST ISSUE
NAME & SIGNATURE
(as Sheet A3 size)
NTS
AM-NOT-03DESIGN
DRAWN
CHECKED
APPROVED
PROJECT:
NOTES:
A. GENERALALL DIMENSIONS ARE IN MILLIMETER UNLESSOTHERWISE MENTIONED
B. SHAPE CODE & BAR SHAPETHE STANDARD SHAPE CODES AND ITS METHODOF MEASUREMENT HAVE BEEN PREPARED ASPER EUROPEAN STANDARD BS EN ISO 4006 : 2000.
TYPE OF REBAR DIA OF REBAR
SPACING
LOCATION/REMARKS
BAR MARK
NOS. OF BAR
BAR MARK
20 - 05 - T 20 - 150 - EF
M.N.LAMICHANEY (CE,BD)
400 Feet BAILEY SUSPENSIONBRIDGE OVER AMOCHU ONDOROKHA-DENCHUKHA FARM ROAD
RINCHEN KHANDU (Dy. EE)CONSTRUCTION OFAMOCHU BAILEYSUSPENSION BRIDGE
August, 2012 KARMA WANGDI(EE, BD)
M.N.LAMICHANEY (CE,BD)
SHEET CONTENTS :
ROYAL GOVERNMENT OF BHUTANMinistry of Works & Human settlement
Department of Roads, Bridge DivisionThimphu, Bhutan
GENERAL PLAN(1)
REVISION DATE DRAWING NO.
SCALE:
FIRST ISSUE
NAME & SIGNATURE
(as Sheet A3 size)
1:700
AM-GP-04DESIGN
DRAWN
CHECKED
APPROVED
PROJECT:
M.N.LAMICHANEY (CE,BD)
400 Feet BAILEY SUSPENSIONBRIDGE OVER AMOCHU ONDOROKHA-DENCHUKHA FARM ROAD
RINCHEN KHANDU (Dy. EE)CONSTRUCTION OFAMOCHU BAILEYSUSPENSION BRIDGE
August, 2012 KARMA WANGDI(EE, BD)
M.N.LAMICHANEY (CE,BD)
SHEET CONTENTS :
ROYAL GOVERNMENT OF BHUTANMinistry of Works & Human settlement
Department of Roads, Bridge DivisionThimphu, Bhutan
GENERAL PLAN(2)
REVISION DATE DRAWING NO.
SCALE:
FIRST ISSUE
NAME & SIGNATURE
(as Sheet A3 size)
1:500
AM-GP-05DESIGN
DRAWN
CHECKED
APPROVED
PROJECT:
M.N.LAMICHANEY (CE,BD)
400 Feet BAILEY SUSPENSIONBRIDGE OVER AMOCHU ONDOROKHA-DENCHUKHA FARM ROAD
RINCHEN KHANDU (Dy. EE)CONSTRUCTION OFAMOCHU BAILEYSUSPENSION BRIDGE
August, 2012 KARMA WANGDI(EE, BD)
M.N.LAMICHANEY (CE,BD)
SHEET CONTENTS :
ROYAL GOVERNMENT OF BHUTANMinistry of Works & Human settlement
Department of Roads, Bridge DivisionThimphu, Bhutan
GENERAL ELEVATION(1)
REVISION DATE DRAWING NO.
SCALE:
FIRST ISSUE
NAME & SIGNATURE
(as Sheet A3 size)
1:550
AM-GE-06DESIGN
DRAWN
CHECKED
APPROVED
PROJECT:
M.N.LAMICHANEY (CE,BD)
400 Feet BAILEY SUSPENSIONBRIDGE OVER AMOCHU ONDOROKHA-DENCHUKHA FARM ROAD
RINCHEN KHANDU (Dy. EE)CONSTRUCTION OFAMOCHU BAILEYSUSPENSION BRIDGE
August, 2012 KARMA WANGDI(EE, BD)
M.N.LAMICHANEY (CE,BD)
SHEET CONTENTS :
ROYAL GOVERNMENT OF BHUTANMinistry of Works & Human settlement
Department of Roads, Bridge DivisionThimphu, Bhutan
GENERAL ELEVATION(2)
REVISION DATE DRAWING NO.
SCALE:
FIRST ISSUE
NAME & SIGNATURE
(as Sheet A3 size)
1:450
AM-GE-07DESIGN
DRAWN
CHECKED
APPROVED
PROJECT:
M.N.LAMICHANEY (CE,BD)
400 Feet BAILEY SUSPENSIONBRIDGE OVER AMOCHU ONDOROKHA-DENCHUKHA FARM ROAD
RINCHEN KHANDU (Dy. EE)CONSTRUCTION OFAMOCHU BAILEYSUSPENSION BRIDGE
August, 2012 KARMA WANGDI(EE, BD)
M.N.LAMICHANEY (CE,BD)
SIDE ELEVATION FRONT ELEVATION (VIEW C-C)
CC
Weep holes 11cmÏ(HDPE Pipes) 1 in 20 slope
Weep holes 11cmÏ(HDPE Pipes) 1 in 20 slope
Filter material
500 mm thick
HH
SHEET CONTENTS :
ROYAL GOVERNMENT OF BHUTANMinistry of Works & Human settlement
Department of Roads, Bridge DivisionThimphu, Bhutan
RIGHT ABUTMENTDRAWINGS(1)
REVISION DATE DRAWING NO.
SCALE:
FIRST ISSUE
NAME & SIGNATURE
(as Sheet A3 size)
1:90
AM-RABT-08DESIGN
DRAWN
CHECKED
APPROVED
PROJECT:
M.N.LAMICHANEY (CE,BD)
400 Feet BAILEY SUSPENSIONBRIDGE OVER AMOCHU ONDOROKHA-DENCHUKHA FARM ROAD
RINCHEN KHANDU (Dy. EE)CONSTRUCTION OFAMOCHU BAILEYSUSPENSION BRIDGE
August, 2012 KARMA WANGDI(EE, BD)
M.N.LAMICHANEY (CE,BD)
FOOTING PLAN
ABUTMENT TOP PLAN
A A
EE
F F
SHEET CONTENTS :
ROYAL GOVERNMENT OF BHUTANMinistry of Works & Human settlement
Department of Roads, Bridge DivisionThimphu, Bhutan
RIGHT ABUTMENTDRAWINGS(2)
REVISION DATE DRAWING NO.
SCALE:
FIRST ISSUE
NAME & SIGNATURE
(as Sheet A3 size)
1:75
AM-RABT-09DESIGN
DRAWN
CHECKED
APPROVED
PROJECT:
M.N.LAMICHANEY (CE,BD)
400 Feet BAILEY SUSPENSIONBRIDGE OVER AMOCHU ONDOROKHA-DENCHUKHA FARM ROAD
RINCHEN KHANDU (Dy. EE)CONSTRUCTION OFAMOCHU BAILEYSUSPENSION BRIDGE
August, 2012 KARMA WANGDI(EE, BD)
M.N.LAMICHANEY (CE,BD)
FRONT ELEVATION (VIEW H-H)
Weep holes 11cmÏ(HDPE Pipes) 1 in 20 slope
Weep holes 11cmÏ(HDPE Pipes) 1 in 20 slope
Filter material
500 mm thick
SIDE ELEVATION
Weep holes 11cmÏ(HDPE Pipes) 1 in 20 slope
Weep holes 11cmÏ(HDPE Pipes) 1 in 20 slope
SHEET CONTENTS :
ROYAL GOVERNMENT OF BHUTANMinistry of Works & Human settlement
Department of Roads, Bridge DivisionThimphu, Bhutan
RIGHT ABUTMENTDRAWINGS(3)
REVISION DATE DRAWING NO.
SCALE:
FIRST ISSUE
NAME & SIGNATURE
(as Sheet A3 size)
1:75
AM-RABT-10DESIGN
DRAWN
CHECKED
APPROVED
PROJECT:
M.N.LAMICHANEY (CE,BD)
400 Feet BAILEY SUSPENSIONBRIDGE OVER AMOCHU ONDOROKHA-DENCHUKHA FARM ROAD
RINCHEN KHANDU (Dy. EE)CONSTRUCTION OFAMOCHU BAILEYSUSPENSION BRIDGE
August, 2012 KARMA WANGDI(EE, BD)
M.N.LAMICHANEY (CE,BD)
74-02-T16-130-BOTT
79-01-T16-130-BOTT
7x10=70-04-T20-Chairs
6x2=12-05-T16-Side Reinf.
6x2=12-03-T16-Face Reinf.
60=120-07-T20-160-TOP74=148-06-T20-140-TOP
93-08-T25-110-INNER69-09-T20-150-OUTER
9x2=18-10-T16-Face Reinf.
93-11-T20-110-INNER69-12-T20-150-OUTER
12x11=132-16-T12-1.0m-Spacres
84-14-T20-150-INNER81-15-T20-150-OUTER
69-18-T16-150-BOTTOM & TOP
7-20-T20-150-BOTTOM
38-24-T16-150-TOP
11-25-T16-1.0m-Spacers11-(26-29)-T16-1.0m-Spacers
22-19-T16-150-BOTTOM
69-17-T16-150-BOTTOM
3-21-T16-Side reinf.2-22-T16-Side reinf.
9x2=18-13-T16-Face Reinf.
REINFORCEMENT DETAILS (Section A-A)
B B
D D
69-23-T20-150-TOP +22-23-T20-100-TOP BEAM PORTION
SHEET CONTENTS :
ROYAL GOVERNMENT OF BHUTANMinistry of Works & Human settlement
Department of Roads, Bridge DivisionThimphu, Bhutan
RIGHT ABUTMENTDRAWINGS(4)
REVISION DATE DRAWING NO.
SCALE:
FIRST ISSUE
NAME & SIGNATURE
(as Sheet A3 size)
1:75
AM-RABT-11DESIGN
DRAWN
CHECKED
APPROVED
PROJECT:
M.N.LAMICHANEY (CE,BD)
400 Feet BAILEY SUSPENSIONBRIDGE OVER AMOCHU ONDOROKHA-DENCHUKHA FARM ROAD
RINCHEN KHANDU (Dy. EE)CONSTRUCTION OFAMOCHU BAILEYSUSPENSION BRIDGE
August, 2012 KARMA WANGDI(EE, BD)
M.N.LAMICHANEY (CE,BD)
93-08-T25-110-INNER
93-11-T20-110-INNER
69-09-T20-150-OUTER
69-12-T20-150-OUTER
84-14-T20-150-INNER
81-15-T20-150-OUTER
REINFORCEMENT DETAILS (View C-C)
16-23-T20-150-TOP
69-17-T16-150-BOTTOM
69-18-T16-150-BOTTOM & TOP
38-24-T16-150-TOP
7-20-T20-150-BOTTOM
ABUTMENT TOP REINFORCEMENT DETAILS (View D-D)
1x2=2-(39-54)-T12-150-STIRRUP
G G
13-23-T20-100-TOP BEAM PORTION
22-19-T16-150-BOTTOM
16-23-T20-150-TOP
17-23-T20-150-TOP
13-23-T20-100-TOP BEAM PORTION
SHEET CONTENTS :
ROYAL GOVERNMENT OF BHUTANMinistry of Works & Human settlement
Department of Roads, Bridge DivisionThimphu, Bhutan
RIGHT ABUTMENTDRAWINGS(5)
REVISION DATE DRAWING NO.
SCALE:
FIRST ISSUE
NAME & SIGNATURE
(as Sheet A3 size)
1:75
AB-RABT-12DESIGN
DRAWN
CHECKED
APPROVED
PROJECT:
M.N.LAMICHANEY (CE,BD)
400 Feet BAILEY SUSPENSIONBRIDGE OVER AMOCHU ONDOROKHA-DENCHUKHA FARM ROAD
RINCHEN KHANDU (Dy. EE)CONSTRUCTION OFAMOCHU BAILEYSUSPENSION BRIDGE
August, 2012 KARMA WANGDI(EE, BD)
M.N.LAMICHANEY (CE,BD)
79-01-T16-130-BOTT
74-02-T16-130-BOTT
60-07-T20-160-TOP
74-06-T20-140-TOP
FOOTING REINFORCEMENT DETAILS (View B-B)
83x2=166-55-T16-150-HUNCH REINF.
Mesh Type "A"2x2=4-56-T12-100-both directions
Mesh Type "B"2x2=4-57-T12-100-both directions
BEARING PAD REINFORCEMENT DETAILS
SHEET CONTENTS :
ROYAL GOVERNMENT OF BHUTANMinistry of Works & Human settlement
Department of Roads, Bridge DivisionThimphu, Bhutan
RIGHT ABUTMENTDRAWINGS(6)
REVISION DATE DRAWING NO.
SCALE:
FIRST ISSUE
NAME & SIGNATURE
(as Sheet A3 size)
1:75
AB-RABT-13DESIGN
DRAWN
CHECKED
APPROVED
PROJECT:
M.N.LAMICHANEY (CE,BD)
400 Feet BAILEY SUSPENSIONBRIDGE OVER AMOCHU ONDOROKHA-DENCHUKHA FARM ROAD
RINCHEN KHANDU (Dy. EE)CONSTRUCTION OFAMOCHU BAILEYSUSPENSION BRIDGE
August, 2012 KARMA WANGDI(EE, BD)
M.N.LAMICHANEY (CE,BD)
41x2=82-30-T25-110-INNER
31x2=62-31-T16-150-OUTER
41X2=82-32-T20-110-INNER
3x2=6-35-T16-Face Reinf.
3x2=6-34-T16-Face Reinf.
121x2=242-36-T20-110-INNER
103x2=206-37-T12-130-OUTER
13x6x2=156-38-T12-1.0m-Spacres
31X2=62-33-T16-150-OUTER
RETURN WALL REINFORCEMENT DETAILS (Section E-E)
41x2=82-30-T25-110-INNER
41X2=82-32-T20-110-INNER
31x2=62-31-T16-150-OUTER
31X2=62-33-T16-150-OUTER
121x2=242-36-T20-110-INNER
103x2=206-37-T12-130-OUTER
RETURN WALL REINFORCEMENT DETAILS (View F-F)
I I
H H
SHEET CONTENTS :
ROYAL GOVERNMENT OF BHUTANMinistry of Works & Human settlement
Department of Roads, Bridge DivisionThimphu, Bhutan
RIGHT ABUTMENTDRAWINGS(7)
REVISION DATE DRAWING NO.
SCALE:
FIRST ISSUE
NAME & SIGNATURE
(as Sheet A3 size)
1:75
AB-RABT-14DESIGN
DRAWN
CHECKED
APPROVED
PROJECT:
M.N.LAMICHANEY (CE,BD)
400 Feet BAILEY SUSPENSIONBRIDGE OVER AMOCHU ONDOROKHA-DENCHUKHA FARM ROAD
RINCHEN KHANDU (Dy. EE)CONSTRUCTION OFAMOCHU BAILEYSUSPENSION BRIDGE
August, 2012 KARMA WANGDI(EE, BD)
M.N.LAMICHANEY (CE,BD)
69-18-T16-150-BOTTOM & TOP
7-20-T20-150-BOTTOM
38-24-T16-150-TOP
11-25-T16-1.0m-Spacers
22-19-T16-150-BOTTOM
69-17-T16-150-BOTTOM
3-21-T16-Side reinf.2-22-T16-Side reinf.
1x2=2-(39-54)-T12-150-STIRRUP
REINFORCEMENT DETAILS (Section G-G)
41x2=82-30-T25-110-INNER
31x2=62-31-T16-150-OUTER
121x2=242-36-T20-110-INNER
103x2=206-37-T12-130-OUTER
RETURN WALL REINFORCEMENT DETAILS (Section H-H)
121x2=242-36-T20-110-INNER
103x2=206-37-T12-130-OUTER
RETURN WALL REINFORCEMENT DETAILS (Section I-I)
41X2=82-32-T20-110-INNER
31X2=62-33-T16-150-OUTER
69-23-T20-150-TOP +22-23-T20-100-TOP BEAM PORTION
SHEET CONTENTS :
ROYAL GOVERNMENT OF BHUTANMinistry of Works & Human settlement
Department of Roads, Bridge DivisionThimphu, Bhutan
RIGHT ABUTMENTDRAWINGS(8)
REVISION DATE DRAWING NO.
SCALE:
FIRST ISSUE
NAME & SIGNATURE
(as Sheet A3 size)
1:50
AB-RABT-15DESIGN
DRAWN
CHECKED
APPROVED
PROJECT:
M.N.LAMICHANEY (CE,BD)
400 Feet BAILEY SUSPENSIONBRIDGE OVER AMOCHU ONDOROKHA-DENCHUKHA FARM ROAD
RINCHEN KHANDU (Dy. EE)CONSTRUCTION OFAMOCHU BAILEYSUSPENSION BRIDGE
August, 2012 KARMA WANGDI(EE, BD)
M.N.LAMICHANEY (CE,BD)
SHEET CONTENTS :
ROYAL GOVERNMENT OF BHUTANMinistry of Works & Human settlement
Department of Roads, Bridge DivisionThimphu, Bhutan
RIGHT ABUTMENTDRAWINGS(9)REINF. LISTS
REVISION DATE DRAWING NO.
SCALE:
FIRST ISSUE
NAME & SIGNATURE
(as Sheet A3 size)
NTS
AB-RABT-16DESIGN
DRAWN
CHECKED
APPROVED
PROJECT:
M.N.LAMICHANEY (CE,BD)
400 Feet BAILEY SUSPENSIONBRIDGE OVER AMOCHU ONDOROKHA-DENCHUKHA FARM ROAD
RINCHEN KHANDU (Dy. EE)CONSTRUCTION OFAMOCHU BAILEYSUSPENSION BRIDGE
August, 2012 KARMA WANGDI(EE, BD)
M.N.LAMICHANEY (CE,BD)
SHEET CONTENTS :
ROYAL GOVERNMENT OF BHUTANMinistry of Works & Human settlement
Department of Roads, Bridge DivisionThimphu, Bhutan
RIGHT ABUTMENTDRAWINGS(10)REINF. LISTS
REVISION DATE DRAWING NO.
SCALE:
FIRST ISSUE
NAME & SIGNATURE
(as Sheet A3 size)
NTS
AM-RABT-17DESIGN
DRAWN
CHECKED
APPROVED
PROJECT:
M.N.LAMICHANEY (CE,BD)
400 Feet BAILEY SUSPENSIONBRIDGE OVER AMOCHU ONDOROKHA-DENCHUKHA FARM ROAD
RINCHEN KHANDU (Dy. EE)CONSTRUCTION OFAMOCHU BAILEYSUSPENSION BRIDGE
August, 2012 KARMA WANGDI(EE, BD)
M.N.LAMICHANEY (CE,BD)
SHEET CONTENTS :
ROYAL GOVERNMENT OF BHUTANMinistry of Works & Human settlement
Department of Roads, Bridge DivisionThimphu, Bhutan
RIGHT ABUTMENTDRAWINGS(11)REINF. LISTS
REVISION DATE DRAWING NO.
SCALE:
FIRST ISSUE
NAME & SIGNATURE
(as Sheet A3 size)
NTS
AM-RABT-18DESIGN
DRAWN
CHECKED
APPROVED
PROJECT:
M.N.LAMICHANEY (CE,BD)
400 Feet BAILEY SUSPENSIONBRIDGE OVER AMOCHU ONDOROKHA-DENCHUKHA FARM ROAD
RINCHEN KHANDU (Dy. EE)CONSTRUCTION OFAMOCHU BAILEYSUSPENSION BRIDGE
August, 2012 KARMA WANGDI(EE, BD)
M.N.LAMICHANEY (CE,BD)
Ground Level Ground Level Ground Level Ground Level
SIDE ELEVATION
FRONT ELEVATION(View 1-1)
Undistrub soilUndistrub soil
Undistrub soilUndistrub soil
11
PLAN
3 3
SHEET CONTENTS :
ROYAL GOVERNMENT OF BHUTANMinistry of Works & Human settlement
Department of Roads, Bridge DivisionThimphu, Bhutan
RIGHT BANK ANCHORAGEBLOCK DETAILS (1)
REVISION DATE DRAWING NO.
SCALE:
FIRST ISSUE
NAME & SIGNATURE
(as Sheet A3 size)
1:75
AM-RAB-19DESIGN
DRAWN
CHECKED
APPROVED
PROJECT:
M.N.LAMICHANEY (CE,BD)
400 Feet BAILEY SUSPENSIONBRIDGE OVER AMOCHU ONDOROKHA-DENCHUKHA FARM ROAD
RINCHEN KHANDU (Dy. EE)CONSTRUCTION OFAMOCHU BAILEYSUSPENSION BRIDGE
August, 2012 KARMA WANGDI(EE, BD)
M.N.LAMICHANEY (CE,BD)
36x2x2=144-02-T20-150-FRONT Reinf.
36x2x2=144-01-T20-150-BACK Reinf.
36x2x4=288-07-T16-150-Anchorage Reinf.
27x2x2=108-03-T20-150-BOTT
31x2x2=124-05-T206-150-BACK
37x2x2=148-06-T20-150-TOP
34x2x2=136-04-T20-150-FRONT
11
2 2
REINFORCEMENT DETAILS (Section 3-3)
6x2x2=24-08-T16
Mesh Type "C"1x2=2-09-T16-100-both directions
SHEET CONTENTS :
ROYAL GOVERNMENT OF BHUTANMinistry of Works & Human settlement
Department of Roads, Bridge DivisionThimphu, Bhutan
RIGHT BANKANCHORAGEBLOCK DETAILS (2)
REVISION DATE DRAWING NO.
SCALE:
FIRST ISSUE
NAME & SIGNATURE
(as Sheet A3 size)
1:50
AM-RAB-20DESIGN
DRAWN
CHECKED
APPROVED
PROJECT:
M.N.LAMICHANEY (CE,BD)
400 Feet BAILEY SUSPENSIONBRIDGE OVER AMOCHU ONDOROKHA-DENCHUKHA FARM ROAD
RINCHEN KHANDU (Dy. EE)CONSTRUCTION OFAMOCHU BAILEYSUSPENSION BRIDGE
August, 2012 KARMA WANGDI(EE, BD)
M.N.LAMICHANEY (CE,BD)
REINFORCEMENT DETAILS (View 2-2)
REINFORCEMENT DETAILS (View 1-1)36x2x2=144-01-T20-150-BACK Reinf.
36x2x2=144-02-T20-150-FRONT Reinf.
37x2x2=148-06-T20-150-TOP
27x2x2=108-03-T20-150-BOTT
34x2x2=136-04-T20-150-FRONT36x2x2=144-02-T20-150FRONT Reinf.
36x2x2=144-01-T20-150BACK Reinf.
34x2x2=136-04-T20-150-FRONT
31x2x2=124-05-T20-150-BACK
SHEET CONTENTS :
ROYAL GOVERNMENT OF BHUTANMinistry of Works & Human settlement
Department of Roads, Bridge DivisionThimphu, Bhutan
RIGHT BANK ANCHORAGEBLOCK DETAILS (3)
REVISION DATE DRAWING NO.
SCALE:
FIRST ISSUE
NAME & SIGNATURE
(as Sheet A3 size)
1:50
AM-RAB-21DESIGN
DRAWN
CHECKED
APPROVED
PROJECT:
M.N.LAMICHANEY (CE,BD)
400 Feet BAILEY SUSPENSIONBRIDGE OVER AMOCHU ONDOROKHA-DENCHUKHA FARM ROAD
RINCHEN KHANDU (Dy. EE)CONSTRUCTION OFAMOCHU BAILEYSUSPENSION BRIDGE
August, 2012 KARMA WANGDI(EE, BD)
M.N.LAMICHANEY (CE,BD)
SHEET CONTENTS :
ROYAL GOVERNMENT OF BHUTANMinistry of Works & Human settlement
Department of Roads, Bridge DivisionThimphu, Bhutan
RIGHT BANK ANCHORAGEBLOCK REINF. LISTS(1)
REVISION DATE DRAWING NO.
SCALE:
FIRST ISSUE
NAME & SIGNATURE
(as Sheet A3 size)
1:50
AM-RAB-22DESIGN
DRAWN
CHECKED
APPROVED
PROJECT:
M.N.LAMICHANEY (CE,BD)
400 Feet BAILEY SUSPENSIONBRIDGE OVER AMOCHU ONDOROKHA-DENCHUKHA FARM ROAD
RINCHEN KHANDU (Dy. EE)CONSTRUCTION OFAMOCHU BAILEYSUSPENSION BRIDGE
August, 2012 KARMA WANGDI(EE, BD)
M.N.LAMICHANEY (CE,BD)
Weep holes 11cmÏ(HDPE Pipes) 1 in 20 slope
Filter material
500 mm thick
SIDE ELEVATION
FRONT ELEVATION (VIEW C-C)
Weep holes 11cmÏ(HDPE Pipes) 1 in 20 slope
CC
HH
SHEET CONTENTS :
ROYAL GOVERNMENT OF BHUTANMinistry of Works & Human settlement
Department of Roads, Bridge DivisionThimphu, Bhutan
LEFT ABUTMENTDRAWINGS(1)
REVISION DATE DRAWING NO.
SCALE:
FIRST ISSUE
NAME & SIGNATURE
(as Sheet A3 size)
1:75
AM-LABT-23DESIGN
DRAWN
CHECKED
APPROVED
PROJECT:
M.N.LAMICHANEY (CE,BD)
400 Feet BAILEY SUSPENSIONBRIDGE OVER AMOCHU ONDOROKHA-DENCHUKHA FARM ROAD
RINCHEN KHANDU (Dy. EE)CONSTRUCTION OFAMOCHU BAILEYSUSPENSION BRIDGE
August, 2012 KARMA WANGDI(EE, BD)
M.N.LAMICHANEY (CE,BD)
FOOTING PLAN
EE
FF
ABUTMENT TOP PLAN
AA
SHEET CONTENTS :
ROYAL GOVERNMENT OF BHUTANMinistry of Works & Human settlement
Department of Roads, Bridge DivisionThimphu, Bhutan
LEFT ABUTMENTDRAWINGS(2)
REVISION DATE DRAWING NO.
SCALE:
FIRST ISSUE
NAME & SIGNATURE
(as Sheet A3 size)
1:75
AM-LABT-24DESIGN
DRAWN
CHECKED
APPROVED
PROJECT:
M.N.LAMICHANEY (CE,BD)
400 Feet BAILEY SUSPENSIONBRIDGE OVER AMOCHU ONDOROKHA-DENCHUKHA FARM ROAD
RINCHEN KHANDU (Dy. EE)CONSTRUCTION OFAMOCHU BAILEYSUSPENSION BRIDGE
August, 2012 KARMA WANGDI(EE, BD)
M.N.LAMICHANEY (CE,BD)
FRONT ELEVATION (VIEW H-H)
Weep holes 11cmÏ(HDPE Pipes) 1 in 20 slope
Filter material
500 mm thick
Weep holes 11cmÏ(HDPE Pipes) 1 in 20 slope
Weep holes 11cmÏ(HDPE Pipes) 1 in 20 slope
Weep holes 11cmÏ(HDPE Pipes) 1 in 20 slope
SIDE ELEVATION
SHEET CONTENTS :
ROYAL GOVERNMENT OF BHUTANMinistry of Works & Human settlement
Department of Roads, Bridge DivisionThimphu, Bhutan
LEFT ABUTMENTDRAWINGS(3)
REVISION DATE DRAWING NO.
SCALE:
FIRST ISSUE
NAME & SIGNATURE
(as Sheet A3 size)
1:75
AM-LABT-25DESIGN
DRAWN
CHECKED
APPROVED
PROJECT:
M.N.LAMICHANEY (CE,BD)
400 Feet BAILEY SUSPENSIONBRIDGE OVER AMOCHU ONDOROKHA-DENCHUKHA FARM ROAD
RINCHEN KHANDU (Dy. EE)CONSTRUCTION OFAMOCHU BAILEYSUSPENSION BRIDGE
August, 2012 KARMA WANGDI(EE, BD)
M.N.LAMICHANEY (CE,BD)
REINFORCEMENT DETAILS (Section A-A)
BB
28-02-T16-180-BOTT
57-01-T16-180-BOTT
3x2=6-03-T16-Face Reinf.
3x10=30-04-T16-Chairs
41-07-T16-120-TOP86-06-T16-120-TOP
3x2=6-05-T16-Side Reinf.
34-12-T16-180-OUTER40-11-T16-150-INNER
69-09-T16-150-OUTER69-08-T20-150-INNER
6x10=60-13-T12-1.0m-Spacres
5x2=10-10-T16-Face Reinf.
24-16-T12-150-BOTTOM09-17-T12-150-BOTTOM
79-14-T16-130-BOTTOM69-15-T16-150-BOTTOM
2x2=4-18-T12-Side reinf.
10-(21-24)-T16-1.0m-Spacers
38-20-T16-150-TOP
61-19-T20-130-TOP +13X2=26-19-T20-100-TOP BEAM PORTION
DD
7x14=98-50-T25-800-both direction
Rock Anchorage
SHEET CONTENTS :
ROYAL GOVERNMENT OF BHUTANMinistry of Works & Human settlement
Department of Roads, Bridge DivisionThimphu, Bhutan
LEFT ABUTMENTDRAWINGS(4)
REVISION DATE DRAWING NO.
SCALE:
FIRST ISSUE
NAME & SIGNATURE
(as Sheet A3 size)
1:50
AM-LABT-26DESIGN
DRAWN
CHECKED
APPROVED
PROJECT:
M.N.LAMICHANEY (CE,BD)
400 Feet BAILEY SUSPENSIONBRIDGE OVER AMOCHU ONDOROKHA-DENCHUKHA FARM ROAD
RINCHEN KHANDU (Dy. EE)CONSTRUCTION OFAMOCHU BAILEYSUSPENSION BRIDGE
August, 2012 KARMA WANGDI(EE, BD)
M.N.LAMICHANEY (CE,BD)
AA
FOOTING REINFORCEMENT DETAILS (View B-B)
40x2=80-25-T16-150-HUNCH REINF.
57-01-T16-180-BOTT
86-06-T16-120-TOP
28-02-T16-180-BOTT
41-07-T16-120-TOP
40x2=80-25-T16-150-HUNCH REINF.
BEARING PAD REINFORCEMENT DETAILS
Mesh Type "A"2x2=4-48-T12-100-both directions
Mesh Type "B"2x2=4-49-T12-100-both directions
BOTTOM REINF.
TOP REINF.
SHEET CONTENTS :
ROYAL GOVERNMENT OF BHUTANMinistry of Works & Human settlement
Department of Roads, Bridge DivisionThimphu, Bhutan
LEFT ABUTMENTDRAWINGS(5)
REVISION DATE DRAWING NO.
SCALE:
FIRST ISSUE
NAME & SIGNATURE
(as Sheet A3 size)
1:75
AM-LABT-27DESIGN
DRAWN
CHECKED
APPROVED
PROJECT:
M.N.LAMICHANEY (CE,BD)
400 Feet BAILEY SUSPENSIONBRIDGE OVER AMOCHU ONDOROKHA-DENCHUKHA FARM ROAD
RINCHEN KHANDU (Dy. EE)CONSTRUCTION OFAMOCHU BAILEYSUSPENSION BRIDGE
August, 2012 KARMA WANGDI(EE, BD)
M.N.LAMICHANEY (CE,BD)
REINFORCEMENT DETAILS (View C-C)
69-08-T20-150-INNER
69-09-T16-150-OUTER
40-11-T16-150-INNER
34-12-T16-180-OUTER
BACKFILL SIDE
VALLEY SIDE
38-20-T16-150-TOP
ABUTMENT TOP REINFORCEMENT DETAILS (View D-D)
1x2=2-(26-42)-T12-150-STIRRUP
GG
13-19-T20-100-TOP BEAM PORTION
79-14-T16-130-BOTTOM
69-15-T16-150-BOTTOM
09-17-T12-150-BOTTOM
24-16-T12-150-BOTTOM
20-19-T20-130-TOP
20-19-T20-130-TOP
21-19-T20-130-TOP
13-19-T20-100-TOP BEAM PORTION
SHEET CONTENTS :
ROYAL GOVERNMENT OF BHUTANMinistry of Works & Human settlement
Department of Roads, Bridge DivisionThimphu, Bhutan
LEFT ABUTMENTDRAWINGS(6)
REVISION DATE DRAWING NO.
SCALE:
FIRST ISSUE
NAME & SIGNATURE
(as Sheet A3 size)
1:75
AM-LABT-28DESIGN
DRAWN
CHECKED
APPROVED
PROJECT:
M.N.LAMICHANEY (CE,BD)
400 Feet BAILEY SUSPENSIONBRIDGE OVER AMOCHU ONDOROKHA-DENCHUKHA FARM ROAD
RINCHEN KHANDU (Dy. EE)CONSTRUCTION OFAMOCHU BAILEYSUSPENSION BRIDGE
August, 2012 KARMA WANGDI(EE, BD)
M.N.LAMICHANEY (CE,BD)
17x2=34-44-T12-150-OUTER
17x2=34-43-T16-150-INNER
46x2=92-46-T12-150-OUTER46x2=92-45-T12-150-INNER
7X3x2=42-47-T12-1.0m-Spacres
17x2=34-43-T16-150-INNER
17x2=34-44-T12-150-OUTER
46x2=92-45-T12-150-INNER
46x2=92-46-T12-150-OUTER
RETURN WALL REINFORCEMENT DETAILS (View F-F) RETURN WALL REINFORCEMENT DETAILS (Section E-E)
BACKFILL SIDE
VALLEY SIDE
H H
SHEET CONTENTS :
ROYAL GOVERNMENT OF BHUTANMinistry of Works & Human settlement
Department of Roads, Bridge DivisionThimphu, Bhutan
LEFT ABUTMENTDRAWINGS(7)
REVISION DATE DRAWING NO.
SCALE:
FIRST ISSUE
NAME & SIGNATURE
(as Sheet A3 size)
1:60
AM-LABT-29DESIGN
DRAWN
CHECKED
APPROVED
PROJECT:
M.N.LAMICHANEY (CE,BD)
400 Feet BAILEY SUSPENSIONBRIDGE OVER AMOCHU ONDOROKHA-DENCHUKHA FARM ROAD
RINCHEN KHANDU (Dy. EE)CONSTRUCTION OFAMOCHU BAILEYSUSPENSION BRIDGE
August, 2012 KARMA WANGDI(EE, BD)
M.N.LAMICHANEY (CE,BD)
24-16-T12-150-BOTTOM09-17-T12-150-BOTTOM
79-14-T16-130-BOTTOM69-15-T16-150-BOTTOM
2-18-T12-Side reinf.
38-20-T16-150-TOP
61-19-T20-130-TOP +13X2=26-19-T20-100-TOP BEAM PORTION
2-18-T12-Side reinf.
1x2=2-(26-42)-T12-150-STIRRUP
REINFORCEMENT DETAILS (Section G-G)
RETURN WALL REINFORCEMENT DETAILS (Section H-H)
17x2=34-43-T16-150-INNER
17x2=34-44-T12-150-OUTER
46x2=92-45-T12-150-INNER
46x2=92-46-T12-150-OUTER
SHEET CONTENTS :
ROYAL GOVERNMENT OF BHUTANMinistry of Works & Human settlement
Department of Roads, Bridge DivisionThimphu, Bhutan
LEFT ABUTMENTDRAWINGS(8)
REVISION DATE DRAWING NO.
SCALE:
FIRST ISSUE
NAME & SIGNATURE
(as Sheet A3 size)
1:50
AM-LABT-30DESIGN
DRAWN
CHECKED
APPROVED
PROJECT:
M.N.LAMICHANEY (CE,BD)
400 Feet BAILEY SUSPENSIONBRIDGE OVER AMOCHU ONDOROKHA-DENCHUKHA FARM ROAD
RINCHEN KHANDU (Dy. EE)CONSTRUCTION OFAMOCHU BAILEYSUSPENSION BRIDGE
August, 2012 KARMA WANGDI(EE, BD)
M.N.LAMICHANEY (CE,BD)
SHEET CONTENTS :
ROYAL GOVERNMENT OF BHUTANMinistry of Works & Human settlement
Department of Roads, Bridge DivisionThimphu, Bhutan
LEFT ABUTMENT REINF.LISTS DETAILS (1)
REVISION DATE DRAWING NO.
SCALE:
FIRST ISSUE
NAME & SIGNATURE
(as Sheet A3 size)
1:50
AM-LABT-31DESIGN
DRAWN
CHECKED
APPROVED
PROJECT:
M.N.LAMICHANEY (CE,BD)
400 Feet BAILEY SUSPENSIONBRIDGE OVER AMOCHU ONDOROKHA-DENCHUKHA FARM ROAD
RINCHEN KHANDU (Dy. EE)CONSTRUCTION OFAMOCHU BAILEYSUSPENSION BRIDGE
August, 2012 KARMA WANGDI(EE, BD)
M.N.LAMICHANEY (CE,BD)
SHEET CONTENTS :
ROYAL GOVERNMENT OF BHUTANMinistry of Works & Human settlement
Department of Roads, Bridge DivisionThimphu, Bhutan
REVISION DATE DRAWING NO.
SCALE:
FIRST ISSUE
NAME & SIGNATURE
(as Sheet A3 size)
1:50
AM-LABT-32DESIGN
DRAWN
CHECKED
APPROVED
PROJECT:
M.N.LAMICHANEY (CE,BD)
400 Feet BAILEY SUSPENSIONBRIDGE OVER AMOCHU ONDOROKHA-DENCHUKHA FARM ROAD
RINCHEN KHANDU (Dy. EE)CONSTRUCTION OFAMOCHU BAILEYSUSPENSION BRIDGE
August, 2012 KARMA WANGDI(EE, BD)
M.N.LAMICHANEY (CE,BD)
LEFT ABUTMENT REINF.LISTS DETAILS (2)
SHEET CONTENTS :
ROYAL GOVERNMENT OF BHUTANMinistry of Works & Human settlement
Department of Roads, Bridge DivisionThimphu, Bhutan
REVISION DATE DRAWING NO.
SCALE:
FIRST ISSUE
NAME & SIGNATURE
(as Sheet A3 size)
1:50
AM-LABT-33DESIGN
DRAWN
CHECKED
APPROVED
PROJECT:
M.N.LAMICHANEY (CE,BD)
400 Feet BAILEY SUSPENSIONBRIDGE OVER AMOCHU ONDOROKHA-DENCHUKHA FARM ROAD
RINCHEN KHANDU (Dy. EE)CONSTRUCTION OFAMOCHU BAILEYSUSPENSION BRIDGE
August, 2012 KARMA WANGDI(EE, BD)
M.N.LAMICHANEY (CE,BD)
LEFT ABUTMENT REINF.LISTS DETAILS (3)
ROCK ANCHORAGE PLAN (View 5-5)
44
Minimum diameter of the hole required for25mm dia. anchorage is 34mm.
SECTION 4-4
Hard Rock
Hard Rock
5
5
8x5x2=80-10-T25-800-both directionRock Anchorage
SHEET CONTENTS :
ROYAL GOVERNMENT OF BHUTANMinistry of Works & Human settlement
Department of Roads, Bridge DivisionThimphu, Bhutan
LEFT ANCHORAGE BLOCKDETAILS
REVISION DATE DRAWING NO.
SCALE:
FIRST ISSUE
NAME & SIGNATURE
(as Sheet A3 size)
1:50
AM-LAB-34DESIGN
DRAWN
CHECKED
APPROVED
PROJECT:
M.N.LAMICHANEY (CE,BD)
400 Feet BAILEY SUSPENSIONBRIDGE OVER AMOCHU ONDOROKHA-DENCHUKHA FARM ROAD
RINCHEN KHANDU (Dy. EE)CONSTRUCTION OFAMOCHU BAILEYSUSPENSION BRIDGE
August, 2012 KARMA WANGDI(EE, BD)
M.N.LAMICHANEY (CE,BD)
10x2=20-02-T16-150-Bottom
41x2=82-01-T16-150-Bottom
Mesh Type "C"1x2=2-09-T16-100-both directions41x2=82-04-T16-150-Front
7x2x2=28-07-T16- Face Reinf.
41x2=82-03-T16-150-Back
21x2=42-05-T16-150-Back
8x2=16-08-T16-150-Top
24x2=48-06-T16-150-Front
SHEET CONTENTS :
ROYAL GOVERNMENT OF BHUTANMinistry of Works & Human settlement
Department of Roads, Bridge DivisionThimphu, Bhutan
LEFT ANCHORAGE BLOCKDETAILS
REVISION DATE DRAWING NO.
SCALE:
FIRST ISSUE
NAME & SIGNATURE
(as Sheet A3 size)
1:30
AM-LAB-35DESIGN
DRAWN
CHECKED
APPROVED
PROJECT:
M.N.LAMICHANEY (CE,BD)
400 Feet BAILEY SUSPENSIONBRIDGE OVER AMOCHU ONDOROKHA-DENCHUKHA FARM ROAD
RINCHEN KHANDU (Dy. EE)CONSTRUCTION OFAMOCHU BAILEYSUSPENSION BRIDGE
August, 2012 KARMA WANGDI(EE, BD)
M.N.LAMICHANEY (CE,BD)
SHEET CONTENTS :
ROYAL GOVERNMENT OF BHUTANMinistry of Works & Human settlement
Department of Roads, Bridge DivisionThimphu, Bhutan
LEFT ANCHORAGE BLOCKREINF. LISTS
REVISION DATE DRAWING NO.
SCALE:
FIRST ISSUE
NAME & SIGNATURE
(as Sheet A3 size)
NTS
AM-LAB-36DESIGN
DRAWN
CHECKED
APPROVED
PROJECT:
M.N.LAMICHANEY (CE,BD)
400 Feet BAILEY SUSPENSIONBRIDGE OVER AMOCHU ONDOROKHA-DENCHUKHA FARM ROAD
RINCHEN KHANDU (Dy. EE)CONSTRUCTION OFAMOCHU BAILEYSUSPENSION BRIDGE
August, 2012 KARMA WANGDI(EE, BD)
M.N.LAMICHANEY (CE,BD)
Replacement Concrete (M10)-side elevation
Replacement Concrete (M10)-Plan
SHEET CONTENTS :
ROYAL GOVERNMENT OF BHUTANMinistry of Works & Human settlement
Department of Roads, Bridge DivisionThimphu, Bhutan
LEFT REPLACEMENTCONCRETE BLOCK
DETAILS
REVISION DATE DRAWING NO.
SCALE:
FIRST ISSUE
NAME & SIGNATURE
(as Sheet A3 size)
1:75
AM-LRC-37DESIGN
DRAWN
CHECKED
APPROVED
PROJECT:
M.N.LAMICHANEY (CE,BD)
400 Feet BAILEY SUSPENSIONBRIDGE OVER AMOCHU ONDOROKHA-DENCHUKHA FARM ROAD
RINCHEN KHANDU (Dy. EE)CONSTRUCTION OFAMOCHU BAILEYSUSPENSION BRIDGE
August, 2012 KARMA WANGDI(EE, BD)
M.N.LAMICHANEY (CE,BD)
Note: (1) Provide Weep holes for wingwalls @1.5m c/c in Both direction
(2) The Dimension of weep hole is 10cmX10cm in Slope 1:20
(3) Provide Bond stone stagger @1m c/c in both direction
(3) Provide RRM in CM 1:4 for Wingwalls
Typical crossection of
right bank RRM wall
Levelling concrete
Grade M10
Random Rubble
Masonry in CM 1:4
Backfill sideValley Side
Levelling concrete
Grade M10
25mm expensiongap
Random Rubble
Masonry in CM 1:4
Front Elevation
(4) The wall height might change subject to present ground level
SHEET CONTENTS :
ROYAL GOVERNMENT OF BHUTANMinistry of Works & Human settlement
Department of Roads, Bridge DivisionThimphu, Bhutan
BREST WALL DETAILS
REVISION DATE DRAWING NO.
SCALE:
FIRST ISSUE
NAME & SIGNATURE
(as Sheet A3 size)
1:75
AM-LBW-38DESIGN
DRAWN
CHECKED
APPROVED
PROJECT:
M.N.LAMICHANEY (CE,BD)
400 Feet BAILEY SUSPENSIONBRIDGE OVER AMOCHU ONDOROKHA-DENCHUKHA FARM ROAD
RINCHEN KHANDU (Dy. EE)CONSTRUCTION OFAMOCHU BAILEYSUSPENSION BRIDGE
August, 2012 KARMA WANGDI(EE, BD)
M.N.LAMICHANEY (CE,BD)