Total Site Area (sqm) = 33543 5455.3 2378 2399.5 Total built area (sqm) = 2260 Total built area (sqft) = 24321 Task Name Cost Cost per sq.ft. TOTAL PROJECT COST ₹ 5,14,73,199 ₹ 2,116 SITE MOBILIZATION ₹ 6,94,600 ₹ 29 FOUNDATIONS ₹ 14,92,883 ₹ 61 CONCRETING ₹ 1,23,34,208 ₹ 507 MASONRY WORKS ₹ 53,72,675 ₹ 221 TERRACING ₹ 5,52,123 ₹ 23 PLASTERING ₹ 30,52,753 ₹ 126 ELECTRICAL ₹ 2,95,000 ₹ 12 EXTERNAL SANITATION & WATER SUPPLY ₹ 74,40,934 ₹ 306 INTERNAL SANITATION AND WATER SUPPLY ₹ 5,87,800 ₹ 24 FINISHES Flooring ₹ 27,67,464 ₹ 114 Doors/Windows ₹ 9,97,864 ₹ 41 Painting ₹ 16,54,645 ₹ 68 SITE DEVELOPMENT BOUNDARY WALL ₹ 89,64,000 ₹ 369 ROADS & FOOTPATHS ₹ 48,63,735 ₹ 200 LANDSCAPING ₹ 4,02,516 ₹ 17 SITE MOBILIZATION 1% FOUNDATIONS 3% CONCRETING 24% MASONRY WORKS 10% TERRACING 1% PLASTERING 6% ELECTRICAL 1% EXTERNAL SANITATION & WATER SUPPLY 14% INTERNAL SANITATION AND WATER SUPPLY 1% Flooring 5% Doors/Windows 2% Painting 3% BOUNDARY WALL 17% ROADS & FOOTPATHS 9% LANDSCAPING 1% COST DISTRIBUTION

Upload: pallav-paban-baruah

Post on 02-Feb-2016

212 views

Category:

Documents


0 download

DESCRIPTION

COST ESTIMATE

TRANSCRIPT

Page 1: Cost Per Sqft

Total Site Area (sqm) = 33543 5455.3 2378 2399.5Total built area (sqm) = 2260Total built area (sqft) = 24321

Task Name Cost Cost per sq.ft.

TOTAL PROJECT COST ₹ 5,14,73,199 ₹ 2,116SITE MOBILIZATION ₹ 6,94,600 ₹ 29FOUNDATIONS ₹ 14,92,883 ₹ 61CONCRETING ₹ 1,23,34,208 ₹ 507MASONRY WORKS ₹ 53,72,675 ₹ 221TERRACING ₹ 5,52,123 ₹ 23PLASTERING ₹ 30,52,753 ₹ 126ELECTRICAL ₹ 2,95,000 ₹ 12EXTERNAL SANITATION & WATER SUPPLY ₹ 74,40,934 ₹ 306

INTERNAL SANITATION AND WATER SUPPLY ₹ 5,87,800 ₹ 24

FINISHESFlooring ₹ 27,67,464 ₹ 114Doors/Windows ₹ 9,97,864 ₹ 41 Painting ₹ 16,54,645 ₹ 68SITE DEVELOPMENTBOUNDARY WALL ₹ 89,64,000 ₹ 369ROADS & FOOTPATHS ₹ 48,63,735 ₹ 200LANDSCAPING ₹ 4,02,516 ₹ 17

SITE MOBILIZATION1% FOUNDATIONS

3%

CONCRETING24%

MASONRY WORKS10%

TERRACING1%

PLASTERING6%ELECTRICAL

1%

EXTERNAL SANITATION & WATER SUPPLY

14%

INTERNAL SANITATION AND WATER SUPPLY

1%

Flooring5%

Doors/Windows2%

Painting3%

BOUNDARY WALL17%

ROADS & FOOTPATHS9%

LANDSCAPING1%

COST DISTRIBUTION