Cost of Compliance with the 2014 Massachusetts MS4
Permit
Massachusetts Department of Environmental Protection
Michael Giroux Cameron Peterson Eric Correia
The Massachusetts Department of Environmental Protection
Findings and Recommendations
Cost Analysis
Goals and Objectives
Background Information
Roadmap
Background
The Six Minimum Control Measures
The Central Massachusetts Regional StormwaterCoalition (Coalition)
Subject Towns Southbridge Holden Millbury
Worcester Polytechnic Institute
The Six Minimum Control Measures
WCPC DEP 20145
1 Public Education and Outreach
2 Public Involvement and Participation
3 Illicit Discharge Detection and Elimination (IDDE)
4 Construction Site Stormwater Runoff Control
5 Post Construction Site Runoff Control
6 Pollution Prevention and Good Housekeeping
Worcester Polytechnic Institute
Central Mass Regional Stormwater Coalition
WCPC DEP 20146
13 Original Towns in Fiscal Year
2012
17 More Joined in Fiscal Year 2013
Worcester Polytechnic Institute
Subject Towns
WCPC DEP 20147
Population 17636
Town Budget $52774844
Area 362 mi2
Percent Impervious 704
Holden
Worcester Polytechnic Institute
Subject Towns
WCPC DEP 20148
Population 16799
Town Budget $56739257
Area 209 mi2
Percent Impervious 869
Southbridge
Worcester Polytechnic Institute
Subject Towns
WCPC DEP 20149
Population 13305
Town Budget $9018827
Area 163 mi2
Percent Impervious 1309
Millbury
Project Goal and Objectives
Project Goal
Objectives
Worcester Polytechnic Institute
Project Goal
Provide the towns of Southbridge Holden and Millbury a comprehensive cost analysis of implementing the 2014 MS4 draft permit
WCPC DEP 201411
Worcester Polytechnic Institute
Objectives
bull Objective 1 Become Educated
bull
bull
bull
bull
bull
WCPC DEP 201412
Worcester Polytechnic Institute
Objectives
Objective 1 Become Educated
bull Objective 2 Assess Compliance
bull
bull
bull
bull
WCPC DEP 201413
Worcester Polytechnic Institute
Objectives
Objective 1 Become Educated
Objective 2 Assess Compliance
bull Objective 3 Current Total Expenditures
bull
bull
bull
WCPC DEP 201414
Worcester Polytechnic Institute
Objectives
Objective 1 Become Educated
Objective 2 Assess Compliance
Objective 3 Current Total Expenditures
bull Objective 4 Identify Necessary Changes
bull
bull
WCPC DEP 201415
Worcester Polytechnic Institute
Objectives
Objective 1 Become Educated
Objective 2 Assess Compliance
Objective 3 Current Total Expenditures
Objective 4 Identify Necessary Changes
bull Objective 5 Create a Detailed Cost Analysis
bull
WCPC DEP 201416
Worcester Polytechnic Institute
Objectives
Objective 1 Become Educated
Objective 2 Assess Compliance
Objective 3 Current Total Expenditures
Objective 4 Identify Necessary Changes
Objective 5 Create a Detailed Cost Analysis
bull Objective 6 Create an Informational Video
WCPC DEP 201417
Cost Analysis
Current Cost of Compliance
Example Cost Sheet Holden
Anticipated Future Costs for Complying with the 2014 MS4 Draft Permit
Worcester Polytechnic Institute
Current Cost of Compliance
WCPC DEP 201419
Control Measure
Holden Millbury Southbridge
Public Education
$1000 $566 $10952
Public Participation
$0 $3242 $0
IDDE $3520 $4678 $2452
Construction $0 $350 $0
PostConstruction
$1760 $0 $0
Good Housekeeping
$180246 $576124 $255200
Total $186526 $584960 $268604
Impervious Area 704 1309 869
Worcester Polytechnic Institute
Example Future Cost Chart Holden
WCPC DEP 201420
Control Measure
Annual CostOne-Time
CostIntermittent
Cost
Public Education
$9908 $0 $0
Public Participation
$0 $0 $0
IDDE $7872 $314494 $50440
Construction $0 $770 $0
Post-Construction
$5280 $1496 $7436
Good Housekeeping
$220562 $6292 $0
Miscellaneous $15168 $2376 $0
Total $258790 $325428 $57876
Worcester Polytechnic Institute
Example Future Cost Chart Holden
WCPC DEP 201421
Control Measure
Annual CostOne-Time
CostIntermittent
Cost
Public Education
$9908 $0 $0
Public Participation
$0 $0 $0
IDDE $7872 $314494 $50440
Construction $0 $770 $0
Post-Construction
$5280 $1496 $7436
Good Housekeeping
$220562 $6292 $0
Miscellaneous $15168 $2376 $0
Total $258790 $325428 $57876
Worcester Polytechnic Institute
Example Future Cost Chart Holden
WCPC DEP 201422
Control Measure
Annual CostOne-Time
CostIntermittent
Cost
Public Education
$9908 $0 $0
Public Participation
$0 $0 $0
IDDE $7872 $314494 $50440
Construction $0 $770 $0
Post-Construction
$5280 $1496 $7436
Good Housekeeping
$220562 $6292 $0
Miscellaneous $15168 $2376 $0
Total $258790 $325428 $57876
Worcester Polytechnic Institute
Anticipated Future Costs for Complying with the 2014 MS4 Draft Permit
WCPC DEP 201423
Holden Southbridge Millbury
Impervious Area
704 869 1309
Number of Outfalls
144 206 267
Current Cost $186526 $268604 $584960
Predicted Annual Cost
$258790 $343008 $735629
Percent Increase
39 28 26
Findings and Recommendations
Funding Techniques
Centralized Management
Innovative Funding
Regionalization
Worcester Polytechnic Institute
Finding amp Recommendation 1
Finding
bull Funding Techniques
CIC Grant
Alternatives
Millburyrsquos Technique
Recommendation
bull Seek Alternative Funding
604(b) Source Water Protection etc
25 WCPC DEP 2014
Worcester Polytechnic Institute
Finding amp Recommendation 2
Finding
bull Easier With Stormwater Coordinator
Scattered Information
Recommendation
bull Designated Person
DCR
26 WCPC DEP 2014
Worcester Polytechnic Institute
Finding amp Recommendation 3
Finding
bull Innovative Management
Millburyrsquos Piping
Art Contest
Recommendation
bull Be Creative
27 WCPC DEP 2014
Worcester Polytechnic Institute
Finding amp Recommendation 4
Finding
bull Regionalization Is Beneficial
More Efficient
High CostBenefit Ratio
Savings with Coalition
Recommendation
bull Form Coalitions
bull Work With Neighbors
28 WCPC DEP 2014
Worcester Polytechnic Institute
Citations
httpwwwepagovregion1npdesstormwatermaicMA_Imperv2010_Holdenpdf
httpwwwepagovregion1npdesstormwatermaicMA_Imperv2010_Millburypdf
httpwwwepagovregion1npdesstormwatermaicMA_Imperv2010_Millburypdf
httpsdlsgatewaydorstatemausDLSReportsDLSReportVieweraspxReportName=At_A_GlanceampReportTitle=At+A+Glance -
httpsrjengineeringcomservices_npdes_08html
WCPC DEP 201429
Questions
The Massachusetts Department of Environmental Protection
Findings and Recommendations
Cost Analysis
Goals and Objectives
Background Information
Roadmap
Background
The Six Minimum Control Measures
The Central Massachusetts Regional StormwaterCoalition (Coalition)
Subject Towns Southbridge Holden Millbury
Worcester Polytechnic Institute
The Six Minimum Control Measures
WCPC DEP 20145
1 Public Education and Outreach
2 Public Involvement and Participation
3 Illicit Discharge Detection and Elimination (IDDE)
4 Construction Site Stormwater Runoff Control
5 Post Construction Site Runoff Control
6 Pollution Prevention and Good Housekeeping
Worcester Polytechnic Institute
Central Mass Regional Stormwater Coalition
WCPC DEP 20146
13 Original Towns in Fiscal Year
2012
17 More Joined in Fiscal Year 2013
Worcester Polytechnic Institute
Subject Towns
WCPC DEP 20147
Population 17636
Town Budget $52774844
Area 362 mi2
Percent Impervious 704
Holden
Worcester Polytechnic Institute
Subject Towns
WCPC DEP 20148
Population 16799
Town Budget $56739257
Area 209 mi2
Percent Impervious 869
Southbridge
Worcester Polytechnic Institute
Subject Towns
WCPC DEP 20149
Population 13305
Town Budget $9018827
Area 163 mi2
Percent Impervious 1309
Millbury
Project Goal and Objectives
Project Goal
Objectives
Worcester Polytechnic Institute
Project Goal
Provide the towns of Southbridge Holden and Millbury a comprehensive cost analysis of implementing the 2014 MS4 draft permit
WCPC DEP 201411
Worcester Polytechnic Institute
Objectives
bull Objective 1 Become Educated
bull
bull
bull
bull
bull
WCPC DEP 201412
Worcester Polytechnic Institute
Objectives
Objective 1 Become Educated
bull Objective 2 Assess Compliance
bull
bull
bull
bull
WCPC DEP 201413
Worcester Polytechnic Institute
Objectives
Objective 1 Become Educated
Objective 2 Assess Compliance
bull Objective 3 Current Total Expenditures
bull
bull
bull
WCPC DEP 201414
Worcester Polytechnic Institute
Objectives
Objective 1 Become Educated
Objective 2 Assess Compliance
Objective 3 Current Total Expenditures
bull Objective 4 Identify Necessary Changes
bull
bull
WCPC DEP 201415
Worcester Polytechnic Institute
Objectives
Objective 1 Become Educated
Objective 2 Assess Compliance
Objective 3 Current Total Expenditures
Objective 4 Identify Necessary Changes
bull Objective 5 Create a Detailed Cost Analysis
bull
WCPC DEP 201416
Worcester Polytechnic Institute
Objectives
Objective 1 Become Educated
Objective 2 Assess Compliance
Objective 3 Current Total Expenditures
Objective 4 Identify Necessary Changes
Objective 5 Create a Detailed Cost Analysis
bull Objective 6 Create an Informational Video
WCPC DEP 201417
Cost Analysis
Current Cost of Compliance
Example Cost Sheet Holden
Anticipated Future Costs for Complying with the 2014 MS4 Draft Permit
Worcester Polytechnic Institute
Current Cost of Compliance
WCPC DEP 201419
Control Measure
Holden Millbury Southbridge
Public Education
$1000 $566 $10952
Public Participation
$0 $3242 $0
IDDE $3520 $4678 $2452
Construction $0 $350 $0
PostConstruction
$1760 $0 $0
Good Housekeeping
$180246 $576124 $255200
Total $186526 $584960 $268604
Impervious Area 704 1309 869
Worcester Polytechnic Institute
Example Future Cost Chart Holden
WCPC DEP 201420
Control Measure
Annual CostOne-Time
CostIntermittent
Cost
Public Education
$9908 $0 $0
Public Participation
$0 $0 $0
IDDE $7872 $314494 $50440
Construction $0 $770 $0
Post-Construction
$5280 $1496 $7436
Good Housekeeping
$220562 $6292 $0
Miscellaneous $15168 $2376 $0
Total $258790 $325428 $57876
Worcester Polytechnic Institute
Example Future Cost Chart Holden
WCPC DEP 201421
Control Measure
Annual CostOne-Time
CostIntermittent
Cost
Public Education
$9908 $0 $0
Public Participation
$0 $0 $0
IDDE $7872 $314494 $50440
Construction $0 $770 $0
Post-Construction
$5280 $1496 $7436
Good Housekeeping
$220562 $6292 $0
Miscellaneous $15168 $2376 $0
Total $258790 $325428 $57876
Worcester Polytechnic Institute
Example Future Cost Chart Holden
WCPC DEP 201422
Control Measure
Annual CostOne-Time
CostIntermittent
Cost
Public Education
$9908 $0 $0
Public Participation
$0 $0 $0
IDDE $7872 $314494 $50440
Construction $0 $770 $0
Post-Construction
$5280 $1496 $7436
Good Housekeeping
$220562 $6292 $0
Miscellaneous $15168 $2376 $0
Total $258790 $325428 $57876
Worcester Polytechnic Institute
Anticipated Future Costs for Complying with the 2014 MS4 Draft Permit
WCPC DEP 201423
Holden Southbridge Millbury
Impervious Area
704 869 1309
Number of Outfalls
144 206 267
Current Cost $186526 $268604 $584960
Predicted Annual Cost
$258790 $343008 $735629
Percent Increase
39 28 26
Findings and Recommendations
Funding Techniques
Centralized Management
Innovative Funding
Regionalization
Worcester Polytechnic Institute
Finding amp Recommendation 1
Finding
bull Funding Techniques
CIC Grant
Alternatives
Millburyrsquos Technique
Recommendation
bull Seek Alternative Funding
604(b) Source Water Protection etc
25 WCPC DEP 2014
Worcester Polytechnic Institute
Finding amp Recommendation 2
Finding
bull Easier With Stormwater Coordinator
Scattered Information
Recommendation
bull Designated Person
DCR
26 WCPC DEP 2014
Worcester Polytechnic Institute
Finding amp Recommendation 3
Finding
bull Innovative Management
Millburyrsquos Piping
Art Contest
Recommendation
bull Be Creative
27 WCPC DEP 2014
Worcester Polytechnic Institute
Finding amp Recommendation 4
Finding
bull Regionalization Is Beneficial
More Efficient
High CostBenefit Ratio
Savings with Coalition
Recommendation
bull Form Coalitions
bull Work With Neighbors
28 WCPC DEP 2014
Worcester Polytechnic Institute
Citations
httpwwwepagovregion1npdesstormwatermaicMA_Imperv2010_Holdenpdf
httpwwwepagovregion1npdesstormwatermaicMA_Imperv2010_Millburypdf
httpwwwepagovregion1npdesstormwatermaicMA_Imperv2010_Millburypdf
httpsdlsgatewaydorstatemausDLSReportsDLSReportVieweraspxReportName=At_A_GlanceampReportTitle=At+A+Glance -
httpsrjengineeringcomservices_npdes_08html
WCPC DEP 201429
Questions
Findings and Recommendations
Cost Analysis
Goals and Objectives
Background Information
Roadmap
Background
The Six Minimum Control Measures
The Central Massachusetts Regional StormwaterCoalition (Coalition)
Subject Towns Southbridge Holden Millbury
Worcester Polytechnic Institute
The Six Minimum Control Measures
WCPC DEP 20145
1 Public Education and Outreach
2 Public Involvement and Participation
3 Illicit Discharge Detection and Elimination (IDDE)
4 Construction Site Stormwater Runoff Control
5 Post Construction Site Runoff Control
6 Pollution Prevention and Good Housekeeping
Worcester Polytechnic Institute
Central Mass Regional Stormwater Coalition
WCPC DEP 20146
13 Original Towns in Fiscal Year
2012
17 More Joined in Fiscal Year 2013
Worcester Polytechnic Institute
Subject Towns
WCPC DEP 20147
Population 17636
Town Budget $52774844
Area 362 mi2
Percent Impervious 704
Holden
Worcester Polytechnic Institute
Subject Towns
WCPC DEP 20148
Population 16799
Town Budget $56739257
Area 209 mi2
Percent Impervious 869
Southbridge
Worcester Polytechnic Institute
Subject Towns
WCPC DEP 20149
Population 13305
Town Budget $9018827
Area 163 mi2
Percent Impervious 1309
Millbury
Project Goal and Objectives
Project Goal
Objectives
Worcester Polytechnic Institute
Project Goal
Provide the towns of Southbridge Holden and Millbury a comprehensive cost analysis of implementing the 2014 MS4 draft permit
WCPC DEP 201411
Worcester Polytechnic Institute
Objectives
bull Objective 1 Become Educated
bull
bull
bull
bull
bull
WCPC DEP 201412
Worcester Polytechnic Institute
Objectives
Objective 1 Become Educated
bull Objective 2 Assess Compliance
bull
bull
bull
bull
WCPC DEP 201413
Worcester Polytechnic Institute
Objectives
Objective 1 Become Educated
Objective 2 Assess Compliance
bull Objective 3 Current Total Expenditures
bull
bull
bull
WCPC DEP 201414
Worcester Polytechnic Institute
Objectives
Objective 1 Become Educated
Objective 2 Assess Compliance
Objective 3 Current Total Expenditures
bull Objective 4 Identify Necessary Changes
bull
bull
WCPC DEP 201415
Worcester Polytechnic Institute
Objectives
Objective 1 Become Educated
Objective 2 Assess Compliance
Objective 3 Current Total Expenditures
Objective 4 Identify Necessary Changes
bull Objective 5 Create a Detailed Cost Analysis
bull
WCPC DEP 201416
Worcester Polytechnic Institute
Objectives
Objective 1 Become Educated
Objective 2 Assess Compliance
Objective 3 Current Total Expenditures
Objective 4 Identify Necessary Changes
Objective 5 Create a Detailed Cost Analysis
bull Objective 6 Create an Informational Video
WCPC DEP 201417
Cost Analysis
Current Cost of Compliance
Example Cost Sheet Holden
Anticipated Future Costs for Complying with the 2014 MS4 Draft Permit
Worcester Polytechnic Institute
Current Cost of Compliance
WCPC DEP 201419
Control Measure
Holden Millbury Southbridge
Public Education
$1000 $566 $10952
Public Participation
$0 $3242 $0
IDDE $3520 $4678 $2452
Construction $0 $350 $0
PostConstruction
$1760 $0 $0
Good Housekeeping
$180246 $576124 $255200
Total $186526 $584960 $268604
Impervious Area 704 1309 869
Worcester Polytechnic Institute
Example Future Cost Chart Holden
WCPC DEP 201420
Control Measure
Annual CostOne-Time
CostIntermittent
Cost
Public Education
$9908 $0 $0
Public Participation
$0 $0 $0
IDDE $7872 $314494 $50440
Construction $0 $770 $0
Post-Construction
$5280 $1496 $7436
Good Housekeeping
$220562 $6292 $0
Miscellaneous $15168 $2376 $0
Total $258790 $325428 $57876
Worcester Polytechnic Institute
Example Future Cost Chart Holden
WCPC DEP 201421
Control Measure
Annual CostOne-Time
CostIntermittent
Cost
Public Education
$9908 $0 $0
Public Participation
$0 $0 $0
IDDE $7872 $314494 $50440
Construction $0 $770 $0
Post-Construction
$5280 $1496 $7436
Good Housekeeping
$220562 $6292 $0
Miscellaneous $15168 $2376 $0
Total $258790 $325428 $57876
Worcester Polytechnic Institute
Example Future Cost Chart Holden
WCPC DEP 201422
Control Measure
Annual CostOne-Time
CostIntermittent
Cost
Public Education
$9908 $0 $0
Public Participation
$0 $0 $0
IDDE $7872 $314494 $50440
Construction $0 $770 $0
Post-Construction
$5280 $1496 $7436
Good Housekeeping
$220562 $6292 $0
Miscellaneous $15168 $2376 $0
Total $258790 $325428 $57876
Worcester Polytechnic Institute
Anticipated Future Costs for Complying with the 2014 MS4 Draft Permit
WCPC DEP 201423
Holden Southbridge Millbury
Impervious Area
704 869 1309
Number of Outfalls
144 206 267
Current Cost $186526 $268604 $584960
Predicted Annual Cost
$258790 $343008 $735629
Percent Increase
39 28 26
Findings and Recommendations
Funding Techniques
Centralized Management
Innovative Funding
Regionalization
Worcester Polytechnic Institute
Finding amp Recommendation 1
Finding
bull Funding Techniques
CIC Grant
Alternatives
Millburyrsquos Technique
Recommendation
bull Seek Alternative Funding
604(b) Source Water Protection etc
25 WCPC DEP 2014
Worcester Polytechnic Institute
Finding amp Recommendation 2
Finding
bull Easier With Stormwater Coordinator
Scattered Information
Recommendation
bull Designated Person
DCR
26 WCPC DEP 2014
Worcester Polytechnic Institute
Finding amp Recommendation 3
Finding
bull Innovative Management
Millburyrsquos Piping
Art Contest
Recommendation
bull Be Creative
27 WCPC DEP 2014
Worcester Polytechnic Institute
Finding amp Recommendation 4
Finding
bull Regionalization Is Beneficial
More Efficient
High CostBenefit Ratio
Savings with Coalition
Recommendation
bull Form Coalitions
bull Work With Neighbors
28 WCPC DEP 2014
Worcester Polytechnic Institute
Citations
httpwwwepagovregion1npdesstormwatermaicMA_Imperv2010_Holdenpdf
httpwwwepagovregion1npdesstormwatermaicMA_Imperv2010_Millburypdf
httpwwwepagovregion1npdesstormwatermaicMA_Imperv2010_Millburypdf
httpsdlsgatewaydorstatemausDLSReportsDLSReportVieweraspxReportName=At_A_GlanceampReportTitle=At+A+Glance -
httpsrjengineeringcomservices_npdes_08html
WCPC DEP 201429
Questions
Background
The Six Minimum Control Measures
The Central Massachusetts Regional StormwaterCoalition (Coalition)
Subject Towns Southbridge Holden Millbury
Worcester Polytechnic Institute
The Six Minimum Control Measures
WCPC DEP 20145
1 Public Education and Outreach
2 Public Involvement and Participation
3 Illicit Discharge Detection and Elimination (IDDE)
4 Construction Site Stormwater Runoff Control
5 Post Construction Site Runoff Control
6 Pollution Prevention and Good Housekeeping
Worcester Polytechnic Institute
Central Mass Regional Stormwater Coalition
WCPC DEP 20146
13 Original Towns in Fiscal Year
2012
17 More Joined in Fiscal Year 2013
Worcester Polytechnic Institute
Subject Towns
WCPC DEP 20147
Population 17636
Town Budget $52774844
Area 362 mi2
Percent Impervious 704
Holden
Worcester Polytechnic Institute
Subject Towns
WCPC DEP 20148
Population 16799
Town Budget $56739257
Area 209 mi2
Percent Impervious 869
Southbridge
Worcester Polytechnic Institute
Subject Towns
WCPC DEP 20149
Population 13305
Town Budget $9018827
Area 163 mi2
Percent Impervious 1309
Millbury
Project Goal and Objectives
Project Goal
Objectives
Worcester Polytechnic Institute
Project Goal
Provide the towns of Southbridge Holden and Millbury a comprehensive cost analysis of implementing the 2014 MS4 draft permit
WCPC DEP 201411
Worcester Polytechnic Institute
Objectives
bull Objective 1 Become Educated
bull
bull
bull
bull
bull
WCPC DEP 201412
Worcester Polytechnic Institute
Objectives
Objective 1 Become Educated
bull Objective 2 Assess Compliance
bull
bull
bull
bull
WCPC DEP 201413
Worcester Polytechnic Institute
Objectives
Objective 1 Become Educated
Objective 2 Assess Compliance
bull Objective 3 Current Total Expenditures
bull
bull
bull
WCPC DEP 201414
Worcester Polytechnic Institute
Objectives
Objective 1 Become Educated
Objective 2 Assess Compliance
Objective 3 Current Total Expenditures
bull Objective 4 Identify Necessary Changes
bull
bull
WCPC DEP 201415
Worcester Polytechnic Institute
Objectives
Objective 1 Become Educated
Objective 2 Assess Compliance
Objective 3 Current Total Expenditures
Objective 4 Identify Necessary Changes
bull Objective 5 Create a Detailed Cost Analysis
bull
WCPC DEP 201416
Worcester Polytechnic Institute
Objectives
Objective 1 Become Educated
Objective 2 Assess Compliance
Objective 3 Current Total Expenditures
Objective 4 Identify Necessary Changes
Objective 5 Create a Detailed Cost Analysis
bull Objective 6 Create an Informational Video
WCPC DEP 201417
Cost Analysis
Current Cost of Compliance
Example Cost Sheet Holden
Anticipated Future Costs for Complying with the 2014 MS4 Draft Permit
Worcester Polytechnic Institute
Current Cost of Compliance
WCPC DEP 201419
Control Measure
Holden Millbury Southbridge
Public Education
$1000 $566 $10952
Public Participation
$0 $3242 $0
IDDE $3520 $4678 $2452
Construction $0 $350 $0
PostConstruction
$1760 $0 $0
Good Housekeeping
$180246 $576124 $255200
Total $186526 $584960 $268604
Impervious Area 704 1309 869
Worcester Polytechnic Institute
Example Future Cost Chart Holden
WCPC DEP 201420
Control Measure
Annual CostOne-Time
CostIntermittent
Cost
Public Education
$9908 $0 $0
Public Participation
$0 $0 $0
IDDE $7872 $314494 $50440
Construction $0 $770 $0
Post-Construction
$5280 $1496 $7436
Good Housekeeping
$220562 $6292 $0
Miscellaneous $15168 $2376 $0
Total $258790 $325428 $57876
Worcester Polytechnic Institute
Example Future Cost Chart Holden
WCPC DEP 201421
Control Measure
Annual CostOne-Time
CostIntermittent
Cost
Public Education
$9908 $0 $0
Public Participation
$0 $0 $0
IDDE $7872 $314494 $50440
Construction $0 $770 $0
Post-Construction
$5280 $1496 $7436
Good Housekeeping
$220562 $6292 $0
Miscellaneous $15168 $2376 $0
Total $258790 $325428 $57876
Worcester Polytechnic Institute
Example Future Cost Chart Holden
WCPC DEP 201422
Control Measure
Annual CostOne-Time
CostIntermittent
Cost
Public Education
$9908 $0 $0
Public Participation
$0 $0 $0
IDDE $7872 $314494 $50440
Construction $0 $770 $0
Post-Construction
$5280 $1496 $7436
Good Housekeeping
$220562 $6292 $0
Miscellaneous $15168 $2376 $0
Total $258790 $325428 $57876
Worcester Polytechnic Institute
Anticipated Future Costs for Complying with the 2014 MS4 Draft Permit
WCPC DEP 201423
Holden Southbridge Millbury
Impervious Area
704 869 1309
Number of Outfalls
144 206 267
Current Cost $186526 $268604 $584960
Predicted Annual Cost
$258790 $343008 $735629
Percent Increase
39 28 26
Findings and Recommendations
Funding Techniques
Centralized Management
Innovative Funding
Regionalization
Worcester Polytechnic Institute
Finding amp Recommendation 1
Finding
bull Funding Techniques
CIC Grant
Alternatives
Millburyrsquos Technique
Recommendation
bull Seek Alternative Funding
604(b) Source Water Protection etc
25 WCPC DEP 2014
Worcester Polytechnic Institute
Finding amp Recommendation 2
Finding
bull Easier With Stormwater Coordinator
Scattered Information
Recommendation
bull Designated Person
DCR
26 WCPC DEP 2014
Worcester Polytechnic Institute
Finding amp Recommendation 3
Finding
bull Innovative Management
Millburyrsquos Piping
Art Contest
Recommendation
bull Be Creative
27 WCPC DEP 2014
Worcester Polytechnic Institute
Finding amp Recommendation 4
Finding
bull Regionalization Is Beneficial
More Efficient
High CostBenefit Ratio
Savings with Coalition
Recommendation
bull Form Coalitions
bull Work With Neighbors
28 WCPC DEP 2014
Worcester Polytechnic Institute
Citations
httpwwwepagovregion1npdesstormwatermaicMA_Imperv2010_Holdenpdf
httpwwwepagovregion1npdesstormwatermaicMA_Imperv2010_Millburypdf
httpwwwepagovregion1npdesstormwatermaicMA_Imperv2010_Millburypdf
httpsdlsgatewaydorstatemausDLSReportsDLSReportVieweraspxReportName=At_A_GlanceampReportTitle=At+A+Glance -
httpsrjengineeringcomservices_npdes_08html
WCPC DEP 201429
Questions
Worcester Polytechnic Institute
The Six Minimum Control Measures
WCPC DEP 20145
1 Public Education and Outreach
2 Public Involvement and Participation
3 Illicit Discharge Detection and Elimination (IDDE)
4 Construction Site Stormwater Runoff Control
5 Post Construction Site Runoff Control
6 Pollution Prevention and Good Housekeeping
Worcester Polytechnic Institute
Central Mass Regional Stormwater Coalition
WCPC DEP 20146
13 Original Towns in Fiscal Year
2012
17 More Joined in Fiscal Year 2013
Worcester Polytechnic Institute
Subject Towns
WCPC DEP 20147
Population 17636
Town Budget $52774844
Area 362 mi2
Percent Impervious 704
Holden
Worcester Polytechnic Institute
Subject Towns
WCPC DEP 20148
Population 16799
Town Budget $56739257
Area 209 mi2
Percent Impervious 869
Southbridge
Worcester Polytechnic Institute
Subject Towns
WCPC DEP 20149
Population 13305
Town Budget $9018827
Area 163 mi2
Percent Impervious 1309
Millbury
Project Goal and Objectives
Project Goal
Objectives
Worcester Polytechnic Institute
Project Goal
Provide the towns of Southbridge Holden and Millbury a comprehensive cost analysis of implementing the 2014 MS4 draft permit
WCPC DEP 201411
Worcester Polytechnic Institute
Objectives
bull Objective 1 Become Educated
bull
bull
bull
bull
bull
WCPC DEP 201412
Worcester Polytechnic Institute
Objectives
Objective 1 Become Educated
bull Objective 2 Assess Compliance
bull
bull
bull
bull
WCPC DEP 201413
Worcester Polytechnic Institute
Objectives
Objective 1 Become Educated
Objective 2 Assess Compliance
bull Objective 3 Current Total Expenditures
bull
bull
bull
WCPC DEP 201414
Worcester Polytechnic Institute
Objectives
Objective 1 Become Educated
Objective 2 Assess Compliance
Objective 3 Current Total Expenditures
bull Objective 4 Identify Necessary Changes
bull
bull
WCPC DEP 201415
Worcester Polytechnic Institute
Objectives
Objective 1 Become Educated
Objective 2 Assess Compliance
Objective 3 Current Total Expenditures
Objective 4 Identify Necessary Changes
bull Objective 5 Create a Detailed Cost Analysis
bull
WCPC DEP 201416
Worcester Polytechnic Institute
Objectives
Objective 1 Become Educated
Objective 2 Assess Compliance
Objective 3 Current Total Expenditures
Objective 4 Identify Necessary Changes
Objective 5 Create a Detailed Cost Analysis
bull Objective 6 Create an Informational Video
WCPC DEP 201417
Cost Analysis
Current Cost of Compliance
Example Cost Sheet Holden
Anticipated Future Costs for Complying with the 2014 MS4 Draft Permit
Worcester Polytechnic Institute
Current Cost of Compliance
WCPC DEP 201419
Control Measure
Holden Millbury Southbridge
Public Education
$1000 $566 $10952
Public Participation
$0 $3242 $0
IDDE $3520 $4678 $2452
Construction $0 $350 $0
PostConstruction
$1760 $0 $0
Good Housekeeping
$180246 $576124 $255200
Total $186526 $584960 $268604
Impervious Area 704 1309 869
Worcester Polytechnic Institute
Example Future Cost Chart Holden
WCPC DEP 201420
Control Measure
Annual CostOne-Time
CostIntermittent
Cost
Public Education
$9908 $0 $0
Public Participation
$0 $0 $0
IDDE $7872 $314494 $50440
Construction $0 $770 $0
Post-Construction
$5280 $1496 $7436
Good Housekeeping
$220562 $6292 $0
Miscellaneous $15168 $2376 $0
Total $258790 $325428 $57876
Worcester Polytechnic Institute
Example Future Cost Chart Holden
WCPC DEP 201421
Control Measure
Annual CostOne-Time
CostIntermittent
Cost
Public Education
$9908 $0 $0
Public Participation
$0 $0 $0
IDDE $7872 $314494 $50440
Construction $0 $770 $0
Post-Construction
$5280 $1496 $7436
Good Housekeeping
$220562 $6292 $0
Miscellaneous $15168 $2376 $0
Total $258790 $325428 $57876
Worcester Polytechnic Institute
Example Future Cost Chart Holden
WCPC DEP 201422
Control Measure
Annual CostOne-Time
CostIntermittent
Cost
Public Education
$9908 $0 $0
Public Participation
$0 $0 $0
IDDE $7872 $314494 $50440
Construction $0 $770 $0
Post-Construction
$5280 $1496 $7436
Good Housekeeping
$220562 $6292 $0
Miscellaneous $15168 $2376 $0
Total $258790 $325428 $57876
Worcester Polytechnic Institute
Anticipated Future Costs for Complying with the 2014 MS4 Draft Permit
WCPC DEP 201423
Holden Southbridge Millbury
Impervious Area
704 869 1309
Number of Outfalls
144 206 267
Current Cost $186526 $268604 $584960
Predicted Annual Cost
$258790 $343008 $735629
Percent Increase
39 28 26
Findings and Recommendations
Funding Techniques
Centralized Management
Innovative Funding
Regionalization
Worcester Polytechnic Institute
Finding amp Recommendation 1
Finding
bull Funding Techniques
CIC Grant
Alternatives
Millburyrsquos Technique
Recommendation
bull Seek Alternative Funding
604(b) Source Water Protection etc
25 WCPC DEP 2014
Worcester Polytechnic Institute
Finding amp Recommendation 2
Finding
bull Easier With Stormwater Coordinator
Scattered Information
Recommendation
bull Designated Person
DCR
26 WCPC DEP 2014
Worcester Polytechnic Institute
Finding amp Recommendation 3
Finding
bull Innovative Management
Millburyrsquos Piping
Art Contest
Recommendation
bull Be Creative
27 WCPC DEP 2014
Worcester Polytechnic Institute
Finding amp Recommendation 4
Finding
bull Regionalization Is Beneficial
More Efficient
High CostBenefit Ratio
Savings with Coalition
Recommendation
bull Form Coalitions
bull Work With Neighbors
28 WCPC DEP 2014
Worcester Polytechnic Institute
Citations
httpwwwepagovregion1npdesstormwatermaicMA_Imperv2010_Holdenpdf
httpwwwepagovregion1npdesstormwatermaicMA_Imperv2010_Millburypdf
httpwwwepagovregion1npdesstormwatermaicMA_Imperv2010_Millburypdf
httpsdlsgatewaydorstatemausDLSReportsDLSReportVieweraspxReportName=At_A_GlanceampReportTitle=At+A+Glance -
httpsrjengineeringcomservices_npdes_08html
WCPC DEP 201429
Questions
Worcester Polytechnic Institute
Central Mass Regional Stormwater Coalition
WCPC DEP 20146
13 Original Towns in Fiscal Year
2012
17 More Joined in Fiscal Year 2013
Worcester Polytechnic Institute
Subject Towns
WCPC DEP 20147
Population 17636
Town Budget $52774844
Area 362 mi2
Percent Impervious 704
Holden
Worcester Polytechnic Institute
Subject Towns
WCPC DEP 20148
Population 16799
Town Budget $56739257
Area 209 mi2
Percent Impervious 869
Southbridge
Worcester Polytechnic Institute
Subject Towns
WCPC DEP 20149
Population 13305
Town Budget $9018827
Area 163 mi2
Percent Impervious 1309
Millbury
Project Goal and Objectives
Project Goal
Objectives
Worcester Polytechnic Institute
Project Goal
Provide the towns of Southbridge Holden and Millbury a comprehensive cost analysis of implementing the 2014 MS4 draft permit
WCPC DEP 201411
Worcester Polytechnic Institute
Objectives
bull Objective 1 Become Educated
bull
bull
bull
bull
bull
WCPC DEP 201412
Worcester Polytechnic Institute
Objectives
Objective 1 Become Educated
bull Objective 2 Assess Compliance
bull
bull
bull
bull
WCPC DEP 201413
Worcester Polytechnic Institute
Objectives
Objective 1 Become Educated
Objective 2 Assess Compliance
bull Objective 3 Current Total Expenditures
bull
bull
bull
WCPC DEP 201414
Worcester Polytechnic Institute
Objectives
Objective 1 Become Educated
Objective 2 Assess Compliance
Objective 3 Current Total Expenditures
bull Objective 4 Identify Necessary Changes
bull
bull
WCPC DEP 201415
Worcester Polytechnic Institute
Objectives
Objective 1 Become Educated
Objective 2 Assess Compliance
Objective 3 Current Total Expenditures
Objective 4 Identify Necessary Changes
bull Objective 5 Create a Detailed Cost Analysis
bull
WCPC DEP 201416
Worcester Polytechnic Institute
Objectives
Objective 1 Become Educated
Objective 2 Assess Compliance
Objective 3 Current Total Expenditures
Objective 4 Identify Necessary Changes
Objective 5 Create a Detailed Cost Analysis
bull Objective 6 Create an Informational Video
WCPC DEP 201417
Cost Analysis
Current Cost of Compliance
Example Cost Sheet Holden
Anticipated Future Costs for Complying with the 2014 MS4 Draft Permit
Worcester Polytechnic Institute
Current Cost of Compliance
WCPC DEP 201419
Control Measure
Holden Millbury Southbridge
Public Education
$1000 $566 $10952
Public Participation
$0 $3242 $0
IDDE $3520 $4678 $2452
Construction $0 $350 $0
PostConstruction
$1760 $0 $0
Good Housekeeping
$180246 $576124 $255200
Total $186526 $584960 $268604
Impervious Area 704 1309 869
Worcester Polytechnic Institute
Example Future Cost Chart Holden
WCPC DEP 201420
Control Measure
Annual CostOne-Time
CostIntermittent
Cost
Public Education
$9908 $0 $0
Public Participation
$0 $0 $0
IDDE $7872 $314494 $50440
Construction $0 $770 $0
Post-Construction
$5280 $1496 $7436
Good Housekeeping
$220562 $6292 $0
Miscellaneous $15168 $2376 $0
Total $258790 $325428 $57876
Worcester Polytechnic Institute
Example Future Cost Chart Holden
WCPC DEP 201421
Control Measure
Annual CostOne-Time
CostIntermittent
Cost
Public Education
$9908 $0 $0
Public Participation
$0 $0 $0
IDDE $7872 $314494 $50440
Construction $0 $770 $0
Post-Construction
$5280 $1496 $7436
Good Housekeeping
$220562 $6292 $0
Miscellaneous $15168 $2376 $0
Total $258790 $325428 $57876
Worcester Polytechnic Institute
Example Future Cost Chart Holden
WCPC DEP 201422
Control Measure
Annual CostOne-Time
CostIntermittent
Cost
Public Education
$9908 $0 $0
Public Participation
$0 $0 $0
IDDE $7872 $314494 $50440
Construction $0 $770 $0
Post-Construction
$5280 $1496 $7436
Good Housekeeping
$220562 $6292 $0
Miscellaneous $15168 $2376 $0
Total $258790 $325428 $57876
Worcester Polytechnic Institute
Anticipated Future Costs for Complying with the 2014 MS4 Draft Permit
WCPC DEP 201423
Holden Southbridge Millbury
Impervious Area
704 869 1309
Number of Outfalls
144 206 267
Current Cost $186526 $268604 $584960
Predicted Annual Cost
$258790 $343008 $735629
Percent Increase
39 28 26
Findings and Recommendations
Funding Techniques
Centralized Management
Innovative Funding
Regionalization
Worcester Polytechnic Institute
Finding amp Recommendation 1
Finding
bull Funding Techniques
CIC Grant
Alternatives
Millburyrsquos Technique
Recommendation
bull Seek Alternative Funding
604(b) Source Water Protection etc
25 WCPC DEP 2014
Worcester Polytechnic Institute
Finding amp Recommendation 2
Finding
bull Easier With Stormwater Coordinator
Scattered Information
Recommendation
bull Designated Person
DCR
26 WCPC DEP 2014
Worcester Polytechnic Institute
Finding amp Recommendation 3
Finding
bull Innovative Management
Millburyrsquos Piping
Art Contest
Recommendation
bull Be Creative
27 WCPC DEP 2014
Worcester Polytechnic Institute
Finding amp Recommendation 4
Finding
bull Regionalization Is Beneficial
More Efficient
High CostBenefit Ratio
Savings with Coalition
Recommendation
bull Form Coalitions
bull Work With Neighbors
28 WCPC DEP 2014
Worcester Polytechnic Institute
Citations
httpwwwepagovregion1npdesstormwatermaicMA_Imperv2010_Holdenpdf
httpwwwepagovregion1npdesstormwatermaicMA_Imperv2010_Millburypdf
httpwwwepagovregion1npdesstormwatermaicMA_Imperv2010_Millburypdf
httpsdlsgatewaydorstatemausDLSReportsDLSReportVieweraspxReportName=At_A_GlanceampReportTitle=At+A+Glance -
httpsrjengineeringcomservices_npdes_08html
WCPC DEP 201429
Questions
Worcester Polytechnic Institute
Subject Towns
WCPC DEP 20147
Population 17636
Town Budget $52774844
Area 362 mi2
Percent Impervious 704
Holden
Worcester Polytechnic Institute
Subject Towns
WCPC DEP 20148
Population 16799
Town Budget $56739257
Area 209 mi2
Percent Impervious 869
Southbridge
Worcester Polytechnic Institute
Subject Towns
WCPC DEP 20149
Population 13305
Town Budget $9018827
Area 163 mi2
Percent Impervious 1309
Millbury
Project Goal and Objectives
Project Goal
Objectives
Worcester Polytechnic Institute
Project Goal
Provide the towns of Southbridge Holden and Millbury a comprehensive cost analysis of implementing the 2014 MS4 draft permit
WCPC DEP 201411
Worcester Polytechnic Institute
Objectives
bull Objective 1 Become Educated
bull
bull
bull
bull
bull
WCPC DEP 201412
Worcester Polytechnic Institute
Objectives
Objective 1 Become Educated
bull Objective 2 Assess Compliance
bull
bull
bull
bull
WCPC DEP 201413
Worcester Polytechnic Institute
Objectives
Objective 1 Become Educated
Objective 2 Assess Compliance
bull Objective 3 Current Total Expenditures
bull
bull
bull
WCPC DEP 201414
Worcester Polytechnic Institute
Objectives
Objective 1 Become Educated
Objective 2 Assess Compliance
Objective 3 Current Total Expenditures
bull Objective 4 Identify Necessary Changes
bull
bull
WCPC DEP 201415
Worcester Polytechnic Institute
Objectives
Objective 1 Become Educated
Objective 2 Assess Compliance
Objective 3 Current Total Expenditures
Objective 4 Identify Necessary Changes
bull Objective 5 Create a Detailed Cost Analysis
bull
WCPC DEP 201416
Worcester Polytechnic Institute
Objectives
Objective 1 Become Educated
Objective 2 Assess Compliance
Objective 3 Current Total Expenditures
Objective 4 Identify Necessary Changes
Objective 5 Create a Detailed Cost Analysis
bull Objective 6 Create an Informational Video
WCPC DEP 201417
Cost Analysis
Current Cost of Compliance
Example Cost Sheet Holden
Anticipated Future Costs for Complying with the 2014 MS4 Draft Permit
Worcester Polytechnic Institute
Current Cost of Compliance
WCPC DEP 201419
Control Measure
Holden Millbury Southbridge
Public Education
$1000 $566 $10952
Public Participation
$0 $3242 $0
IDDE $3520 $4678 $2452
Construction $0 $350 $0
PostConstruction
$1760 $0 $0
Good Housekeeping
$180246 $576124 $255200
Total $186526 $584960 $268604
Impervious Area 704 1309 869
Worcester Polytechnic Institute
Example Future Cost Chart Holden
WCPC DEP 201420
Control Measure
Annual CostOne-Time
CostIntermittent
Cost
Public Education
$9908 $0 $0
Public Participation
$0 $0 $0
IDDE $7872 $314494 $50440
Construction $0 $770 $0
Post-Construction
$5280 $1496 $7436
Good Housekeeping
$220562 $6292 $0
Miscellaneous $15168 $2376 $0
Total $258790 $325428 $57876
Worcester Polytechnic Institute
Example Future Cost Chart Holden
WCPC DEP 201421
Control Measure
Annual CostOne-Time
CostIntermittent
Cost
Public Education
$9908 $0 $0
Public Participation
$0 $0 $0
IDDE $7872 $314494 $50440
Construction $0 $770 $0
Post-Construction
$5280 $1496 $7436
Good Housekeeping
$220562 $6292 $0
Miscellaneous $15168 $2376 $0
Total $258790 $325428 $57876
Worcester Polytechnic Institute
Example Future Cost Chart Holden
WCPC DEP 201422
Control Measure
Annual CostOne-Time
CostIntermittent
Cost
Public Education
$9908 $0 $0
Public Participation
$0 $0 $0
IDDE $7872 $314494 $50440
Construction $0 $770 $0
Post-Construction
$5280 $1496 $7436
Good Housekeeping
$220562 $6292 $0
Miscellaneous $15168 $2376 $0
Total $258790 $325428 $57876
Worcester Polytechnic Institute
Anticipated Future Costs for Complying with the 2014 MS4 Draft Permit
WCPC DEP 201423
Holden Southbridge Millbury
Impervious Area
704 869 1309
Number of Outfalls
144 206 267
Current Cost $186526 $268604 $584960
Predicted Annual Cost
$258790 $343008 $735629
Percent Increase
39 28 26
Findings and Recommendations
Funding Techniques
Centralized Management
Innovative Funding
Regionalization
Worcester Polytechnic Institute
Finding amp Recommendation 1
Finding
bull Funding Techniques
CIC Grant
Alternatives
Millburyrsquos Technique
Recommendation
bull Seek Alternative Funding
604(b) Source Water Protection etc
25 WCPC DEP 2014
Worcester Polytechnic Institute
Finding amp Recommendation 2
Finding
bull Easier With Stormwater Coordinator
Scattered Information
Recommendation
bull Designated Person
DCR
26 WCPC DEP 2014
Worcester Polytechnic Institute
Finding amp Recommendation 3
Finding
bull Innovative Management
Millburyrsquos Piping
Art Contest
Recommendation
bull Be Creative
27 WCPC DEP 2014
Worcester Polytechnic Institute
Finding amp Recommendation 4
Finding
bull Regionalization Is Beneficial
More Efficient
High CostBenefit Ratio
Savings with Coalition
Recommendation
bull Form Coalitions
bull Work With Neighbors
28 WCPC DEP 2014
Worcester Polytechnic Institute
Citations
httpwwwepagovregion1npdesstormwatermaicMA_Imperv2010_Holdenpdf
httpwwwepagovregion1npdesstormwatermaicMA_Imperv2010_Millburypdf
httpwwwepagovregion1npdesstormwatermaicMA_Imperv2010_Millburypdf
httpsdlsgatewaydorstatemausDLSReportsDLSReportVieweraspxReportName=At_A_GlanceampReportTitle=At+A+Glance -
httpsrjengineeringcomservices_npdes_08html
WCPC DEP 201429
Questions
Worcester Polytechnic Institute
Subject Towns
WCPC DEP 20148
Population 16799
Town Budget $56739257
Area 209 mi2
Percent Impervious 869
Southbridge
Worcester Polytechnic Institute
Subject Towns
WCPC DEP 20149
Population 13305
Town Budget $9018827
Area 163 mi2
Percent Impervious 1309
Millbury
Project Goal and Objectives
Project Goal
Objectives
Worcester Polytechnic Institute
Project Goal
Provide the towns of Southbridge Holden and Millbury a comprehensive cost analysis of implementing the 2014 MS4 draft permit
WCPC DEP 201411
Worcester Polytechnic Institute
Objectives
bull Objective 1 Become Educated
bull
bull
bull
bull
bull
WCPC DEP 201412
Worcester Polytechnic Institute
Objectives
Objective 1 Become Educated
bull Objective 2 Assess Compliance
bull
bull
bull
bull
WCPC DEP 201413
Worcester Polytechnic Institute
Objectives
Objective 1 Become Educated
Objective 2 Assess Compliance
bull Objective 3 Current Total Expenditures
bull
bull
bull
WCPC DEP 201414
Worcester Polytechnic Institute
Objectives
Objective 1 Become Educated
Objective 2 Assess Compliance
Objective 3 Current Total Expenditures
bull Objective 4 Identify Necessary Changes
bull
bull
WCPC DEP 201415
Worcester Polytechnic Institute
Objectives
Objective 1 Become Educated
Objective 2 Assess Compliance
Objective 3 Current Total Expenditures
Objective 4 Identify Necessary Changes
bull Objective 5 Create a Detailed Cost Analysis
bull
WCPC DEP 201416
Worcester Polytechnic Institute
Objectives
Objective 1 Become Educated
Objective 2 Assess Compliance
Objective 3 Current Total Expenditures
Objective 4 Identify Necessary Changes
Objective 5 Create a Detailed Cost Analysis
bull Objective 6 Create an Informational Video
WCPC DEP 201417
Cost Analysis
Current Cost of Compliance
Example Cost Sheet Holden
Anticipated Future Costs for Complying with the 2014 MS4 Draft Permit
Worcester Polytechnic Institute
Current Cost of Compliance
WCPC DEP 201419
Control Measure
Holden Millbury Southbridge
Public Education
$1000 $566 $10952
Public Participation
$0 $3242 $0
IDDE $3520 $4678 $2452
Construction $0 $350 $0
PostConstruction
$1760 $0 $0
Good Housekeeping
$180246 $576124 $255200
Total $186526 $584960 $268604
Impervious Area 704 1309 869
Worcester Polytechnic Institute
Example Future Cost Chart Holden
WCPC DEP 201420
Control Measure
Annual CostOne-Time
CostIntermittent
Cost
Public Education
$9908 $0 $0
Public Participation
$0 $0 $0
IDDE $7872 $314494 $50440
Construction $0 $770 $0
Post-Construction
$5280 $1496 $7436
Good Housekeeping
$220562 $6292 $0
Miscellaneous $15168 $2376 $0
Total $258790 $325428 $57876
Worcester Polytechnic Institute
Example Future Cost Chart Holden
WCPC DEP 201421
Control Measure
Annual CostOne-Time
CostIntermittent
Cost
Public Education
$9908 $0 $0
Public Participation
$0 $0 $0
IDDE $7872 $314494 $50440
Construction $0 $770 $0
Post-Construction
$5280 $1496 $7436
Good Housekeeping
$220562 $6292 $0
Miscellaneous $15168 $2376 $0
Total $258790 $325428 $57876
Worcester Polytechnic Institute
Example Future Cost Chart Holden
WCPC DEP 201422
Control Measure
Annual CostOne-Time
CostIntermittent
Cost
Public Education
$9908 $0 $0
Public Participation
$0 $0 $0
IDDE $7872 $314494 $50440
Construction $0 $770 $0
Post-Construction
$5280 $1496 $7436
Good Housekeeping
$220562 $6292 $0
Miscellaneous $15168 $2376 $0
Total $258790 $325428 $57876
Worcester Polytechnic Institute
Anticipated Future Costs for Complying with the 2014 MS4 Draft Permit
WCPC DEP 201423
Holden Southbridge Millbury
Impervious Area
704 869 1309
Number of Outfalls
144 206 267
Current Cost $186526 $268604 $584960
Predicted Annual Cost
$258790 $343008 $735629
Percent Increase
39 28 26
Findings and Recommendations
Funding Techniques
Centralized Management
Innovative Funding
Regionalization
Worcester Polytechnic Institute
Finding amp Recommendation 1
Finding
bull Funding Techniques
CIC Grant
Alternatives
Millburyrsquos Technique
Recommendation
bull Seek Alternative Funding
604(b) Source Water Protection etc
25 WCPC DEP 2014
Worcester Polytechnic Institute
Finding amp Recommendation 2
Finding
bull Easier With Stormwater Coordinator
Scattered Information
Recommendation
bull Designated Person
DCR
26 WCPC DEP 2014
Worcester Polytechnic Institute
Finding amp Recommendation 3
Finding
bull Innovative Management
Millburyrsquos Piping
Art Contest
Recommendation
bull Be Creative
27 WCPC DEP 2014
Worcester Polytechnic Institute
Finding amp Recommendation 4
Finding
bull Regionalization Is Beneficial
More Efficient
High CostBenefit Ratio
Savings with Coalition
Recommendation
bull Form Coalitions
bull Work With Neighbors
28 WCPC DEP 2014
Worcester Polytechnic Institute
Citations
httpwwwepagovregion1npdesstormwatermaicMA_Imperv2010_Holdenpdf
httpwwwepagovregion1npdesstormwatermaicMA_Imperv2010_Millburypdf
httpwwwepagovregion1npdesstormwatermaicMA_Imperv2010_Millburypdf
httpsdlsgatewaydorstatemausDLSReportsDLSReportVieweraspxReportName=At_A_GlanceampReportTitle=At+A+Glance -
httpsrjengineeringcomservices_npdes_08html
WCPC DEP 201429
Questions
Worcester Polytechnic Institute
Subject Towns
WCPC DEP 20149
Population 13305
Town Budget $9018827
Area 163 mi2
Percent Impervious 1309
Millbury
Project Goal and Objectives
Project Goal
Objectives
Worcester Polytechnic Institute
Project Goal
Provide the towns of Southbridge Holden and Millbury a comprehensive cost analysis of implementing the 2014 MS4 draft permit
WCPC DEP 201411
Worcester Polytechnic Institute
Objectives
bull Objective 1 Become Educated
bull
bull
bull
bull
bull
WCPC DEP 201412
Worcester Polytechnic Institute
Objectives
Objective 1 Become Educated
bull Objective 2 Assess Compliance
bull
bull
bull
bull
WCPC DEP 201413
Worcester Polytechnic Institute
Objectives
Objective 1 Become Educated
Objective 2 Assess Compliance
bull Objective 3 Current Total Expenditures
bull
bull
bull
WCPC DEP 201414
Worcester Polytechnic Institute
Objectives
Objective 1 Become Educated
Objective 2 Assess Compliance
Objective 3 Current Total Expenditures
bull Objective 4 Identify Necessary Changes
bull
bull
WCPC DEP 201415
Worcester Polytechnic Institute
Objectives
Objective 1 Become Educated
Objective 2 Assess Compliance
Objective 3 Current Total Expenditures
Objective 4 Identify Necessary Changes
bull Objective 5 Create a Detailed Cost Analysis
bull
WCPC DEP 201416
Worcester Polytechnic Institute
Objectives
Objective 1 Become Educated
Objective 2 Assess Compliance
Objective 3 Current Total Expenditures
Objective 4 Identify Necessary Changes
Objective 5 Create a Detailed Cost Analysis
bull Objective 6 Create an Informational Video
WCPC DEP 201417
Cost Analysis
Current Cost of Compliance
Example Cost Sheet Holden
Anticipated Future Costs for Complying with the 2014 MS4 Draft Permit
Worcester Polytechnic Institute
Current Cost of Compliance
WCPC DEP 201419
Control Measure
Holden Millbury Southbridge
Public Education
$1000 $566 $10952
Public Participation
$0 $3242 $0
IDDE $3520 $4678 $2452
Construction $0 $350 $0
PostConstruction
$1760 $0 $0
Good Housekeeping
$180246 $576124 $255200
Total $186526 $584960 $268604
Impervious Area 704 1309 869
Worcester Polytechnic Institute
Example Future Cost Chart Holden
WCPC DEP 201420
Control Measure
Annual CostOne-Time
CostIntermittent
Cost
Public Education
$9908 $0 $0
Public Participation
$0 $0 $0
IDDE $7872 $314494 $50440
Construction $0 $770 $0
Post-Construction
$5280 $1496 $7436
Good Housekeeping
$220562 $6292 $0
Miscellaneous $15168 $2376 $0
Total $258790 $325428 $57876
Worcester Polytechnic Institute
Example Future Cost Chart Holden
WCPC DEP 201421
Control Measure
Annual CostOne-Time
CostIntermittent
Cost
Public Education
$9908 $0 $0
Public Participation
$0 $0 $0
IDDE $7872 $314494 $50440
Construction $0 $770 $0
Post-Construction
$5280 $1496 $7436
Good Housekeeping
$220562 $6292 $0
Miscellaneous $15168 $2376 $0
Total $258790 $325428 $57876
Worcester Polytechnic Institute
Example Future Cost Chart Holden
WCPC DEP 201422
Control Measure
Annual CostOne-Time
CostIntermittent
Cost
Public Education
$9908 $0 $0
Public Participation
$0 $0 $0
IDDE $7872 $314494 $50440
Construction $0 $770 $0
Post-Construction
$5280 $1496 $7436
Good Housekeeping
$220562 $6292 $0
Miscellaneous $15168 $2376 $0
Total $258790 $325428 $57876
Worcester Polytechnic Institute
Anticipated Future Costs for Complying with the 2014 MS4 Draft Permit
WCPC DEP 201423
Holden Southbridge Millbury
Impervious Area
704 869 1309
Number of Outfalls
144 206 267
Current Cost $186526 $268604 $584960
Predicted Annual Cost
$258790 $343008 $735629
Percent Increase
39 28 26
Findings and Recommendations
Funding Techniques
Centralized Management
Innovative Funding
Regionalization
Worcester Polytechnic Institute
Finding amp Recommendation 1
Finding
bull Funding Techniques
CIC Grant
Alternatives
Millburyrsquos Technique
Recommendation
bull Seek Alternative Funding
604(b) Source Water Protection etc
25 WCPC DEP 2014
Worcester Polytechnic Institute
Finding amp Recommendation 2
Finding
bull Easier With Stormwater Coordinator
Scattered Information
Recommendation
bull Designated Person
DCR
26 WCPC DEP 2014
Worcester Polytechnic Institute
Finding amp Recommendation 3
Finding
bull Innovative Management
Millburyrsquos Piping
Art Contest
Recommendation
bull Be Creative
27 WCPC DEP 2014
Worcester Polytechnic Institute
Finding amp Recommendation 4
Finding
bull Regionalization Is Beneficial
More Efficient
High CostBenefit Ratio
Savings with Coalition
Recommendation
bull Form Coalitions
bull Work With Neighbors
28 WCPC DEP 2014
Worcester Polytechnic Institute
Citations
httpwwwepagovregion1npdesstormwatermaicMA_Imperv2010_Holdenpdf
httpwwwepagovregion1npdesstormwatermaicMA_Imperv2010_Millburypdf
httpwwwepagovregion1npdesstormwatermaicMA_Imperv2010_Millburypdf
httpsdlsgatewaydorstatemausDLSReportsDLSReportVieweraspxReportName=At_A_GlanceampReportTitle=At+A+Glance -
httpsrjengineeringcomservices_npdes_08html
WCPC DEP 201429
Questions
Project Goal and Objectives
Project Goal
Objectives
Worcester Polytechnic Institute
Project Goal
Provide the towns of Southbridge Holden and Millbury a comprehensive cost analysis of implementing the 2014 MS4 draft permit
WCPC DEP 201411
Worcester Polytechnic Institute
Objectives
bull Objective 1 Become Educated
bull
bull
bull
bull
bull
WCPC DEP 201412
Worcester Polytechnic Institute
Objectives
Objective 1 Become Educated
bull Objective 2 Assess Compliance
bull
bull
bull
bull
WCPC DEP 201413
Worcester Polytechnic Institute
Objectives
Objective 1 Become Educated
Objective 2 Assess Compliance
bull Objective 3 Current Total Expenditures
bull
bull
bull
WCPC DEP 201414
Worcester Polytechnic Institute
Objectives
Objective 1 Become Educated
Objective 2 Assess Compliance
Objective 3 Current Total Expenditures
bull Objective 4 Identify Necessary Changes
bull
bull
WCPC DEP 201415
Worcester Polytechnic Institute
Objectives
Objective 1 Become Educated
Objective 2 Assess Compliance
Objective 3 Current Total Expenditures
Objective 4 Identify Necessary Changes
bull Objective 5 Create a Detailed Cost Analysis
bull
WCPC DEP 201416
Worcester Polytechnic Institute
Objectives
Objective 1 Become Educated
Objective 2 Assess Compliance
Objective 3 Current Total Expenditures
Objective 4 Identify Necessary Changes
Objective 5 Create a Detailed Cost Analysis
bull Objective 6 Create an Informational Video
WCPC DEP 201417
Cost Analysis
Current Cost of Compliance
Example Cost Sheet Holden
Anticipated Future Costs for Complying with the 2014 MS4 Draft Permit
Worcester Polytechnic Institute
Current Cost of Compliance
WCPC DEP 201419
Control Measure
Holden Millbury Southbridge
Public Education
$1000 $566 $10952
Public Participation
$0 $3242 $0
IDDE $3520 $4678 $2452
Construction $0 $350 $0
PostConstruction
$1760 $0 $0
Good Housekeeping
$180246 $576124 $255200
Total $186526 $584960 $268604
Impervious Area 704 1309 869
Worcester Polytechnic Institute
Example Future Cost Chart Holden
WCPC DEP 201420
Control Measure
Annual CostOne-Time
CostIntermittent
Cost
Public Education
$9908 $0 $0
Public Participation
$0 $0 $0
IDDE $7872 $314494 $50440
Construction $0 $770 $0
Post-Construction
$5280 $1496 $7436
Good Housekeeping
$220562 $6292 $0
Miscellaneous $15168 $2376 $0
Total $258790 $325428 $57876
Worcester Polytechnic Institute
Example Future Cost Chart Holden
WCPC DEP 201421
Control Measure
Annual CostOne-Time
CostIntermittent
Cost
Public Education
$9908 $0 $0
Public Participation
$0 $0 $0
IDDE $7872 $314494 $50440
Construction $0 $770 $0
Post-Construction
$5280 $1496 $7436
Good Housekeeping
$220562 $6292 $0
Miscellaneous $15168 $2376 $0
Total $258790 $325428 $57876
Worcester Polytechnic Institute
Example Future Cost Chart Holden
WCPC DEP 201422
Control Measure
Annual CostOne-Time
CostIntermittent
Cost
Public Education
$9908 $0 $0
Public Participation
$0 $0 $0
IDDE $7872 $314494 $50440
Construction $0 $770 $0
Post-Construction
$5280 $1496 $7436
Good Housekeeping
$220562 $6292 $0
Miscellaneous $15168 $2376 $0
Total $258790 $325428 $57876
Worcester Polytechnic Institute
Anticipated Future Costs for Complying with the 2014 MS4 Draft Permit
WCPC DEP 201423
Holden Southbridge Millbury
Impervious Area
704 869 1309
Number of Outfalls
144 206 267
Current Cost $186526 $268604 $584960
Predicted Annual Cost
$258790 $343008 $735629
Percent Increase
39 28 26
Findings and Recommendations
Funding Techniques
Centralized Management
Innovative Funding
Regionalization
Worcester Polytechnic Institute
Finding amp Recommendation 1
Finding
bull Funding Techniques
CIC Grant
Alternatives
Millburyrsquos Technique
Recommendation
bull Seek Alternative Funding
604(b) Source Water Protection etc
25 WCPC DEP 2014
Worcester Polytechnic Institute
Finding amp Recommendation 2
Finding
bull Easier With Stormwater Coordinator
Scattered Information
Recommendation
bull Designated Person
DCR
26 WCPC DEP 2014
Worcester Polytechnic Institute
Finding amp Recommendation 3
Finding
bull Innovative Management
Millburyrsquos Piping
Art Contest
Recommendation
bull Be Creative
27 WCPC DEP 2014
Worcester Polytechnic Institute
Finding amp Recommendation 4
Finding
bull Regionalization Is Beneficial
More Efficient
High CostBenefit Ratio
Savings with Coalition
Recommendation
bull Form Coalitions
bull Work With Neighbors
28 WCPC DEP 2014
Worcester Polytechnic Institute
Citations
httpwwwepagovregion1npdesstormwatermaicMA_Imperv2010_Holdenpdf
httpwwwepagovregion1npdesstormwatermaicMA_Imperv2010_Millburypdf
httpwwwepagovregion1npdesstormwatermaicMA_Imperv2010_Millburypdf
httpsdlsgatewaydorstatemausDLSReportsDLSReportVieweraspxReportName=At_A_GlanceampReportTitle=At+A+Glance -
httpsrjengineeringcomservices_npdes_08html
WCPC DEP 201429
Questions
Worcester Polytechnic Institute
Project Goal
Provide the towns of Southbridge Holden and Millbury a comprehensive cost analysis of implementing the 2014 MS4 draft permit
WCPC DEP 201411
Worcester Polytechnic Institute
Objectives
bull Objective 1 Become Educated
bull
bull
bull
bull
bull
WCPC DEP 201412
Worcester Polytechnic Institute
Objectives
Objective 1 Become Educated
bull Objective 2 Assess Compliance
bull
bull
bull
bull
WCPC DEP 201413
Worcester Polytechnic Institute
Objectives
Objective 1 Become Educated
Objective 2 Assess Compliance
bull Objective 3 Current Total Expenditures
bull
bull
bull
WCPC DEP 201414
Worcester Polytechnic Institute
Objectives
Objective 1 Become Educated
Objective 2 Assess Compliance
Objective 3 Current Total Expenditures
bull Objective 4 Identify Necessary Changes
bull
bull
WCPC DEP 201415
Worcester Polytechnic Institute
Objectives
Objective 1 Become Educated
Objective 2 Assess Compliance
Objective 3 Current Total Expenditures
Objective 4 Identify Necessary Changes
bull Objective 5 Create a Detailed Cost Analysis
bull
WCPC DEP 201416
Worcester Polytechnic Institute
Objectives
Objective 1 Become Educated
Objective 2 Assess Compliance
Objective 3 Current Total Expenditures
Objective 4 Identify Necessary Changes
Objective 5 Create a Detailed Cost Analysis
bull Objective 6 Create an Informational Video
WCPC DEP 201417
Cost Analysis
Current Cost of Compliance
Example Cost Sheet Holden
Anticipated Future Costs for Complying with the 2014 MS4 Draft Permit
Worcester Polytechnic Institute
Current Cost of Compliance
WCPC DEP 201419
Control Measure
Holden Millbury Southbridge
Public Education
$1000 $566 $10952
Public Participation
$0 $3242 $0
IDDE $3520 $4678 $2452
Construction $0 $350 $0
PostConstruction
$1760 $0 $0
Good Housekeeping
$180246 $576124 $255200
Total $186526 $584960 $268604
Impervious Area 704 1309 869
Worcester Polytechnic Institute
Example Future Cost Chart Holden
WCPC DEP 201420
Control Measure
Annual CostOne-Time
CostIntermittent
Cost
Public Education
$9908 $0 $0
Public Participation
$0 $0 $0
IDDE $7872 $314494 $50440
Construction $0 $770 $0
Post-Construction
$5280 $1496 $7436
Good Housekeeping
$220562 $6292 $0
Miscellaneous $15168 $2376 $0
Total $258790 $325428 $57876
Worcester Polytechnic Institute
Example Future Cost Chart Holden
WCPC DEP 201421
Control Measure
Annual CostOne-Time
CostIntermittent
Cost
Public Education
$9908 $0 $0
Public Participation
$0 $0 $0
IDDE $7872 $314494 $50440
Construction $0 $770 $0
Post-Construction
$5280 $1496 $7436
Good Housekeeping
$220562 $6292 $0
Miscellaneous $15168 $2376 $0
Total $258790 $325428 $57876
Worcester Polytechnic Institute
Example Future Cost Chart Holden
WCPC DEP 201422
Control Measure
Annual CostOne-Time
CostIntermittent
Cost
Public Education
$9908 $0 $0
Public Participation
$0 $0 $0
IDDE $7872 $314494 $50440
Construction $0 $770 $0
Post-Construction
$5280 $1496 $7436
Good Housekeeping
$220562 $6292 $0
Miscellaneous $15168 $2376 $0
Total $258790 $325428 $57876
Worcester Polytechnic Institute
Anticipated Future Costs for Complying with the 2014 MS4 Draft Permit
WCPC DEP 201423
Holden Southbridge Millbury
Impervious Area
704 869 1309
Number of Outfalls
144 206 267
Current Cost $186526 $268604 $584960
Predicted Annual Cost
$258790 $343008 $735629
Percent Increase
39 28 26
Findings and Recommendations
Funding Techniques
Centralized Management
Innovative Funding
Regionalization
Worcester Polytechnic Institute
Finding amp Recommendation 1
Finding
bull Funding Techniques
CIC Grant
Alternatives
Millburyrsquos Technique
Recommendation
bull Seek Alternative Funding
604(b) Source Water Protection etc
25 WCPC DEP 2014
Worcester Polytechnic Institute
Finding amp Recommendation 2
Finding
bull Easier With Stormwater Coordinator
Scattered Information
Recommendation
bull Designated Person
DCR
26 WCPC DEP 2014
Worcester Polytechnic Institute
Finding amp Recommendation 3
Finding
bull Innovative Management
Millburyrsquos Piping
Art Contest
Recommendation
bull Be Creative
27 WCPC DEP 2014
Worcester Polytechnic Institute
Finding amp Recommendation 4
Finding
bull Regionalization Is Beneficial
More Efficient
High CostBenefit Ratio
Savings with Coalition
Recommendation
bull Form Coalitions
bull Work With Neighbors
28 WCPC DEP 2014
Worcester Polytechnic Institute
Citations
httpwwwepagovregion1npdesstormwatermaicMA_Imperv2010_Holdenpdf
httpwwwepagovregion1npdesstormwatermaicMA_Imperv2010_Millburypdf
httpwwwepagovregion1npdesstormwatermaicMA_Imperv2010_Millburypdf
httpsdlsgatewaydorstatemausDLSReportsDLSReportVieweraspxReportName=At_A_GlanceampReportTitle=At+A+Glance -
httpsrjengineeringcomservices_npdes_08html
WCPC DEP 201429
Questions
Worcester Polytechnic Institute
Objectives
bull Objective 1 Become Educated
bull
bull
bull
bull
bull
WCPC DEP 201412
Worcester Polytechnic Institute
Objectives
Objective 1 Become Educated
bull Objective 2 Assess Compliance
bull
bull
bull
bull
WCPC DEP 201413
Worcester Polytechnic Institute
Objectives
Objective 1 Become Educated
Objective 2 Assess Compliance
bull Objective 3 Current Total Expenditures
bull
bull
bull
WCPC DEP 201414
Worcester Polytechnic Institute
Objectives
Objective 1 Become Educated
Objective 2 Assess Compliance
Objective 3 Current Total Expenditures
bull Objective 4 Identify Necessary Changes
bull
bull
WCPC DEP 201415
Worcester Polytechnic Institute
Objectives
Objective 1 Become Educated
Objective 2 Assess Compliance
Objective 3 Current Total Expenditures
Objective 4 Identify Necessary Changes
bull Objective 5 Create a Detailed Cost Analysis
bull
WCPC DEP 201416
Worcester Polytechnic Institute
Objectives
Objective 1 Become Educated
Objective 2 Assess Compliance
Objective 3 Current Total Expenditures
Objective 4 Identify Necessary Changes
Objective 5 Create a Detailed Cost Analysis
bull Objective 6 Create an Informational Video
WCPC DEP 201417
Cost Analysis
Current Cost of Compliance
Example Cost Sheet Holden
Anticipated Future Costs for Complying with the 2014 MS4 Draft Permit
Worcester Polytechnic Institute
Current Cost of Compliance
WCPC DEP 201419
Control Measure
Holden Millbury Southbridge
Public Education
$1000 $566 $10952
Public Participation
$0 $3242 $0
IDDE $3520 $4678 $2452
Construction $0 $350 $0
PostConstruction
$1760 $0 $0
Good Housekeeping
$180246 $576124 $255200
Total $186526 $584960 $268604
Impervious Area 704 1309 869
Worcester Polytechnic Institute
Example Future Cost Chart Holden
WCPC DEP 201420
Control Measure
Annual CostOne-Time
CostIntermittent
Cost
Public Education
$9908 $0 $0
Public Participation
$0 $0 $0
IDDE $7872 $314494 $50440
Construction $0 $770 $0
Post-Construction
$5280 $1496 $7436
Good Housekeeping
$220562 $6292 $0
Miscellaneous $15168 $2376 $0
Total $258790 $325428 $57876
Worcester Polytechnic Institute
Example Future Cost Chart Holden
WCPC DEP 201421
Control Measure
Annual CostOne-Time
CostIntermittent
Cost
Public Education
$9908 $0 $0
Public Participation
$0 $0 $0
IDDE $7872 $314494 $50440
Construction $0 $770 $0
Post-Construction
$5280 $1496 $7436
Good Housekeeping
$220562 $6292 $0
Miscellaneous $15168 $2376 $0
Total $258790 $325428 $57876
Worcester Polytechnic Institute
Example Future Cost Chart Holden
WCPC DEP 201422
Control Measure
Annual CostOne-Time
CostIntermittent
Cost
Public Education
$9908 $0 $0
Public Participation
$0 $0 $0
IDDE $7872 $314494 $50440
Construction $0 $770 $0
Post-Construction
$5280 $1496 $7436
Good Housekeeping
$220562 $6292 $0
Miscellaneous $15168 $2376 $0
Total $258790 $325428 $57876
Worcester Polytechnic Institute
Anticipated Future Costs for Complying with the 2014 MS4 Draft Permit
WCPC DEP 201423
Holden Southbridge Millbury
Impervious Area
704 869 1309
Number of Outfalls
144 206 267
Current Cost $186526 $268604 $584960
Predicted Annual Cost
$258790 $343008 $735629
Percent Increase
39 28 26
Findings and Recommendations
Funding Techniques
Centralized Management
Innovative Funding
Regionalization
Worcester Polytechnic Institute
Finding amp Recommendation 1
Finding
bull Funding Techniques
CIC Grant
Alternatives
Millburyrsquos Technique
Recommendation
bull Seek Alternative Funding
604(b) Source Water Protection etc
25 WCPC DEP 2014
Worcester Polytechnic Institute
Finding amp Recommendation 2
Finding
bull Easier With Stormwater Coordinator
Scattered Information
Recommendation
bull Designated Person
DCR
26 WCPC DEP 2014
Worcester Polytechnic Institute
Finding amp Recommendation 3
Finding
bull Innovative Management
Millburyrsquos Piping
Art Contest
Recommendation
bull Be Creative
27 WCPC DEP 2014
Worcester Polytechnic Institute
Finding amp Recommendation 4
Finding
bull Regionalization Is Beneficial
More Efficient
High CostBenefit Ratio
Savings with Coalition
Recommendation
bull Form Coalitions
bull Work With Neighbors
28 WCPC DEP 2014
Worcester Polytechnic Institute
Citations
httpwwwepagovregion1npdesstormwatermaicMA_Imperv2010_Holdenpdf
httpwwwepagovregion1npdesstormwatermaicMA_Imperv2010_Millburypdf
httpwwwepagovregion1npdesstormwatermaicMA_Imperv2010_Millburypdf
httpsdlsgatewaydorstatemausDLSReportsDLSReportVieweraspxReportName=At_A_GlanceampReportTitle=At+A+Glance -
httpsrjengineeringcomservices_npdes_08html
WCPC DEP 201429
Questions
Worcester Polytechnic Institute
Objectives
Objective 1 Become Educated
bull Objective 2 Assess Compliance
bull
bull
bull
bull
WCPC DEP 201413
Worcester Polytechnic Institute
Objectives
Objective 1 Become Educated
Objective 2 Assess Compliance
bull Objective 3 Current Total Expenditures
bull
bull
bull
WCPC DEP 201414
Worcester Polytechnic Institute
Objectives
Objective 1 Become Educated
Objective 2 Assess Compliance
Objective 3 Current Total Expenditures
bull Objective 4 Identify Necessary Changes
bull
bull
WCPC DEP 201415
Worcester Polytechnic Institute
Objectives
Objective 1 Become Educated
Objective 2 Assess Compliance
Objective 3 Current Total Expenditures
Objective 4 Identify Necessary Changes
bull Objective 5 Create a Detailed Cost Analysis
bull
WCPC DEP 201416
Worcester Polytechnic Institute
Objectives
Objective 1 Become Educated
Objective 2 Assess Compliance
Objective 3 Current Total Expenditures
Objective 4 Identify Necessary Changes
Objective 5 Create a Detailed Cost Analysis
bull Objective 6 Create an Informational Video
WCPC DEP 201417
Cost Analysis
Current Cost of Compliance
Example Cost Sheet Holden
Anticipated Future Costs for Complying with the 2014 MS4 Draft Permit
Worcester Polytechnic Institute
Current Cost of Compliance
WCPC DEP 201419
Control Measure
Holden Millbury Southbridge
Public Education
$1000 $566 $10952
Public Participation
$0 $3242 $0
IDDE $3520 $4678 $2452
Construction $0 $350 $0
PostConstruction
$1760 $0 $0
Good Housekeeping
$180246 $576124 $255200
Total $186526 $584960 $268604
Impervious Area 704 1309 869
Worcester Polytechnic Institute
Example Future Cost Chart Holden
WCPC DEP 201420
Control Measure
Annual CostOne-Time
CostIntermittent
Cost
Public Education
$9908 $0 $0
Public Participation
$0 $0 $0
IDDE $7872 $314494 $50440
Construction $0 $770 $0
Post-Construction
$5280 $1496 $7436
Good Housekeeping
$220562 $6292 $0
Miscellaneous $15168 $2376 $0
Total $258790 $325428 $57876
Worcester Polytechnic Institute
Example Future Cost Chart Holden
WCPC DEP 201421
Control Measure
Annual CostOne-Time
CostIntermittent
Cost
Public Education
$9908 $0 $0
Public Participation
$0 $0 $0
IDDE $7872 $314494 $50440
Construction $0 $770 $0
Post-Construction
$5280 $1496 $7436
Good Housekeeping
$220562 $6292 $0
Miscellaneous $15168 $2376 $0
Total $258790 $325428 $57876
Worcester Polytechnic Institute
Example Future Cost Chart Holden
WCPC DEP 201422
Control Measure
Annual CostOne-Time
CostIntermittent
Cost
Public Education
$9908 $0 $0
Public Participation
$0 $0 $0
IDDE $7872 $314494 $50440
Construction $0 $770 $0
Post-Construction
$5280 $1496 $7436
Good Housekeeping
$220562 $6292 $0
Miscellaneous $15168 $2376 $0
Total $258790 $325428 $57876
Worcester Polytechnic Institute
Anticipated Future Costs for Complying with the 2014 MS4 Draft Permit
WCPC DEP 201423
Holden Southbridge Millbury
Impervious Area
704 869 1309
Number of Outfalls
144 206 267
Current Cost $186526 $268604 $584960
Predicted Annual Cost
$258790 $343008 $735629
Percent Increase
39 28 26
Findings and Recommendations
Funding Techniques
Centralized Management
Innovative Funding
Regionalization
Worcester Polytechnic Institute
Finding amp Recommendation 1
Finding
bull Funding Techniques
CIC Grant
Alternatives
Millburyrsquos Technique
Recommendation
bull Seek Alternative Funding
604(b) Source Water Protection etc
25 WCPC DEP 2014
Worcester Polytechnic Institute
Finding amp Recommendation 2
Finding
bull Easier With Stormwater Coordinator
Scattered Information
Recommendation
bull Designated Person
DCR
26 WCPC DEP 2014
Worcester Polytechnic Institute
Finding amp Recommendation 3
Finding
bull Innovative Management
Millburyrsquos Piping
Art Contest
Recommendation
bull Be Creative
27 WCPC DEP 2014
Worcester Polytechnic Institute
Finding amp Recommendation 4
Finding
bull Regionalization Is Beneficial
More Efficient
High CostBenefit Ratio
Savings with Coalition
Recommendation
bull Form Coalitions
bull Work With Neighbors
28 WCPC DEP 2014
Worcester Polytechnic Institute
Citations
httpwwwepagovregion1npdesstormwatermaicMA_Imperv2010_Holdenpdf
httpwwwepagovregion1npdesstormwatermaicMA_Imperv2010_Millburypdf
httpwwwepagovregion1npdesstormwatermaicMA_Imperv2010_Millburypdf
httpsdlsgatewaydorstatemausDLSReportsDLSReportVieweraspxReportName=At_A_GlanceampReportTitle=At+A+Glance -
httpsrjengineeringcomservices_npdes_08html
WCPC DEP 201429
Questions
Worcester Polytechnic Institute
Objectives
Objective 1 Become Educated
Objective 2 Assess Compliance
bull Objective 3 Current Total Expenditures
bull
bull
bull
WCPC DEP 201414
Worcester Polytechnic Institute
Objectives
Objective 1 Become Educated
Objective 2 Assess Compliance
Objective 3 Current Total Expenditures
bull Objective 4 Identify Necessary Changes
bull
bull
WCPC DEP 201415
Worcester Polytechnic Institute
Objectives
Objective 1 Become Educated
Objective 2 Assess Compliance
Objective 3 Current Total Expenditures
Objective 4 Identify Necessary Changes
bull Objective 5 Create a Detailed Cost Analysis
bull
WCPC DEP 201416
Worcester Polytechnic Institute
Objectives
Objective 1 Become Educated
Objective 2 Assess Compliance
Objective 3 Current Total Expenditures
Objective 4 Identify Necessary Changes
Objective 5 Create a Detailed Cost Analysis
bull Objective 6 Create an Informational Video
WCPC DEP 201417
Cost Analysis
Current Cost of Compliance
Example Cost Sheet Holden
Anticipated Future Costs for Complying with the 2014 MS4 Draft Permit
Worcester Polytechnic Institute
Current Cost of Compliance
WCPC DEP 201419
Control Measure
Holden Millbury Southbridge
Public Education
$1000 $566 $10952
Public Participation
$0 $3242 $0
IDDE $3520 $4678 $2452
Construction $0 $350 $0
PostConstruction
$1760 $0 $0
Good Housekeeping
$180246 $576124 $255200
Total $186526 $584960 $268604
Impervious Area 704 1309 869
Worcester Polytechnic Institute
Example Future Cost Chart Holden
WCPC DEP 201420
Control Measure
Annual CostOne-Time
CostIntermittent
Cost
Public Education
$9908 $0 $0
Public Participation
$0 $0 $0
IDDE $7872 $314494 $50440
Construction $0 $770 $0
Post-Construction
$5280 $1496 $7436
Good Housekeeping
$220562 $6292 $0
Miscellaneous $15168 $2376 $0
Total $258790 $325428 $57876
Worcester Polytechnic Institute
Example Future Cost Chart Holden
WCPC DEP 201421
Control Measure
Annual CostOne-Time
CostIntermittent
Cost
Public Education
$9908 $0 $0
Public Participation
$0 $0 $0
IDDE $7872 $314494 $50440
Construction $0 $770 $0
Post-Construction
$5280 $1496 $7436
Good Housekeeping
$220562 $6292 $0
Miscellaneous $15168 $2376 $0
Total $258790 $325428 $57876
Worcester Polytechnic Institute
Example Future Cost Chart Holden
WCPC DEP 201422
Control Measure
Annual CostOne-Time
CostIntermittent
Cost
Public Education
$9908 $0 $0
Public Participation
$0 $0 $0
IDDE $7872 $314494 $50440
Construction $0 $770 $0
Post-Construction
$5280 $1496 $7436
Good Housekeeping
$220562 $6292 $0
Miscellaneous $15168 $2376 $0
Total $258790 $325428 $57876
Worcester Polytechnic Institute
Anticipated Future Costs for Complying with the 2014 MS4 Draft Permit
WCPC DEP 201423
Holden Southbridge Millbury
Impervious Area
704 869 1309
Number of Outfalls
144 206 267
Current Cost $186526 $268604 $584960
Predicted Annual Cost
$258790 $343008 $735629
Percent Increase
39 28 26
Findings and Recommendations
Funding Techniques
Centralized Management
Innovative Funding
Regionalization
Worcester Polytechnic Institute
Finding amp Recommendation 1
Finding
bull Funding Techniques
CIC Grant
Alternatives
Millburyrsquos Technique
Recommendation
bull Seek Alternative Funding
604(b) Source Water Protection etc
25 WCPC DEP 2014
Worcester Polytechnic Institute
Finding amp Recommendation 2
Finding
bull Easier With Stormwater Coordinator
Scattered Information
Recommendation
bull Designated Person
DCR
26 WCPC DEP 2014
Worcester Polytechnic Institute
Finding amp Recommendation 3
Finding
bull Innovative Management
Millburyrsquos Piping
Art Contest
Recommendation
bull Be Creative
27 WCPC DEP 2014
Worcester Polytechnic Institute
Finding amp Recommendation 4
Finding
bull Regionalization Is Beneficial
More Efficient
High CostBenefit Ratio
Savings with Coalition
Recommendation
bull Form Coalitions
bull Work With Neighbors
28 WCPC DEP 2014
Worcester Polytechnic Institute
Citations
httpwwwepagovregion1npdesstormwatermaicMA_Imperv2010_Holdenpdf
httpwwwepagovregion1npdesstormwatermaicMA_Imperv2010_Millburypdf
httpwwwepagovregion1npdesstormwatermaicMA_Imperv2010_Millburypdf
httpsdlsgatewaydorstatemausDLSReportsDLSReportVieweraspxReportName=At_A_GlanceampReportTitle=At+A+Glance -
httpsrjengineeringcomservices_npdes_08html
WCPC DEP 201429
Questions
Worcester Polytechnic Institute
Objectives
Objective 1 Become Educated
Objective 2 Assess Compliance
Objective 3 Current Total Expenditures
bull Objective 4 Identify Necessary Changes
bull
bull
WCPC DEP 201415
Worcester Polytechnic Institute
Objectives
Objective 1 Become Educated
Objective 2 Assess Compliance
Objective 3 Current Total Expenditures
Objective 4 Identify Necessary Changes
bull Objective 5 Create a Detailed Cost Analysis
bull
WCPC DEP 201416
Worcester Polytechnic Institute
Objectives
Objective 1 Become Educated
Objective 2 Assess Compliance
Objective 3 Current Total Expenditures
Objective 4 Identify Necessary Changes
Objective 5 Create a Detailed Cost Analysis
bull Objective 6 Create an Informational Video
WCPC DEP 201417
Cost Analysis
Current Cost of Compliance
Example Cost Sheet Holden
Anticipated Future Costs for Complying with the 2014 MS4 Draft Permit
Worcester Polytechnic Institute
Current Cost of Compliance
WCPC DEP 201419
Control Measure
Holden Millbury Southbridge
Public Education
$1000 $566 $10952
Public Participation
$0 $3242 $0
IDDE $3520 $4678 $2452
Construction $0 $350 $0
PostConstruction
$1760 $0 $0
Good Housekeeping
$180246 $576124 $255200
Total $186526 $584960 $268604
Impervious Area 704 1309 869
Worcester Polytechnic Institute
Example Future Cost Chart Holden
WCPC DEP 201420
Control Measure
Annual CostOne-Time
CostIntermittent
Cost
Public Education
$9908 $0 $0
Public Participation
$0 $0 $0
IDDE $7872 $314494 $50440
Construction $0 $770 $0
Post-Construction
$5280 $1496 $7436
Good Housekeeping
$220562 $6292 $0
Miscellaneous $15168 $2376 $0
Total $258790 $325428 $57876
Worcester Polytechnic Institute
Example Future Cost Chart Holden
WCPC DEP 201421
Control Measure
Annual CostOne-Time
CostIntermittent
Cost
Public Education
$9908 $0 $0
Public Participation
$0 $0 $0
IDDE $7872 $314494 $50440
Construction $0 $770 $0
Post-Construction
$5280 $1496 $7436
Good Housekeeping
$220562 $6292 $0
Miscellaneous $15168 $2376 $0
Total $258790 $325428 $57876
Worcester Polytechnic Institute
Example Future Cost Chart Holden
WCPC DEP 201422
Control Measure
Annual CostOne-Time
CostIntermittent
Cost
Public Education
$9908 $0 $0
Public Participation
$0 $0 $0
IDDE $7872 $314494 $50440
Construction $0 $770 $0
Post-Construction
$5280 $1496 $7436
Good Housekeeping
$220562 $6292 $0
Miscellaneous $15168 $2376 $0
Total $258790 $325428 $57876
Worcester Polytechnic Institute
Anticipated Future Costs for Complying with the 2014 MS4 Draft Permit
WCPC DEP 201423
Holden Southbridge Millbury
Impervious Area
704 869 1309
Number of Outfalls
144 206 267
Current Cost $186526 $268604 $584960
Predicted Annual Cost
$258790 $343008 $735629
Percent Increase
39 28 26
Findings and Recommendations
Funding Techniques
Centralized Management
Innovative Funding
Regionalization
Worcester Polytechnic Institute
Finding amp Recommendation 1
Finding
bull Funding Techniques
CIC Grant
Alternatives
Millburyrsquos Technique
Recommendation
bull Seek Alternative Funding
604(b) Source Water Protection etc
25 WCPC DEP 2014
Worcester Polytechnic Institute
Finding amp Recommendation 2
Finding
bull Easier With Stormwater Coordinator
Scattered Information
Recommendation
bull Designated Person
DCR
26 WCPC DEP 2014
Worcester Polytechnic Institute
Finding amp Recommendation 3
Finding
bull Innovative Management
Millburyrsquos Piping
Art Contest
Recommendation
bull Be Creative
27 WCPC DEP 2014
Worcester Polytechnic Institute
Finding amp Recommendation 4
Finding
bull Regionalization Is Beneficial
More Efficient
High CostBenefit Ratio
Savings with Coalition
Recommendation
bull Form Coalitions
bull Work With Neighbors
28 WCPC DEP 2014
Worcester Polytechnic Institute
Citations
httpwwwepagovregion1npdesstormwatermaicMA_Imperv2010_Holdenpdf
httpwwwepagovregion1npdesstormwatermaicMA_Imperv2010_Millburypdf
httpwwwepagovregion1npdesstormwatermaicMA_Imperv2010_Millburypdf
httpsdlsgatewaydorstatemausDLSReportsDLSReportVieweraspxReportName=At_A_GlanceampReportTitle=At+A+Glance -
httpsrjengineeringcomservices_npdes_08html
WCPC DEP 201429
Questions
Worcester Polytechnic Institute
Objectives
Objective 1 Become Educated
Objective 2 Assess Compliance
Objective 3 Current Total Expenditures
Objective 4 Identify Necessary Changes
bull Objective 5 Create a Detailed Cost Analysis
bull
WCPC DEP 201416
Worcester Polytechnic Institute
Objectives
Objective 1 Become Educated
Objective 2 Assess Compliance
Objective 3 Current Total Expenditures
Objective 4 Identify Necessary Changes
Objective 5 Create a Detailed Cost Analysis
bull Objective 6 Create an Informational Video
WCPC DEP 201417
Cost Analysis
Current Cost of Compliance
Example Cost Sheet Holden
Anticipated Future Costs for Complying with the 2014 MS4 Draft Permit
Worcester Polytechnic Institute
Current Cost of Compliance
WCPC DEP 201419
Control Measure
Holden Millbury Southbridge
Public Education
$1000 $566 $10952
Public Participation
$0 $3242 $0
IDDE $3520 $4678 $2452
Construction $0 $350 $0
PostConstruction
$1760 $0 $0
Good Housekeeping
$180246 $576124 $255200
Total $186526 $584960 $268604
Impervious Area 704 1309 869
Worcester Polytechnic Institute
Example Future Cost Chart Holden
WCPC DEP 201420
Control Measure
Annual CostOne-Time
CostIntermittent
Cost
Public Education
$9908 $0 $0
Public Participation
$0 $0 $0
IDDE $7872 $314494 $50440
Construction $0 $770 $0
Post-Construction
$5280 $1496 $7436
Good Housekeeping
$220562 $6292 $0
Miscellaneous $15168 $2376 $0
Total $258790 $325428 $57876
Worcester Polytechnic Institute
Example Future Cost Chart Holden
WCPC DEP 201421
Control Measure
Annual CostOne-Time
CostIntermittent
Cost
Public Education
$9908 $0 $0
Public Participation
$0 $0 $0
IDDE $7872 $314494 $50440
Construction $0 $770 $0
Post-Construction
$5280 $1496 $7436
Good Housekeeping
$220562 $6292 $0
Miscellaneous $15168 $2376 $0
Total $258790 $325428 $57876
Worcester Polytechnic Institute
Example Future Cost Chart Holden
WCPC DEP 201422
Control Measure
Annual CostOne-Time
CostIntermittent
Cost
Public Education
$9908 $0 $0
Public Participation
$0 $0 $0
IDDE $7872 $314494 $50440
Construction $0 $770 $0
Post-Construction
$5280 $1496 $7436
Good Housekeeping
$220562 $6292 $0
Miscellaneous $15168 $2376 $0
Total $258790 $325428 $57876
Worcester Polytechnic Institute
Anticipated Future Costs for Complying with the 2014 MS4 Draft Permit
WCPC DEP 201423
Holden Southbridge Millbury
Impervious Area
704 869 1309
Number of Outfalls
144 206 267
Current Cost $186526 $268604 $584960
Predicted Annual Cost
$258790 $343008 $735629
Percent Increase
39 28 26
Findings and Recommendations
Funding Techniques
Centralized Management
Innovative Funding
Regionalization
Worcester Polytechnic Institute
Finding amp Recommendation 1
Finding
bull Funding Techniques
CIC Grant
Alternatives
Millburyrsquos Technique
Recommendation
bull Seek Alternative Funding
604(b) Source Water Protection etc
25 WCPC DEP 2014
Worcester Polytechnic Institute
Finding amp Recommendation 2
Finding
bull Easier With Stormwater Coordinator
Scattered Information
Recommendation
bull Designated Person
DCR
26 WCPC DEP 2014
Worcester Polytechnic Institute
Finding amp Recommendation 3
Finding
bull Innovative Management
Millburyrsquos Piping
Art Contest
Recommendation
bull Be Creative
27 WCPC DEP 2014
Worcester Polytechnic Institute
Finding amp Recommendation 4
Finding
bull Regionalization Is Beneficial
More Efficient
High CostBenefit Ratio
Savings with Coalition
Recommendation
bull Form Coalitions
bull Work With Neighbors
28 WCPC DEP 2014
Worcester Polytechnic Institute
Citations
httpwwwepagovregion1npdesstormwatermaicMA_Imperv2010_Holdenpdf
httpwwwepagovregion1npdesstormwatermaicMA_Imperv2010_Millburypdf
httpwwwepagovregion1npdesstormwatermaicMA_Imperv2010_Millburypdf
httpsdlsgatewaydorstatemausDLSReportsDLSReportVieweraspxReportName=At_A_GlanceampReportTitle=At+A+Glance -
httpsrjengineeringcomservices_npdes_08html
WCPC DEP 201429
Questions
Worcester Polytechnic Institute
Objectives
Objective 1 Become Educated
Objective 2 Assess Compliance
Objective 3 Current Total Expenditures
Objective 4 Identify Necessary Changes
Objective 5 Create a Detailed Cost Analysis
bull Objective 6 Create an Informational Video
WCPC DEP 201417
Cost Analysis
Current Cost of Compliance
Example Cost Sheet Holden
Anticipated Future Costs for Complying with the 2014 MS4 Draft Permit
Worcester Polytechnic Institute
Current Cost of Compliance
WCPC DEP 201419
Control Measure
Holden Millbury Southbridge
Public Education
$1000 $566 $10952
Public Participation
$0 $3242 $0
IDDE $3520 $4678 $2452
Construction $0 $350 $0
PostConstruction
$1760 $0 $0
Good Housekeeping
$180246 $576124 $255200
Total $186526 $584960 $268604
Impervious Area 704 1309 869
Worcester Polytechnic Institute
Example Future Cost Chart Holden
WCPC DEP 201420
Control Measure
Annual CostOne-Time
CostIntermittent
Cost
Public Education
$9908 $0 $0
Public Participation
$0 $0 $0
IDDE $7872 $314494 $50440
Construction $0 $770 $0
Post-Construction
$5280 $1496 $7436
Good Housekeeping
$220562 $6292 $0
Miscellaneous $15168 $2376 $0
Total $258790 $325428 $57876
Worcester Polytechnic Institute
Example Future Cost Chart Holden
WCPC DEP 201421
Control Measure
Annual CostOne-Time
CostIntermittent
Cost
Public Education
$9908 $0 $0
Public Participation
$0 $0 $0
IDDE $7872 $314494 $50440
Construction $0 $770 $0
Post-Construction
$5280 $1496 $7436
Good Housekeeping
$220562 $6292 $0
Miscellaneous $15168 $2376 $0
Total $258790 $325428 $57876
Worcester Polytechnic Institute
Example Future Cost Chart Holden
WCPC DEP 201422
Control Measure
Annual CostOne-Time
CostIntermittent
Cost
Public Education
$9908 $0 $0
Public Participation
$0 $0 $0
IDDE $7872 $314494 $50440
Construction $0 $770 $0
Post-Construction
$5280 $1496 $7436
Good Housekeeping
$220562 $6292 $0
Miscellaneous $15168 $2376 $0
Total $258790 $325428 $57876
Worcester Polytechnic Institute
Anticipated Future Costs for Complying with the 2014 MS4 Draft Permit
WCPC DEP 201423
Holden Southbridge Millbury
Impervious Area
704 869 1309
Number of Outfalls
144 206 267
Current Cost $186526 $268604 $584960
Predicted Annual Cost
$258790 $343008 $735629
Percent Increase
39 28 26
Findings and Recommendations
Funding Techniques
Centralized Management
Innovative Funding
Regionalization
Worcester Polytechnic Institute
Finding amp Recommendation 1
Finding
bull Funding Techniques
CIC Grant
Alternatives
Millburyrsquos Technique
Recommendation
bull Seek Alternative Funding
604(b) Source Water Protection etc
25 WCPC DEP 2014
Worcester Polytechnic Institute
Finding amp Recommendation 2
Finding
bull Easier With Stormwater Coordinator
Scattered Information
Recommendation
bull Designated Person
DCR
26 WCPC DEP 2014
Worcester Polytechnic Institute
Finding amp Recommendation 3
Finding
bull Innovative Management
Millburyrsquos Piping
Art Contest
Recommendation
bull Be Creative
27 WCPC DEP 2014
Worcester Polytechnic Institute
Finding amp Recommendation 4
Finding
bull Regionalization Is Beneficial
More Efficient
High CostBenefit Ratio
Savings with Coalition
Recommendation
bull Form Coalitions
bull Work With Neighbors
28 WCPC DEP 2014
Worcester Polytechnic Institute
Citations
httpwwwepagovregion1npdesstormwatermaicMA_Imperv2010_Holdenpdf
httpwwwepagovregion1npdesstormwatermaicMA_Imperv2010_Millburypdf
httpwwwepagovregion1npdesstormwatermaicMA_Imperv2010_Millburypdf
httpsdlsgatewaydorstatemausDLSReportsDLSReportVieweraspxReportName=At_A_GlanceampReportTitle=At+A+Glance -
httpsrjengineeringcomservices_npdes_08html
WCPC DEP 201429
Questions
Cost Analysis
Current Cost of Compliance
Example Cost Sheet Holden
Anticipated Future Costs for Complying with the 2014 MS4 Draft Permit
Worcester Polytechnic Institute
Current Cost of Compliance
WCPC DEP 201419
Control Measure
Holden Millbury Southbridge
Public Education
$1000 $566 $10952
Public Participation
$0 $3242 $0
IDDE $3520 $4678 $2452
Construction $0 $350 $0
PostConstruction
$1760 $0 $0
Good Housekeeping
$180246 $576124 $255200
Total $186526 $584960 $268604
Impervious Area 704 1309 869
Worcester Polytechnic Institute
Example Future Cost Chart Holden
WCPC DEP 201420
Control Measure
Annual CostOne-Time
CostIntermittent
Cost
Public Education
$9908 $0 $0
Public Participation
$0 $0 $0
IDDE $7872 $314494 $50440
Construction $0 $770 $0
Post-Construction
$5280 $1496 $7436
Good Housekeeping
$220562 $6292 $0
Miscellaneous $15168 $2376 $0
Total $258790 $325428 $57876
Worcester Polytechnic Institute
Example Future Cost Chart Holden
WCPC DEP 201421
Control Measure
Annual CostOne-Time
CostIntermittent
Cost
Public Education
$9908 $0 $0
Public Participation
$0 $0 $0
IDDE $7872 $314494 $50440
Construction $0 $770 $0
Post-Construction
$5280 $1496 $7436
Good Housekeeping
$220562 $6292 $0
Miscellaneous $15168 $2376 $0
Total $258790 $325428 $57876
Worcester Polytechnic Institute
Example Future Cost Chart Holden
WCPC DEP 201422
Control Measure
Annual CostOne-Time
CostIntermittent
Cost
Public Education
$9908 $0 $0
Public Participation
$0 $0 $0
IDDE $7872 $314494 $50440
Construction $0 $770 $0
Post-Construction
$5280 $1496 $7436
Good Housekeeping
$220562 $6292 $0
Miscellaneous $15168 $2376 $0
Total $258790 $325428 $57876
Worcester Polytechnic Institute
Anticipated Future Costs for Complying with the 2014 MS4 Draft Permit
WCPC DEP 201423
Holden Southbridge Millbury
Impervious Area
704 869 1309
Number of Outfalls
144 206 267
Current Cost $186526 $268604 $584960
Predicted Annual Cost
$258790 $343008 $735629
Percent Increase
39 28 26
Findings and Recommendations
Funding Techniques
Centralized Management
Innovative Funding
Regionalization
Worcester Polytechnic Institute
Finding amp Recommendation 1
Finding
bull Funding Techniques
CIC Grant
Alternatives
Millburyrsquos Technique
Recommendation
bull Seek Alternative Funding
604(b) Source Water Protection etc
25 WCPC DEP 2014
Worcester Polytechnic Institute
Finding amp Recommendation 2
Finding
bull Easier With Stormwater Coordinator
Scattered Information
Recommendation
bull Designated Person
DCR
26 WCPC DEP 2014
Worcester Polytechnic Institute
Finding amp Recommendation 3
Finding
bull Innovative Management
Millburyrsquos Piping
Art Contest
Recommendation
bull Be Creative
27 WCPC DEP 2014
Worcester Polytechnic Institute
Finding amp Recommendation 4
Finding
bull Regionalization Is Beneficial
More Efficient
High CostBenefit Ratio
Savings with Coalition
Recommendation
bull Form Coalitions
bull Work With Neighbors
28 WCPC DEP 2014
Worcester Polytechnic Institute
Citations
httpwwwepagovregion1npdesstormwatermaicMA_Imperv2010_Holdenpdf
httpwwwepagovregion1npdesstormwatermaicMA_Imperv2010_Millburypdf
httpwwwepagovregion1npdesstormwatermaicMA_Imperv2010_Millburypdf
httpsdlsgatewaydorstatemausDLSReportsDLSReportVieweraspxReportName=At_A_GlanceampReportTitle=At+A+Glance -
httpsrjengineeringcomservices_npdes_08html
WCPC DEP 201429
Questions
Worcester Polytechnic Institute
Current Cost of Compliance
WCPC DEP 201419
Control Measure
Holden Millbury Southbridge
Public Education
$1000 $566 $10952
Public Participation
$0 $3242 $0
IDDE $3520 $4678 $2452
Construction $0 $350 $0
PostConstruction
$1760 $0 $0
Good Housekeeping
$180246 $576124 $255200
Total $186526 $584960 $268604
Impervious Area 704 1309 869
Worcester Polytechnic Institute
Example Future Cost Chart Holden
WCPC DEP 201420
Control Measure
Annual CostOne-Time
CostIntermittent
Cost
Public Education
$9908 $0 $0
Public Participation
$0 $0 $0
IDDE $7872 $314494 $50440
Construction $0 $770 $0
Post-Construction
$5280 $1496 $7436
Good Housekeeping
$220562 $6292 $0
Miscellaneous $15168 $2376 $0
Total $258790 $325428 $57876
Worcester Polytechnic Institute
Example Future Cost Chart Holden
WCPC DEP 201421
Control Measure
Annual CostOne-Time
CostIntermittent
Cost
Public Education
$9908 $0 $0
Public Participation
$0 $0 $0
IDDE $7872 $314494 $50440
Construction $0 $770 $0
Post-Construction
$5280 $1496 $7436
Good Housekeeping
$220562 $6292 $0
Miscellaneous $15168 $2376 $0
Total $258790 $325428 $57876
Worcester Polytechnic Institute
Example Future Cost Chart Holden
WCPC DEP 201422
Control Measure
Annual CostOne-Time
CostIntermittent
Cost
Public Education
$9908 $0 $0
Public Participation
$0 $0 $0
IDDE $7872 $314494 $50440
Construction $0 $770 $0
Post-Construction
$5280 $1496 $7436
Good Housekeeping
$220562 $6292 $0
Miscellaneous $15168 $2376 $0
Total $258790 $325428 $57876
Worcester Polytechnic Institute
Anticipated Future Costs for Complying with the 2014 MS4 Draft Permit
WCPC DEP 201423
Holden Southbridge Millbury
Impervious Area
704 869 1309
Number of Outfalls
144 206 267
Current Cost $186526 $268604 $584960
Predicted Annual Cost
$258790 $343008 $735629
Percent Increase
39 28 26
Findings and Recommendations
Funding Techniques
Centralized Management
Innovative Funding
Regionalization
Worcester Polytechnic Institute
Finding amp Recommendation 1
Finding
bull Funding Techniques
CIC Grant
Alternatives
Millburyrsquos Technique
Recommendation
bull Seek Alternative Funding
604(b) Source Water Protection etc
25 WCPC DEP 2014
Worcester Polytechnic Institute
Finding amp Recommendation 2
Finding
bull Easier With Stormwater Coordinator
Scattered Information
Recommendation
bull Designated Person
DCR
26 WCPC DEP 2014
Worcester Polytechnic Institute
Finding amp Recommendation 3
Finding
bull Innovative Management
Millburyrsquos Piping
Art Contest
Recommendation
bull Be Creative
27 WCPC DEP 2014
Worcester Polytechnic Institute
Finding amp Recommendation 4
Finding
bull Regionalization Is Beneficial
More Efficient
High CostBenefit Ratio
Savings with Coalition
Recommendation
bull Form Coalitions
bull Work With Neighbors
28 WCPC DEP 2014
Worcester Polytechnic Institute
Citations
httpwwwepagovregion1npdesstormwatermaicMA_Imperv2010_Holdenpdf
httpwwwepagovregion1npdesstormwatermaicMA_Imperv2010_Millburypdf
httpwwwepagovregion1npdesstormwatermaicMA_Imperv2010_Millburypdf
httpsdlsgatewaydorstatemausDLSReportsDLSReportVieweraspxReportName=At_A_GlanceampReportTitle=At+A+Glance -
httpsrjengineeringcomservices_npdes_08html
WCPC DEP 201429
Questions
Worcester Polytechnic Institute
Example Future Cost Chart Holden
WCPC DEP 201420
Control Measure
Annual CostOne-Time
CostIntermittent
Cost
Public Education
$9908 $0 $0
Public Participation
$0 $0 $0
IDDE $7872 $314494 $50440
Construction $0 $770 $0
Post-Construction
$5280 $1496 $7436
Good Housekeeping
$220562 $6292 $0
Miscellaneous $15168 $2376 $0
Total $258790 $325428 $57876
Worcester Polytechnic Institute
Example Future Cost Chart Holden
WCPC DEP 201421
Control Measure
Annual CostOne-Time
CostIntermittent
Cost
Public Education
$9908 $0 $0
Public Participation
$0 $0 $0
IDDE $7872 $314494 $50440
Construction $0 $770 $0
Post-Construction
$5280 $1496 $7436
Good Housekeeping
$220562 $6292 $0
Miscellaneous $15168 $2376 $0
Total $258790 $325428 $57876
Worcester Polytechnic Institute
Example Future Cost Chart Holden
WCPC DEP 201422
Control Measure
Annual CostOne-Time
CostIntermittent
Cost
Public Education
$9908 $0 $0
Public Participation
$0 $0 $0
IDDE $7872 $314494 $50440
Construction $0 $770 $0
Post-Construction
$5280 $1496 $7436
Good Housekeeping
$220562 $6292 $0
Miscellaneous $15168 $2376 $0
Total $258790 $325428 $57876
Worcester Polytechnic Institute
Anticipated Future Costs for Complying with the 2014 MS4 Draft Permit
WCPC DEP 201423
Holden Southbridge Millbury
Impervious Area
704 869 1309
Number of Outfalls
144 206 267
Current Cost $186526 $268604 $584960
Predicted Annual Cost
$258790 $343008 $735629
Percent Increase
39 28 26
Findings and Recommendations
Funding Techniques
Centralized Management
Innovative Funding
Regionalization
Worcester Polytechnic Institute
Finding amp Recommendation 1
Finding
bull Funding Techniques
CIC Grant
Alternatives
Millburyrsquos Technique
Recommendation
bull Seek Alternative Funding
604(b) Source Water Protection etc
25 WCPC DEP 2014
Worcester Polytechnic Institute
Finding amp Recommendation 2
Finding
bull Easier With Stormwater Coordinator
Scattered Information
Recommendation
bull Designated Person
DCR
26 WCPC DEP 2014
Worcester Polytechnic Institute
Finding amp Recommendation 3
Finding
bull Innovative Management
Millburyrsquos Piping
Art Contest
Recommendation
bull Be Creative
27 WCPC DEP 2014
Worcester Polytechnic Institute
Finding amp Recommendation 4
Finding
bull Regionalization Is Beneficial
More Efficient
High CostBenefit Ratio
Savings with Coalition
Recommendation
bull Form Coalitions
bull Work With Neighbors
28 WCPC DEP 2014
Worcester Polytechnic Institute
Citations
httpwwwepagovregion1npdesstormwatermaicMA_Imperv2010_Holdenpdf
httpwwwepagovregion1npdesstormwatermaicMA_Imperv2010_Millburypdf
httpwwwepagovregion1npdesstormwatermaicMA_Imperv2010_Millburypdf
httpsdlsgatewaydorstatemausDLSReportsDLSReportVieweraspxReportName=At_A_GlanceampReportTitle=At+A+Glance -
httpsrjengineeringcomservices_npdes_08html
WCPC DEP 201429
Questions
Worcester Polytechnic Institute
Example Future Cost Chart Holden
WCPC DEP 201421
Control Measure
Annual CostOne-Time
CostIntermittent
Cost
Public Education
$9908 $0 $0
Public Participation
$0 $0 $0
IDDE $7872 $314494 $50440
Construction $0 $770 $0
Post-Construction
$5280 $1496 $7436
Good Housekeeping
$220562 $6292 $0
Miscellaneous $15168 $2376 $0
Total $258790 $325428 $57876
Worcester Polytechnic Institute
Example Future Cost Chart Holden
WCPC DEP 201422
Control Measure
Annual CostOne-Time
CostIntermittent
Cost
Public Education
$9908 $0 $0
Public Participation
$0 $0 $0
IDDE $7872 $314494 $50440
Construction $0 $770 $0
Post-Construction
$5280 $1496 $7436
Good Housekeeping
$220562 $6292 $0
Miscellaneous $15168 $2376 $0
Total $258790 $325428 $57876
Worcester Polytechnic Institute
Anticipated Future Costs for Complying with the 2014 MS4 Draft Permit
WCPC DEP 201423
Holden Southbridge Millbury
Impervious Area
704 869 1309
Number of Outfalls
144 206 267
Current Cost $186526 $268604 $584960
Predicted Annual Cost
$258790 $343008 $735629
Percent Increase
39 28 26
Findings and Recommendations
Funding Techniques
Centralized Management
Innovative Funding
Regionalization
Worcester Polytechnic Institute
Finding amp Recommendation 1
Finding
bull Funding Techniques
CIC Grant
Alternatives
Millburyrsquos Technique
Recommendation
bull Seek Alternative Funding
604(b) Source Water Protection etc
25 WCPC DEP 2014
Worcester Polytechnic Institute
Finding amp Recommendation 2
Finding
bull Easier With Stormwater Coordinator
Scattered Information
Recommendation
bull Designated Person
DCR
26 WCPC DEP 2014
Worcester Polytechnic Institute
Finding amp Recommendation 3
Finding
bull Innovative Management
Millburyrsquos Piping
Art Contest
Recommendation
bull Be Creative
27 WCPC DEP 2014
Worcester Polytechnic Institute
Finding amp Recommendation 4
Finding
bull Regionalization Is Beneficial
More Efficient
High CostBenefit Ratio
Savings with Coalition
Recommendation
bull Form Coalitions
bull Work With Neighbors
28 WCPC DEP 2014
Worcester Polytechnic Institute
Citations
httpwwwepagovregion1npdesstormwatermaicMA_Imperv2010_Holdenpdf
httpwwwepagovregion1npdesstormwatermaicMA_Imperv2010_Millburypdf
httpwwwepagovregion1npdesstormwatermaicMA_Imperv2010_Millburypdf
httpsdlsgatewaydorstatemausDLSReportsDLSReportVieweraspxReportName=At_A_GlanceampReportTitle=At+A+Glance -
httpsrjengineeringcomservices_npdes_08html
WCPC DEP 201429
Questions
Worcester Polytechnic Institute
Example Future Cost Chart Holden
WCPC DEP 201422
Control Measure
Annual CostOne-Time
CostIntermittent
Cost
Public Education
$9908 $0 $0
Public Participation
$0 $0 $0
IDDE $7872 $314494 $50440
Construction $0 $770 $0
Post-Construction
$5280 $1496 $7436
Good Housekeeping
$220562 $6292 $0
Miscellaneous $15168 $2376 $0
Total $258790 $325428 $57876
Worcester Polytechnic Institute
Anticipated Future Costs for Complying with the 2014 MS4 Draft Permit
WCPC DEP 201423
Holden Southbridge Millbury
Impervious Area
704 869 1309
Number of Outfalls
144 206 267
Current Cost $186526 $268604 $584960
Predicted Annual Cost
$258790 $343008 $735629
Percent Increase
39 28 26
Findings and Recommendations
Funding Techniques
Centralized Management
Innovative Funding
Regionalization
Worcester Polytechnic Institute
Finding amp Recommendation 1
Finding
bull Funding Techniques
CIC Grant
Alternatives
Millburyrsquos Technique
Recommendation
bull Seek Alternative Funding
604(b) Source Water Protection etc
25 WCPC DEP 2014
Worcester Polytechnic Institute
Finding amp Recommendation 2
Finding
bull Easier With Stormwater Coordinator
Scattered Information
Recommendation
bull Designated Person
DCR
26 WCPC DEP 2014
Worcester Polytechnic Institute
Finding amp Recommendation 3
Finding
bull Innovative Management
Millburyrsquos Piping
Art Contest
Recommendation
bull Be Creative
27 WCPC DEP 2014
Worcester Polytechnic Institute
Finding amp Recommendation 4
Finding
bull Regionalization Is Beneficial
More Efficient
High CostBenefit Ratio
Savings with Coalition
Recommendation
bull Form Coalitions
bull Work With Neighbors
28 WCPC DEP 2014
Worcester Polytechnic Institute
Citations
httpwwwepagovregion1npdesstormwatermaicMA_Imperv2010_Holdenpdf
httpwwwepagovregion1npdesstormwatermaicMA_Imperv2010_Millburypdf
httpwwwepagovregion1npdesstormwatermaicMA_Imperv2010_Millburypdf
httpsdlsgatewaydorstatemausDLSReportsDLSReportVieweraspxReportName=At_A_GlanceampReportTitle=At+A+Glance -
httpsrjengineeringcomservices_npdes_08html
WCPC DEP 201429
Questions
Worcester Polytechnic Institute
Anticipated Future Costs for Complying with the 2014 MS4 Draft Permit
WCPC DEP 201423
Holden Southbridge Millbury
Impervious Area
704 869 1309
Number of Outfalls
144 206 267
Current Cost $186526 $268604 $584960
Predicted Annual Cost
$258790 $343008 $735629
Percent Increase
39 28 26
Findings and Recommendations
Funding Techniques
Centralized Management
Innovative Funding
Regionalization
Worcester Polytechnic Institute
Finding amp Recommendation 1
Finding
bull Funding Techniques
CIC Grant
Alternatives
Millburyrsquos Technique
Recommendation
bull Seek Alternative Funding
604(b) Source Water Protection etc
25 WCPC DEP 2014
Worcester Polytechnic Institute
Finding amp Recommendation 2
Finding
bull Easier With Stormwater Coordinator
Scattered Information
Recommendation
bull Designated Person
DCR
26 WCPC DEP 2014
Worcester Polytechnic Institute
Finding amp Recommendation 3
Finding
bull Innovative Management
Millburyrsquos Piping
Art Contest
Recommendation
bull Be Creative
27 WCPC DEP 2014
Worcester Polytechnic Institute
Finding amp Recommendation 4
Finding
bull Regionalization Is Beneficial
More Efficient
High CostBenefit Ratio
Savings with Coalition
Recommendation
bull Form Coalitions
bull Work With Neighbors
28 WCPC DEP 2014
Worcester Polytechnic Institute
Citations
httpwwwepagovregion1npdesstormwatermaicMA_Imperv2010_Holdenpdf
httpwwwepagovregion1npdesstormwatermaicMA_Imperv2010_Millburypdf
httpwwwepagovregion1npdesstormwatermaicMA_Imperv2010_Millburypdf
httpsdlsgatewaydorstatemausDLSReportsDLSReportVieweraspxReportName=At_A_GlanceampReportTitle=At+A+Glance -
httpsrjengineeringcomservices_npdes_08html
WCPC DEP 201429
Questions
Findings and Recommendations
Funding Techniques
Centralized Management
Innovative Funding
Regionalization
Worcester Polytechnic Institute
Finding amp Recommendation 1
Finding
bull Funding Techniques
CIC Grant
Alternatives
Millburyrsquos Technique
Recommendation
bull Seek Alternative Funding
604(b) Source Water Protection etc
25 WCPC DEP 2014
Worcester Polytechnic Institute
Finding amp Recommendation 2
Finding
bull Easier With Stormwater Coordinator
Scattered Information
Recommendation
bull Designated Person
DCR
26 WCPC DEP 2014
Worcester Polytechnic Institute
Finding amp Recommendation 3
Finding
bull Innovative Management
Millburyrsquos Piping
Art Contest
Recommendation
bull Be Creative
27 WCPC DEP 2014
Worcester Polytechnic Institute
Finding amp Recommendation 4
Finding
bull Regionalization Is Beneficial
More Efficient
High CostBenefit Ratio
Savings with Coalition
Recommendation
bull Form Coalitions
bull Work With Neighbors
28 WCPC DEP 2014
Worcester Polytechnic Institute
Citations
httpwwwepagovregion1npdesstormwatermaicMA_Imperv2010_Holdenpdf
httpwwwepagovregion1npdesstormwatermaicMA_Imperv2010_Millburypdf
httpwwwepagovregion1npdesstormwatermaicMA_Imperv2010_Millburypdf
httpsdlsgatewaydorstatemausDLSReportsDLSReportVieweraspxReportName=At_A_GlanceampReportTitle=At+A+Glance -
httpsrjengineeringcomservices_npdes_08html
WCPC DEP 201429
Questions
Worcester Polytechnic Institute
Finding amp Recommendation 1
Finding
bull Funding Techniques
CIC Grant
Alternatives
Millburyrsquos Technique
Recommendation
bull Seek Alternative Funding
604(b) Source Water Protection etc
25 WCPC DEP 2014
Worcester Polytechnic Institute
Finding amp Recommendation 2
Finding
bull Easier With Stormwater Coordinator
Scattered Information
Recommendation
bull Designated Person
DCR
26 WCPC DEP 2014
Worcester Polytechnic Institute
Finding amp Recommendation 3
Finding
bull Innovative Management
Millburyrsquos Piping
Art Contest
Recommendation
bull Be Creative
27 WCPC DEP 2014
Worcester Polytechnic Institute
Finding amp Recommendation 4
Finding
bull Regionalization Is Beneficial
More Efficient
High CostBenefit Ratio
Savings with Coalition
Recommendation
bull Form Coalitions
bull Work With Neighbors
28 WCPC DEP 2014
Worcester Polytechnic Institute
Citations
httpwwwepagovregion1npdesstormwatermaicMA_Imperv2010_Holdenpdf
httpwwwepagovregion1npdesstormwatermaicMA_Imperv2010_Millburypdf
httpwwwepagovregion1npdesstormwatermaicMA_Imperv2010_Millburypdf
httpsdlsgatewaydorstatemausDLSReportsDLSReportVieweraspxReportName=At_A_GlanceampReportTitle=At+A+Glance -
httpsrjengineeringcomservices_npdes_08html
WCPC DEP 201429
Questions
Worcester Polytechnic Institute
Finding amp Recommendation 2
Finding
bull Easier With Stormwater Coordinator
Scattered Information
Recommendation
bull Designated Person
DCR
26 WCPC DEP 2014
Worcester Polytechnic Institute
Finding amp Recommendation 3
Finding
bull Innovative Management
Millburyrsquos Piping
Art Contest
Recommendation
bull Be Creative
27 WCPC DEP 2014
Worcester Polytechnic Institute
Finding amp Recommendation 4
Finding
bull Regionalization Is Beneficial
More Efficient
High CostBenefit Ratio
Savings with Coalition
Recommendation
bull Form Coalitions
bull Work With Neighbors
28 WCPC DEP 2014
Worcester Polytechnic Institute
Citations
httpwwwepagovregion1npdesstormwatermaicMA_Imperv2010_Holdenpdf
httpwwwepagovregion1npdesstormwatermaicMA_Imperv2010_Millburypdf
httpwwwepagovregion1npdesstormwatermaicMA_Imperv2010_Millburypdf
httpsdlsgatewaydorstatemausDLSReportsDLSReportVieweraspxReportName=At_A_GlanceampReportTitle=At+A+Glance -
httpsrjengineeringcomservices_npdes_08html
WCPC DEP 201429
Questions
Worcester Polytechnic Institute
Finding amp Recommendation 3
Finding
bull Innovative Management
Millburyrsquos Piping
Art Contest
Recommendation
bull Be Creative
27 WCPC DEP 2014
Worcester Polytechnic Institute
Finding amp Recommendation 4
Finding
bull Regionalization Is Beneficial
More Efficient
High CostBenefit Ratio
Savings with Coalition
Recommendation
bull Form Coalitions
bull Work With Neighbors
28 WCPC DEP 2014
Worcester Polytechnic Institute
Citations
httpwwwepagovregion1npdesstormwatermaicMA_Imperv2010_Holdenpdf
httpwwwepagovregion1npdesstormwatermaicMA_Imperv2010_Millburypdf
httpwwwepagovregion1npdesstormwatermaicMA_Imperv2010_Millburypdf
httpsdlsgatewaydorstatemausDLSReportsDLSReportVieweraspxReportName=At_A_GlanceampReportTitle=At+A+Glance -
httpsrjengineeringcomservices_npdes_08html
WCPC DEP 201429
Questions
Worcester Polytechnic Institute
Finding amp Recommendation 4
Finding
bull Regionalization Is Beneficial
More Efficient
High CostBenefit Ratio
Savings with Coalition
Recommendation
bull Form Coalitions
bull Work With Neighbors
28 WCPC DEP 2014
Worcester Polytechnic Institute
Citations
httpwwwepagovregion1npdesstormwatermaicMA_Imperv2010_Holdenpdf
httpwwwepagovregion1npdesstormwatermaicMA_Imperv2010_Millburypdf
httpwwwepagovregion1npdesstormwatermaicMA_Imperv2010_Millburypdf
httpsdlsgatewaydorstatemausDLSReportsDLSReportVieweraspxReportName=At_A_GlanceampReportTitle=At+A+Glance -
httpsrjengineeringcomservices_npdes_08html
WCPC DEP 201429
Questions
Worcester Polytechnic Institute
Citations
httpwwwepagovregion1npdesstormwatermaicMA_Imperv2010_Holdenpdf
httpwwwepagovregion1npdesstormwatermaicMA_Imperv2010_Millburypdf
httpwwwepagovregion1npdesstormwatermaicMA_Imperv2010_Millburypdf
httpsdlsgatewaydorstatemausDLSReportsDLSReportVieweraspxReportName=At_A_GlanceampReportTitle=At+A+Glance -
httpsrjengineeringcomservices_npdes_08html
WCPC DEP 201429
Questions