cost estimate workshop office r1 12.03.15

Upload: abhishekkumar

Post on 13-Apr-2018

238 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/23/2019 Cost Estimate Workshop Office R1 12.03.15

    1/69

    DRAFT COST ESTIMATE WORKSHOP OFFICE

    Client : Delhi Metro Rail Corporation Ltd.

    Architect: M! Mahendra Ra" Con!#ltant! Pri$ate Li%ited

    Co!t En&ineerin& Con!#ltant: M! Creati$e Con!#ltant! ' En&ineer!( )*+

    Creati$e Con!#ltant! ' En&ineer! , An ISO -/:01 Certi2ied Co%pan34 Cost Engineering Consultant

    105, Lower Ground Floor, New Arya Nagar

    Patel Marg, Ghaziabad!0100" M#$%10&&01$0

    Ph' No' 01!0!%"10&(

    E)ail# **e'engg+g)ail'*o)

    ebsite#www'*reati-e*onsultants'*o'in

    Doc#%ent 5o:6

    .1 0&'0!'15 7 8

    .0 0!'0!'15 7 8For A//ro-al Er' .a)esh Er Ar-ind Er. A%it Cha#dhar3

    Re$ Date De!cription Prepared +3 Chec9ed Appro$ed +3

    5AME OF WORK : PROPOSED ARO5DA DEPOT C;M WORKSHOP I5C;DI5) SER

  • 7/23/2019 Cost Estimate Workshop Office R1 12.03.15

    2/69

    S;MMAR= OF CI?/./-

    SCHED;LE + 5DSR ITEMS

    FI5ISHI5)1 226 2.3 9 P:C 2.3 14&&5%'11

    ! FL22.NG 1&(%"00'4!

    " FN8NG 10(5&'04

    4 AE. P.22FNG !(0(!0'00

    TOTAL ,+4 0/@??.>B

    Total A + 0//1??.B@

    Sa3 0/.0 Lac!

    Area o2 +#ildin& B@B. S%

    Co!t Per S% 0@0?B.>0

    Co!t Per S2t. 0?-.@

    Total Rein2orce%ent @->@. K&

    Per S% B-.> K&S%

    Per S2t B.? K&S2t

    5AME OF WORK : PROPOSED ARO5DA DEPOT C;M WORKSHOP I5C;DI5) SER

  • 7/23/2019 Cost Estimate Workshop Office R1 12.03.15

    3/69

    Pro

  • 7/23/2019 Cost Estimate Workshop Office R1 12.03.15

    4/69

    Pro0'00

    Pro-iding and laying in /osition *e)ent *on*rete o> s/e*i>ied gradee*luding the *ost o> *entering and shuttering All wor= u/ to /linth le-el#

    1#4#% B1 Ce)ent # 4 *oarse sand # % graded stone aggregate 40 ))

    no)inal size@'

    Pro-iding and laying *e)ent *on*rete in retaining walls, returnwalls, walls Bany thi*=ness@ in*luding atta*hed /ilasters, *olu)ns, /iers,abut)ents, /illars, /osts, struts, buttresses, string or la*ing *ourses,/ara/ets, *o/ing, bed blo*=s, an*hor blo*=s, /lain window sills, >illets,sun=en >loor,et*', u/ to >loor >i-e le-el, e*luding the *ost o> *entering,shuttering and >inishing #

    1#!#4 B1 *e)ent # ! *oarse sand # 4 graded stone aggregate !0 ))no)inal size@

    Pro-iding and laying da)//roo> *ourse 50)) thi*= with *e)ent*on*rete 1#!#4 B1 *e)ent # ! *oarse sand # 4 graded stone aggregate!0)) no)inal size@'

    Etra >or /ro-iding and )iing water /roo>ing )aterial in *e)ent*on*rete wor= in doses by weight o> *e)ent as /er )anu>a*turerss/e*i>i*ation'

    /er 50=gCe)ent

    A//lying a *oat o> residual /etroleu) bitu)en o> grade o> :G10 o>a//ro-ed Duality using 1'(=g /er sDuare )etre on da)/ /roo> *oursea>ter *leaning the sur>a*e with brushes and >inally with a /ie*e o> *lothlightly soa=ed in =erosene oil'

  • 7/23/2019 Cost Estimate Workshop Office R1 12.03.15

    5/69

    Proloors, roo>s, landings, bal*onies and a**ess /lat>or)' $&%'00 8D) 401'&5 "%%($('!0

    d@ 5'$'4 8hel-es B*ast in situ@ 1"'00 8D) 401'&5 5!!1'45

    e@ 5'$'5 Lintels, bea)s, /linth bea)s, girders, bressu)ers and *antile-ers'1!%%'00 8D) ""!'15 4!(%0$'!0

    >@ 5'$'& Colu)ns, Pillars, Piers, Abut)ents, Posts and 8truts 51&'00 8D) 4"5'"5 !!4&40'&0

    g@ 5'$'( 8tairs BE*luding landings@ %$'00 8D) "$5'&5 "5!1!'%5

    h@ 5'$'15

    !4'00 8D) 1$&'45 4(14'%0

    i@ 5'$'1$ eather shade, Chaloor : le-el' "%('00 Cu) ("&"'00 !%4$4%1'00

    0'00

    Total o2 !#6head 0'00 1-@1?./0'00

    Centering 9 shuttering in*luding strutting, /ro//ing et*' and re)o-al o>>or) wor= >or#

    alls Bany thi*=ness@ in*luding atta*hed /ilasters, butteresses, /linth

    and string *ourses et*'

    8)all lintels not e*eeding 1'5) *lear s/an, )oulding as in *orni*es,window sills, string *ourses, bands,*o/ings, bed /lates, an*hor blo*=sand the li=e'

    Pro-iding /re*ast *e)ent *on*rete ali 1#!#4 B1 *e)ent # ! *oarse sand #4 graded stone aggregate &)) no)inal size@ rein>or*ed with 1'& )) dia)ild steel wire in*luding *entering and shuttering, roughening *leaning,>iing and >inishing in *e)ent )ortar 1#" B1 *e)ent# " >ine sand@ et*'*o)/lete e*luding /lastering o> the >its'

    8teel rein>or*e)ent >or .'C'C' wor= in*luding straightening, *utting,bending, /la*ing in /osition and binding all *o)/lete u/to /linth le-el'

    8teel rein>or*e)ent >or .'C'C' wor= in*luding straightening, *utting,bending, /la*ing in /osition and binding all *o)/lete abo-e /linth le-el'

    Add >or /laster dri/ *ourse groo-e in /lastered sur>a*e or )oulding to.'C'C' /roro)transit )ier to site o> laying , e*luding the *ost o> *entering, shuttering>inishing and rein>or*e)ent in*luding *ost o> ad)itures inre*o))ended /ro/ortions as /er 8 # $10" to a**elerate retard setting

    o> *on*rete, i)/ro-e wor=ability without i)/airing strength and durabilityas /er dire*tion o> the Engineer in *harge'

    BNote # Ce)ent *ontent *onsidered in this ite) is + ""0 =g*u)'E*essless *e)ent used as /er design )i is /ayablere*o-erablese/arately@'

  • 7/23/2019 Cost Estimate Workshop Office R1 12.03.15

    6/69

    Pro

  • 7/23/2019 Cost Estimate Workshop Office R1 12.03.15

    7/69

    Proa*ing on the e/osed sur>a*e with stone stri/s o> )ini)u) length"00 )) and reDuired width in*luding e)bedding e-ery tenth layer andbotto) )ost layer in )asonry or *on*rete a>ter )a=ing ne*essary*hases o> size (5(5)) and by /ro-iding layer o> (5)) thi*= stri/s i*1!)) thi*= bed o> *e)ent )ortar 1#" B1 Ce)ent # " *oarse sand@ i*ruled /ointing in *e)ent )ortar 1#! B1 white *e)ent # ! stone dust@ withan ad)iture o> /ig)ent to )at*h the shade o> stone *o)/lete as /erdire*tion o> Engineerin*harge'

    Pro-iding and >iing 1%)) thi*= gang saw *ut )irror /olished/re)oulded and /re/olished@ )a*hine *ut >or =it*hen /lat>or)s, -anity*ounters, window sills , >a*ias and si)ilar lo*ations o> reDuired size o>

    a//ro-ed shade, *olour and teture laid o-er !0)) thi*= base *e)ent)ortar 1#4 B1 *e)ent # 4 *oarse sand@ with inishet*' *o)/lete at all le-els'

    Pro-iding edge )oulding to 1%)) thi*= )arble stone *ounters,:anities et*' in*luding )a*hine /olishing to edge to gi-e high gloss > inishet*' *o)/lete as /er design a//ro-ed by EngineerinCharge'

    Etra >or >iing )arble granite stone o-er and abo-e *orres/ondingbasi* ite), in >a*ia and dro/s o> width u/to 150 )) with e/oy resinbased adhesi-e in*luding *leaning et*' *o)/lete

    Etra >or /ro-iding o/ening o> reDuired size 9 sha/e >or washbasins=it*hen sin= in =it*hen /lat>or), -anity *ounters and si)ilarlo*ation in )arbleGranitestone wor= in*luding ne*essary holes >or /illarta/s et*' in*luding rubbing and /olishing o> *ut edges et*' *o)/lete'

    Mirrior /olishing on )arble wor= granite wor= stone wor= where e-erreDuired to gi-e high gloss >inish *o)/lete

    Pro-iding and >iing stone slab table rubbed, edges rounded and/olished o> size (550 *) dee/ and 1'% *) thi*= >ied in urinal/artitions by *utting a *hase o> a//ro/riate width with *hase *utter ande)bedding the stone in the *hase with e/oy grout or with *e)ent*on*rete 1#!#4 B1 *e)ent # ! *oarse sand # 4 graded stone aggregate &)) no)inal size@ as /er dire*tion o> Engineerin*harge and >inisheds)ooth'

  • 7/23/2019 Cost Estimate Workshop Office R1 12.03.15

    8/69

    Proiing 8 )ar=ed >lush door shutters *on>or)ing to 8#!!0! BPart @ de*orati-e ty/e, *ore o> blo*= board *onstru*tion with>ra)e o> 1st *lass hard wood and well )at*hed tea= " /ly -eneering with-erti*al grains or *ross bands and >a*e -eneers on both >a*es o>shutters'

    "5 )) thi*= in*luding 8 )ar=ed 8tainless 8teel butt hinges withne*essary s*rews'

    Pro-iding and >iing alu)iniu) die *ast body tubular ty/e uni-ersalhydrauli* door *loser Bha-ing brand logo with 8, 8 # "5&4, e)bossedon the body, door weight u/to "5 =g and door width u/to (00 ))@ withne*essary a**essories and s*rews et*' *o)/lete'

    Pro-iding and >iing 50*) long alu)iniu) =i*=ing /late 100"'15)) anodised Banodi* *oating not less than grade AC 10 as /er8 #1%&%@ trans/arent or dyed to reDuired *olour or shade withne*essary s*rews et*' *o)/lete'

  • 7/23/2019 Cost Estimate Workshop Office R1 12.03.15

    9/69

    Pro@@B--.@0'00

    Pro-iding and >iing /ressed steel door >ra)es *on>or)ing to 8# 4"51)anu>a*tured >ro) *o))er*ial )ild steel sheet o> 1'&0 ))thi*=ness in*luding hinges, )ild steel angle o> se*tion 50!5)), or base ties o> 1'&0)) /ressed )ild steel welded or rigidly >ied together by )e*hani*al)eans, in*luding M'8' /ressed butt hinges, !'5)) thi*= with )ortarguards, lo*= stri=e/late and sho*= absorbers as s/e*i>ied and a//lyinga *oat o> a//ro-ed steel /ri)er a>ter /retreat)ent o> the sur>a*e asdire*ted by Engineerin*harge#

    Pro-iding and >iing stainless steel B Grade "04@ railing )ade o> ollowtubes, *hannels, /lates et*', in*luding welding, grinding, bu>>ing,/olishing and )a=ing *ur-ature Bwhere-er reDuired@ and >itting the sa)ewith ne*essary stainless steel nuts and bolts *o)/lete, i* >iing therailing with ne*essary a**essories 9 stainless steel dash >asteners ,stainless steel bolts et*', o> reDuired size, on the to/ o> the >loor or theside o> waist slab with suitable arrange)ent as /er a//ro-al o>Engineerin*harge, B >or /ay)ent /ur/ose only weight o> stainless steel)e)bers shall be *onsidered e*luding >iing a**essories su*h as nuts,bolts, >asteners et*'@'

  • 7/23/2019 Cost Estimate Workshop Office R1 12.03.15

    10/69

    Proinished with a >loating *oat o> neat *e)ent'

    Marble stone >looring with 1%)) thi*= )arble stone Bsa)/le o> )arbleshall be a//ro-ed by Engineerin*harge@ o-er !0 )) Ba-erage@ thi*=base o> *e)ent )ortar 1#4 B1 *e)ent # 4 *oarse sand@ laid and looring o-er !0 )) Ba-erage@ thi*= base laid o-er and the slab in*luding rubbing and /olishing *o)/lete with base o> *e)ent)ortar 1 # 4 B1 *e)ent # 4 *oarse sand@ #

    3ota stone slabs !0 )) thi*= in risers o> ste/s, s=irting, dado and /illarslaid on 1! )) Ba-erage@ thi*= *e)ent )ortar 1#" B1 *e)ent " *oarsesand@ and the slabs, in*luding rubbing and /olishing *o)/lete'

    7ased on68. te)11'!%'1

    40 )) thi*= >ine dressed stone >looring o-er !0 )) Ba-erage@ thi*=base o> *e)ent )ortar 1#5 B 1*e)ent # 5 *oarse sand@ with inished >lush'

    Pro-iding and >iing st Duality *era)i* glazed wall tiles *on>or)ing to8 # 15&!! Bthi*=ness to be s/e*i>ied by the )anu>a*turer @ o> a//ro-ed)a=e in all *olours, shades o> any size as a//ro-ed by EngineerinCharge, in s=irting, risers o> ste/s and dados o-er 1! )) thi*= bed o>*e)ent Mortar 1#" B1 *e)ent # " *oarse sand@ and )at*hing shade *o)/lete'B7asi* *ost o> Cera)i* tiles.s'"0 /er sD>t'@

    Pro-iding and laying -itri>ied >loor tiles in di>>erent sizes Bthi*=ness to bes/e*i>ied by the )anu>a*turer@ with water absor/tions less than 0'0%Hand *on>or)ing to 8 # 15&!! o> a//ro-ed )a=e in all *olours andshades, laid on !0)) thi*= *e)ent )ortar 1#4 B1 *e)ent # 4 *oarsesand@ in*luding grouting the

  • 7/23/2019 Cost Estimate Workshop Office R1 12.03.15

    11/69

    Proied tiles in di>>erent sizes Bthi*=ness to bes/e*i>ied by )anu>a*turer@ with water absor/tion less than 0'0% H and*on>or)ing to '8' 15&!!, o> a//ro-ed )a=e in all *olours 9 shade ins=irting, riser o> ste/s, o-er 1! )) thi*= bed o> *e)ent )ortar 1#" B1*e)ent# " *oarse sand@, in*luding grouting the

  • 7/23/2019 Cost Estimate Workshop Office R1 12.03.15

    12/69

    Proro) 0'"" )) thi*=B)ini)u)@ sheet, s/a*ed 1!00)) *entre to *entre, and *ross II o>size !4!%)) )ade out o> 0'"")) BMini)u)@ sheet, 1!00)) longs/a*ed between )ain at &00)) *entre to *entre to >or) a grid o>1!00&00)) and se*ondary *ross o> length &00)) and size !4!%)) )ade o> 0'"")) thi*= BMini)u)@ sheet to be inter lo*=ed at)iddle o> the 1!00 &00)) /anel to >ro) grid o> size &00&00)),resting on /eri/hery walls /artitions on a Peri)eter wall angle /re*oated steel o> sizeB!4!4J"000 )) )ade o> 0'40 )) thi*=

    B)ini)u)@ sheet with the hel/ o> rawl /lugs at 450)) *entre to *entrewith !5)) long dry wall s*rews + !"0)) inter-al and laying 15))

    thi*= densi>ied edges *ali*u) sili*ate *eiling tiles o> a//ro-ed tetureB8/intone Cos)oshea@ in the grid in*luding, *utting )a=ing o/ening>or ser-i*es li=e di>>users, grills,light >ittings, >itures, s)o=e dete*torset*', wheree-er reDuired, Main runners to be sus/ended >ro) *eilingusing G'' slotted *leats o> size !5"51'&)) >ied to *eiling with 1!'5)) dia and 50)) long dash >asteners, 4)) G'' ad size %5 "0 0'% )), s/a*ed at1!00)) *entre to *entre along )ain , botto) e/osed with !4)) o>all se*tions shall be /re/ainted with /olyster ba=ed /aint, >or allheights, as /er s/e*i>i*ations, drawings and as dire*ted by engineerin*harge'

    Note # 2nly *al*iu) sili*ate >alse *eiling area will be )easured >ro) wallto wall' No dedu*tion shall be )ade >or e/osed >ra)eso/ening B*ut

    outs@ ha-ing area less than 0'"0 sD)'he *al*iu) sili*ate *eiling tileshall ha-e N.C' -alue o> 0'50BMini)u)@, light re>le*tion K %5H, non *o)bustible as /er 7'8' 4(& /art :, 100H hu)idity resistan*e and alsoha-ing ther)al *ondu*ti-ity0'04" w) 0 3C'

  • 7/23/2019 Cost Estimate Workshop Office R1 12.03.15

    13/69

    Proine sand@ 1&0('00 8D) 1%$'40 "04"&5'%0

    0'00 0'00

    %'0" 1"'1& & )) *e)ent /laster o> )i# 0'00 0'00

    a@ 1"'1&'1 1#" B1 *e)ent # " >ine sand@ 11&1'00 8D) 1"4'(0 15&"%&'(0

    0'00 0'00

    %'04 1"'!&

    "414'00 8D) 110'$5 "(%(%"'"0

    0'00 0'00

    %'05 1"'410'00 0'00

    a@ 1"'41'1"414'00 8D) %$'(0 "0&!"5'%0

    0'00 0'00%'0& 1"'45 Finishing walls with tetured eterior /aint o> reDuired shade # 0'00 0'00

    a@ 1"'45'1

    1&0('00 8D) 14&'45 !"5"45'15

    0'00

    Total o2 !#6head 0'00 /B/B10B.@0'00

    15 )) *e)ent /laster on the rough side o> single or hal> bri*= wall o>

    )i #

    Pro-iding and a//lying /laster o> /aris /utty o> ! )) thi*=ness o-er/lastered sur>a*e to /re/are the sur>a*e e-en and s)ooth *o)/lete

    6iste)/ering with oil bound washable diste)/er o> a//ro-ed brand and)anu>a*ture to gi-e an e-en shade

    New wor= Btwo or )ore *oats@ o-er and in*luding water thinnable/ri)ing *oat with *e)ent /ri)er'

    New wor= Bwo or )ore *oats a//lied + "'!% ltr10 sD)@ o-er andin*luding /ri)ing *oat o> eterior /ri)er a//lied +!'!0=g10 sD)'

  • 7/23/2019 Cost Estimate Workshop Office R1 12.03.15

    14/69

    Proloat glass /anes o> 5'50)) thi*=ness $0'00 8D) 1054'!0 $4%(%'00

    0'00 0'00$'0" !1'%0

    0'00 0'00

    a@ !1'%'1 ;/to 5)) de/th and 5 )) width !$0'00 Metre %%'(5 !5("('50

    0'00 0'00

    $'04 !1'11

    0'00 0'00

    a@ !1'11'" "55 J 1$ )) 4%'00 Ea*h "50'(0 1&%""'&0

    0'00 0'00

    $'05 !1'15

    0'00 0'00

    a@ !1'15'! Powder *oated )ini)u) thi*=ness 50 )i*ron alu)iniu)' &0'00 Ea*h 55'15 ""0$'00

    0'00 0'00

    $'0& !1'1(

    !00'00 3g 40"'"5 %0&(0'00

    0'00

    Total o2 !#6head 0'00 >?-0?.B0'00

    Pro-iding and >iing alu)iniu) wor= >or doors, windows, -entilators and/artitions with etruded built u/ standard tubular se*tions a//ro/riate zse*tions and other se*tions o> a//ro-ed )a=e *on>or)ing to 8 # (""and 8 # 1!%5, >ied with rawl /lugs and s*rews or with >iing *li/s, orwith e/ansion hold >asteners in*luding ne*essary >illing u/ o> ga/s atelt et*'Alu)iniu) se*tions shall be s)ooth, rust >ee, straight, )itred andor glazing /anelling, C'P' brass stainless steel s*rews,all *o)/lete as /er ar*hite*tural drawings and the dire*tions o>Engineerin*harge BGlazing and /anelling to be /aid >or se/arately'

    Anodised alu)iniu) Banodised trans/arent or dyed to reDuired shadea**ording to 8# 1%&%, Mini)u) anodi* *oating o> grade AC 15@

    For shutters o> doors, windows 9 -entilators in*luding /ro-iding and>iing hinges /i-ots and )a=ing /ro-ision >or >iing o> >ittings where-erreDuired in*luding the *ost o> EP6M rubber neo/rene gas=et reDuiredBFittings shall be /aid >or se/arately@'

    Anodised alu)iniu) Banodised trans/arent or dyed to reDuired shadea**ording to 8# 1%&%, Mini)u) anodi* *oating o> grade AC 15@

    Pro-iding and >iing glazing in alu)iniu) door window -entilator shuttersand /artitions et*' with P:C neo/rene gas=et e*t' Co)/lete as /er thear*hite*tural drawing and the dire*tions o> engineer in *harge'B *ost o>alu)iniu) sna/ beading shall be /aid in basi* ite)@#

    Filling the ga/ in between alu)iniu) >ra)e 9 ada//ro-ed Duality as /er ar*hite*tural drawings and dire*tion o> Engineerin*harge *o)/lete'

    Pro-iding and >iing stainless steel B88 "04 grade@ adri*tionwindows stays o> a//ro-ed Duality with ne*essary stainless steels*rews et*' to the side hung windows as /er dire*tion o> Engineerin*harge *o)/lete'

    Pro-iding and >iing alu)iniu) *ase)ent windows >astener o> reDuired

    length >or alu)iniu) windows with ne*essary s*rews et*' *o)/lete'

    Pro-iding and >iing anodised alu)iniu) grill Banodised trans/arent ordyed to reDuired shade a**ording to 8# 1%&% with )ini)u) anodi**oating o> grade AC 15@ o> a//ro-ed design/attern, with a//ro-edstandard se*tion and >ied to the eisting window >ra)e with C'P' brassstainless steel s*rews + !00)) *entre to *entre, in*luding *utting thegrill to /ro/er o/ening size >or >iing and o/eration o> handles and>iing a//ro-ed anodised alu)iniu) standard se*tion around theo/ening, all *o)/lete as /er reDuire)ent and dire*tion o> Engineerin*harge' B2nly weight o> grill to be )easured >or /ay)ent@'

  • 7/23/2019 Cost Estimate Workshop Office R1 12.03.15

    15/69

    Proing treat)ent in sun=en /ortion o> Cs,bathroo) et*', by a//lying *e)ent slurry )ied with water /roo>ing*e)ent *o)/ound *onsisting o> a//lying # a@ First layer o> slurry o>*e)ent + 0'4%% =gsD) )ied with water /roo>ing *e)ent *o)/ound+ 0'!5" =gsD)' his layer will be allowed to air *ure >or 4 hours' b@8e*ond layer o> slurry o> *e)ent + 0'!4! =gsD) )ied with water/roo>ing *e)ent *o)/ound + 0'1!& =gsD)' his layer will be allowedto air *ure >or 4 hours >ollowed with water *uring >or 4% hours' he ratein*ludes /re/aration o> sur>a*e, treat)ent and sealing o> all walls andslabs *@ A>ter two days o> /ro/er *uring a//lying a se*ond *oat o>*e)ent slurry using !'(5=g sD) o> *e)ent ad)ied with water /roo>ing*o)/ound *on>or)ing to 8 # !&45 and a//ro-ed by Engineerin*harge'd@ Finishing the sur>a*e with !0 )) thi*= )i

    1#4 B1 *e)ent #4 *oarse sand@ ad)ied with water /roo>ing *o)/ound*on>or)ing to 8 # !&45 and a//ro-ed by Engineerin*harge in*ludinglaying glass >ibre *loth o> a//ro-ed Duality in to/ layer o> /laster and>inally >inishing the sur>a*e with trowel with neat *e)ent slurry and)a=ing /attern o> "00"00 )) sDuare ")) dee/' e@ he whole terra*eso >inished shall be >looded with water >or a )ini)u) /eriod o> twowee=s >or *uring and >or >inal test' All abo-e o/erations to be done inorder and as dire*ted and s/e*i>ied by the EngineerinCharge #

    ith a-erage thi*=ness o> 1!0)) and )ini)u) thi*=ness at =hurra as&5 ))'

  • 7/23/2019 Cost Estimate Workshop Office R1 12.03.15

    16/69

    Pro good earth at site in*luding royalty and*arriage u/ to 1 =) Bearth )easured in sta*=s will be redu*ed by !0H>or /ay)ent@'

    Pro-iding and >iing 1 )) thi*= la)inate o> a//ro-ed brand,*olour,shade 9 teture on >lush door with adhesi-e and )ala)ine >inish ondoor edges *o)/lete'2nly /lan area o> door shall be )easured'

    Pro-iding and >iing 8tainless steel 8 )ar=ed tower bolts o> a//ro-ed)a=e,trans/arent or dyed to reDuired *olour or shade with steel nutsand s*rews et*' *o)/lete'

    Pro-iding and >iing 8tainless steel 8 )ar=ed 8liding door boltstrans/arent or dyed to reDuired *olour or shade with steel nuts ands*rews et*' *o)/lete'

    Pro-iding and >iing 8tainless steel 8 )ar=ed handles , trans/arent ordyed to reDuired *olour or shade with steel nuts and s*rews et*'

    *o)/lete'

    Pro-iding and >iing 8tainless steel 8 )ar=ed door sto//er o> a//ro-ed)a=e , trans/arent or dyed to reDuired *olour or shade with steel nutsand s*rews et*' *o)/lete'

  • 7/23/2019 Cost Estimate Workshop Office R1 12.03.15

    17/69

    Proloor tiles "05"05)) Bthi*=ness to bes/e*i>ied by the )anu>a*turer@ o> 1st Duality *on>er)ing to rele-ent 8 o>a//ro-ed )a=e in *olours su*h as white l-ory, gray >u)e, red and brownlaid on !0)) thi*= *e)ent )ortor 1#4 in*luding /ointing the

  • 7/23/2019 Cost Estimate Workshop Office R1 12.03.15

    18/69

    Pro

  • 7/23/2019 Cost Estimate Workshop Office R1 12.03.15

    19/69

    Pro.?

    SA= @.

    Pro-iding and laying in /osition *e)ent *on*rete o>s/e*i>ied grade e*luding the *ost o> *entering andshuttering All wor= u/ to /linth le-el #

    Pro-iding and laying *e)ent *on*rete inretaining walls, return walls, walls Bany thi*=ness@

    1#!#4 B1 *e)ent # ! *oarse sand # 4 graded stone

  • 7/23/2019 Cost Estimate Workshop Office R1 12.03.15

    20/69

    Pro Mid Grid"4 8D) 1'00 4'55 0'!" 1'05

    all o> 2n Grid4 8D) 1'00 5'&0 0'!" 1'!$

    all o> l 2n Grid4& 8D) 1'00 $'10 0'!" !'0$

    all o> 2n Grid4& 8D) 1'00 $'10 0'!" !'0$

    all o> Mid Grid&% 8D) 1'00 $'10 0'!" !'0$

    all o> Mid Grid&% 8D) 1'00 $'10 0'!" !'0$

    all o> Mid Grid%$ 8D) 1'00 4'55 0'!" 1'05

    all o> Mid Grid%$ 8D) 1'00 "'1! 0'!" 0'(!all o> Mid Grid%$ 8D) 1'00 1'$% 0'!" 0'4&

    all o> Near Grid$ 8D) 1'00 1'&5 0'!" 0'"%

    all o> Mid Grid%$ 8D) 1'00 !'$0 0'!" 0'&(

    all o> Mid Grid$11 8D) 1'00 $'10 0'!" !'0$

    all o> Mid Grid$11 8D) 1'00 $'10 0'!" !'0$

    all o> Mid Grid111! 8D) 1'00 4'55 0'!" 1'05

    all o> Mid Grid111! 8D) 1'00 4'55 0'!" 1'05

    all o> 2n Grid1! 8D) 1'00 5'&0 0'!" 1'!$

    all o> Mid Grid1!1" 8D) 1'00 4'55 0'!" 1'05

    all o> 2n Grid1" 8D) 1'00 ('&0 0'!" 1'(5

    Internal Wall ,04 0'00 0'00 0'00 0'00

    all o> 2n Grid& 8D) 1'00 5'&0 0'!" 1'!$all o> 2n Grid% 8D) 1'00 5'&0 0'!" 1'!$

    all o> Mid Grid%$ 8D) 1'00 5'0! 0'!" 1'15

    all o> 2n Grid$ 8D) 1'00 5'&0 0'!" 1'!$

    all o>2n Grid11 8D) 1'00 5'&0 0'!" 1'!$

    all o> Near Grid1" 8D) 1'00 0'5! 0'!" 0'1!

    all o> Near Grid1" 8D) 1'00 0'!! 0'!" 0'05

    0 %% ric9 Gor9 eloG Hal2 +W 0'00 0'00 0'00

    LoG Hi&ht Wall //>%% Internal 0'00 0'00 0'00

    wall o> Mid Grid %$ 8D) 1'00 1'45 0'!" 0'""

    wall o> Mid Grid %$ 8D) 1'00 1'4! 0'!" 0'""

    Total 1.0SA= -.

    !'04

    ty trans>er >ro) 6PC r 50=g Ce) 1 "%'!" 0'!& $'$4

    Total -.-?

    SA= /.

    !'05

    8a)e as 6PC ty 8D) 1 "%'!" "%'!"

    Total 1.0SA= -.

    Pro$idin& and la3in& da%p6proo2 co#r!e >%%

    Etra >or /ro-iding and )iing water /roo>ing

    A//lying a *oat o> residual /etroleu) bitu)en o>

  • 7/23/2019 Cost Estimate Workshop Office R1 12.03.15

    21/69

    Pro

  • 7/23/2019 Cost Estimate Workshop Office R1 12.03.15

    22/69

    Pro>i*e 8D) 1 1'41 0'(1 1'00

    Pantry Cu) Lo*=er .oo) 8D) 1 4'55 0'&0 !'("

    Toilet 0 0'00 0'00 0'00

    Ladiesoilet 8D) 1 1'"5 0'&0 0'%1

    Gentsoilet 8D) 1 !'$! 0'&( 1'$&

    Total -.0BSA= /.

    e4 Sh#tterin& 2or +ea%!

    Plinth +ea%

    orizontal 7ea)s 0 0'00 0'00 0'00 0'00

    7ea) on Grid 11" 7 8D) ! 5"'40 0'50 10&'%0

    :eti*al 7ea)s 0 0'00 0'00 0'00 0'00

    7ea) on Grid 11" A7 8D) 1" 5'50 0'50 (1'50

    )ro#nd Floor Roo2 +ea%

    Horiantal +ea%7ea) on Grid 11" 7 8D) ! 54'& 0'45 0'55 1&$'!&

    7ea) on Grid 11" A 8D) 1 &0'45 0'!" 0'40 &!'!&

  • 7/23/2019 Cost Estimate Workshop Office R1 12.03.15

    23/69

    Pro

  • 7/23/2019 Cost Estimate Workshop Office R1 12.03.15

    24/69

    Pro

    SA= /B.

    24 Sh#tterin& 2or col#%n!

    )ro#nd Floor to Fir!t FloorC1 8D) !& 0'45 0'45 4'(0 !1$'$&

    Fir!t Floor to Terrace 0 0'00 0'00 0'00 0'00

    C1 8D) !& 0'45 0'45 "'(0 1("'1&

    Terrace to M#%t3 0 0'00 0'00 0'00 0'00

    C1 8D) 4 0'45 0'45 "'00 !1'&0

    Total ?/?.B0

    Sa3 ?/>.

    &4 Sh#ttrin& 2or Stairca!e

    )ro#nd Floor to Fir!t Floor

    Stairca!e S/Flight 1 8D) 1 1'&5 "'%0 &'!(

    Flight ! 8D) 1 1'&5 1'4" !'"&

    Flight " 8D) 1 1'&5 4'14 &'%!

    For ste/s in Flight 1 8D) 1! 1'&5 0'1& "'10

    For ste/s in Flight ! 8D) 5 1'&5 0'1& 1'!$

    For ste/s in Flight " 8D) 1" 1'&5 0'1& "'"&

    8ide 8D) 1 $'"( 0'1& 1'4(

    Total 0?.@1

    Stairca!e S0

    Flight 1 8D) 1 1'&5 4'(4 ('%"

    Flight ! 8D) 1 1'&5 1'(4 !'%(Flight " 8D) 1 1'&5 "'41 5'&!

    For ste/s in Flight 1 8D) 15 1'&5 0'15 "'&4

    For ste/s in Flight ! 8D) & 1'&5 0'15 1'45

    For ste/s in Flight " 8D) 11 1'&5 0'15 !'&(

    8ide 8D) 1 $'%$ 0'15 1'45

    Total 0>.>

  • 7/23/2019 Cost Estimate Workshop Office R1 12.03.15

    25/69

    Pro>i*ient !%(1'00

    1>.B Total />B.

  • 7/23/2019 Cost Estimate Workshop Office R1 12.03.15

    26/69

    Pro

  • 7/23/2019 Cost Estimate Workshop Office R1 12.03.15

    27/69

    Proi*ient 10!&5'00all Cu) 1'&5 100'00 As /er *o>>i*ient 1&5'00

    8lab Cu) 11('4! %0'00 As /er *o>>i*ient $"$4'00

    7ea)s Abo-e Plinth Cu) 11('$1 140'00 As /er *o>>i*ient 1&50('00

    Pro>i*ient !0!'00

    8hel-es Cu) 0'$" &0'00 As /er *o>>i*ient 5&'00

    /.?1 Total 1>B@.

    SA= 1>B@.

    .>

    Fir!t FloorTapered SlaEle-ation A Metre 1 11'50 11'50

    0 Metre 1 4"'45 4"'45

    8ide Ele-ation Metre 1 %'45 %'45

    0 0 0'00

    M#%t3 RCC For Pro"ection! 0 0'00Ele-ation A Metre ! 4'!" %'45

    Ele-ation A Metre ! "'!5 &'50

    Total B1.>SA= B-.

    .@

    a4 All wor=s u/to /linth le-el'

    Footin&

    F1 Cu) 1" 1'%5 1'%5 0'400 1('%0

    F! Cu) 1" !'00 !'00 0'500 !&'00

    Total ?.1

    R.C.C. 2or Pede!tal

    C1 BFor F1@ Cu) 1" 0'55 0'55 !'1!5 %'"&

    C1 BFor F!@ Cu) 1" 0'55 0'55 !'0!5 ('$&

    0 Total /@.0

    R.C.C. 2or col#%n!

    Colu)n u/to /linth l-l'

    C1 Cu) !& 0'45 0'45 0'%45 4'45

    Total ?.?>

    Add or dedu*t >or /laster dri/ *oursegroo-e in/lastered sur>a*e or )oulding to .'C'C' Proor rein>or*ed *e)ent *on*retewor=, using *e)ent *ontent as /er a//ro-ed

  • 7/23/2019 Cost Estimate Workshop Office R1 12.03.15

    28/69

    Pro

    RCC 2or SLA+S Sla Depth ./>

    )ro#nd Floor Roo2

    8lab on Grid A7 1" Cu) ! 4'55 5'&0 0'150 ('&4

    8lab on Grid A7 "4 Cu) 1 4'55 1'15 0'150 0'($

    8lab on Grid A7 45 Cu) 1 "'"1 5'&0 0'150 !'(%

    8lab on Grid A7 45 Cu) 1 1'01 5'&0 0'150 0'%5

    8lab on Grid A7 5& Cu) 1 !'04 5'&0 0'150 1'(1

    8lab on Grid A7 5& Cu) 1 !'!% 5'&0 0'150 1'$!

    8lab on Grid A7 &% Cu) ! 4'55 5'&0 0'150 ('&4

    8lab on Grid A7 %$ Cu) 1 4'55 5'&0 0'1(5 4'4&

    8lab on Grid A7 $1! Cu) " 4'55 5'&0 0'150 11'4(

    8lab on Grid A7 1!1" Cu) 1 4'55 1'15 0'150 0'($

    8lab on Grid A 1! Cu) 1! 4'55 1'(( 0'150 14'50

    0'00

    Landing 8lab Cu) 4 1'50 1'50 0'150 1'"5

    Fir!t Floor Roo2 0'00

    8lab on Grid A7 1( Cu) & 4'55 5'&0 0'150 !!'$"

    8lab on Grid A7 (% Cu) 1 !'"! 5'&0 0'150 1'$5

    8lab on Grid A7 (% Cu) 1 !'00 5'&0 0'150 1'&%

    8lab on Grid A7 %1! Cu) 4 4'55 5'&0 0'150 15'!$

    8lab on Grid A7 1!1" Cu) 1 4'55 1'15 0'150 0'($

    Pro-iding and laying in /osition ready )ied M!5grade *on*rete >or rein>or*ed *e)ent *on*retewor=, using *e)ent *ontent as /er a//ro-ed

  • 7/23/2019 Cost Estimate Workshop Office R1 12.03.15

    29/69

    Pro

  • 7/23/2019 Cost Estimate Workshop Office R1 12.03.15

    30/69

    Pro

  • 7/23/2019 Cost Estimate Workshop Office R1 12.03.15

    31/69

    Pro

  • 7/23/2019 Cost Estimate Workshop Office R1 12.03.15

    32/69

    Pro

  • 7/23/2019 Cost Estimate Workshop Office R1 12.03.15

    33/69

    Pro

  • 7/23/2019 Cost Estimate Workshop Office R1 12.03.15

    34/69

    Pro 2n Grid1" Cu) 1 $'10 0'!" 0'%4 1'((

    all o> 2n Grid" Cu) 1 5'&0 0'!" 0'%4 1'0$

    all o> Mid Grid"4 Cu) 1 4'55 0'!" 0'%4 0'%%

    all o> 2n Grid4 Cu) 1 5'&0 0'!" 0'%4 1'0$

    all o> l 2n Grid4& Cu) 1 $'10 0'!" 0'%4 1'((

    all o> 2n Grid4& Cu) 1 $'10 0'!" 0'%4 1'((

    all o> Mid Grid&% Cu) 1 $'10 0'!" 0'%4 1'((

    all o> Mid Grid&% Cu) 1 $'10 0'!" 0'%4 1'((

    all o> Mid Grid%$ Cu) 1 4'55 0'!" 0'%4 0'%%

    all o> Mid Grid%$ Cu) 1 "'1! 0'!" 0'%4 0'&1

    all o> Mid Grid%$ Cu) 1 1'$% 0'!" 0'%4 0'"%

    all o> Near Grid$ Cu) 1 1'&5 0'!" 0'%4 0'"!

    all o> Mid Grid%$ Cu) 1 !'$0 0'!" 0'%4 0'5&

    all o> Mid Grid$11 Cu) 1 $'10 0'!" 0'%4 1'((

    all o> Mid Grid$11 Cu) 1 $'10 0'!" 0'%4 1'((

    all o> Mid Grid111! Cu) 1 4'55 0'!" 0'%4 0'%%

    all o> Mid Grid111! Cu) 1 4'55 0'!" 0'%4 0'%%

    all o> 2n Grid1! Cu) 1 5'&0 0'!" 0'%4 1'0$

    all o> Mid Grid1!1" Cu) 1 4'55 0'!" 0'%4 0'%%

    all o> 2n Grid1" Cu) 1 ('&0 0'!" 0'%4 1'4%

    otal [email protected]

    Internal Wall ,04

    all o> 2n Grid& Cu) 1 5'&0 0'!" 0'%4 1'0$

    all o> 2n Grid% Cu) 1 5'&0 0'!" 0'%4 1'0$

    all o> Mid Grid%$ Cu) 1 5'0! 0'!" 0'%4 0'$%

    all o> 2n Grid$ Cu) 1 5'&0 0'!" 0'%4 1'0$

    all o>2n Grid11 Cu) 1 5'&0 0'!" 0'%4 1'0$

    all o> Near Grid1" Cu) 1 0'5! 0'!" 0'%4 0'10

    all o> Near Grid1" Cu) 1 0'!! 0'!" 0'%4 0'04

    otal >.?B

    0 %% ric9 Gor9 eloG Hal2 +W

    LoG Hi&ht Wall //>%% Internal

    wall o> Mid Grid %$ 8D) 1 1'45 0'!" 0'%4 0'!%

    wall o> Mid Grid %$ 8D) 1 1'4! 0'!" 0'%4 0'!%

    7ri*= wor= with *o))on burnt *lay F'P'8' Bnon)odular@ bri*=s o> *lass designation ('5 in>oundation and /linth in#

  • 7/23/2019 Cost Estimate Workshop Office R1 12.03.15

    35/69

    Pro Gents 9 Ladies oilet Near Grid$ Cu) 1 1'&5 0'!" 4'15 1'5(

    8ha>t all o> Gents 9 Ladies oilet Mid Grid%$ Cu) 1 !'$0 0'!" 4'15 !'((

    Front all o> Consu)ables 8tore Mid Grid$11 Cu) 1 $'10 0'!" 4'15 %'&$

    7a*= all o> Consu)ables 8tore Mid Grid$11 Cu) 1 $'10 0'!" 4'15 %'&$

    Front all o> 8ee n 8/e*tion Mid Grid111! Cu) 1 4'55 0'!" 4'15 4'"4

    7a*= all o> 8ee n 8/e*tion Mid Grid111! Cu) 1 4'55 0'!" 4'15 4'"4

    .ight 8ide all o> 8ee n 8/e*tion 2n Grid1! Cu) 1 5'&0 0'!" 4'15 5'"5

    7a*= all o> 8tair Mid Grid1!1" Cu) 1 4'55 0'!" 4'15 4'"4

    .ight 8ide all o> 8tair 2n Grid1" Cu) 1 ('&0 0'!" 4'15 ('!5

    Ded#ction

    61B6@ Cu) 1 !'00 0'!" !'10 0'$(

    61 Cu) $ 1'%0 0'!" !'10 ('%!

    6" Cu) ! 0'$0 0'!" !'10 0'%(

    1 Cu) % !'55 0'!" 1'!0 5'&"

    ! Cu) ! !'00 0'!" 1'!0 1'10

    " Cu) " 0'$0 0'!" 1'!0 0'(5

    :! Cu) ! 0'&0 0'!" 0'&0 0'1(

    8ha>t Cu) 1 "'10 0'!" 1'40 1'00

    7ri*= wor= with *o))on burnt *lay F'P'8' Bnon)odular@ bri*=s o> *lass designation ('5 insu/erstru*ture abo-e /linth le-el u/ to >loor : le-elin all sha/es and sizes in #

  • 7/23/2019 Cost Estimate Workshop Office R1 12.03.15

    36/69

    Pro

  • 7/23/2019 Cost Estimate Workshop Office R1 12.03.15

    37/69

    Pro Ladies toilet 9 Consu)ables 8tore 2n Cu) 1 5'&0 0'!" 4'55 5'%&

    Mid all o> Consu)ables 8tore 9 8ee ns/e*tion st Cu) 1 5'&0 0'!" 4'15 5'"5

    all o> in 8tair Near Grid1" Cu) 1 0'5! 0'"0 4'15 0'&5

    all o> in 8tair Near Grid1" Cu) 1 0'!! 0'"0 4'15 0'!(

    /-.01

    Fir!t Floor Floor Hei&ht .B

    +ea% Depth .>>Eternal Wall ,04 ./>

    Front all o> Meeting .oo) Mid Grid1" Cu) 1 $'10 0'!" "'15 &'5$

    Le>t side all o> Meeting .oo) 2n Grid1 Cu) 1 5'&0 0'!" "'15 4'0&

    7a*= all o> Meeting .oo) Mid Grid1" Cu) 1 $'10 0'!" "'15 &'5$

    .ight 8ide all o> Meeting .oo) 2n Grid" Cu) 1 5'&0 0'!" "'15 4'0&

    7a*= all o> o> 8tair Mid Grid"4 Cu) 1 4'55 0'!" "'15 "'"0

    Le>t 8ide all o> :isitors .oo) 2n Grid4 Cu) 1 5'&0 0'!" "'15 4'0&

    Front all o> :isitors .oo) Near Grid4 Cu) 1 "'"1 0'!" "'15 !'40

    7a*= all o> :isitors .oo) Near Grid4 Cu) 1 "'"1 0'!" "'15 !'"$

    Front all o> P'A'8 .oo) Near Grid5& Cu) 1 "'!% 0'!" "'15 !'"%

    7a*= all o> P'A'8 .oo) Near Grid5& Cu) 1 "'!% 0'!" "'15 !'"%

    Front all o> C''M 2>>i*e Mid Grid&( Cu) 1 ('0& 0'!" "'15 5'117a*= all o> C''M 2>>i*e Near Grid&( Cu) 1 ('0& 0'!" "'15 5'11

    Front all o> Pantry Cu) Lo*=er .oo) Mid Grid(% Cu) 1 4'55 0'!" "'15 "'"0

    7a*= all o> oilet Mid Grid(% Cu) 1 4'55 0'!" "'15 "'"0

    Front all o> Gents 9 Ladies oilet Mid Grid%$ Cu) 1 4'55 0'!" "'15 "'"0

    7a*= all o> Gents 9 Ladies oilet Near Grid% Cu) 1 "'1" 0'!" "'15 !'!(

    8ide all o> Gents 9 Ladies oilet Mid Grid%$ Cu) 1 1'(5 0'!" "'15 1'!(

    7a*= all o> Gents 9 Ladies oilet Near Grid$ Cu) 1 1'&5 0'!" "'15 1'!0

    8ha>t all o> Gents 9 Ladies oilet Mid Grid%$ Cu) 1 !'$0 0'!" "'15 !'10

    Front all o> 2/enerra*e Mid Grid$10 Cu) 1 4'55 0'!" "'15 "'"0

    7a*= all o> 2/enerra*e Mid Grid$10 Cu) 1 4'55 0'!" 0'!0 0'!1

    Front all o> AE1,!,", Mid Grid1011 Cu) 1 4'55 0'!" "'15 "'"07a*= all o> AE1,!,", Mid Grid1011 Cu) 1 4'55 0'!" "'15 "'"0

    Front all o> 6o*u)entation Centre Mid Grid111! Cu) 1 4'55 0'!" "'15 "'"0

    7a*= all o> 6o*u)entation Centre Mid Grid111! Cu) 1 4'55 0'!" "'15 "'"0

    8ide all o> 6o*u)entation Centre 2n Grid1! Cu) 1 5'&0 0'!" "'15 4'0&

    7a*= all o> 8tair Mid Grid1!1" Cu) 1 4'!5 0'!" "'15 "'0%

    8ide all o> 8tair 2n Grid1" Cu) 1 5'&0 0'!" "'15 4'0&

    all o> 8tair 2n Grid1" Cu) 1 0'(50 0'"0 "'15 0'(1

    all o> 8tair 2n Grid1" Cu) 1 0'!!0 0'"0 "'15 0'!1

  • 7/23/2019 Cost Estimate Workshop Office R1 12.03.15

    38/69

    Pro AE 1,!," 9 6o*u)entation Centre 2n G Cu) 1 5'&0 0'!" "'15 4'0&

    Ded#ction

    6" Cu) ! 0'$0 0'!" !'10 0'%(

    //@.>>

    Floor Hei&ht .

    +ea% Depth .>

    M#%t3 0.>

    Eternal Wall ,04Le>t 8ide all Cu) 1 &'05 0'!" !'50 "'4%

    .ight 8ide all Cu) 1 &'05 0'!" !'50 "'4%

    7a*= 8ide all Cu) 1 5'!" 0'!" !'50 "'00

    Front 8ide all Cu) 1 5'!" 0'!" !'50 "'00

    Ded#ction

    6" Cu) 1 0'$0 0'!" !'10 0'4"

    Parapet Wall ,Terrace4

    Para/et all Cu) " &'500 0'!5 0'"0 1'4&

    Para/et all Cu) 1 10'!! 0'!" 0'"0 0'(1

    Para/et all Cu) 1 10'!! 0'!" 1'00 !'"5

    Para/et all Cu) 1 40'45 0'!" 0'"0 !'($

    Para/et all Cu) 1 40'45 0'!" 1'00 $'"0M#%t3

    Para/et all Cu) ! 5'!" 0'!" 0'"00 0'(!

    Para/et all Cu) ! &'50 0'!" 0'"00 0'$0

  • 7/23/2019 Cost Estimate Workshop Office R1 12.03.15

    39/69

    Pro

  • 7/23/2019 Cost Estimate Workshop Office R1 12.03.15

    40/69

    Pro C in oilet Mid Grid %$ 8D) 1 1'4! !'40 "'41

    Ded#ction

    64 8D) ! 0'%0 !'10 "'"&

    Fir!t FloorInternal Wall ,//>4

    Toilet

    Front wall o> C in oilet Mid Grid %$ 8D) 1 1'10 !'40 !'&4

    Toilet

    Front wall o> C in oilet Mid Grid %$ 8D) 1 1'4! !'40 "'41

    Front wall o> C in oilet Mid Grid %$ 8D) 1 1'&4 !'40 "'$4

    Ded#ction

    64 8D) " 0'%0 !'10 5'04

    Total 1.?B

    Sa3 1.

    /.?

    ty sa)e as hal> bri*= )asonary

    As total Duantity o> al> 7ri*= wor= 8D) 1 %'00 1.

    Total 1.

    Sa3 1.

    STO5E WORK

    0./ Eternal Claddin&

    150)) high at botto) 8D) 1 1!4'%0 0'150 1%'(!

    /%% Gide !tone ed&e aro#nd GindoG

    WindoG

    1 8D) 14 !'(5 0'10 1'!00 11'0&

    ! 8D) 5 !'!0 0'10 1'!00 "'40

    " 8D) 4 1'10 0'10 1'!00 1'%4

    6!B@ 8D) ! 1'5% 0'10 "'&&0 !'0$

    t 8D) ! "'10 0'10 1'400 1'%0

    Total ?.0-

    Etra >or /ro-iding and /la*ing in /osition ! Nos'

  • 7/23/2019 Cost Estimate Workshop Office R1 12.03.15

    41/69

    Pro

  • 7/23/2019 Cost Estimate Workshop Office R1 12.03.15

    42/69

    Proi*e 8D) 1 1'41 0'(1 1'00Pantry Cu) Lo*=er .oo) 8D) 1 4'55 0'&0 !'("

    Toilet

    Ladiesoilet 8D) 1 1'"5 0'&0 0'%1

    Gentsoilet 8D) 1 !'$! 0'&( 1'$&

    Total -.0B

    Sa3 /.

    "'0!

    )ro#nd Floor

    Toilet 0

    Ladiesoilet Metre 1 1'"5 1'"5

    Gentsoilet Metre 1 "'5$1 "'5$0 0

    Fir!t Floor 0

    oilet in C''M 2>>i*e Metre 1 !'1!1 !'1!

    Pantry Cu) Lo*=er .oo) Metre 1 "'15 "'15

    0 0

    Toilet 0

    Ladiesoilet Metre 1 1'"5 1'"5

    Gentsoilet Metre 1 "'5$1 "'5$

    0 Total />./>

    0 Sa3 /@.

    . Metre 1&'00

    Total /@.

    Sa3 /@.

    .?

    Ground Floor Ea*h 4 4'00

    First Floor Ea*h 5 5'00

    Total -.

    Sa3 -.

    .>

    8a)e as *ounter 8D) 10'00

    Total /.

    Sa3 /.

    .@

    ;rinal Partition 8D) & 0'5 1'000 "'00

    Total .

    Sa3 .

    Pro-iding edge )oulding to 1%)) thi*= )arble

    Etra >or >iing )arble granite stone o-er and

    Etra >or /ro-iding 2/ening in *ounters>or o-al

    Mirrior /olishing on )arble wor= granite wor=

    Pro-iding and >iing stone slab table rubbed,

  • 7/23/2019 Cost Estimate Workshop Office R1 12.03.15

    43/69

    Pro

  • 7/23/2019 Cost Estimate Workshop Office R1 12.03.15

    44/69

    Pro

  • 7/23/2019 Cost Estimate Workshop Office R1 12.03.15

    45/69

    Pro

    Metre 1 10'00 10'00

    eight 3g " 10'00 0'5% /B.0@

    !5)), 100 dia ss 'shoe Metre 1 10'00 10'00

    eight 3g % 1'5% /./B

    (5(5" )) thi*= insert /late Metre 1 10'00 10'00

    eight 3g % 0'14 /./

    otal eight >or 10M .ailing 3g &%'05

    otal eight >or 1M .ailing 3g 1 &'%0 &'%0

    SA= 1.

    For 3g 1 "1'$0 %'00 0>>./B

    Total 0>>./B

    Sa3 0>@.

    Corridor First Floor Metre 1 &4'!% &4'!%

    Total @?.01

    Raillin& Gei&ht o2 /M

    T3pe C

    Metre 1 10'00 10'00

    eight 3g 1 10'00 1'$& /-.@?

    Metre 1 10'00 10'00

    eight 3g % !'!5 0'$0 /@.1>

    50'%)) dia stainless steel handrail B1'5%)) thi*=

    "%'1)) dia !'5)) thi*= stainless steel u/rights +

    1&)) dia stainless steel tubular )e)ber B1'5%))

    50'%)) dia stainless steel handrail B1'5%)) thi*=

    "%'1)) dia !'5)) thi*= stainless steel u/rights +

  • 7/23/2019 Cost Estimate Workshop Office R1 12.03.15

    46/69

    Pro> 8D) 1 1'00 !$'$5 ard*rete !$'$5

    Ent'8ee ns/e*tion 9 ns/e*tion 8ta>> 8D) 1 1'%0 0'!" ard*rete 0'41

    8tair 8D) 1 1'00 !$'54 3ota 8tone !$'54

    Co-ered Corridor 8D) 1 &0'45 !'00 3ota 8tone 1!0'$0

    Total ?B>.1

  • 7/23/2019 Cost Estimate Workshop Office R1 12.03.15

    47/69

    Proied iles !%'&5

    Ent' 6oor BAE 1,!,"@ 8D) 1 1'00 0'!" :itri>ied iles 0'!"

    6o*u)entation Center 8D) 1 1'00 !$'$5 :itri>ied iles !$'$5

    Ent' 6oor B6o*u)entation@ 8D) 1 1'00 0'!" :itri>ied iles 0'!"

    2uter o> 8tair 8D) 1 4'(% 1'&0 3ota 8tone ('&5Co-ered Corridor 8D) 1 &0'!5 !'00 3ota 8tone 1!0'50

    B?B.@>

    5on S9id Tile! B/. S%

    Ce%ent Concrete ./B S%

    -.> S%

    Hardcrete [email protected] S%

    Kota Stone /?.0B S%

    S9irtin&

    5on S9id Tile! B/. S% B./Ce%ent Concrete ./B S% .0

    -.> S% >.-/

    Hardcrete [email protected] S% [email protected]

    Kota Stone /?.0B S% /.?

    Total Floor Area B?B.@> S%

    @./ Ce%ent Concrete 2loorin&

    ty ta=en in Flooring ""'1(

    Sa3 ?.

    @.0 Hardcrete

    ty ta=en in Flooring !&$'%"

  • 7/23/2019 Cost Estimate Workshop Office R1 12.03.15

    48/69

    Pro

  • 7/23/2019 Cost Estimate Workshop Office R1 12.03.15

    49/69

    Pro

  • 7/23/2019 Cost Estimate Workshop Office R1 12.03.15

    50/69

    Pro@.>0

    Sa3 >B.

    @.B Pro$idin& ' 2iin& &lae Tile! in Dado Ht. 0./

    Pantr3 Ht. 0./

    )ro#nd Floor

    Ladie! Toilet

    'C 8D) 1 1'4! 1'(5 !'10 1"'"0

    ashbasin Area BLadies oilet@ 8D) 1 $'!! !'10 1$'"&

    )ent! Toilet 0 0'00 0'00 0'00

    'C 8D) 1 1'4! 1'%( !'10 1"'%0

    ;rinal Area BGents oilet@ 8D) 1 14'!$ !'10 "0'01

    Ded#ction

    64 8D) 4 0'%0 !'10 &'(!

    :! 8D) ! 0'&0 0'&0 0'(!

    6" 8D) ! 0'$0 !'10 "'(%

    Total @>.0?

  • 7/23/2019 Cost Estimate Workshop Office R1 12.03.15

    51/69

    Pro

  • 7/23/2019 Cost Estimate Workshop Office R1 12.03.15

    52/69

    Pro /ara/et wall Metre 1 144'"0 144'"0

    Total /??.

    Sa3 /?>.

    B.0 Kh#rra

    otal no o> 3hurra Ea*h 5 5'00

    Total >.

    Sa3 >.

    B. Calci#% Silicate Panel! Fal!e Ceillin&

    Meeting .oo) 8D) 1'00 1'00 5$'$5 5$'$5

    :isitor .oo) 8D) 1'00 1'00 !1'!! !1'!!

    P'A'8 .oo) 8D) 1'00 1'00 !0'$4 !0'$4

    C''M 2>>i*e 8D) 1'00 1'00 45'0! 45'0!

    0'00 0'00 0'00 0'00 0'00 0'00

    0'00 0'00 0'00 0'00 0'00 Total /?B./

    0'00 0'00 0'00 0'00 0'00 Sa3 /?1.

    0'00 0'00 0'00 0'00 0'00 0'00

    SECTIO5 / FI5ISHI5)

    1./ Pla!ter Internal ,/:@( /0%% thic94 F't 4'(00

    8lab 6e/th 0'150

    . C't 4'550

    )ro#nd Floor0'00

    .'8 Contra*tors 9 8tore 8D) 1 "!'$4 4'55 14$'%%

    8tair 8D) 1 4'55 &'!( 4'55 (('(&

    PP2 9 Crew Control 8D) 1 "!'50 4'55 14('%%

    ool .oo) 8D) 1 "%'11 4'55 1("'40

    8ha>t 8D) 1 $'(4 4'55 44'"1

    'C 8D) 1 1'4! 1'(5 4'55 !!'"&

    Entran*e all 8D) ! 1'4! !'40 &'%!

    ashbasin Area BLadies oilet@ 8D) 1 ('%0 4'55 "5'4%

    )ent! Toilet 0 0'00 0'00

    'C 8D) 1 1'4! 1'%( 4'55 !"'4"

    Entran*e all 8D) ! 1'4! !'40 &'%!

    ;rinal Area BGents oilet@ 8D) 1 1!'%( 4'55 5%'5&

    Consu)ables 8tore 8D) 1 "!'5! 4'55 14('$%

    8ee ns/e*tion 9 ns/e*tion 8ta>> 8D) 1 !!'0& 4'55 100'"(

    8tair 8D) 1 1('5" 4'55 ($'(&

  • 7/23/2019 Cost Estimate Workshop Office R1 12.03.15

    53/69

    Pro>i*e 8D) 1 !('$& "'55 $$'!&

    'C 8D) 1 5'"" "'55 1%'$!

    Entran*e wall 8D) ! 1'10 !'40 5'!%

    oilet 8D) 1 !'54 !'"1 "'55 "0'5"

    Pantry Cu) Lo*=er .oo) 8D) 1 1%'$5 "'55 &('!(

    8ha>t 8D) 1 !'$0 1'(5 "'55 ""'0!

    'C 8D) 1 1'4! 1'(5 "'55 1('44

    Entran*e wall 8D) ! 1'4! !'40 &'%!

    ashbasin Area BLadies oilet@ 8D) 1 ('(4 "'55 !('4&

    'C 8D) 1 5'15 "'55 1%'!%

    Entran*e wall 8D) ! 1'4! !'40 &'%!

    ;rinal Area BGents oilet@ 8D) 1 14'!& "'55 50'&!

    2/en erra*e 8D) 1 4'55 5'$% "'55 5%'5%

    2/en errae* 8D) 1 4'55 0'!0 0'$1

  • 7/23/2019 Cost Estimate Workshop Office R1 12.03.15

    54/69

    Pro

  • 7/23/2019 Cost Estimate Workshop Office R1 12.03.15

    55/69

    Pro

  • 7/23/2019 Cost Estimate Workshop Office R1 12.03.15

    56/69

    Prot 8D) 1 "'10 1'40 4'"4

    Fir!t Floor

    Eternal Pla!ter 8D) 1 1!4'%0 "'(0 4&1'(&

    Ded#ction

    61 8D) " 1'%0 !'10 11'"4

    6! 8D) 4 1'00 !'10 %'40

    6" 8D) " 0'$0 !'10 5'&(

    1 8D) & !'55 1'!0 1%'"&

    :! 8D) 1 0'&0 0'&0 0'"&

    :1 8D) 1 1'50 0'&0 0'$0

    ! 8D) 1 !'00 1'!0 !'40

    " 8D) 1 0'$0 1'!0 1'0%

    6!B6@ 8D) 1 1'%0 !'10 "'(%

    6!B@ 8D) ! 1'"% !'10 5'(%

    8ha>t 8D) 1 "'10 1'40 4'"4

    M#%t3

    Eternal Plaster 8D) 1 !4'"4 "'00 ("'0!

    Ded#ction

    6" 8D) 1 0'$0 !'10 1'%$

    Parapet Wall ,Internal Pla!ter4

    Terrace

  • 7/23/2019 Cost Estimate Workshop Office R1 12.03.15

    57/69

    Pro> 8D) 1 1'00 !$'$5 !$'$5

    8tair 8D) 1 1'00 !$'54 !$'54

    Co-ered Corridor 8D) 1 &0'45 !'00 1!0'$0

  • 7/23/2019 Cost Estimate Workshop Office R1 12.03.15

    58/69

    Pro>i*e 8D) 1 1'00 45'0! 45'0!

    'C 8D) 1 1'00 !'!% !'!%

    oilet 8D) 1 !'54 !'"1 5'%(

    Pantry Cu) Lo*=er .oo) 8D) 1 1'00 1$'0( 1$'0(

    Ladie! Toilet 0 0'00 0'00 0'00

    'C 8D) 1 1'4! 1'(5 !'4%

    ashbasin Area BLadies oilet@ 8D) 1 1'00 4'41 4'41

    )ent! Toilet 0 0'00 0'00 0'00'C 8D) 1 1'00 !'&0 !'&0

    ;rinal Area BGents oilet@ 8D) 1 1'00 1!'1$ 1!'1$

    AE 1,!," 8D) 1 1'00 !%'&5 !%'&5

    6o*u)entation Center 8D) 1 1'00 !$'$5 !$'$5

    2uter o> 8tair 8D) 1 4'(% 1'&0 ('&5

    Co-ered Corridor 8D) 1 &0'!5 !'00 1!0'50

    )ro#nd Floor to Fir!t Floor 0 0 0'00 0'00 0'00

    Stairca!e S/

    Flight 1 8D) 1 1'&5 "'%0 0'00 &'!(

    Flight ! 8D) 1 1'&5 1'4" 0'00 !'"&Flight " 8D) 1 1'&5 4'14 0'00 &'%!

    Landing 8D) 1 1'&5 !'1! "'4$

    Landing 8D) 1 1'&% 1'%! "'04

    8ide 8D) 1 $'"( 0'1& 0'00 1'4(

    0'00 0'00 0'00 0'00

    Stairca!e S0 0 0'00 0'00 0'00 0'00

    Flight 1 8D) 1 1'&5 4'(4 0'00 ('%"

    Flight ! 8D) 1 1'&5 1'(4 0'00 !'%(

    Flight " 8D) 1 1'&5 "'41 0'00 5'&!

    Landing 8D) 1 1'&5 1'&( !'(5

    Landing 8D) 1 1'%4 1'&( "'0(

    8ide 8D) 1 $'%$ 0'15 0'00 1'450 0 0'00 0'00 0'00 0'00

    Fir!t Floor to Terrace 0 0'00 0'00 0'00 0'00

    0 0 0'00 0'00 0'00 0'00

    8tair*ase 8! 0 0'00 0'00 0'00 0'00

    Flight 1 8D) 1 1'&5 "'"& 0'00 5'54

    Flight ! 8D) 1 1'&5 1'"% 0'00 !'!%

    Flight " 8D) 1 1'&5 "'"& 0'00 5'54

    Landing 8D) 1 1'&5 1'&( !'(5

    Landing 8D) 1 1'%4 1'&( "'0(

    For ste/s in Flight 1 8D) 11 1'&5 0'14 0'00 !'4$

    For ste/s in Flight ! 8D) 5 1'&5 0'14 0'00 1'1"

    For ste/s in Flight " 8D) 11 1'&5 0'14 0'00 !'4$8ide 8D) 1 %'10 0'14 0'00 1'11

    Total -?.?

    Sa3 ->.

  • 7/23/2019 Cost Estimate Workshop Office R1 12.03.15

    59/69

    Pro

  • 7/23/2019 Cost Estimate Workshop Office R1 12.03.15

    60/69

    Pro

  • 7/23/2019 Cost Estimate Workshop Office R1 12.03.15

    61/69

    ProSa3 0.

    -.? indow stays1 Ea*h 14 !'00 !%'00

    ! Ea*h 5 1'00 5'00

    " Ea*h 4 1'00 4'00

    :1 Ea*h 1 1'00 1'00

    Total 1.Sa3 1.

    -.> indow Faster1 Ea*h 14 !'00 !%'00

    ! Ea*h 5 !'00 10'00

    " Ea*h 4 !'00 %'00

    :1 Ea*h 1 !'00 !'00

    Total ?1.Sa3 ?1.

    -.@ Alu)iniu) Grill1 8D) !% 0'( 0 1'! !"'5!

    ! 8D) 5 0'( 0 1'! 4'!0

    " 8D) 4 0'$ 0 1'! 4'"!

    otal "!'04

  • 7/23/2019 Cost Estimate Workshop Office R1 12.03.15

    62/69

    Pro

  • 7/23/2019 Cost Estimate Workshop Office R1 12.03.15

    63/69

    Pro>i*e

    orizontal 8D) 1'00 1'00 45'0! 45'0!

    :erti*al 8D) 1'00 !('$( 0'"0 %'"$

    Total 001.

    Sa3 001.

    /.0 7ri*= bat *oba2n erra*e areaBotal Area@ 8D) 1 &0'45 %'51 514'&(

    Less 8ha>t 8D) 1 !'$0 1'(5 5'0%

    Total >-.@Sa3 >/.

    HORTIC;LT;RE A5D LA5DSCAPI5) WORK

    //./

    otal Filling &&0'00

    Less E*a-ation !!5'00

    8u//lying and sta*=ing o> good earth at site

    in*luding royalty and *arriage u/ to 1 =) Bearth)easured in sta*=s will be redu*ed by !0H >or/ay)ent@'

  • 7/23/2019 Cost Estimate Workshop Office R1 12.03.15

    64/69

    Pro

  • 7/23/2019 Cost Estimate Workshop Office R1 12.03.15

    65/69

    Proiing 1 )) thi*= la)inate o>a//ro-ed brand,*olour, shade 9 teture on >lushdoor with adhesi-e and )ala)ine >inish on dooredges *o)/lete'2nly /lan area o> door shall be)easured'

  • 7/23/2019 Cost Estimate Workshop Office R1 12.03.15

    66/69

    Pro

  • 7/23/2019 Cost Estimate Workshop Office R1 12.03.15

    67/69

    Pro 7ea) and all

    Ground Floor 8D) 1 5&%'0! 0'15 %5'!0

    0'00 0

    Total //0.>Sa3 //.

    WATER PROOFI5)

    ?./ Cilder Fillin&Fir!t Floor0

    'C in C''M 2>>i*e

    orizontal Cu) 1 !'1! 1'10 0'40 0'$"

    oilet in C''M 2>>i*e 0'00 0'00

    orizontal Cu) 1 !'54 !'"1 0'40 !'"5

    Ladies toilet in 'C 0'00

    orizontal Cu) 1 1'4! 1'(5 0'40 0'$$

    Ladies toilet 0'00

    orizontal Cu) 1 $'&! 0'00 0'40 "'%5

    Gents toilet in 'C 0'00

    orizontal Cu) 1 1'&5 1'!0 0'40 0'($

    Gents toilet 0'00orizontal Cu) 1 15'&% 0 0'40 &'!(

    Meeting .oo) 0 0'00 0 0'00

    orizontal Cu) 1 5$'$5 0'40 !"'$%

    :isitor .oo) 0 0 0'00

    orizontal Cu) 1 !1'!! 0'40 %'4$

    P'A'8 .oo) 0 0 0'00

    orizontal Cu) 1 !0'$4 0'40 %'"%

    C''M 2>>i*e 0 0 0'00

    orizontal Cu) 1 45'01$ 0'40 1%'01

    Total B?.Sa3 B>.

  • 7/23/2019 Cost Estimate Workshop Office R1 12.03.15

    68/69

    Door!WindoG! Shed#leLen&th Hei&ht 5o!

    )ro#nd Floor

    Door61 1'%0 !'10 1! "5 )) hi*= Flush 6oor ith Prela)inated 7oard

    6! 1'00 !'10 4 "5 )) hi*= Flush 6oor ith Prela)inated 7oard6" 0'$0 !'10 ( "5 )) hi*= Flush 6oor ith Prela)inated 7oard

    64 0'%0 !'10 5 "5 )) hi*= Flush 6oor ith 450 wide AL' 3i*= Plate at 7ase

    61B6@ !'00 !'10 1 Glazed 6oubal Pi-oted 6oor Anodised Alu)iniu) Fra)e

    6!B6@ 1'%0 !'10 1 Glazed 6oubal Pi-oted 6oor 9 Fied Glazing Anodised Alu)iniu

    WindoG1 !'55 1'!0 14 8huttar Fra)e Alu)iniu)

    ! !'00 1'!0 5 8huttar Fra)e Alu)iniu)

    " 0'$0 1'!0 4 8huttar Fra)e Alu)iniu)

    6!B@ 1'"% !'10 ! 8huttar Fra)e Alu)iniu)

    t "'10 1'40 !

    5AME OF WORK : PROPOSED ARO5DA DEPOT C;M WORKSHOP I5C;DI5) SER

  • 7/23/2019 Cost Estimate Workshop Office R1 12.03.15

    69/69

    1 P** around the .ain water /i/e 1#!#4! 7elow Foundation and Flooring 1#4#%

    " Co>>i*ent >or .ein>or*e)ent

    Footing (0 3g Cu)

    Colu)ns !!0 3g Cu)

    7ea)s 140 3g Cu)

    all 100 3g Cu)

    8lab %0 3g Cu)

    8tair 100 3g Cu)

    Lintels &0 3g Cu)

    8hel-es &0 3g Cu)

    Pro