corridor study parsons brinckerhoff...to remain in place concrete median existing raised panel...

5
Mini-Skip Line Replace (YIELD sign) Replace Sign Panel Ramp Gore and along Edge Lines in Replace Existing Turn Lane Shared Thru/Left Remove Existing and Adjust Markings Traffic Signal Equipment Remove Existing with post sign (R1-1) Install STOP and Stop Bar Install Crosswalk Install Sidewalk Close Driveways Street to Lendall Lane - Install sidewalk along south side of Route 17 from Short and Route 17 eastbound right lane drop at Olde Forge Drive - Add pavement for extending the I-95 Off-Ramp merge lane Forge Drive - Install Raised Median between Short Street and Olde and to allow the Short Street Northbound Right Turns only to prohibit the Route 17 Eastbound and Westbound Left Turns - Install Raised Median at the Short Street intersection Final Conceptual Layout: 0 SCALE 100' 200' M A T CHL I NE S HEET 2 S ho r t S t r e e t ( W a rr e n t on R o a d ) U S 17 B u s i n e ss Ho r n e t s Ne s t L a n e O ff- Ra m p I- 95 No r t h O n - Ra m p I- 95 No r t h SHEET 1 OF 5 FINAL CONCEPTUAL LAYOUT N Legend: New Signal Existing Signal Median Proposed Raised Proposed Pavement Pavement Demo 11 : 26 BRINCKERHOFF PARSONS CORRIDOR STUDY US 17 BUSINESS (WARRENTON RD) MARCH 2017

Upload: others

Post on 17-Jul-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CORRIDOR STUDY PARSONS BRINCKERHOFF...To Remain in Place Concrete Median Existing Raised Panel (W7-1) Warning Sign Replace Truck Existing Guardrail Repair or Replace with Post STOP

Mini-Skip LineReplace

(YIELD sign)Replace Sign Panel

RampGore and alongEdge Lines inReplace Existing

Turn LaneShared Thru/Left Remove Existing

and Adjust MarkingsTraffic Signal EquipmentRemove Existing

with postsign (R1-1) Install STOP

and Stop BarInstall Crosswalk

Install Sidewalk

Close Driveways

Street to Lendall Lane- Install sidewalk along south side of Route 17 from Short

and Route 17 eastbound right lane drop at Olde Forge Drive- Add pavement for extending the I-95 Off-Ramp merge lane

Forge Drive- Install Raised Median between Short Street and Olde

and to allow the Short Street Northbound Right Turns only to prohibit the Route 17 Eastbound and Westbound Left Turns - Install Raised Median at the Short Street intersection

Final Conceptual Layout:

0

SCALE

100' 200'

MA

TC

HLIN

E

SH

EE

T 2

Short Street

(Warrenton Road)

US 17 Business

Horn

ets N

est Lane

Off-R

amp

I-95 N

orth

On-R

am

p

I-95 N

orth

SHEET 1 OF 5

FINAL CONCEPTUAL LAYOUT

N

Legend:

New Signal

Existing Signal

MedianProposed Raised

Proposed Pavement

Pavement Demo

11:2

6

BRINCKERHOFFPARSONS

CORRIDOR STUDYUS 17 BUSINESS (WARRENTON RD)

MARCH 2017

Page 2: CORRIDOR STUDY PARSONS BRINCKERHOFF...To Remain in Place Concrete Median Existing Raised Panel (W7-1) Warning Sign Replace Truck Existing Guardrail Repair or Replace with Post STOP

end Existing DrivewayInstall Cul-de-sac to

Close Driveway

Close Driveway

Close Driveway

Drivewayto end Existing Install Cul-de-sac

Signalized Intersection(RV Parkway) with new Realign existing Route 698

Street to Lendall Lane- Install sidewalk along south side of Route 17 from Short

traffic signal and pavement markings- Realign RV Parkway across Olde Forge Drive; add new

drop at Olde Forge Drive- Add pavement for new Route 17 eastbound right lane

Forge Drive- Install Raised Median between Short Street and Olde

Final Conceptual Layout:

along US 17 an Eastbound to Westbound U-Turn movementPedestrian Signal Equipment; AccommodateInstall Traffic Signal with Crosswalks and

Legend:

New Signal

Existing Signal

MedianProposed Raised

Proposed Pavement

Pavement Demo

0

SCALE

100' 200'

N

MA

TC

HLIN

E

SH

EE

T 1

MA

TC

HLIN

E

SH

EE

T 3

(Warrenton Road)

US 17 Business

Olde F

org

e Drive

Gle

n Alice L

ane

FINAL CONCEPTUAL LAYOUT

SHEET 2 OF 5

Road

Quarles

RV P

ark

way

11:2

6

BRINCKERHOFFPARSONS

CORRIDOR STUDYUS 17 BUSINESS (WARRENTON RD)

MARCH 2017

Page 3: CORRIDOR STUDY PARSONS BRINCKERHOFF...To Remain in Place Concrete Median Existing Raised Panel (W7-1) Warning Sign Replace Truck Existing Guardrail Repair or Replace with Post STOP

Close 2 Entrances

and Stop BarInstall Crosswalk

Shared Thru/LeftConvert Center Lane to

TimeAdjust Pedestrian Clearance Signals to New Crosswalks; Markings; Add Pedestrian Refresh Existing Crosswalk

signal equipment and adjust pedestrian clearance timing shared Thru / Left andAdjust signal heads; Add pedestrian- Convert Solomon Drive southbound center lane to a

Lane east to existing median- Install Raised Median between Solomon Drive / Lendall

Forge Drive to Lendall Lane- Install sidewalk along south side of Route 17 from Olde

Final Conceptual Layout:

Close Driveway

ConnectionInstall Sidwalk

Legend:

New Signal

Existing Signal

MedianProposed Raised

Proposed Pavement

Pavement Demo

0

SCALE

100' 200'

N

MA

TC

HLIN

E

SH

EE

T 2

MA

TC

HLIN

E

SH

EE

T 4

(Warrenton Road)US 17 Business

Lendall L

ane

Solo

mon Drive

Sa

mson Street

SHEET 3 OF 5

FINAL CONCEPTUAL LAYOUT

11:2

6

BRINCKERHOFFPARSONS

CORRIDOR STUDYUS 17 BUSINESS (WARRENTON RD)

MARCH 2017

Page 4: CORRIDOR STUDY PARSONS BRINCKERHOFF...To Remain in Place Concrete Median Existing Raised Panel (W7-1) Warning Sign Replace Truck Existing Guardrail Repair or Replace with Post STOP

Install Stop Bar

with PostSTOP sign (R1-1) Install Stop Bar and

Sign and PostDamaged Route DesignationReplace and Relocate

TaperInstall Right Turn

Wyne Drive- Add right turn lane taper on Route 17 westbound at

- Install Raised Median at Wyne Drive intersection

industrial site truck traffic Lane east to existing median, with a median break for the- Install Raised Median between Solomon Drive / Lendall

Final Conceptual Layout:

for Industrial Site trafficInstall Median Break

0

SCALE

100' 200'

N

MA

TC

HLIN

E

SH

EE

T 5

MA

TC

HLIN

E

SH

EE

T 3

(Warrenton Road)

US 17 Business

Wyne Drive

FINAL CONCEPTUAL LAYOUT

SHEET 4 OF 511:2

7

BRINCKERHOFFPARSONS

CORRIDOR STUDYUS 17 BUSINESS (WARRENTON RD)

MARCH 2017

Page 5: CORRIDOR STUDY PARSONS BRINCKERHOFF...To Remain in Place Concrete Median Existing Raised Panel (W7-1) Warning Sign Replace Truck Existing Guardrail Repair or Replace with Post STOP

To Remain in PlaceConcrete MedianExisting Raised

Panel (W7-1)Warning Sign Replace Truck

Existing GuardrailRepair or Replace

with PostSTOP sign (R1-1) Install Stop Bar and

Storage)Lane (100 FT. Install Right Turn

Legend:

New Signal

Existing Signal

MedianProposed Raised

Proposed Pavement

Pavement Demo

0

SCALE

100' 200'

N

MA

TC

HLIN

E

SH

EE

T 4

(Warrenton Road)

US 17 Business

Heartfie

lds Lane

Washingto

n Stre

et

Melch

ers D

rive

FINAL CONCEPTUAL LAYOUT

SHEET 5 OF 511:2

7

BRINCKERHOFFPARSONS

CORRIDOR STUDYUS 17 BUSINESS (WARRENTON RD)

MARCH 2017