 S & P INFRA

EXECUTIVE  SUMMARY    Business  Overview    

 

   

Line  of  Business  Construction  and  Civil  Engineering  Industry    Management  Chairperson  Ashwani  Kumar  Srivastava    Directors    Kumudini  Srivastava  Krishna  Pandey  Rohtash  Singh    Chief  Operating  Officer  Saumil  Sharma      

 

 

 

 

About  Us  

S&P   INFRA   group   was   incorporated   in   2000   with   a   vision   of   efficient   and  sustainable  infrastructure  development.  Headquartered  in  New  Delhi,  it  is  one  of   the   fastest   growing   infrastructure   development   groups   in   India   with   a  significant   presence   in   construction,   repair,   and   maintenance   of   civil  infrastructure  in  India.    

S&P  INFRA  group  is  built  on  its  integrity,  reliability,  innovation,  and  economic  efficiency,   which   reflect   from   the   several   important   projects   successfully  undertaken  by  the  company  in  a  span  of  10  years.  

We   value   our   balanced  mix   of   engineering   knowledge,   technical   innovation,  and  meticulous   project   management,   which   allows   us   to   harness   maximum  utility   of   our   human   capital   and   material   resources.   Cross-­‐stream   feedback  mechanism   used  within   our   organization   provides   a  world-­‐class   framework  for   efficient   project   management   and   allows   us   to   minimize   any   risks   or  redundancies.          

S&P  INFRA’s  excellent  track  record  in  the  industry  and  its  incessant  efforts  has  enabled  it  to  undertake  various  multi-­‐disciplinary  projects  on  EPC  basis  and  it  is   currently   underway   to   achieve   high   growth   corridor   highway   projects  under   build,   operate,   and   transfer   (BOT)   basis,   in   either   Toll   or   Annuity  category.    

We   strongly  believe   in  holistic   contributions   to  our   society,  which  positively  impact  our   communities  at  a  micro-­‐level.  Our  endeavours  create   sustainable  civil   infrastructure   and   our   project   life   cycle   management   is   exemplary   of  maintaining   quality   while   achieving   end-­‐goals   within   pre-­‐defined   timelines,  something  that  is  rarely  done  than  said  in  the  infrastructure  sector  in  India.    

S&P  INFRA  maintains  an  inventory  of  the  latest  modern  equipment  and  specialized  machinery  for  the  execution  of  roads  and  highway  building  and  maintenance  projects  around  the  country.  S&P  Infra  group  has  successfully  completed  13  roads  and  highway  projects,  and  is  currently  undertaking  15  other  projects  at  various  locations  in  India.  Company’s  portfolio  of  works  is  expanding  through  its  interest  in  21  new  projects  that  have  been  bid  in  the  last  2  quarters  of  2010,  creating  a  strong  future  order  book  and  an  exponential  growth  potential  in  the  years  to  come.      

   S&P  Infrastructure  Development  (P)  Limited      

S&P  Infra  –  Company  Profile                      3  

 S & P INFRA

 

 

 

Vision  

We  aspire  to  set  an  example  of  our  craftsmanship  in  the  field  of  infrastructure  development   around   the   world   through   our   consistent   performance   and  engineering   innovation   in   the  demanding  conditions  of   this   industry.  On  this  journey  of  rapid  growth  we  measure  our  success  by  the  difference  we  create  in  lives  of  the  local  communities  that  use  our  flyovers,  roads,  tunnels,  airports,  and   other   world-­‐class   infrastructure   developed   by   our   company.   While  maintaining   international   standards   we   care   to   remain   sensitive   to   the  environment  we  build  in  and  our  goals  are  rendered  to  minimize  the  impacts  on  our  surroundings.    

Business  Highlights  Geographic  and  Product  spread  helps  in  revenue  growth    The  Company  has  undertaken  the  projects  in  different  parts  of  India  through  its   diverse   activities   in   the   field   of   turnkey   execution.   It   undertakes   design,  detailed  engineering,  construction,  maintenance,  and  repair  of  complete  range  of   civil   infrastructure   projects   like   roads,   highways,   and   tunnels.   Currently,  S&P  Infra  has  project  undertakings  in  Himachal  Pradesh,  Delhi,  Uttar  Pradesh,  Bihar,  Jharkhand,  and  Arunachal  Pradesh.      Increased  revenue  share  from  Design  and  EPC  Division    The  company  has  grown  multi-­‐folds  between  2006  and  2010  by  its  meticulous  approach   towards   the  undergoing  projects.  EPC  division  has  provided  major  revenue  share  due  to  its  strategic  advantage  of  timely  completion  of  projects  and   value   creation   in   each   region   of   company’s   operation.   Design   team   has  also  supported  our  performance  in  project  handling  and  construction.                Research  and  Development  Activities    The  Company  has   in-­‐house   team   for   research   and  development  working   for  improvement  in  these  productivity  and  processes.    

From  the  Chairman    

At  S&P  Infra  we  deliver  the  best  quality  work   in  roads  and  highway  projects  with  world-­‐class  maintenance.  Our  mission   is   to   develop   civil   infrastructure  through   our   professional   project   management   and   efficient   construction  processes  across  India  and  overseas.  With  our  ever-­‐expanding  base  and  work  horizon  we  aspire  to  become  a  pan-­‐India  group  by  2013.    

Regards,  Ashwani  Kumar  Srivastava  

 

 

 

 

   S&P  Infrastructure  Development  (P)  Limited      

S&P  Infra  –  Company  Profile                      4  

 S & P INFRA

Alliances  and  Partners We   share   trustworthy   relationships   with   our   partners   and   maintain  professional  value  in  all  our  global  alliances.  Our  class-­‐apart  performance  and  project   completion  well  within   the   expected  project   timeframe  have   led   our  partnerships  go  stronger  by  the  day.  We  find  faith  in  our  alliances  along  with  true  business  value   to   create   concrete  bonds  with  our  partner   companies   in  India  and  overseas.    

Achievements  –  Financial  and  Technical     S&P   INFRA   in   comparison   to   its   peers   has   performed   relatively  well   on  

parameters  like  revenue  growth,  return  on  revenue  and  liquidity.    

Strong   financial   growth   with   FY   2009-­‐10   revenue   of   Rs.   544.97   million  and  a  CAGR  of  56.77%  between  2006  and  2010.          

 

We  have   revived  many  projects  of   companies   that  have  not  been  able   to  execute  their  projects.  (S&P  Infra  took  over  a  Rs.  600  million  project  from  M/s  Atlanta  Infrastructure  and  completed  by  time  under  a  JV).      

 

Our  company  is  known  for  its  excellent  track  record  of  project  completion  in  our  working  areas  like  Uttar  Pradesh,  where  major  share  of  our  projects  are  located.      

 

Company’s  technical  expertise  lies  in  roads  and  highway  building  through  the  use  of  latest  technology.      

 

We  have  a  strong  base  in  regions  of  Bihar,  Jharkhand,  and  the  North  East  where   most   infrastructure   companies   have   not   performed   well   in   last  many  years.      

 

Peer  Comparison    

Line  of  Business:  Roads  and  highway  development            

Turnover  Range:  Rs.  500  Million  to  Rs.  2,500  Million    

In  comparison  to  its  peers:    

S&P  INFRA  has  a  better  project  completion  rate  by  time  and  value  retention.        

Total  debt  to  equity  ratio  of  the  company  is  low.      

Company’s  return  on  funds  invested  is  high.      

Compared   to   Indian   construction   industry’s   estimated  CAGR   of   ~8.7%   over   the   period   FY   2006-­‐10,   the  company  has  grown  with  a  CAGR  of  56.77%.  

 

With   the   current   portfolio   of   projects   the   company   is  on   the   path   to   reach   net   revenue   of   Rs.   1,000   by   FY  2011-­‐13   and   Rs.   2,500   by   FY   2012-­‐13,   with   an  estimated  Y-­‐O-­‐Y  growth  of  almost  100%.    

 

 

   

BLA  Projects  (P)  Limited    Dinesh  Chandra  R  Agrawal  (P)  Limited  Meena  Traders  Faridabad  Gurgaon  Minerals    MBL  Infrastructure  Limited        

 

 

 

 

 

Joint  Ventures  Partners    

Financial  Growth  

 in Million Rs.

Annual  Sectorial  Project  Consolidation    

 

   S&P  Infrastructure  Development  (P)  Limited      

S&P  Infra  –  Company  Profile                      5  

 S & P INFRA

 

 

     

 

Asphalt  Plant  (Hot  Mix Plant)   RM  Concrete  Mixer  Plant   Porcelain  Machine   Excavators  Machine  (JCB)   Pavers  Machine   Vibrator  Roller   Soil  Compactors   Dumpers  (HYWA)   Tandom  Rollers   Water  Tankers   Generator  Sets   Wheel  Loader   Transit  Mixers   Truck  Mounted  Sprayer  (Bichmen  

Sprayer)   Grader  (CAT)            

 

Equipment  Highlights    

Areas  of  expertise  

Business  Areas  –  Roads  and  Highways  We  provide  Engineering,  Procurement,  and  Construction  services  for  medium  to  large-­‐scale  roads  and  highway  projects    

Services    S&P   Infra   provides   EPC   services   as   a   single   point   responsibility   on   a   Lump  Sump  Turnkey  basis  for  the  infrastructure  projects.    

Transport  and  logistics  for  equipment    

Design,  testing  and  execution      

Operation  and  maintenance  contracts  long  term  &  short  term      

Training  of  manpower      

On  site  mechanical  maintenance  contracts  for  equipment      

Repair  and  refurbishment  works  for  existing  roads  &  highways      

Complete  renewal,  patchwork  and  equipment  asset  management    

 

Engineering  We  have  strong  engineering  capability  and  resources  using  which  we  offer  an  agile   and   flexible   approach   for   different   project   needs,   technologies,   and  unique  local  requirements.    

Procurement  We  maintain  a  global  network  alliance  for  sourcing  material,  which  enables  us  to   get   the   competitive   costs   at   the   best   available   quality   and   range.   Our  centralized   control   system   enables   the   project   teams   to   undertake   effective  and  flexible  construction  scheduling.  

Construction  Our   enhanced   construction   techniques   enable   the   project   teams   to   take   on  complex  projects.  We  are  among  the  few  companies  who  can  lay  and  execute  highway  projects  within  stipulated  time  in  states  like  UP  and  Bihar.    

Equipment Equipment  management   renders   a   strategic   advantage   which   serves   as   key  factor  for  timely  completion  of  all  our  projects  across  the  country  due  to  ease  of  equipment  mobilization.  Our  various  project  sites  house  these  equipments.  At   S&P   Infra   we   minimize   downtime   by   using   highly   skilled   operators   and  maintenance  crew  to  use  preventive  and  condition-­‐based  maintenance  at  our  sites.   Our   skill   set   includes   equipment   asset   planning   and   resource  management  for  inventory  maintenance.  

 

 

 

 

 

 

   S&P  Infrastructure  Development  (P)  Limited      

S&P  Infra  –  Company  Profile                      6  

 S & P INFRA

 Completed  Projects  

 

 

 

Ongoing  Projects  

Future  Projects  

 

 

 

 

 

 

 

S.  No.  

Name  of  Work  

Length  (Km)  

Cost  (in  Mn  Rs.)  

Ref.  Work  Order   Remarks  Principal  Employer  

Client  Name  

1  

Maintenance  of  NH-­‐2  from  Km  127.00  to  Km  202.02  between  Khaga  to  Allahabad  city  U.P  

75.2   32.0  01/PD/Allahabad/2000-­‐2002  

Execution  of  BM,  SDBC,  pot  hole  and  patch  repair  &  Earth  work  

National  Highways  Authority  of  India  

M/s  Dineshchandra  R.  Agrawal  Infracon  Pvt.  Ltd.  

2  

Maintenance  of  NH-­‐27  from  Km  4.00  to  Km  42.50.00  (between  Allahabad  to  Chakghat  MP  Board  in  the  state  of    U.P)  

38.4   8.5  

01/PD/Allahabad/2000-­‐2002  (Variation)  

Execution  of  BM,  SDBC  &  Earth  work  National  Highways  Authority  of  India  

M/s  Dineshchandra  R.  Agrawal  Infracon  Pvt.  Ltd.  

3  

Maintenance  of  NH-­‐2  from  Km  286.00  to  Km  319.00  and  Km  21.00  to  Km  46.25  (UP  Border)  including  Varanasi  Bypass    

58.25   40.0  

03/NH-­‐22/PD  (Varanasi)  2000-­‐2001  

Executive  of  BM,  SDBC,  WBM,  pot  hole  and    patch  repair  &  Earth  

Work  

National  Highways  Authority  of  India  

M/s  Dineshchandra  R.  Agrawal  Infracon  Pvt.  Ltd.  

4  

Major  maintenance  work  under  phase  I  rehabilitation  of  SH  66  from  Azamgarh  to  Dohrighat  (39.5  Km)  and  MDR  69  E  Mohammadpur  to  Azamgarh  (15.9  Km);  total  length  55.40  Km  

55.4   165.0  22/PD/SRP-­‐II/2002-­‐2003  

Execution  of  GSB,  WMM,  DBM,  SDBC,  BC  &  FDR,  HP  Culvert,  RCC  Culvert,  Earth  Work  ,  KC  Drain,  Traffic  Sign  

marking,  and  other  Road  &  Metal  Beam  

Crash  Barrier  

Chief  Engineer  World  Bank  UPPWD  CD-­‐2  (SRP-­‐II)  Azamgarh  

MBL  Infrastructure  Ltd  

5  

Construction  of  Toll  Plaza  at  Km  164.55  and  Km  75.1  of  Delhi  –Agra  section  of  NH  2  

LS   100.0  NHAI/110    15/3/98  

Toll  Plaza  building  &  widening  of  road  to  14  lanes  for  toll  plaza  cement  

concrete  pavement  

National  Highways  Authority  of  India  

MBL  Infrastructure  Ltd.  

 

 

 

   S&P  Infrastructure  Development  (P)  Limited      

S&P  Infra  –  Company  Profile                      7  

 S & P INFRA

 Completed  Projects  

 

 

 

Ongoing  Projects  

Future  Projects  

 

 

 

 

 

 

 

 

S.  No.  

Name  of  Work  

Length  (Km)  

Cost  (in  Mn  Rs.)  

Ref.   Work  Order  

Remarks  Principal  Employer  

Client  Name  

6  

Major  maintenance  work  under  phase  II  rehabilitation  of  Lakhimpur  –  Bahraich  section  (Km  156  to  Km  192)  

36   310.0  41/PD/SRP/2004-­‐05   Dated  24.03.2005  

Execution  of  GSB,  WMM,DBM,  SDBC  ,BC  &  FDR,  HP  Culvert,  RCC  Culvert,  Earth  Work  ,  KC  Drain,  

Traffic  Signs  Marking  and  other  Road  &  Metal  Beam  Crash  

Barrier  

UP  PWD  Chief  Engineer  World  Bank  UP  PWD  CD-­‐2  (SRP-­‐II)  Nirman  Bhawan  MG  Road,  Lucknow  

M/s  Dineshchandra  R.  Agrawal  Infracon  Pvt.  Ltd.  

7  

Widening  and  strengthening  of  existing  2  lane  road  (NH  24A)  Lucknow  Bypass.  

11    

510.0    

06/SE-­‐28/2007-­‐2008    

Execution  of  GSB,  DBM,  SDBC  and  BC  &  Bridge  work  (Grade  Separator,  ROB)  and  RCC  Culvert,  Earth  Work,  Reinforced  concrete  wall,  KC  Drain,  Traffic  Signs  Marking,  and  other  Road  &  Metal  Beam  

Crash  Barrier  

Chief  Engineer  (NH)  UP  PWD,  Nirman  Bhawan  MG  Road,  Lucknow  

M/s  Dineshchandra  R.  Agrawal  Infracon  Pvt.  Ltd.  

8  

PMGSY  (World  Bank)  Package  No.2906  

7.5   41.0  17/SE   V/05-­‐06   Dated:-­‐09/01/2006  

Execution  of  GSB,G1,G2,  G3,  

P1,P2,PC,RCC  and  Earth  Work  

UP  PWD  ,  Nirman  Khand  Gazipur  UP  

S&P  Infrastructure  Developers  (P)  Ltd.  

9

Construction  of  road  and  CD  work  of  Package  No.  UP-­‐4337  under  PMGSY  Kushinagar  

6.65

34.7

90/SE/RES/GKP  Circle/2006/07

Execution  of  GSB,CD  and  Earth  Work

Executive  Engineer,  RES  PIU,  Kushinagar  

S&P  Infrastructure  Developers  (P)  Ltd.  

10

Widening  to  2  lane  Km  135  to  Km  149  and  from  Km  152.6  to  Km  166  of  NH  28B  

27.4 285.1

691/114  CAM-­‐18/08  dated  31.07.2008

Execution  of  GSB,WMM,  BC,  and  

Earth  Work  

UPPWD-­‐  NH  Division,  Gorakhpur  

S&P  Infrastructure  Developers  (P)  Ltd.  

 

   S&P  Infrastructure  Development  (P)  Limited      

S&P  Infra  –  Company  Profile                      8  

 S & P INFRA

 

  TOTAL COMPLETED PROJE CT VALUE

Rs. 879.5 MILLION

 

 

 

 

 

 

 

 

 

 

Completed  Projects    

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TOTAL COMPLETED PROJECT VALUE

Rs. 879.5 MILLION

 

 

 

 

 

 

S.  No.  

Name  of  Work  

Length  (Km)  

Cost  (in  Mn  Rs.)  

Ref.  Work  Order   Remarks  Principal  Employer  

Client  Name  

11  

Widening  &  strengthening  from  Km  0  to  Km.18  of  NH  2C  Aurangabad  Division,  Bihar  

18   116.7  02C-­‐BR-­‐2008-­‐779  Dated  08-­‐12-­‐2008  

Execution  of  GSB,WMM,  BC,  and  

Earth  Work  Chief  Engineer,  NH  Division  Aurangabad  

S&P  Infrastructure  Developers  (P)  Ltd.  

12  

LKO-­‐CNB,  LKO-­‐SLN-­‐ZBD,  LKO-­‐RBL,  RBL-­‐LOT,  RBL-­‐ALD,  UTR-­‐SLN,  UTR-­‐AMG,  ALH-­‐AMG,  PRG-­‐SLN  &  LKO-­‐FD  Sec.,  in  Lucknow  Div.  Esstt.  No.  473-­‐08,  472-­‐08,  479-­‐08,  341-­‐08,  476-­‐08,  478-­‐08,  477-­‐08,  340-­‐08,  521-­‐08,  522-­‐08  &  481-­‐08  

LS   40.0  

48/WA/Ten/Work/05/DE

N-­‐V-­‐LKO/2008-­‐09  

Dated  20.02.2009  

Rail  Track  Repair  &  Earth  Work  

Sr.DFM,  Northern  Railway,  Lucknow  

S&P  Infrastructure  Developers  (P)  Ltd.  

 

 

   S&P  Infrastructure  Development  (P)  Limited      

S&P  Infra  –  Company  Profile                      9  

 S & P INFRA

  Ongoing  Projects    

 

 

 

 

 

 

 

 

 

S.  No.  

Name  of  Work  

Length  (Km)  

Cost  (in  Mn  Rs.)  

Ref.  Work  Order   Remarks  Principal  Employer  

Client  Name  

1  

Anjan  Saheed  to  Pakwainal  Hajipur  Road  at  Km  10.250  to  Km  20.500  Widening  &  strengthening.    

10.25   42.80   24/SE  Feb  2007  

Execution  of  WBM,  DBM  

SDBC,  BC  &  Earth  Work    

Executive  Engineer,  CD-­‐5  UP  PWD,  Azamgarh  (Central  Road  Fund)  

S&P  Infrastructure  Developers  (P)  Ltd.  

2  

Tumkuhi  Mahanth  to  Samaur  (16.82  Km)  under  PMGSY  

16.82   61.20  569/RES/PMGSY/CBF/08-­‐09  May  2008  

Execution  of  WBM,  DBM  

SDBC,  BC  &  Earth  Work    

Executive  Engineer,  RES,  UPPWD,  Kushi  Nagar  

S&P  Infrastructure  Developers  (P)  Ltd.  

3  

Samaur  to  Nonia  Patti  (15.75  Km)  under  PMGSY  

15.75   60.23  568/RES/PMGSY/CBF/08-­‐09  May  2008  

Execution  of  PCC,  SDBC,  &  Earth  

Work    Executive  Engineer,  RES,  UPPWD,  Kushi  Nagar  

S&P  Infrastructure  Developers  (P)  Ltd.  

4  

PMGSY  Package  No.  UPT-­‐0654  Rajadipur  to  Harya  Road  at  Azamghar  

7.25   31.28   50/SE  Oct  2008  Execution  of  PCC,  SDBC,  &  Earth  

Work    Executive  Engineer,  CD-­‐3  (RES)  UPPWD,  Azamgarh    

S&P  Infrastructure  Developers  (P)  Ltd.  

5  

PMGSY  Package  No.  UP-­‐4437A,  Kheri,  Lakhimpur  

4.5   27.76  86/SE/PMGSY  O  B/Y/2008-­‐09  March  2009  

Execution  of  PCC,  SDBC,  &  Earth  

Work    Executive  Engineer,  PMGSY-­‐1  UPPWD,  Kheri,  Lakhimpur  

S&P  Infrastructure  Developers  (P)  Ltd.  

6  

 

PMGSY  Package  No.  UP-­‐4437B  Kheri,  Lakhimpur  

4.5   27.74  87/SE/PMGSY  O  B/Y/2008-­‐09  March  2009  

Execution  of  PCC,  SDBC,  &  Earth  

Work    Executive  Engineer  PMGSY-­‐1  UPPWD,  Kheri,  Lakhimpur  

S&P  Infrastructure  Developers  (P)  Ltd.  

 

   S&P  Infrastructure  Development  (P)  Limited      

S&P  Infra  –  Company  Profile                      10  

 S & P INFRA

  Ongoing  Projects    

 

 

 

 

 

 

 

 

 

S.  No.  

Name  of  Work  

Length  (Km)  

Cost  (in  Mn  Rs.)  

Ref.  Work  Order   Remarks  Principal  Employer  

Client  Name  

7  

Short  term  improvement  &  routine  maintenance  of  Varanasi  –  Mohania  –  Sasaram  –  Dehri-­‐On-­‐Sone  from  Km  317  to  Km  140  on  NH  2  in    the  state  of  Uttar  Pradesh     177  

 72.72    

NHAI/CM/Varanasi  –  Dehri-­‐On-­‐Sone/2009/10649  Oct  2009  

Execution  of  BM,  SDBC,  pothole  and  patch  repair,  &  Earth  work  

National  Highways  Authority  of  India  

S&P  Infrastructure  Developers  (P)  Ltd.  

8  

I.R.Q.P.  work  for  Km  74  to  93  of  NH  80  during  the  year  2009-­‐10  at  Lakhisarai  

19   82.4  

(JOB  NO.  080-­‐BR-­‐2010-­‐822)  RCD,  Road  Division,  

Lakhisarai  at  Munger,  Bihar  Aug  2010  

Execution  of  BM,  SDBC,  pothole  and  patch  repair    

 Executive  Engineer,  RCD,  Lakhisarai  at  Munger,  Bihar  

S&P  Infrastructure  Developers  (P)  Ltd.  

9  

Widening  to  2  lane  and  improvement  Aba-­‐Navinagar  Road    from  Km  0  to  Km  24  in  Aurangabad  in  the  state  of  Bihar  under  LWE  Scheme  for  the  year    2010-­‐2011  

24   140.0  

RCD  ,  Road  Division-­‐  I,    Aurangabad,    

Bihar    July  2010  

Execution  of  BM,  SDBC,  pothole  and  patch  repair,  &  Earth  Work    

Executive  Engineer,  RCD,  Aurangabad,  Bihar    

S&P  Infrastructure  Developers  (P)  Ltd.  

10  

Periodical  Renewal  from  Km  103.00  to  Km  112.00    &  Km  113.500  to  Km  127.520  on  NH  98  in  the  state  of  Bihar  

14.02   58.57  

Contract  No.  98-­‐BR-­‐2010-­‐1360  NH  Division,  Aurangabad,  

Bihar  July  2010  

Execution  of  BM,  SDBC,  pothole  and  patch  repair,  &  Earth  Work    

Executive  Engineer,  NH  Division,  Aurangabad,  Bihar    

S&P  Infrastructure  Developers  (P)  Ltd.  

11  

Repair  of  expansion  joint  and  construction  of  new  Bituminous  wearing  coat  in  place  damages  cement  concrete  wearing  coat  over  U/S  lane  of  M.G.  Setu  on  NH-­‐19  

-­‐-­‐  40.5    

National  Highways  Authority  of  India,  PIU,  Guljarbag    Sep  2010  

 

Execution  of    BC,  pot  hole  and  patch  repair,    

and  mastic  work    

Executive  Engineer,  NH  Division,  Guljarbag,    

S&P  Infrastructure  Developers  (P)  Ltd.  

12  

Strengthening  of  NH-­‐83  from  Km  36  to  43  &  46.775  to  68  under  LWE  plan  for  the  year  2010-­‐11  

29   196.05  

National  Highways  Authority  of  

India,  PIU,  Gaya  Dec  2010  

 

Execution  of  BM,  SDBC,  pot  hole  and  patch  repair,  and  Earth  work  

 

Executive  Engineer,  NH  Division,  Gaya  

S&P  Infrastructure  Developers  (P)  Ltd.  

 

   S&P  Infrastructure  Development  (P)  Limited      

S&P  Infra  –  Company  Profile                      11  

 S & P INFRA

 

                                               TOTAL ONGOING PROJECT VALUE

Rs. 1,427.05 MILLION

 

 

 

 

 

Ongoing  Projects    

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

S.  No.  

Name  of  Work  

Length  (Km)  

Cost  (in  Mn  Rs.)  

Ref.  Work  Order   Remarks  Principal  Employer  

Client  Name  

13  

Extension  of  NH  37  near  Saikhowaghat  in  Assam  ending  near  Roing  in  Arunachal  Pradesh  under  Arunachal  Pradesh  package  of  Roads  &  Highways  (from  Shantipur  Gate  to  Meka  in  Arunachal  Pradesh  Border);  total  length  19.50  Km  

19.5   330.0  

NH  Division,  Roing,  

Arunanchal  Pradesh  Aug  2010  

Execution  of  GSB,  WMM,  DBM,  

SDBC,  BC  &  FDR,  HP  Culvert,  RCC  Culvert,  Earth  Work,  KC  Drain,  Traffic  Signs  marking,  other  Road  &  Metal  Beam  Crash  Barrier  

Chief  Engineer,  (NH)  Itanagar  ,  Arunanchal  Pradesh  

S&P  Infrastructure  Developers  (P)  Ltd.  

14  

Maintenance  and  Renewal  work  of  Varanasi  –  Gorakhpur  Section  of  NH  29  from  Km  110.000  to  Km  211.200  

101.2   62.4  

National  Highways  Authority  of  India,  PIU,  Gorakhpur  Dec  2010  

Execution  of  BM,  SDBC,  pothole  and  patch  repair,  and  Earth  Work    

Project  Director.  PIU  GKP  (NHAI)  

S&P  Infrastructure  Developers  (P)  Ltd.  

15  

Strengthening  work  in  Km  181-­‐190  of  Bhagalpur  -­‐Mirjachoki  section  of  NH-­‐80    

10   192.63  

National  Highways  Authority  of  India,  PIU,  Gorakhpur    Aug  2010  

Execution  of  B  M,  SDBC,  pot  hole  and  patch  repair,  and  Earth  work  

Executive  Engineer,  NH  Division,  Bhagalpur  

S&P  Infrastructure  Developers  (P)  Ltd.  

 

   

   S&P  Infrastructure  Development  (P)  Limited      

S&P  Infra  –  Company  Profile                      12  

 S & P INFRA

  SUBMITTED  TENDERS  (in  2010)      

 

 

Ongoing  Projects  

Future  Projects  

 

 

 

 

 

 

 

S.  No.  

Name  of  Work  

Length  (Km)  

Cost  (in  Mn  Rs.)  

Location  Principal  Employer  

Client  Name  

1  

Rehabilitation  of  wearing  Coat  with  Bitumen  Mastick  Asphalt  and  Repair  of  expansion  joints  U/s  lane  of  Mahatma  Gandhi  Setu  at  Patna  on  NH-­‐19  (Job  No.  019-­‐BR-­‐09-­‐807)  in  the  State  of  Bihar  

12   45.0   Patna,  Bihar  The  Executive  Engineer,  NH  Division,  Gulzarbagh,  Patna,  Bihar  

S&P  Infrastructure  Developers  (P)  Ltd.  

2  

Improvement  work  from  Km  148  to  Km  151  and  Km  154  to  Km  159  on  Chapra  –  Hajipur  section  of  NH-­‐19  

5.0   4.95   Hazirpur,  Patna  The  Executive  Engineer,  National  Highway  Division,  Gulzarbagh,  Patna,  Bihar  

S&P  Infrastructure  Developers  (P)  Ltd.  

3  

Short  Term  Improvement  &  Routine  Maintenance  of  Lucknow  –  Kanpur  section  from  Km  11.380  to  Km.  59.190  of  NH  25  in  the  state  of  Uttar  Pradesh  

47.81   160.0   Lucknow,  UP  National  Highways  Authority  of  India  

S&P  Infrastructure  Developers  (P)  Ltd.  

4  

Short  Term  Improvement  &  Routine  Maintenance  of  Sikandra  -­‐  Bhaunti  Section  from  Km  393  to  Km  470  of  NH  2  in  the  state  of  Uttar  Pradesh  

77.00   69.0  Sikandra  (Agra),  

UP  National  Highways  Authority  of  India  

S&P  Infrastructure  Developers  (P)  Ltd.  

5  

Short  Term  Improvement  &  Routine  Maintenance  of  Km  398.750  to  Km  441.563  Barwa  Adda  –  Barakar  Section  on  NH  2  from  in  the  state  of  Jharkhand  

47.81   75.0   Jharkhand  National  Highways  Authority  of  India  

S&P  Infrastructure  Developers  (P)  Ltd.  

6  

Widening  and  Strengthening  of    Dehri    Railway  Station  Rakshbir  from  Km.  0.000  to  Km.  1.500  for  the  year  2010-­‐11  

1.5   3.30  Dehri-­‐on-­‐Sone,  

Bihar  The  Executive  Engineer,  RCD  ,  Road  Division,  Dehri-­‐On-­‐Sone,  Bihar  

S&P  Infrastructure  Developers  (P)  Ltd.  

 

   S&P  Infrastructure  Development  (P)  Limited      

S&P  Infra  –  Company  Profile                      13  

 S & P INFRA

  SUBMITTED  TENDERS  (in  2010)      

 

 

Ongoing  Projects  

Future  Projects  

 

 

 

 

 

 

 

S.  No.  

Name  of  Work  

Length  (Km)  

Cost  (in  Mn  Rs.)  

Location  Principal  Employer  

Client  Name  

7  

Widening  and  Strengthening  of    G.T.  Road  To  Pahleza  Station  Via  Nehru  Collage  in  the  state  of  Bihar  

2    

15.10    

Dehri-­‐on-­‐Sone,  Bihar  

The  Executive  Engineer,  RCD  ,  Road  Division,  Dehri-­‐On-­‐Sone,  Bihar  

S&P  Infrastructure  Developers  (P)  Ltd.  

8  

Widening  and  Strengthening  work  in  Km.  129.30  to  Km.  143.00  on  Manjhi  –  Chapra  Section  of  NH  19  in  the  state  of  Bihar  

12.5    

51.21    

Chapra,  Bihar  The  Executive  Engineer,  NH  Division,  Gulzarbagh,  Bihar  

S&P  Infrastructure  Developers  (P)  Ltd.  

9  

Widening  and  Strengthening  work  in  Km  14.50to  Km  30.00  of  NH  101  for  the  year  2010-­‐11    in  the  state  of  Bihar  

14.50   376.30   Chapra,  Bihar  The  Executive  Engineer,  NH  Division,  Chapra,  Bihar  

S&P  Infrastructure  Developers  (P)  Ltd.  

10  

Strengthening  of  NH  83  from  Km  36.00  to  Km  43.00  and  Km  46.775  to  Km  68.000  under  LWE  plan  for  the    year  2010-­‐2011    in  the  state  of  Bihar  

3.78   220.0   Gaya,  Bihar  The  Executive  Engineer,  NH  Division,  Gaya,  Bihar  

S&P  Infrastructure  Developers  (P)  Ltd.  

11  

Bitumen  Renewal  and  annual  maintenance  work  of  NH  29  Varanasi  –  Gorakhpur  section  from  Km  2.225  to  Km  111.00  

108.78   21.50   Gorakhpur  UP  National  Highways  Authority  of  India  

S&P  Infrastructure  Developers  (P)  Ltd.  

12  

Bitumen  Renewal  and  annual  maintenance  work  of  NH  91  Kanpur  –  Kannouj  section  from  Km  280.00  to  Km.  418.00  

138.00   51.60   Kannouj,  UP  National  Highways  Authority  of  India  

S&P  Infrastructure  Developers  (P)  Ltd.  

 

   S&P  Infrastructure  Development  (P)  Limited      

S&P  Infra  –  Company  Profile                      14  

 S & P INFRA

 

  SUBMITTED  TENDERS  (in  2010)      

 

 

Ongoing  Projects  

Future  Projects  

 

 

 

 

 

 

 

S.  No.  

Name  of  Work  Length  (Km)  

Cost  (in  Mn  Rs.)  

Location  Principal  Employer  

Client  Name  

13  

Strengthening  work  in  Km  181  to  Km  190  of  Bhagalpur  –  Mirzachouki  section  of  NH  80  for  the  year  2009-­‐10    

9.00   106.70   Bhagalpur  Bihar  The  Executive  Engineer,  NH  Division,  Bhagalpur,  Bihar  

S&P  Infrastructure  Developers  (P)  Ltd.  

14  

Widening  and  Strengthening  of  Existing  Single  /  Intermediate  Lane  Carriageway  with  Geometric  Improvement  to  Two  Lane  Carriageway  in  Km  172/0  to  Km  203/0  of  NH  88  in  the  State  of  Himachal  Pradesh  under  Special  Project  Scheme   31.00   618.10  

Hamirpur,  Himachal  Pradesh  The  Executive  Engineer,  NH  Division,  HP  PWD,  Hamirpur  

Joint  Venture  of  BLA,  S&P  Infra,  and  FGM    

15  

Widening  and  Strengthening  of  Existing  Single  /  Intermediate  Lane  Carriageway  with  Geometric  Improvement  to  2  Lane  Carriageway  in  Km  58/400  to  Km  105/0  (except  in  Km  69/0  to  Km  71/400)  of  NH  70  in  the  State  of  Himachal  Pradesh  under  Special  Project  Scheme  

46.60    

864.20    

Hamirpur,  Himachal  Pradesh  The  Executive  Engineer,  National  Highway  Division,  HP  PWD,  Hamirpur  

Joint  Venture  of  BLA,  S&P  Infra,  and  FGM  

16  

2  Laning  of  State  Road  from  Gobuk  –  Mariyang  –  Sijhon  Nallah  (total  length  of  49.28  Km)  in  Arunachal  Pradesh  under  Arunachal  Pradesh  of  SARDP-­‐NE  Project  

49.28    

2,342.7    

Itanagar,  Arunachal  Pradesh  

Chief  Engineer,  P.W.D.  Highways,  Itanagar,  Arunanchal  Pradesh    

Joint  Venture  of  BLA,  S&P  Infra,  and  FGM  

17  

2  laning  from  Longding  –  Tissa  –  Khonsa  Bypass  connector  (NH  52B)  (total  length  of  42.5  km)  in  Arunachal  Pradesh  under  Arunachal  Pradesh  Package  of  SARDP-­‐NE  

42.50   1,772.0  Itanagar,  Arunachal  Pradesh  

Chief  Engineer,  P.W.D.  Highways,  Itanagar,  Arunanchal  Pradesh    

Joint  Venture  of  BLA,  S&P  Infra,  and  FGM  

 

CORE  COMPETENCE:    

o We  are  currently  in  transition  of  becoming  a  pan-­‐India  group  from  being  a  region  specific  company.  o Very  strong  technical  team  that  fully  understands  infrastructure  in  roads  and  highways.    o Clear  access  to  local-­‐knowledge  and  critical  information  for  bidding  in  high  traffic  growth  areas.  o Backed  by  a  professional  management  team  that  works  towards  a  common  goal:  Sustainable  Growth.    o Geographic  spread  is  broad  to  contain  any  extended  exposure  to  specific  regional  risks.    

 

   S&P  Infrastructure  Development  (P)  Limited      

S&P  Infra  –  Company  Profile                      15  

 S & P INFRA

 

TOTAL BIDDED PROJECT VALUE FOR YEAR 2010 Rs. 7,405.7 MILLION

SUBMITTED  TENDERS  (in  2010)      

 

 

Ongoing  Projects  

Future  Projects  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TOTAL BIDDED PROJECT VALUE FOR YEAR 2010

Rs. 7,405.7 MILLION

S.  No.  

Name  of  Work  Length  (Km)  

Cost  (in  Mn  Rs.)  

Location  Principal  Employer  

Client  Name  

18  

Procurement,  Installation,  Commissioning,  Operation  &  Maintenance  for  five  years  of  a  system  of  Portable  Automatic  Traffic  Counter-­‐cum-­‐Classifiers  (ATCCs)  at  identified  locations  on  identified  single/intermediate/2/4/6  lane  National  Highways  in  the  state  of  Tamilnadu,  Pondicherry,  Kerala,  Karnataka,  Andhra  Pradesh  and  A&N  Island  in  India  with  data  processing  unit    at  Central  Data  Centers  (CDC)  at  Zonal  Head  Quarters  at  Chennai  including  Technical  support  system/staff  for  data  processing,  data  collection,  analysis,  monthly  report  publication  of  traffic  data,  provision  of  an  authorized/General  user  interface  for  assessing  the  information  through  World  Wide  Web  (www),    and  software  upgradation  etc.  

0.00   120.0  South  Zone  

Regional  Officer  Chennai,  Ministry  of  Road  Transport  &  Highways,  C-­‐1-­‐A  Rajaji  Bhawan,          Besant  Nagar,  Chennai-­‐600090  

Joint  Venture  of  S&P  Infra,  and  AJS  

19  

Procurement,  Installation,  Commissioning,  Operation  &  Maintenance  for  five  years  of  a  system  of  Portable  Automatic  Traffic  Counter-­‐cum-­‐Classifiers  (ATCCs)  at  identified  locations  on  identified  single/intermediate/2/4/6  lane  National  Highways  in  the  state  of  Rajasthan,  Gujarat,  Maharashtra,  Madhya  Pradesh  (MP),  and  Goa  in  India  with  data  processing  unit    at  Central  Data  Centers  (CDC)  at  respective  Zonal  Head  Quarters  at  Jaipur  including  Technical  support  system/staff  for  data  processing,  data  collection,  analysis,  monthly  report  publication  of  traffic  data,  provision  of  an  authorized/General  user  interface  for  assessing  the  information  through  World  Wide  Web  (www),    and  software  upgradation    

0.00   120.0  North  Zone  

Regional  Officer  Ministry  of  Road  Transport  &  Highways  Opp.DCM  Godown,  Ajmer  Road,  P.O.  Shyam  Nagar,  Jaipur-­‐302019  (Rajasthan)  Joint  Venture  of  S&P  Infra  and  AJS  

20  

Short  Term  Improvement  &  Routine  Maintenance  of  Aurangabad  –  Gorhar  Section  From  Km  180.  000  To  Km  320.000  of  NH  2  in  the  state  of  Bihar  &  Jharkhand  

140.00  106.80  

Bihar  &  Jharkhan

d  National  Highways  Authority  of  India  

S&P  Infrastructure  Developers  (P)  Ltd.  

21  

Short  Term  Improvement  &  Routine  Maintenance  of  Handia  –  Rajatalab  Section  From  Km  245.  000  To  Km  317.389  of  NH  2  in  the  state  of  Uttar  Pradesh  

72.39   46.50  Uttar  Pradesh  National  Highways  Authority  of  India  

S&P  Infrastructure  Developers  (P)  Ltd.  

 In just over the last 2 quarters of 2010 S&P aggressively bid for 21 highway projects and have a strong forward looking growth potential.

   

   S&P  Infrastructure  Development  (P)  Limited      

S&P  Infra  –  Company  Profile                      16  

 S & P INFRA

 

         

 

 

   

Registered  Address  907,  New  Delhi  House  Barakhamba  Road  Connaught  Place  Delhi  –  110001  India  

   

Project  Offices  Himachal  Pradesh    New  Delhi    Uttar  Pradesh    Bihar    Jharkhand    Arunachal  Pradesh  

     

Website  http://www.spinfra.in  

 Email    [email protected]  

 Telephone    +91  11  2224  3609  

 Fax    +91  11  2224  1853  

 Management    Saumil  Sharma,    COO  Ph#  +91  98738  02125  

 

 

   

 

Contact  Details    

Republication  or  re  dissemination  of  the  contents  of  this  document  is  expressly  prohibited  without  the  written  consent  of  S&P  Infrastructure  Developers  (P)  Ltd.