Page 1: Corporate Alignment Logoprecision... · • Amongst the top 100 international construction contractors of the World since 1982 • Ranked # 65 in ENR Top 250 International Contractors
Page 2: Corporate Alignment Logoprecision... · • Amongst the top 100 international construction contractors of the World since 1982 • Ranked # 65 in ENR Top 250 International Contractors

Corporate Alignment Logo

Page 3: Corporate Alignment Logoprecision... · • Amongst the top 100 international construction contractors of the World since 1982 • Ranked # 65 in ENR Top 250 International Contractors

Corporate MVV

Page 4: Corporate Alignment Logoprecision... · • Amongst the top 100 international construction contractors of the World since 1982 • Ranked # 65 in ENR Top 250 International Contractors

• Founded in 1957

• A group of companies composed of more than 50 subsidiaries operating in 6 major geographical areas: CIS, Asia, Middle East, Europe, Africa & Turkey

• 476 projects in 45 countries, with historical value of US$ 41 billion

• Turnover $6,6 B (2015)

• Amongst the top 100 international construction contractors of the World since 1982

• Ranked # 65 in ENR Top 250 International Contractors in 2015

• 21,500 people

• Traded publicly in Istanbul Stock Exchange, Market Cap $10 B

• Holds ISO 9001, OHSAS 18001 & ISO 14001 and ASME certificates

• Shares the vision & goals of its customers, adopts to their needs and to local conditions

Business Lines:

• Engineering & Construction, Power, Real Estate, Trade

ENKA

Page 5: Corporate Alignment Logoprecision... · • Amongst the top 100 international construction contractors of the World since 1982 • Ranked # 65 in ENR Top 250 International Contractors

• Installed CCPP capacity of 4,000MW (#1 Turkish Electricity Generator

• All 3 power plants (Gebze 1,554 MW, Adapazari 777 MW & İzmir 1,523 MW) have been built, owned and are being operated by ENKA.

• Electricity generation over 300 TWh in 13 years.

• Annual capacity meeting 12% of Turkey’s energy demand

• GE scope of USD1.0b since 1998 (10 9FA machines)

• GE PSA extension with a value of USD0.8b for the next 20 years

• AGP Improvement, first implementation in the fleet, validation units (NPI)

• Availability 5% over the F technology fleet average

• In 2011, ENKA’s Adapazari Power Plant (GT9FA) has been selected as the Power Plant of the Year with an availability of 99,8 % by the Power Magazine

ENKA

Page 6: Corporate Alignment Logoprecision... · • Amongst the top 100 international construction contractors of the World since 1982 • Ranked # 65 in ENR Top 250 International Contractors

• A subsidiary of ENKA

• Incorporated in 1973 in Turkey as a local steel fabricator now an EPFI group of 5 companies: Gemlik, Turkey:

• Cimtas Steel, www.cimtas.com • Cimtas Pipe Fabrication and Trading Ltd. Co., www.cimtaspipe.com • Cimtas Precision Machining Industries and Trading Ltd. Co. www.cimtasmachining.com

Kocaeli, Turkey: • Cimtas Module and Shipyard, www.cimtasshipyard.com

Ningbo, China:

• Cimtas Ningbo Steel Processing Co. Ltd., www.cimtasnbo.com

• 3,550 people including 300 engineers

• With Activities in

• Engineering (structural, pressure vessels, piping, plant engineering)

• Fabrication (7 fabrication shops including pipe/fitting production and machining shops, 6 in Turkey & 1 in China, over 210,000 tons/year total capacity)

• Modularization (Pre-assembled racks, Pre-assembled units)

• Installation - Structural & Mechanical & Electrical (domestic and overseas jobsites)

• Shipbuilding (powerships, barges, tankers / gas carriers)

About Cimtas Group

Page 7: Corporate Alignment Logoprecision... · • Amongst the top 100 international construction contractors of the World since 1982 • Ranked # 65 in ENR Top 250 International Contractors

Locations Cimtas Group

Page 8: Corporate Alignment Logoprecision... · • Amongst the top 100 international construction contractors of the World since 1982 • Ranked # 65 in ENR Top 250 International Contractors

GE - ENKA - CIMTAS • Supplier to GE since 1999 started with Turkey BOO by ENKA where 10 9FA MSD piping has been supplied

by Cimtas.. As of today, Cimtas supplied piping have been installed on ~1.100 GE frames

• Qualified by Gas, MSD, EPE, PGS, Wind, Hydro and O&G

• Supported GE’s China Migration Initiative and opened a Pipe Prefab. Shop in Ningbo/China in 2003

• Supplied GE directly with GT & ST Prefabricated Piping, Pressure Vessels, Skids, Wind Towers, Ducting Combustion Casings and End Covers

• 2nd Tier supplier with HRSG, Process & BOP piping for GE in the past

• Holds ISO9001, ASME (U,U2,S,PP), PED, TUV DIN EN 729, TRD 201/HPO & Nuclear Certs(NS,NA,NPT) and AS9100

• Supported GE’s Combustion Part Supplier Development Initiative and opened a Precision Machining Shop in Gemlik/Turkey in 2014.

• Selected as “Strategic Partner” in 2015, “Excellence in Delivery” in 2003 & 2004 and “Supplier of the Year” in 2002 for GE

• 3 years (2014-16) Long Term Agreement for Gas Turbine Prefabricated Piping with GE

• 4 years (2015-2018) Long Term Agreement for Combustion Casings, End Covers and Liners with GE

• Algeria 9FA Mega Deal ; 100% MSD piping (both Gas and Steam) has been successfully fulfilled by Cimtas

• Successfully delivered the first 9HA gas turbine piping (EDF/Bouchain).

• Successfully delivered the piping and structural steel for GE’s AGP(Advance Gas Path) Upgrade. ENKA-GE-Cimtas as a team, validated the project first time in the fleet.

Partnership

Page 9: Corporate Alignment Logoprecision... · • Amongst the top 100 international construction contractors of the World since 1982 • Ranked # 65 in ENR Top 250 International Contractors

Cimtas Precision Machining

12,000 SQM (129,000 SQ FT) FENCED YARD 5,500 SQM (59,000 SQ FT) COVERED FABRICATION SHOP SPACE

conveniently located within 3 km from four international deep sea ports

Facility

Page 10: Corporate Alignment Logoprecision... · • Amongst the top 100 international construction contractors of the World since 1982 • Ranked # 65 in ENR Top 250 International Contractors

Marmara Sea

Safety

• Zero Accident Programme

• Corporate HSE Programme

• OHSAS regulation

• Risk Analysis

• Lessons Learned

• 5S + 2S Programmes

World Class Quality

• High-tech Machinery

• Multi-Metallurgy Production

• Excellence in Services

• Proven Quality Assurance Systems

• Wide International Experience

• Skilled and Dynamic Personnel

Reliability

• Preferred Partner

• Proprietary Privilege

• Business Ethics: Code of Conduct

• Consistency

• On Time Delivery

• Least Total Installed Cost

Efficiency

• State-of–the–art facility

• One Way Flow

• Lean Programme

• Kaizen Workshops

• Multiple Award Winner with Proven Flexibility

• Advanced Information Technology

Differentiators Cimtas Precision Machining

Page 11: Corporate Alignment Logoprecision... · • Amongst the top 100 international construction contractors of the World since 1982 • Ranked # 65 in ENR Top 250 International Contractors

Health Safety Environment

• Zero Accident Program

Training, Toolbox, Near Miss, Permit to Work

• Corporate HSE Program OHSAS 18001

• Risk Analysis

Department base procedures

• Behavior Safety (ASA)

Partnership between Management & Employees that

focuses safety attentions

• Lessons Learned & Best Practices

Safety improvements of equipment and tools

No LTA since the beginning Best Performance: 1,187 days 631,355 Mh without LTA

Page 12: Corporate Alignment Logoprecision... · • Amongst the top 100 international construction contractors of the World since 1982 • Ranked # 65 in ENR Top 250 International Contractors

Cimtas Precision Machining About

Award Winning Manufacturer of Complex Gas Turbine Components

We are recognized for our leadership in welding, vertically integrated high-speed manufacturing systems and our specialization for working with advanced materials.

We deliver added value through continuous investment, complete in-house control of processes and our lean production culture.

Page 13: Corporate Alignment Logoprecision... · • Amongst the top 100 international construction contractors of the World since 1982 • Ranked # 65 in ENR Top 250 International Contractors

New Facility - Growth Cimtas Precision Machining

Civil & Steel Structure Works Jan 5th

Machinary Orders - Delivery & Installation Jan 12th

Civil & Steel Structure Works

Machinary Orders - Delivery & Installation

Operator Training & Process Qualifications

Operator Training & Process Qualifications incl. EB-Welding, Vacuum Heat Treatment and Brazing.

May 18th Start Mfg of Production Orders Nov 7th

Jan Aug Oct

2015

Nov

Page 14: Corporate Alignment Logoprecision... · • Amongst the top 100 international construction contractors of the World since 1982 • Ranked # 65 in ENR Top 250 International Contractors

2012 2013 2014

2015-2016

On-going Qualifications

Closed Qualifications 2

4

11

20 Qualifications - Growth Cimtas Precision Machining

Page 15: Corporate Alignment Logoprecision... · • Amongst the top 100 international construction contractors of the World since 1982 • Ranked # 65 in ENR Top 250 International Contractors

Volume - Growth

With continuous heavy yearly investments in new technologies, equipment and employees, Cimtas Precision Machining positions itself for growth to meet future challenges of its customers

Cimtas Precision Machining

Page 16: Corporate Alignment Logoprecision... · • Amongst the top 100 international construction contractors of the World since 1982 • Ranked # 65 in ENR Top 250 International Contractors

Combustion Casings

End Cover

Welded Turbulated Liner

Transition Pieces

qualified opportunity

Opportunity - Growth Cimtas Precision Machining

Page 17: Corporate Alignment Logoprecision... · • Amongst the top 100 international construction contractors of the World since 1982 • Ranked # 65 in ENR Top 250 International Contractors

Capabilities – Engineering Cimtas Precision Machining

Cimtas Precision Machining Engineering is the foundation of our high-quality manufacturing, superior efficiency, best in class fulfillment performance and full customer satisfaction.

Utilizes the latest CAD/CAM Technology:

• Esprit 2 + C + Y + B Simultaneous Mill Turn

• Catia V5R20

• Unigraphics NX 9.0

Page 18: Corporate Alignment Logoprecision... · • Amongst the top 100 international construction contractors of the World since 1982 • Ranked # 65 in ENR Top 250 International Contractors

Capabilities – Precision Machining Cimtas Precision Machining

Expertise in most complex parts with tight tolerances via state of the art 5-Axis CNC machines and customized equipment operated by skilled machinists.

• Simultaneous 5-Axis Turning & Milling – Vertical (up to 1,250 mm diameter)

• Simultaneous 5-Axis Turning & Milling – Horizontal (up to 650 mm diameter)

• 3 - 4 and 5-Axis CNC Milling

• Compliance with stringent machining tolerances (+/- 0.0002’’)

Page 19: Corporate Alignment Logoprecision... · • Amongst the top 100 international construction contractors of the World since 1982 • Ranked # 65 in ENR Top 250 International Contractors

MAZAK eTower 1060/1250 V8-II 5-axis simultaneous milling + turning

Number of machines : 7

Number of Pallets : 2 Pallet changer

Number of tools in magazine : 80

Max. work-piece diameter : Ø1,250 mm

Max. work-piece height : 1,250 mm

Max. work-piece weight : 2,700 kg

Capabilities – Precision Machining Cimtas Precision Machining

Page 20: Corporate Alignment Logoprecision... · • Amongst the top 100 international construction contractors of the World since 1982 • Ranked # 65 in ENR Top 250 International Contractors

Number of machines : 1

Number of tools in magazine : 10

Max. work-piece diameter : Ø460 mm

Max. work-piece height : 728 mm

Max. work-piece weight : 5 kg

DMG Moriseiki NLX 2500 I 700 C+Y axis Multi Spindle turning and milling

Capabilities – Precision Machining Cimtas Precision Machining

DMG DMU 85 Monoblock 5-axis universal milling and turning

Number of machines : 4

Number of Pallets : 1

Number of tools in magazine : 30

Max. work-piece diameter : Ø1.040 mm

Max. work-piece height : 590 mm

Max. work-piece weight : 1,000 kg

Page 21: Corporate Alignment Logoprecision... · • Amongst the top 100 international construction contractors of the World since 1982 • Ranked # 65 in ENR Top 250 International Contractors

Number of machines : 1

Number of Pallets : 1

Number of tools in magazine : 30

Max. work-piece width : 1,250 mm

Max. work-piece height : 660 mm

Max. work-piece weight : 2,000 kg

MAZAK FJV 60/80 3-axis vertical machining center

Number of machines : 1

Number of Pallets : 1

Number of tools in magazine : 40

Max. work-piece diameter : Ø800 mm

Max. work-piece height : 500 mm

Max. work-piece weight : 1,000 kg

MAZAK Variaxis i800 5-axis simultaneous milling

Capabilities – Precision Machining Cimtas Precision Machining

Page 22: Corporate Alignment Logoprecision... · • Amongst the top 100 international construction contractors of the World since 1982 • Ranked # 65 in ENR Top 250 International Contractors

Number of machines : 2

Pallet number : 1

Number of tools in magazine : 40

Max. work-piece diameter : Ø668 mm

Max. work-piece height : 1.100 mm

Max. work-piece weight : 800 kg

MAZAK Integrex i400 5-axis simultaneous milling

Capabilities – Precision Machining Cimtas Precision Machining

MAZAK Integrex i200 s 5 axis Multi Spindle turning and milling

Number of machines : 2

Number of tools in magazine : 36

Max. work-piece diameter : Ø658 mm

Max. work-piece height : 1,011 mm

Max. work-piece weight : 300 kg

Page 23: Corporate Alignment Logoprecision... · • Amongst the top 100 international construction contractors of the World since 1982 • Ranked # 65 in ENR Top 250 International Contractors

Capabilities – Welding Cimtas Precision Machining

Cimtas Precision Machining is a Welding specialist meeting and exceeding the most stringent welding requirements.

• Electron Beam Welding (30 kW beam, 150 kV acceleration, 11.4 m3 chamber)

• Manual and Automated Welding (GTAW, SMAW, FCAW, GMAW (STT/RMD/CMT) and SAW)

• IIW/EWF certified Welding Engineers

• In-house Fit-up & Welding Training Center (Class DoJo)

Page 24: Corporate Alignment Logoprecision... · • Amongst the top 100 international construction contractors of the World since 1982 • Ranked # 65 in ENR Top 250 International Contractors

• Working Chamber Dimension

2,710 (L) x 2,100 (H) x 2,000 (W)

with a volume of 11.4 m³

• High precision workpiece manipulators with tilt rotatory device

• Pump down time at cde condition to

7 x 10-4 mbar in approx. 8 minutes.

• Combined CNC &PLC control system.

High vacuum electron beam welding equipment with 30 kW beam power and 150 kV acceleration voltage working under 11,4 m3 volume vacuum chamber.

Steigerwald Strahltechnik,

Model : EBOCAM EK 110C/EG 150-30B

Capabilities – EB Welding Cimtas Precision Machining

Page 25: Corporate Alignment Logoprecision... · • Amongst the top 100 international construction contractors of the World since 1982 • Ranked # 65 in ENR Top 250 International Contractors

• 600 PQR and 1,200 WPS in library

• CS (Fine Grain High Strength CS,LTCS) • Austenitic Stainless Steel ( from 304L to 347 all grades),

Duplex Stainless Steel Nickel Alloys (incoloy, inconel

[AMS5536, AMS5542, AMS 5608], Nimonic [C-263] monel) , Alloys ( from P11 to P92 )

• SAW, SMAW, GTAW(Pulse, Hot&Cold Wire /

Semiautomatic, Orbital), GMAW(Lincoln STT, Miller RMD,

Fronius CMT Mechanised, Robotic ), FCAW, GTAW Hotwire, ESW Weld Overlay,

Capabilities – Welding Cimtas Precision Machining

Page 26: Corporate Alignment Logoprecision... · • Amongst the top 100 international construction contractors of the World since 1982 • Ranked # 65 in ENR Top 250 International Contractors

Capabilities – Vacuum H/T & Brazing Cimtas Precision Machining

Cimtas Precision Machining is equipped with top-class furnaces for Heat Treating and Brazing

• Vacuum Heat Treatment & Brazing (1,315 ᵒC, 5 m3, AMS 2750 Class-I)

• Atmospheric Heat Treatment (850 ᵒC)

Page 27: Corporate Alignment Logoprecision... · • Amongst the top 100 international construction contractors of the World since 1982 • Ranked # 65 in ENR Top 250 International Contractors

Horizontal Type, All Metal Insulation Model: HG151422-2EQM

• Capable to furnace Class 1 as per AMS 2750

• Specially designated for Annealing, Stress Relieving, Stabilization, Precipitation Heat Treatments & Brazing Operations

• Max. Operation Temp: 1,350°C

• Work zone Dimension:

1,550 (W) x 1,475 (H) x 2,200 (L) ,

with effective capacity of 5 m³

• Max. Weight Of Load: 3,700 kg and 1,450 kW

• Maximum Vacuum Range: 1 x 10-5 torr , Operating Vacuum Level: 1 x 10-4 torr

• Cooling Gas Pressure of 2 bar and Partial Pressure Control of 10-3 to 10 torr

• Leak Rate : less than 10 mic/h

• Control of PLC programming

2nd vacuum furnace to be installed in Aug ‘16

Capabilities – Vacuum H/T & Brazing Cimtas Precision Machining

Page 28: Corporate Alignment Logoprecision... · • Amongst the top 100 international construction contractors of the World since 1982 • Ranked # 65 in ENR Top 250 International Contractors

Capabilities – Forming Cimtas Precision Machining

Advance forming technologies enabling manufacturing of the most complex parts

• Hydraulic Pressing (2,500 tons with 1,000 tons integrated extruder)

• Hydraulic Expanding (up to 600 mm diameter)

• Roll Bending

• Water Jet Cutting & Trimming (6,200 bar , up to 8 tons loading)

Page 29: Corporate Alignment Logoprecision... · • Amongst the top 100 international construction contractors of the World since 1982 • Ranked # 65 in ENR Top 250 International Contractors

• Press capacity: 2,500 tons • Extruder capacity: 1,000 tons • Operating area dims: 5,000 x 3,500 x 4,500 mm

• Press capacity: 1,000 tons • Operating area dims: 3,000 x 2,500 x 4,000 mm

Capabilities – Forming

Vertical Hydraulic Presses

• Press capacity: 2,000 tons • Operating area dims: 5,000 x 3,500 x 4,500 mm

Cimtas Precision Machining

Page 30: Corporate Alignment Logoprecision... · • Amongst the top 100 international construction contractors of the World since 1982 • Ranked # 65 in ENR Top 250 International Contractors

HAUSLER CM-V-150 Hydraulic Expander

Number of machines : 1

Max. work-piece diameter : Ø600 mm

Max. expansion thickness : 10 mm

Max. hydraulic pressure : 150 tons

Number of machines : 1

Max. work-piece width : 1,000 mm

Max. pre-rolling thickness : 13 mm

Max. rolling thickness : 16 mm

DURMA HRB4 – 1016 4 roller cylinder machine

Capabilities – Forming Cimtas Precision Machining

Page 31: Corporate Alignment Logoprecision... · • Amongst the top 100 international construction contractors of the World since 1982 • Ranked # 65 in ENR Top 250 International Contractors

Number of machines : 1

Net Working Travel : 3.35mX2mX0.2m

Internal Tank Loading : 3.68mX2.3m

Max. Loading capacity : 8,000 kg

Operating Pressure : 6,200 bar

SUPREMA WATERJET KMT-Steamline 125 PRO II

Capabilities – Forming Cimtas Precision Machining

Page 32: Corporate Alignment Logoprecision... · • Amongst the top 100 international construction contractors of the World since 1982 • Ranked # 65 in ENR Top 250 International Contractors

Capabilities – Surface Treatment & Coating Cimtas Precision Machining

In-House controlled Surface Treatment & Coating through dedicated hi-tech equipment and skilled operators

• HVOF Coating

• Automated Grit Blasting

• Ultrasonic Cleaning

• Pickling & Passivation

• In-house controlled processes

• Customized Equıipment

Page 33: Corporate Alignment Logoprecision... · • Amongst the top 100 international construction contractors of the World since 1982 • Ranked # 65 in ENR Top 250 International Contractors

At Cimtas, Quality is produced, not ‘inspected in’

Quality Cimtas Precision Machining

Cimtas Precision Machining is a registered ISO9001:2008/AS9100C + ISO 14001:2004 + OHSAS 18001:2007 company

• CMM Dimensional Inspection

• Radiographic Inspection

• Magnetic Particle Inspection

• Fluorescent Penetrant Inspection

• Liquid Penetrant Inspection

• Video Boroscope Inspection

• Air Flow Inspection

• Ultrasonic Testing

• Hydrostatic Testing

• Positive Material Identification (PMI)

• In-house Level I, II, III NDT personnel

(SNT-TC-1A & PED 97/23, EN 473)

• Mech. Testing & Metallography Lab.

• Fully integrated ERP (Engineering to Shipment)

• On-line documentation & full traceability

Page 34: Corporate Alignment Logoprecision... · • Amongst the top 100 international construction contractors of the World since 1982 • Ranked # 65 in ENR Top 250 International Contractors

Warehouse Cimtas Precision Machining

Materials are stored as per Project No, Description, Material Stock Code and Heat Number at their ERP designated warehouse locations.

Page 35: Corporate Alignment Logoprecision... · • Amongst the top 100 international construction contractors of the World since 1982 • Ranked # 65 in ENR Top 250 International Contractors

Global Sourcing Cimtas Precision Machining

Page 36: Corporate Alignment Logoprecision... · • Amongst the top 100 international construction contractors of the World since 1982 • Ranked # 65 in ENR Top 250 International Contractors

Prime Location for Global Supply Cimtas Precision Machining

Page 37: Corporate Alignment Logoprecision... · • Amongst the top 100 international construction contractors of the World since 1982 • Ranked # 65 in ENR Top 250 International Contractors

Cimtas Precision Machining Ind. has received the prestigious “Strategic Partner” award from GE Power among 15,000 suppliers by the

outstanding performance and efforts of its employees and sustainable growth strategies on Heavy Duty Gas Turbine Combustion Component mnfg.

Cimtas Precision Machining Strategic Partner

Page 38: Corporate Alignment Logoprecision... · • Amongst the top 100 international construction contractors of the World since 1982 • Ranked # 65 in ENR Top 250 International Contractors

www.cimtasmachining.com