coreserv + texol

13
Texol CORESERV + TEXOL Coreserv has collaborated with Texol, who have over two decades of experience in delivering customized APC solutions to various industries. The customer references that form part of this intro-deck is a testimony to over 100 successful installations that have been created since inception. The intent of this collaboration is to synergies and harness original brand Texol that has been synonymous with customized solutions based project ethos that have been demonstrated through the history of successful installations from Texol

Upload: others

Post on 03-Feb-2022

1 views

Category:

Documents


0 download

TRANSCRIPT

Texol CORESERV + TEXOL

Coreserv has collaborated with Texol, who have over two decades of experience in delivering customized APC solutions to various industries. The customer references that form part of this intro-deck is a testimony to over 100 successful installations that have been created since inception.

The intent of this collaboration is to synergies and harness original brand Texol that has been synonymous with customized solutions based project ethos that have been demonstrated through the history of successful installations from Texol

What is Incineration?• Incineration is a waste treatment process that involves the combustion of organic substances contained in waste

materials. Incineration and other high-temperature waste treatment systems are described as "thermal treatment". Incineration of waste materials converts the waste into ash, flue gas and heat.

The salient features of using an Incineration technology to dispose of the wastes are: -

• The hazardous wastes are completely destroyed.

• The volume and weight of the wastes is instantaneously reduced, leaving back clean and sterile ash. This saves huge land area required for any other methods of disposal.

• The air emission will be effectively controlled and within the norms of the PCB. The smoke from the exhaust will be colourless & odourless.

The sterile ash could be directly disposed off by land filling and doesn’t need further treatment; this land requirement will be quite small.

We design, manufacture, supply, erect and commission Incineration Systems for all types of wastes, be it Solid, Liquid, Gas, or Semisolid etc. The classification of various types of wastes have been listed under various classes which is enclosed for your ready reference.

Texol

Product Portfolio

▪ Incinerators : For Solid, Liquid and Gaseous wastes▪ Scrubbers : Box and venturi types for all gaseous wastes▪ Acoustics : Sound proofing systems for generators and other industrial applications▪ Chimneys : Guide supporting, self supporting and wall supporting types

▪ Turn Key Project delivery from concept to completion with consultancy on APC norms, selection of appropriate equipment/system, design, fabrication, installation, erection and commissioning

Texol

Solid Waste Incinerator

• Customer :Himalaya Drug company, , Nelamangala• Solution : Solid waste incinerator • Year of Installation :1997• Handled : R&D and pharma waste• Capacity : 200 kgs per hour

Texol

Solid, Liquid, Gaseous waste Incinerator system

• Customer : Hetero drugs Limited• Solution : Solid, Liquid & Gaseous

waste incinerator system • Year of installation : 1997• Handled : Process waste• Capacity : 50 Kilo liters (2500 liters per hour)• Supply scope : Included Incinerators,

scrubbers, ID Fan and self supporting chimney

Texol

• Customer : Saracca Labs, Hyderabad • Solution : Solid, Liquid and Gaseous

waste incinerator • Year of Installation:1999• Handled : Process waste• Capacity : 25 Kilo liters (1500 liters) per hour• Supply scope : Included incinerator,

scrubber, ID Fan, self supporting chimney and ductwork

Solid, Liquid, Gaseous waste Incinerator systemTexol

• Customer : Naptha Resins and Chemicals Limited, Peenya

• Solution : Liquid waste incinerator• Year of Installation : 1997• Handled : Polyester resin waste• Capacity : 100 liters per hour• Supply scope: Included incinerator,

scrubber, ID Fan, self supporting chimney and ductwork

Liquid waste Incinerator system

Texol

• Customer : SMS Pharmaceuticals. Hyderabad• Solution : Solid, Liquid and gaseous

waste incinerator • Year of installation : 1997• Handled : Process waste• Capacity : 100KL (5000 liters per hour)• Supply scope : Included incinerator, scrubber,

ID Fan , self supporting chimney and ductwork• This was a landmark installation, one of its kind in

India.

Solid, Liquid, Gaseous waste Incinerator systemTexol

• Customer : SPIC Pharmaceuticals, Cuddalore,Tamil Nadu

• Solution : Solid waste incinerator • Year of Installation : 2002• Handled : Pharmaceutical waste• Capacity : 150 Kgs per hour• Supply scope : Included incinerator,

self supporting chimney & ductwork

Solid waste Incinerator system

Texol

Texol SAMPLE REFERENCE LIST OF INSTALLATIONS

SR.NO CLIENT WASTES CAPACITY1 Graphite India, Bangalore Fumes Extraction, Dust collections 40,000-2,00,000 M3/Hr.2 Sykes Gases 3000 Nm3/Hr.3 SAP Labs Gases 2000 Nm3/Hr.4 Cipla Ltd., Bangalore Process Effluent 5000 Ltrs/Day5 TASC Pharmaceuticals Process Wastes,Liquid/Solid/Tarry Liq: 100 Tpd,Solids: 2.5 Tpd6 SMS Pharma Ltd, Hyderabad Process Wastes,Liquid/Solid/Gas Liq:70 Tpd, Solid:3t7 Hetero Drugs Ltd, Hyderabad. Process Wastes,Liquid/Solid/Tarry Liq:70 Tpd, Solid:3t8 Saraca Labs Ltd, Hyderabad Process Wastes Liquid/Garbages Liq: 35tpd, Solid: 2t9 Sree Sakthi paper Mills Recycled paper wastes 450 Kgs/Hr.10 Moscmm hospital kolenchery, kerala hospital waste 150 kgs/hr11 Himalaya Drugs Ltd,Bangalore Garbage And Toxic Wastes 150 Kgs/Hr12 Hyderabad Chemicals Ltd Aqueous And Solid Wastes, Residues Garbages Etc. 150 Kgs/Hr.13 Nehru Zoological Park,Hyderabad Animal Carcasses And Meat 100 Kgs/Hr14 Veega holidays & parks Resort wastes 100 Kgs/Hr.15 Saraca ltd. Factory toxic wastes 100 Kgs/Hr.16 Wonderla, Bangalore Garbage 100 Kgs/Hr.17 Westfort hospital, Trissur Hospital wastes 100 Kgs/Hr.18 Biovet Ltd., Mallur Animal Carcass & research wastes 100 Kgs/Hr.19 Naptha Resins Ltd,Bangalore Aqueous Wastes 100 Ltrs/Hr20 Muthoot Medical Center Kerala Medical/Garbages Wastes 40-60 Kgs/Hr

SAMPLE REFERENCE LIST OF INSTALLATIONS Texol SR.NO CLIENT WASTES CAPACITY

21 Unity Health Complex,Mangalore Medical Wastes 50 Kgs/Hr22 Nitte Trust, Mangalore Medical/Garbages Wastes 50 Kgs/Hr23 Henkel Spic, Karraikal General Wastes 50 Kgs/Hr24 TASC Pharmaceuticals Gaseous Wastes 50 Kgs/Hr.25 Parashakthi Hosp Clinical Wastes 50 Kgs/Hr.26 H&R Johnson, Karraikal Factory wastes 50 Kgs/Hr.27 Santosh Hospital Hospital wastes 50 Kgs/Hr.28 Delta Engineering services Hospital Wastes 50 Kgs/Hr.29 Great India health care,Kerala Hospital wastes 50 Kgs/Hr.30 KIMS hospital Hospital wastes 50 Kgs/Hr.31 Nirmala medical mission hospital muvattupuzha, kerala hospital waste 50 kgs/hr32 Thiruvella Medical Mission kerala Medical/Garbages Wastes 30 Kgs/Hr33 Poyannil Hospital, Kerala Medical Wastes 30 Kgs/Hr34 Bunzl India Limited Production plastic wastes 30 Kgs/Hr.35 CMAH Hospital, Karnataka Bio-Medical Wastes 30 Kgs/Hr.36 DG Hospital Medical Wastes 30 Kgs/Hr37 Speciality hospital group p ltd Trivandrum, kerala hospital waste 30 kgs/ hr38 P&C Construction Residential Garbage 25 Kgs/Hr39 AB Shetty Hospital Medical Wastes 20 Kgs/Hr40 Padmashree Hospital Medical Wastes 20 Kgs/Hr

Texol SAMPLE REFERENCE LIST OF INSTALLATIONS

SR.NO CLIENT WASTES CAPACITY

41 H&R Johnson Ltd.,Bangalore Factory wastes 20 Kgs/Hr.

42 Periyar Heritage General Wastes 20 Kgs/Hr.

43 Mukunda Hospital Clinical Wastes 20 Kgs/Hr.

44 Rajesh Exports Ltd.,Bangalore General wastes 20 Kgs/Hr.

45 Holy cross hospital Hospital wastes 20 Kgs/Hr.

46 Hindustan lever ltd.Bangalore Factory wastes 20 Kgs/Hr.

47 VKM Hospital Hospital wastes 20 Kgs/Hr.

48 Delta engg Office Trash 20 Kgs/Hr.

49 Techni bharathy ltd Aluva, kerala office wastes 20 kgs/hr

50 Upasana Hospital Medical wastes 10 Kgs/Hr.

51 G G hospital Trivandrum, kerala hospital waste 10 kgs/hr

52 VESPAR Pharmaceuticals Wastes from production 10 Kgs/Hr.

53 Peniel Hospital, Kerala Medical wastes 5 Kgs/Hr.

54 Asha remedies co pvt ltd Vadakara, kerala hospital waste 5 kgs/hr

Thank You

We strive to serve YOU

Contact :Murali Narasimhan Managing Director +91-9902783547 / +91 [email protected] / [email protected] Regd. Office : Basement B,#96/16, 34th B Cross, 16th main4th T Block, Jayanagar, Bengaluru – 560041Web-site : www.coreservindustrial.com

Texol