cordoba corp: best practices for security camera implementation
TRANSCRIPT
![Page 1: Cordoba Corp: Best Practices for Security Camera Implementation](https://reader036.vdocuments.site/reader036/viewer/2022062901/58f1bb4e1a28ab522b8b4571/html5/thumbnails/1.jpg)
LONG BEACH CITY COLLEGEDISTRICT WIDE SECURITY CAMERA IMPLEMENTATION BEST PRACTICES
MEDHANIE EPHREM – LONG BEACH CITY COLLEGE
KARL VON DER LINDEN, RCDD – P2S ENGINEERING
TERRANCE DEGRAY, PE, CCM – CORDOBA CORPORATION
![Page 2: Cordoba Corp: Best Practices for Security Camera Implementation](https://reader036.vdocuments.site/reader036/viewer/2022062901/58f1bb4e1a28ab522b8b4571/html5/thumbnails/2.jpg)
2
INTRO AND GOALS OF PRESENTATION
•Learning #1: Initial Project Steps•Learning #2: Define the Scope of Work•Learning #3: Procurement Methods•Learning #4: Construction Phasing
Intro Feasibility & SPR Project Team BODs and SOPs Design Process OFOI and OFCI Bid Process Construction and Phasing Future Projects Q&A
![Page 3: Cordoba Corp: Best Practices for Security Camera Implementation](https://reader036.vdocuments.site/reader036/viewer/2022062901/58f1bb4e1a28ab522b8b4571/html5/thumbnails/3.jpg)
3
FEASIBILITY AND SPR
•Importance of Security Programming Report (SPR)•Approach and User Group•Standard Operating Procedures•Board Approved Policies and Regulations
Intro Feasibility & SPR Project Team BODs and SOPs Design Process OFOI and OFCI Bid Process Construction and Phasing Future Projects Q&A
![Page 4: Cordoba Corp: Best Practices for Security Camera Implementation](https://reader036.vdocuments.site/reader036/viewer/2022062901/58f1bb4e1a28ab522b8b4571/html5/thumbnails/4.jpg)
4
PROJECT TEAM
•Identify your core team early
•Campus Communication•Facilities Advisory
Committee•Citizens Oversight
Committee•Board of Trustees
Intro Feasibility & SPR Project Team BODs and SOPs Design Process OFOI and OFCI Bid Process Construction and Phasing Future Projects Q&A
COREGROUP
DESIGNERS CONSTRUCTIONMANAGER
GENETEC
ARECONTSTRUCTURAL
ARCHITECTURAL
![Page 5: Cordoba Corp: Best Practices for Security Camera Implementation](https://reader036.vdocuments.site/reader036/viewer/2022062901/58f1bb4e1a28ab522b8b4571/html5/thumbnails/5.jpg)
5
DESIGN PARAMETERS•Coverage
Requirements•Visual
Communication with District
•DSA Submission
Intro Feasibility & SPR Project Team BODs and SOPs Design Process OFOI and OFCI Bid Process Construction and Phasing Future Projects Q&A
![Page 6: Cordoba Corp: Best Practices for Security Camera Implementation](https://reader036.vdocuments.site/reader036/viewer/2022062901/58f1bb4e1a28ab522b8b4571/html5/thumbnails/6.jpg)
6
PACIFIC COAST CAMPUS
Intro Feasibility & SPR Project Team BODs and SOPs Design Process OFOI and OFCI Bid Process Construction and Phasing Future Projects Q&A
Red = Facial recognition / Green = Camera coverage
![Page 7: Cordoba Corp: Best Practices for Security Camera Implementation](https://reader036.vdocuments.site/reader036/viewer/2022062901/58f1bb4e1a28ab522b8b4571/html5/thumbnails/7.jpg)
7
LIBERAL ARTS CAMPUS
Intro Feasibility & SPR Project Team BODs and SOPs Design Process OFOI and OFCI Bid Process Construction and Phasing Future Projects Q&A
Red = Facial recognition / Green = Camera coverage
![Page 8: Cordoba Corp: Best Practices for Security Camera Implementation](https://reader036.vdocuments.site/reader036/viewer/2022062901/58f1bb4e1a28ab522b8b4571/html5/thumbnails/8.jpg)
8
DEVELOPMENT OF STANDARD OPERATING PROCEDURES
•Review of other Program SOPs•Prepare our own SOPs•Develop Policies and Regulations for Board Approval
Intro Feasibility & SPR Project Team BODs and SOPs Design Process OFOI and OFCI Bid Process Construction and Phasing Future Projects Q&A
![Page 9: Cordoba Corp: Best Practices for Security Camera Implementation](https://reader036.vdocuments.site/reader036/viewer/2022062901/58f1bb4e1a28ab522b8b4571/html5/thumbnails/9.jpg)
9
DESIGN PROCESS•Basis of Design (BOD)•As-Built Documentation•Campus Master Plan•Campus Systems Network•Field Investigation
Intro Feasibility & SPR Project Team BODs and SOPs Design Process OFOI and OFCI Bid Process Construction and Phasing Future Projects Q&A
10.9.15 – 1.1.16
100% CONSTRUCTIONDOCUMENTS
1.18.16 – 3.21.16 4.1.16 – 5.16.16 5.16.16 – 8.1.16 7.16.16 – 8.14.16 10.1.16 – 8.1.17
75% CONSTRUCTIONDOCUMENTS
PRELIMINARYDESIGN
DSAREVIEW
PREQUALIFICATION& BIDDING CONSTRUCTION
![Page 10: Cordoba Corp: Best Practices for Security Camera Implementation](https://reader036.vdocuments.site/reader036/viewer/2022062901/58f1bb4e1a28ab522b8b4571/html5/thumbnails/10.jpg)
10
DESIGN PROCESS
•Analytics•Camera Selection Process •Education of LBCC by Design Team•Design Deliverables
Intro Feasibility & SPR Project Team BODs and SOPs Design Process OFOI and OFCI Bid Process Construction and Phasing Future Projects Q&A
10.9.15 – 1.1.16
100% CONSTRUCTIONDOCUMENTS
1.18.16 – 3.21.16 4.1.16 – 5.16.16 5.16.16 – 8.1.16 7.16.16 – 8.14.16 10.1.16 – 8.1.17
75% CONSTRUCTIONDOCUMENTS
PRELIMINARYDESIGN
DSAREVIEW
PREQUALIFICATION& BIDDING CONSTRUCTION
![Page 11: Cordoba Corp: Best Practices for Security Camera Implementation](https://reader036.vdocuments.site/reader036/viewer/2022062901/58f1bb4e1a28ab522b8b4571/html5/thumbnails/11.jpg)
11
SYSTEM INTEGRATION WITH LOCAL LAW ENFORCEMENT
•Long Beach Police Department•Video Surveillance Software (Genetec)
Intro Feasibility & SPR Project Team BODs and SOPs Design Process OFOI and OFCI Bid Process Construction and Phasing Future Projects Q&A
![Page 12: Cordoba Corp: Best Practices for Security Camera Implementation](https://reader036.vdocuments.site/reader036/viewer/2022062901/58f1bb4e1a28ab522b8b4571/html5/thumbnails/12.jpg)
12
DATA SYSTEM INFRASTRUCTURE UPGRADES
•As-Builts and Systems Review•Field Investigation•ITS Knowledge
Intro Feasibility & SPR Project Team BODs and SOPs Design Process OFOI and OFCI Bid Process Construction and Phasing Future Projects Q&A
![Page 13: Cordoba Corp: Best Practices for Security Camera Implementation](https://reader036.vdocuments.site/reader036/viewer/2022062901/58f1bb4e1a28ab522b8b4571/html5/thumbnails/13.jpg)
13
DISTRICT PROCURED ITEMS
•Security Cameras / CMAS•Network Switches / CMAS•Network Servers and Storage / CMAS•New Computer Workstations / CMAS
• All other items by the Contractor including the VMS Software
Intro Feasibility & SPR Project Team BODs and SOPs Design Process OFOI and OFCI Bid Process Construction and Phasing Future Projects Q&A
![Page 14: Cordoba Corp: Best Practices for Security Camera Implementation](https://reader036.vdocuments.site/reader036/viewer/2022062901/58f1bb4e1a28ab522b8b4571/html5/thumbnails/14.jpg)
14
BID PROCESS•Prequalification Process•Job Walks•Bid Results
Intro Feasibility & SPR Project Team BODs and SOPs Design Process OFOI and OFCI Bid Process Construction and Phasing Future Projects Q&A
![Page 15: Cordoba Corp: Best Practices for Security Camera Implementation](https://reader036.vdocuments.site/reader036/viewer/2022062901/58f1bb4e1a28ab522b8b4571/html5/thumbnails/15.jpg)
15
CONSTRUCTION AND PHASING•Methodology to mitigate impacts to the District•Phasing Plan with Bid Documents
Intro Feasibility & SPR Project Team BODs and SOPs Design Process OFOI and OFCI Bid Process Construction and Phasing Future Projects Q&A
![Page 16: Cordoba Corp: Best Practices for Security Camera Implementation](https://reader036.vdocuments.site/reader036/viewer/2022062901/58f1bb4e1a28ab522b8b4571/html5/thumbnails/16.jpg)
16
CONSTRUCTION AND PHASING
Intro Feasibility & SPR Project Team BODs and SOPs Design Process OFOI and OFCI Bid Process Construction and Phasing Future Projects Q&A
![Page 17: Cordoba Corp: Best Practices for Security Camera Implementation](https://reader036.vdocuments.site/reader036/viewer/2022062901/58f1bb4e1a28ab522b8b4571/html5/thumbnails/17.jpg)
17
FUTURE PROJECTS AND PLANNING
•District Standards Insert for Upcoming Projects to include design guidelines
•Policies and Regulations are a Living Document•Maintenance and Staffing Requirements
Intro Feasibility & SPR Project Team BODs and SOPs Design Process OFOI and OFCI Bid Process Construction and Phasing Future Projects Q&A
![Page 18: Cordoba Corp: Best Practices for Security Camera Implementation](https://reader036.vdocuments.site/reader036/viewer/2022062901/58f1bb4e1a28ab522b8b4571/html5/thumbnails/18.jpg)
QUESTIONS
Intro Feasibility & SPR Project Team BODs and SOPs Design Process OFOI and OFCI Bid Process Construction and Phasing