Page 1: cor 3999 webinar trng - NALC Br. 3825nalc3825.com/cor_3999_webinar_trng.pdf ·  · 2009-05-16PS FORM 3999 FOR COR. ... • CONDUCT THE 3999 ACCORDING TO THE M-39 ... The COR Program

Delivery Operations Delivery Operations

COR(CARRIER OPTIMAL ROUTING)

WEBINAR

TIPS FOR CONDUCTING A SUCCESSFULPS FORM 3999 FOR COR

Page 2: cor 3999 webinar trng - NALC Br. 3825nalc3825.com/cor_3999_webinar_trng.pdf ·  · 2009-05-16PS FORM 3999 FOR COR. ... • CONDUCT THE 3999 ACCORDING TO THE M-39 ... The COR Program

Delivery Operations Delivery Operations

IMPORTANT RULES FOR COMPLETING THE 3999:

• CONDUCT THE 3999 ACCORDING TO THE M-39RULES AND REGULATIONS.

• INCLUDE NOTES THAT MIGHT ASSIST IN ACOR ADJUSTMENT WHENEVER POSSIBLE.

• NOTE ANY LOCATIONS WHERE DISMOUNTDELIVERY OCCURS RATHER THAN PARK ANDLOOP. MARK THESE STREETS ON THE AQIPOR 3999X.

Page 3: cor 3999 webinar trng - NALC Br. 3825nalc3825.com/cor_3999_webinar_trng.pdf ·  · 2009-05-16PS FORM 3999 FOR COR. ... • CONDUCT THE 3999 ACCORDING TO THE M-39 ... The COR Program

Delivery Operations Delivery Operations

THE FOLLOWING ALLIED TIMES AREHANDLED IN A SPECIFIC MANNER INCOR:

• TRAVEL TO

• TRAVEL FROM

• TRAVEL WITHIN

• RELAY TIME

• REPLENISHMENT TIME

Page 4: cor 3999 webinar trng - NALC Br. 3825nalc3825.com/cor_3999_webinar_trng.pdf ·  · 2009-05-16PS FORM 3999 FOR COR. ... • CONDUCT THE 3999 ACCORDING TO THE M-39 ... The COR Program

Delivery Operations Delivery Operations

TRAVEL TO AND TRAVEL FROM:

Travel To and Travel From are Recorded on the3999 for COR Exactly as they are for Any OtherMethod of Route Adjustment.

When COR Routes are Generated, New TravelTo and Travel From Times are Calculated for AllRoutes Based on the Miles per Hour Set by theUser and the Distances Traveled for EachTravel Segment (for any non-delivery Territory).

Page 5: cor 3999 webinar trng - NALC Br. 3825nalc3825.com/cor_3999_webinar_trng.pdf ·  · 2009-05-16PS FORM 3999 FOR COR. ... • CONDUCT THE 3999 ACCORDING TO THE M-39 ... The COR Program

Delivery Operations Delivery Operations

TRAVEL TO AND TRAVEL FROM:

Because Travel To and Travel From areCalculated in this Manner, it is Very Importantthat Both the Database Prepper and the RouteAdjuster Review the Miles Per Hour (MPH) Setfor Each Class of Streets in the Zone and thatthe Speeds be Set 5-10 MPH Less than theSpeed Limit.

This Allows COR to Consider Acceleration andDeceleration, as well as Stop Lights and Signs.

Page 6: cor 3999 webinar trng - NALC Br. 3825nalc3825.com/cor_3999_webinar_trng.pdf ·  · 2009-05-16PS FORM 3999 FOR COR. ... • CONDUCT THE 3999 ACCORDING TO THE M-39 ... The COR Program

Delivery Operations Delivery Operations

TRAVEL TO AND TRAVEL FROM:

In COR, Travel Times are Originally Estimated atthe Time of Route Generation. These Times arenot Finalized Until After Completion of the Linesof Travel (LOT) for Each Route.

Travel To and Travel From Times Must bePhysically Validated According to the MOU thatwas Signed Between the USPS and the NationalAssociation of Letter Carriers (NALC). ARecord of the Validation Must be Kept.

Page 7: cor 3999 webinar trng - NALC Br. 3825nalc3825.com/cor_3999_webinar_trng.pdf ·  · 2009-05-16PS FORM 3999 FOR COR. ... • CONDUCT THE 3999 ACCORDING TO THE M-39 ... The COR Program

Delivery Operations Delivery Operations

TRAVEL TO AND TRAVEL FROM:

After the Validations of the Travel To and TravelFrom Times are Completed, Any Changes toThose Times Must be Noted and:

Additions/Subtractions Must be Completed inthe Allied Times Menu of the Adjusted RouteSummary for Every Route Where ChangesOccurred.

NOTE: These Changes will Automatically bePrinted on the Reverse of the PS Form 1840.

Page 8: cor 3999 webinar trng - NALC Br. 3825nalc3825.com/cor_3999_webinar_trng.pdf ·  · 2009-05-16PS FORM 3999 FOR COR. ... • CONDUCT THE 3999 ACCORDING TO THE M-39 ... The COR Program

Delivery Operations Delivery Operations

TRAVEL TO AND TRAVEL FROM:

Page 9: cor 3999 webinar trng - NALC Br. 3825nalc3825.com/cor_3999_webinar_trng.pdf ·  · 2009-05-16PS FORM 3999 FOR COR. ... • CONDUCT THE 3999 ACCORDING TO THE M-39 ... The COR Program

Delivery Operations Delivery Operations

TRAVEL WITHIN:

What is Travel Within for the Purpose ofCOR?

Travel Within in COR is Defined as TimeTraveling in the Vehicle to Move from One ParkPoint to Another Park Point or from OneGeographical Location to Another WithoutDelivery.

Page 10: cor 3999 webinar trng - NALC Br. 3825nalc3825.com/cor_3999_webinar_trng.pdf ·  · 2009-05-16PS FORM 3999 FOR COR. ... • CONDUCT THE 3999 ACCORDING TO THE M-39 ... The COR Program

Delivery Operations Delivery Operations

TRAVEL WITHIN:

What is Not Travel Within?• Travel Within is not Collected Between

Curbline Deliveries (Unless there is aSignificant Geographical DistanceTraveled without Delivery).

• Travel Within is not Collected forWalking Deadhead Segments.

Page 11: cor 3999 webinar trng - NALC Br. 3825nalc3825.com/cor_3999_webinar_trng.pdf ·  · 2009-05-16PS FORM 3999 FOR COR. ... • CONDUCT THE 3999 ACCORDING TO THE M-39 ... The COR Program

Delivery Operations Delivery Operations

TRAVEL WITHIN:

Travel Within Times are Originally Estimated atthe Time of Route Generation. These Times arenot Finalized Until After Completion of the Linesof Travel (LOT) for Each Route.

Travel Within Times Must be PhysicallyValidated According to the MOU that wasSigned Between the USPS and the NationalAssociation of Letter Carriers (NALC). ARecord of the Validation Must be Kept.

Page 12: cor 3999 webinar trng - NALC Br. 3825nalc3825.com/cor_3999_webinar_trng.pdf ·  · 2009-05-16PS FORM 3999 FOR COR. ... • CONDUCT THE 3999 ACCORDING TO THE M-39 ... The COR Program

Delivery Operations Delivery Operations

TRAVEL WITHIN:

After the Validations of the Travel Within Timesare Completed, Any Changes to Those TimesMust be Noted and:

Additions/Subtractions Must be Completed inthe Allied Times Menu of the Adjusted RouteSummary for Every Route Where ChangesOccurred.

NOTE: These Changes will Automatically bePrinted on the Reverse of the PS Form 1840.

Page 13: cor 3999 webinar trng - NALC Br. 3825nalc3825.com/cor_3999_webinar_trng.pdf ·  · 2009-05-16PS FORM 3999 FOR COR. ... • CONDUCT THE 3999 ACCORDING TO THE M-39 ... The COR Program

Delivery Operations Delivery Operations

RELAY TIME:

Relay Time is Documented on a PS Form 3999that will be Utilized for COR in the Exact SameManner as it is Documented for All 3999s.

Relay Time for Park and Loop Routes: Relay Time Begins when Travel Within the Route ends and the Carrier begins the replenishment process, or when the Carrier arrives back at the Vehicle to replenish the satchel for the next Park and Loop Relay and unlocks the Vehicle. Relay Time ends when the Carrier locks the Vehicle.

Relay Time for Foot Routes: Relay Time begins when the Carrier unlocks the Relay Box or arrives at the pick up point. Relay Time ends when the Carrier locks the Relay Box or leaves the pick up point.

Page 14: cor 3999 webinar trng - NALC Br. 3825nalc3825.com/cor_3999_webinar_trng.pdf ·  · 2009-05-16PS FORM 3999 FOR COR. ... • CONDUCT THE 3999 ACCORDING TO THE M-39 ... The COR Program

Delivery Operations Delivery Operations

RELAY TIME:

Relay Time is not:Any Time that the Carrier Spends ReplenishingMail on a Motorized Route. That Time isConsidered Replenishment Time and Must beEntered Under “Miscellaneous Time Other” andDocumented as Replenishment Time on theAQIP or 3999X.

Page 15: cor 3999 webinar trng - NALC Br. 3825nalc3825.com/cor_3999_webinar_trng.pdf ·  · 2009-05-16PS FORM 3999 FOR COR. ... • CONDUCT THE 3999 ACCORDING TO THE M-39 ... The COR Program

Delivery Operations Delivery Operations

REPLENISHMENT TIME:

What is Replenishment Time?Replenishment Time is Any Time that the CarrierSpends Replenishing Mail (Including Changing orMoving Trays) on a Motorized Route. It Must be EnteredUnder “Miscellaneous Time Other” and Documented asReplenishment Time on the AQIP or 3999X.

If this Time is not Collected Under “MiscellaneousOther”, and it is Collected as Relay Time, it will beEliminated from the Route and No Time will be Includedfor Replenishing of the Mail on the Motorized Route.

Page 16: cor 3999 webinar trng - NALC Br. 3825nalc3825.com/cor_3999_webinar_trng.pdf ·  · 2009-05-16PS FORM 3999 FOR COR. ... • CONDUCT THE 3999 ACCORDING TO THE M-39 ... The COR Program

Delivery Operations Delivery Operations

RELAY TIME ON THE COR ADJUSTED ROUTE:

How is Relay Time Calculated in COR?Relay Time for the Adjusted COR Route is Calculated by Recordingthe Carrier’s Individual Relay Time for each Relay from the PSForm 3999 Conducted on their Route and Storing that Informationwithin the Program. When Territory on a Route Changes, AllRelays are Eliminated and New Relays are Calculated Based on theOptimal Travel Path and the Carrier’s Relay Time Information.

The Total Time for All of the Relays is Added Together and isDivided by the Total Number of Relays to Determine an AverageTime per Relay. That Average Time is Applied and Added to AllNew Relays that are Created.

Page 17: cor 3999 webinar trng - NALC Br. 3825nalc3825.com/cor_3999_webinar_trng.pdf ·  · 2009-05-16PS FORM 3999 FOR COR. ... • CONDUCT THE 3999 ACCORDING TO THE M-39 ... The COR Program

Delivery Operations Delivery Operations

RELAY TIME EXAMPLE:• The Carrier Completes 20 Relays and Relay Time is

Recorded for Each of the Relays.

• For 10 of the Relays, the Carrier Used 3 Minutes ofRelay Time for Each Relay for a Total of 30 Minutes.

• For 10 of the Relays, the Carrier Used 1 Minute of RelayTime for Each Relay for a Total of 10 Minutes.

30 Minutes + 10 Minutes = 40 Minutes

40 Divided by 20 Relay Time Occurrences = 2:00 MPR

For Each New Relay Created in COR, RelayTime of 2 Minutes Will be Added.

Page 18: cor 3999 webinar trng - NALC Br. 3825nalc3825.com/cor_3999_webinar_trng.pdf ·  · 2009-05-16PS FORM 3999 FOR COR. ... • CONDUCT THE 3999 ACCORDING TO THE M-39 ... The COR Program

Delivery Operations Delivery Operations

OTHER IMPORTANT COR INFORMATION:

• Reviewing the PS Form 3999 and Editing of the3999 must be Completed in DOIS

• Any Delivery Times and Allied Times that areTransferred from DOIS to COR are Consideredto be the Final Evaluation of the Route Times

• Anytime a Carrier Dismounts a ResidentialStreet, Record that Information on the AQIP or3999X so that the Street Segment can beChanged to Driving. If this does not occur, theCarrier Receives the Additional Service TimePlus Allied Time for that Street Segment.

Page 19: cor 3999 webinar trng - NALC Br. 3825nalc3825.com/cor_3999_webinar_trng.pdf ·  · 2009-05-16PS FORM 3999 FOR COR. ... • CONDUCT THE 3999 ACCORDING TO THE M-39 ... The COR Program

Delivery Operations Delivery Operations

OTHER IMPORTANT COR INFORMATION:• The Following Allied Times Received from DOIS into

COR are Considered to have been Reviewed and Editedin DOIS and Become Part of the COR Route:

• Deadhead

• Personal Needs

• Customer Contact

• Gas

• Backtracking

• Animal Interference

• Waiting for Relays

Page 20: cor 3999 webinar trng - NALC Br. 3825nalc3825.com/cor_3999_webinar_trng.pdf ·  · 2009-05-16PS FORM 3999 FOR COR. ... • CONDUCT THE 3999 ACCORDING TO THE M-39 ... The COR Program

Delivery Operations Delivery Operations

OTHER IMPORTANT COR INFORMATION:• Additional Allied Times Received from DOIS into COR

that are Considered to have been Reviewed and Editedin DOIS and Become Part of the COR Route:

• Waiting for Transportation

• Waiting Other

• Temporary Detail

• Management Time

• Accident

• Miscellaneous Other (Remember to IncludeReplenishment Time in this Category)

Page 21: cor 3999 webinar trng - NALC Br. 3825nalc3825.com/cor_3999_webinar_trng.pdf ·  · 2009-05-16PS FORM 3999 FOR COR. ... • CONDUCT THE 3999 ACCORDING TO THE M-39 ... The COR Program

Delivery Operations Delivery Operations

HINTS FOR COMPLETING A SUCCESSFUL CORADJUSTMENT:

• Conduct the 3999 According to the M-39 Rules andRegulations.

• Don’t be Creative. The COR Program was Designed toComplete Accurate Route Adjustments.

• Don’t Spend Time in the COR 3999 Editor ChangingDriving to Walking or Business to Residential. ThoseCodes are Automatically Updated Based on the PSForm 3999 and the AMS Designation Codes for DeliveryType. COR Handles the Deliveries Based on thatInformation.

Page 22: cor 3999 webinar trng - NALC Br. 3825nalc3825.com/cor_3999_webinar_trng.pdf ·  · 2009-05-16PS FORM 3999 FOR COR. ... • CONDUCT THE 3999 ACCORDING TO THE M-39 ... The COR Program

Delivery Operations Delivery Operations

Page 23: cor 3999 webinar trng - NALC Br. 3825nalc3825.com/cor_3999_webinar_trng.pdf ·  · 2009-05-16PS FORM 3999 FOR COR. ... • CONDUCT THE 3999 ACCORDING TO THE M-39 ... The COR Program

Delivery Operations Delivery Operations

COR ESSENTIALS:• USE THE GENERATE ROUTES PROCESS.

There should be no Deviation from this Step.

• FOLLOW THE ROUTE ADJUSTMENTCHECKLIST. Don’t Assume that some Stepshave been Completed by the DatabasePreparation Team.

• ASK FOR SUPPORT IMMEDIATELY. Don’tMove Forward and Possibly Make Errors thatCannot be Easily Corrected.

Page 24: cor 3999 webinar trng - NALC Br. 3825nalc3825.com/cor_3999_webinar_trng.pdf ·  · 2009-05-16PS FORM 3999 FOR COR. ... • CONDUCT THE 3999 ACCORDING TO THE M-39 ... The COR Program

Delivery Operations Delivery Operations

SUPPORT:

CALL 1-800-USPS HELP(1-800-877-7435)