Copyright Reserved GreenTech Malaysia 1 Project Brief/Summary Project goal is to ensure realization of national green technology policy aspiration and translation of green technology policy objectives and strategic thrusts into implementable actions Baseline study for 9 key sectors namely Energy, Building, Transport, Manufacturing, ICT, Water, Waste Management, Agriculture and Forestry Objectives To propose appropriate policy measures for Green Economy To establish holistic and detailed GTMP framework based on six (6) key enablers viz. human capital, financial incentives, infrastructure, regulatory framework, innovation, and branding. To establish national Key Performance Indicator (KPI) targets, prioritized Project Fund: RM 3,755,167 Duration: 1/6/2013 – 1/4/2014 Expected Outcomes Key Performance Indicators and Targets for Green Technology Policy Implementati on Short Term, Medium, Term and Long Term Timelines Status On-going PROJECT : GREEN TECHNOLOGY ROADMAP REPORTING PERIOD : 1/8/2013 – 31/8/2013

Upload: betty-flowers

Post on 04-Jan-2016

213 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Copyright Reserved GreenTech Malaysia 1 Project Brief/Summary  Project goal is to ensure realization of national green technology policy aspiration and

Copyright Reserved GreenTech Malaysia 1

Project Brief/Summary

Project goal is to ensure realization of national green technology policy aspiration and translation of green technology policy objectives and strategic thrusts into implementable actions

Baseline study for 9 key sectors namely Energy, Building, Transport, Manufacturing, ICT, Water, Waste Management, Agriculture and Forestry

ObjectivesTo propose appropriate policy measures for Green EconomyTo establish holistic and detailed GTMP framework based on six (6) key enablers viz. human capital, financial incentives, infrastructure, regulatory framework, innovation, and branding.To establish national Key Performance Indicator (KPI) targets, prioritized strategies, comprehensive action plans and specify implementing agencies and timeline for the key sectors

Project Fund: RM 3,755,167

Duration: 1/6/2013 – 1/4/2014

Expected Outcomes

Key Performance Indicators and Targets for Green Technology Policy Implementation

Short Term, Medium, Term and Long Term Timelines for GT programmes

Status

On-going

PROJECT: GREEN TECHNOLOGY ROADMAP

REPORTING PERIOD: 1/8/2013 – 31/8/2013

Page 2: Copyright Reserved GreenTech Malaysia 1 Project Brief/Summary  Project goal is to ensure realization of national green technology policy aspiration and

Copyright Reserved GreenTech Malaysia 2

Activities Completed (During reporting period)Draft report on project scoping workshop conducted on 29 July 2013 was preparedAddendum to contract for Baseline study on GT related Regulatory Framework was completely signed by both parties Arrangement for half day workshop “Designing of Green Growth Model for Malaysia” was undertaken Proposal for study mission to United States and Europe on September and November was drafted Preliminary arrangement for conducting Ambassadors High Level Roundtable Dialogue with Minister was undertaken. First meeting with EUMCCI was held on 15 August 2013 Proposal on study of impact of Green Incentives (1st and 2nd version) was reviewed by Technical Committee and revised by PwCProposed scope of work for techno-economic assessments was discussed with MIER on 20 August 2013% completed: 9 %% funds utilised: 4.45% (RM 167,236 spent out of RM 3,755,167)

Activities Planned (For next reporting period)

Submission of Project Inception ReportInternal Stakeholders Engagement Workshop – preliminary discussion on strategies and detail action plans Finalization of appointment of PwC for study of impact of Green IncentivesContract preparation for study of impact of Green Incentives Finalization of scope of work with MIER Proposal submission from ISIS Appointment of Technical Experts and Editor Submission of draft report by LESTARI

PROJECT: GREEN TECHNOLOGY ROADMAP

REPORTING PERIOD: 1/8/2013 – 31/8/2013

Page 3: Copyright Reserved GreenTech Malaysia 1 Project Brief/Summary  Project goal is to ensure realization of national green technology policy aspiration and

Copyright Reserved GreenTech Malaysia

PROJECT: GREEN TECHNOLOGY ROADMAP

REPORTING PERIOD: 1/8/2013 – 31/8/2013

3

Impacts of the ProjectDetail project plans and components were planned which inculcated key enabling factors (Institutional Framework, Financing, R&D and Awareness)

Photos of activities for the period of reporting

Challenges

After the completion of Green Technology Roadmap baseline study forthe six sectors in 2011, there are latest development of programmes and initiatives driven by Government and Private sectors. Those developments could have influenced the set ofstrategies and key focus areas that were determined earlier in the baseline study. Thus, some targets may not be relevance anymore and need to be reviewed.

Actions

Internal stakeholders engagement workshop need to be conducted to assess latest development and initiatives as well as the impacts from those initiatives. Gaps on the currentInitiatives and future action items need to be discussed prior to engagement sessions with external stakeholders.

GT Master Plan Project Scoping Workshop,

29 July 2013, Shangri-La Putrajaya