    Summary of Sites - Batch-01

    Sites Loation Structure Type Contractor Comments Total (SAR) Deliver

    ARM0662 Wasit GF-50 MOST Ready to Start CW 45 D

    ARM0664 Berri GF-50 MOST Ready to Start CW 45 D

    ARM0665 Berri NGL GF-50 MOST Ready to Start CW 45 D

    ARM0734 Dahahran GF-35 MOST Lattice Ready to Start CW 45 D

    ARM0665 Dahahran

    GF-50 MOST

    Monopole Ready to Start CW 45 D

    * Delivery Time is 45 Days

  • 8/13/2019 Copy of Civil Works-2

    2/12

    ModelService

    Number

    Service

    GroupService Items Quantity

    Unit of

    Measure

    A.1Applying for SCECO power connection and following up until site is

    energized (SCECO fees will be paid by ZAIN) .1 Each

    B.1

    Submit detailed civil design drawings, Soil Test Report, PCD

    package, PAT ,& Site folders (civil, electrical, telecom &

    transmission) including As built drawings.

    1 Each

    B.2Construction of access road as per approved site layout, (5 X 3 =

    15m2) min Depth 0.30 m as per Zain Specs.

    1 Each

    B.3Supply and installation of cable tray (600mm width) from tower to

    shelter including posts and all accessories as per Zain Specs.5 Mt

    B.4

    Supply of (3.2 X 2.7 X 2.75)m fully equipped shelter (without DC

    Power System ) including testing, commissioning and PAT and

    installation of the shelter on foundation including construction of

    foundation and pedestals as per ZAIN specs .

    1 Each

    B.5

    Construct on o tower oun at on a types , suc as ut not

    limited to ( Dray Raft, Pad & Chimney...etc) except Fully

    Submerged type , including excavationin all types of soilas per

    approved Soil Test Report.(Epoxy reinforcement bars, bitumen

    paint, backfilling, and compaction , final site leveling and gravel

    s readin as er ZAIN s ecs.

    1 Each

    B.6

    Supply and installation for 50m Lattice (MOST) and its vertical

    ladder, Safety lock system ,Aircraft Warning Light System &

    antenna mounting poles for GSM & microwave plus painting the

    tower, including transportation and all accessories as per Zain

    S ecs.

    1 Set

    B.7

    Supply and install complete new PVC chain Link fencing,Ploted area

    (20 X 20 ) m including gates and pad lock as per MOST Zain

    S ecs.

    76 Mt

    B.8

    Construction for SCECO Wall 4 operators. (Only

    ZAIN Electrical MDB will be installed on SCECO wall

    accommodatin the 4 O erators as er Zain S ecs.

    1 Mt

    B.9construction of concrete slab foundation for (Dual Genset ,& ATS )

    as per Zain Specifications and approval.1 Each

    B.10Construction of concrete slab foundation with reinforced wall for

    (Fuel Tanks 5000 L ) as per Zain Specifications and approval.1 Each

    C.1

    Supply and install electrical cable 4 core, XLPE, 1000/600volt rated

    at 90C, including connections, cable pull , RGS pipes and ties as

    necessar 35 mm

    15 Mt

    C.2Supply and installation of grounding system as per ZAIN specs and

    sizes.1 Set

    C.3Supply and installation of lightning protection system as per ZAIN

    specs and sizes.1 Set

    41-3

    Price for working inside of Saudi Aramco, Royal Commission and

    other governmental related Boundaries which needs special

    re arations.

    1 Each

    Total of Basic Model # 41

    41-1

    Additional/Extra price for Excavation on rock for Model as per soil

    test report and accepted and approved by Zain to compensate the

    rock excavation.

    1 Cu.m

    41-4 Dewatering in case of submerged foundation as per Zain Specs. 1 Each

    41-5 Additional/Extra price for Submerged Foundation over the model. 1 Each

    Model4

    1-GF50mLattice

    (MOST)

    Civil

    Electro

    Mechanical

    Model41

    -GF50m

    Lattice(MOST)

  • 8/13/2019 Copy of Civil Works-2

    3/12

    GF-50 MOST

    Berri

    ARM0664

    ModelService

    Number

    Service

    GroupService Items Quantity

    Unit of

    Measure

    A.1

    Applying for SCECO power connection and following up until site is

    energized (SCECO fees will be paid by ZAIN) . 1 Each

    B.1

    Submit detailed civil design drawings, Soil Test Report, PCD

    package, PAT ,& Site folders (civil, electrical, telecom &

    transmission includin As built drawin s.

    1 Each

    B.2Construction of access road as per approved site layout, (5 X 3 =

    15m2) min Depth 0.30 m as per Zain Specs.1 Each

    B.3Supply and installation of cable tray (600mm width) from tower to

    shelter including posts and all accessories as per Zain Specs.5 Mt

    B.4

    Supply of (3.2 X 2.7 X 2.75)m fully equipped shelter (without DC

    Power System ) including testing, commissioning and PAT and

    installation of the shelter on foundation including construction of

    foundation and pedestals as per ZAIN specs .

    1 Each

    B.5

    Construction of tower foundation (all types , such as but not

    limited to ( Dray Raft, Pad & Chimney...etc) except FullySubmerged type , including excavationin all types of soilas per

    approved Soil Test Report.(Epoxy reinforcement bars, bitumen

    paint, backfilling, and compaction , final site leveling and gravel

    s readin as er ZAIN s ecs.

    1 Each

    B.6

    Supply and installation for 50m Lattice (MOST) and its vertical

    ladder, Safety lock system ,Aircraft Warning Light System &

    antenna mounting poles for GSM & microwave plus painting the

    tower, including transportation and all accessories as per Zain

    S ecs.

    1 Set

    B.7

    Supply and install complete new PVC chain Link fencing,Ploted area

    (20 X 20 ) m including gates and pad lock as per MOST Zain

    S ecs.

    76 Mt

    B.8

    Construction for SCECO Wall 4 operators. (Only

    ZAIN Electrical MDB will be installed on SCECO wall

    accommodating the 4 Operators) as per Zain Specs.

    1 Mt

    B.9construction of concrete slab foundation for (Dual Genset ,& ATS )

    as per Zain Specifications and approval.1 Each

    B.10Construction of concrete slab foundation with reinforced wall for

    (Fuel Tanks 5000 L ) as per Zain Specifications and approval.1 Each

    C.1

    Supply and install electrical cable 4 core, XLPE, 1000/600volt rated

    at 90C, including connections, cable pull , RGS pipes and ties as

    necessar 35 mm

    15 Mt

    C.2Supply and installation of grounding system as per ZAIN specs and

    sizes.1 Set

    C.3Supply and installation of lightning protection system as per ZAIN

    specs and sizes.1 Set

    41-3

    Price for working inside of Saudi Aramco, Royal Commission and

    other governmental related Boundaries which needs special

    re arations.

    1 Each

    Total of Basic Model # 41

    41-1

    Additional/Extra price for Excavation on rock for Model as per soil

    test report and accepted and approved by Zain to compensate the

    rock excavation.

    1 Cu.m

    41-4 Dewatering in case of submerged foundation as per Zain Specs. 1 Each

    41-5 Additional/Extra price for Submerged Foundation over the model. 1 Each

    Location

    Site Id

    Model41-GF

    50mLattice(MOST)

    Civi

    l

    Electro

    Mechanical

    Model41-GF

    50mLattice

    (MOST)

  • 8/13/2019 Copy of Civil Works-2

    4/12

    GF-50 MOST

    Berri NGL

    ARM0665

    ModelService

    Number

    Service

    GroupService Items

    A.1Applying for SCECO power connection and following up until site is energize

    will be paid by ZAIN) .

    B.1Submit detailed civil design drawings, Soil Test Report, PCD package, PAT ,

    (civil, electrical, telecom & transmission) including As built drawings.

    B.2Construction of access road as per approved site layout, (5 X 3 = 15m2) m

    as per Zain Specs.

    B.3Supply and installation of cable tray (600mm width) from tower to shelter i

    and all accessories as per Zain Specs.

    B.4

    Supply of (3.2 X 2.7 X 2.75)m fully equipped shelter (without DC Power Sys

    testing, commissioning and PAT and installation of the shelter on foundation

    construction of foundation and pedestals as per ZAIN specs .

    B.5

    Construction of tower foundation (all types , such as but not limited to ( Dra

    Chimney...etc) except Fully Submerged type , including excavationin all ty

    per approved Soil Test Report.(Epoxy reinforcement bars, bitumen paint, ba

    compaction , final site leveling and gravel spreading as per ZAIN specs.

    B.6

    Supply and installation for 50m Lattice (MOST) and its vertical ladder, Safe

    ,Aircraft Warning Light System & antenna mounting poles for GSM & microw

    painting the tower, including transportation and all accessories as per Zain

    B.7Supply and install complete new PVC chain Link fencing,Ploted area (20 X 2

    ates and ad lock as er MOST Zain S ecs.

    B.8Construction for SCECO Wall 4 operators. (Only ZAIN Ele

    be installed on SCECO wall accommodating the 4 Operators) as per Zain Sp

    B.9 construction of concrete slab foundation for (Dual Genset ,& ATS ) as per Zaand a roval.

    B.10Construction of concrete slab foundation with reinforced wall for (Fuel Tanks

    Zain Specifications and approval.

    C.1Supply and install electrical cable 4 core, XLPE, 1000/600volt rated at 90C

    connections, cable pull , RGS pipes and ties as necessary, 35 mmC.2 Supply and installation of grounding system as per ZAIN specs and sizes.

    C.3 Supply and installation of lightning protection system as per ZAIN specs an

    41-3Price for working inside of Saudi Aramco, Royal Commission and other gov

    related Boundaries which needs special preparations.

    Total of Basic Model # 41

    41-1

    Additional/Extra price for Excavation on rock for Model as per soil test repor

    and approved by Zain to compensate the rock excavation.41-4 Dewatering in case of submerged foundation as per Zain Specs.

    41-5 Additional/Extra price for Submerged Foundation over the model.

    Location

    Site Id

    Model41

    -GF50mLattice(MOST)

    Civil

    Electro

    Mechanic

    al

    Model41-

    GF50m

    Lattice(MOST)

  • 8/13/2019 Copy of Civil Works-2

    5/12

    ModelService

    Number

    Service

    GroupService Items

    A.1Applying for SCECO power connection and following up

    until site is energized (SCECO fees will be paid by ZAIN) .

    B.1

    Submit detailed civil design drawings, Soil Test Report,

    PCD package, PAT ,& Site folders (civil, electrical, telecom

    & transmission) including As built drawings.

    B.2Construction of access road as per approved site layout, (5

    X 3 = 15m2) min Depth 0.30 m as per Zain Specs.

    B.4

    Installation of (3.2 X 2.7 X 2.75)m fully equipped shelter

    (without DC Power System ) including testing,

    commissioning and PAT and installation of the shelter on

    B.5

    Construction of tower foundation (all types , such as but

    not limited to ( Dray Raft, Pad & Chimney...etc) except

    Fully Submerged type , including excavationin all types

    B.6

    Installation for 35m Lattice (MOST) and all accessories

    (Like vertical ladder, Safety lock system ,Aircraft Warning

    Light System , antenna mounting poles for GSM &

    B.7

    Supply and install complete new PVC chain Link

    fencing,Ploted area (20 X 20 ) m including gates and pad

    lock as per MOST Zain Specs.

    B.8

    Construction for SCECO Wall 4 operators.

    (Only ZAIN Electrical MDB will be installed on SCECO wall

    accommodating the 4 Operators) as per Zain Specs.

    B.9 construction of concrete slab foundation for (Dual Genset,& ATS ) as per Zain Specifications and approval.

    B.10

    Construction of concrete slab foundation with reinforced

    wall for (Fuel Tanks 5000 L ) as per Zain Specifications and

    approval.

    C.1

    Supply and install electrical cable 4 core, XLPE,

    1000/600volt rated at 90C, including connections, cable

    pull , RGS pipes and ties as necessary, 35 mm

    C.2Supply and installation of grounding system as per ZAIN

    specs and sizes.

    Total of Basic Model # 40

    Additional/Extra price for Excavation on rock for Model as

    per soil test report and accepted and approved by Zain to

    compensate the rock excavation.

    Model40-GF35

    mLattice(MOST)

    Civil

    Electro

    Mechanical

    ems

    F35m

    ST)

  • 8/13/2019 Copy of Civil Works-2

    6/12

    Dewatering in case of submerged foundation as per Zain

    Specs.

    Additional/Extra price for Submerged Foundation over the

    model.AdditionalI

    forModel40-

    Lattice(M

  • 8/13/2019 Copy of Civil Works-2

    7/12

    QuantityUnit of

    Measure

    1 Each

    1 Each

    1 Each

    1 Each

    1 Each

    1 Set

    76 Mt

    1 Each

    1 Each

    1 Each

    15 Mt

    1 Set

    1 cum

  • 8/13/2019 Copy of Civil Works-2

    8/12

    1 Each

    Will be mutually discussed on case to

    case basis

  • 8/13/2019 Copy of Civil Works-2

    9/12

    ModelService

    Number

    Service

    GroupService Items

    A.1

    Applying for SCECO power connection and following up

    until site is energized (SCECO fees will be paid by

    ZAIN) .

    B.1

    Submit detailed civil design drawings, Soil Test Report,

    PCD package, PAT ,& Site folders (civil, electrical,

    telecom & transmission) including As built drawings.

    B.2

    Construction of access road as per approved site

    layout, (5 X 3 = 15m2) min Depth 0.30 m as per Zain

    Specs.

    B.4

    Installation of (3.2 X 2.7 X 2.75)m fully equipped

    shelter (without DC Power System ) including testing,

    commissioning and PAT and installation of the shelter

    B.5

    Construction of tower foundation (all types , such as

    but not limited to ( Dray Raft, Pad & Chimney...etc)

    except Fully Submerged type , including excavationin

    B.6

    Installation for 35m (MOST) Monopole and all

    accessories (Like vertical ladder, Safety lock system

    ,Aircraft Warning Light System , antenna mounting

    B.7

    Supply and install complete new PVC chain Link

    fencing,Ploted area (20 X 20 ) m including gates and

    pad lock as per MOST Zain Specs.

    B.8

    Construction for SCECO Wall 4 operators.

    (Only ZAIN Electrical MDB will be installed on SCECO

    wall accommodating the 4 Operators) as per Zain

    B.9

    construction of concrete slab foundation for (Dual

    Genset ,& ATS ) as per Zain Specifications and

    approval.

    B.10

    Construction of concrete slab foundation with reinforced

    wall for (Fuel Tanks 5000 L ) as per Zain Specifications

    and approval.

    C.1

    Supply and install electrical cable 4 core, XLPE,

    1000/600volt rated at 90C, including connections,

    cable pull , RGS pipes and ties as necessary, 35 mm

    C.2Supply and installation of grounding system as per

    ZAIN specs and sizes.

    Total of Basic Model # 38

    Additional/Extra price for Excavation on rock for Model

    as per soil test report and accepted and approved by

    Zain to compensate the rock excavation.

    Mod

    el38-GF35m

    (MOST)Mon

    opole

    Civil

    Electro

    Mechanical

    msfor

    ole-

  • 8/13/2019 Copy of Civil Works-2

    10/12

    Dewatering in case of submerged foundation as per

    Zain Specs.

    Additional/Extra price for Submerged Foundation over

    the model.AdditionalIte

    35mMostP

    Model3

  • 8/13/2019 Copy of Civil Works-2

    11/12

    QuantityUnit of

    Measure

    1 Each

    1 Each

    1 Each

    1 Each

    1 Each

    1 Set

    76 Mt

    1 Each

    1 Each

    1 Each

    15 Mt

    1 Set

    1 cum

  • 8/13/2019 Copy of Civil Works-2

    12/12

    1 Each

    Will be mutually discussed on case to case

    basis