copy of civil works-2
TRANSCRIPT
-
8/13/2019 Copy of Civil Works-2
1/12
Summary of Sites - Batch-01
Sites Loation Structure Type Contractor Comments Total (SAR) Deliver
ARM0662 Wasit GF-50 MOST Ready to Start CW 45 D
ARM0664 Berri GF-50 MOST Ready to Start CW 45 D
ARM0665 Berri NGL GF-50 MOST Ready to Start CW 45 D
ARM0734 Dahahran GF-35 MOST Lattice Ready to Start CW 45 D
ARM0665 Dahahran
GF-50 MOST
Monopole Ready to Start CW 45 D
* Delivery Time is 45 Days
-
8/13/2019 Copy of Civil Works-2
2/12
ModelService
Number
Service
GroupService Items Quantity
Unit of
Measure
A.1Applying for SCECO power connection and following up until site is
energized (SCECO fees will be paid by ZAIN) .1 Each
B.1
Submit detailed civil design drawings, Soil Test Report, PCD
package, PAT ,& Site folders (civil, electrical, telecom &
transmission) including As built drawings.
1 Each
B.2Construction of access road as per approved site layout, (5 X 3 =
15m2) min Depth 0.30 m as per Zain Specs.
1 Each
B.3Supply and installation of cable tray (600mm width) from tower to
shelter including posts and all accessories as per Zain Specs.5 Mt
B.4
Supply of (3.2 X 2.7 X 2.75)m fully equipped shelter (without DC
Power System ) including testing, commissioning and PAT and
installation of the shelter on foundation including construction of
foundation and pedestals as per ZAIN specs .
1 Each
B.5
Construct on o tower oun at on a types , suc as ut not
limited to ( Dray Raft, Pad & Chimney...etc) except Fully
Submerged type , including excavationin all types of soilas per
approved Soil Test Report.(Epoxy reinforcement bars, bitumen
paint, backfilling, and compaction , final site leveling and gravel
s readin as er ZAIN s ecs.
1 Each
B.6
Supply and installation for 50m Lattice (MOST) and its vertical
ladder, Safety lock system ,Aircraft Warning Light System &
antenna mounting poles for GSM & microwave plus painting the
tower, including transportation and all accessories as per Zain
S ecs.
1 Set
B.7
Supply and install complete new PVC chain Link fencing,Ploted area
(20 X 20 ) m including gates and pad lock as per MOST Zain
S ecs.
76 Mt
B.8
Construction for SCECO Wall 4 operators. (Only
ZAIN Electrical MDB will be installed on SCECO wall
accommodatin the 4 O erators as er Zain S ecs.
1 Mt
B.9construction of concrete slab foundation for (Dual Genset ,& ATS )
as per Zain Specifications and approval.1 Each
B.10Construction of concrete slab foundation with reinforced wall for
(Fuel Tanks 5000 L ) as per Zain Specifications and approval.1 Each
C.1
Supply and install electrical cable 4 core, XLPE, 1000/600volt rated
at 90C, including connections, cable pull , RGS pipes and ties as
necessar 35 mm
15 Mt
C.2Supply and installation of grounding system as per ZAIN specs and
sizes.1 Set
C.3Supply and installation of lightning protection system as per ZAIN
specs and sizes.1 Set
41-3
Price for working inside of Saudi Aramco, Royal Commission and
other governmental related Boundaries which needs special
re arations.
1 Each
Total of Basic Model # 41
41-1
Additional/Extra price for Excavation on rock for Model as per soil
test report and accepted and approved by Zain to compensate the
rock excavation.
1 Cu.m
41-4 Dewatering in case of submerged foundation as per Zain Specs. 1 Each
41-5 Additional/Extra price for Submerged Foundation over the model. 1 Each
Model4
1-GF50mLattice
(MOST)
Civil
Electro
Mechanical
Model41
-GF50m
Lattice(MOST)
-
8/13/2019 Copy of Civil Works-2
3/12
GF-50 MOST
Berri
ARM0664
ModelService
Number
Service
GroupService Items Quantity
Unit of
Measure
A.1
Applying for SCECO power connection and following up until site is
energized (SCECO fees will be paid by ZAIN) . 1 Each
B.1
Submit detailed civil design drawings, Soil Test Report, PCD
package, PAT ,& Site folders (civil, electrical, telecom &
transmission includin As built drawin s.
1 Each
B.2Construction of access road as per approved site layout, (5 X 3 =
15m2) min Depth 0.30 m as per Zain Specs.1 Each
B.3Supply and installation of cable tray (600mm width) from tower to
shelter including posts and all accessories as per Zain Specs.5 Mt
B.4
Supply of (3.2 X 2.7 X 2.75)m fully equipped shelter (without DC
Power System ) including testing, commissioning and PAT and
installation of the shelter on foundation including construction of
foundation and pedestals as per ZAIN specs .
1 Each
B.5
Construction of tower foundation (all types , such as but not
limited to ( Dray Raft, Pad & Chimney...etc) except FullySubmerged type , including excavationin all types of soilas per
approved Soil Test Report.(Epoxy reinforcement bars, bitumen
paint, backfilling, and compaction , final site leveling and gravel
s readin as er ZAIN s ecs.
1 Each
B.6
Supply and installation for 50m Lattice (MOST) and its vertical
ladder, Safety lock system ,Aircraft Warning Light System &
antenna mounting poles for GSM & microwave plus painting the
tower, including transportation and all accessories as per Zain
S ecs.
1 Set
B.7
Supply and install complete new PVC chain Link fencing,Ploted area
(20 X 20 ) m including gates and pad lock as per MOST Zain
S ecs.
76 Mt
B.8
Construction for SCECO Wall 4 operators. (Only
ZAIN Electrical MDB will be installed on SCECO wall
accommodating the 4 Operators) as per Zain Specs.
1 Mt
B.9construction of concrete slab foundation for (Dual Genset ,& ATS )
as per Zain Specifications and approval.1 Each
B.10Construction of concrete slab foundation with reinforced wall for
(Fuel Tanks 5000 L ) as per Zain Specifications and approval.1 Each
C.1
Supply and install electrical cable 4 core, XLPE, 1000/600volt rated
at 90C, including connections, cable pull , RGS pipes and ties as
necessar 35 mm
15 Mt
C.2Supply and installation of grounding system as per ZAIN specs and
sizes.1 Set
C.3Supply and installation of lightning protection system as per ZAIN
specs and sizes.1 Set
41-3
Price for working inside of Saudi Aramco, Royal Commission and
other governmental related Boundaries which needs special
re arations.
1 Each
Total of Basic Model # 41
41-1
Additional/Extra price for Excavation on rock for Model as per soil
test report and accepted and approved by Zain to compensate the
rock excavation.
1 Cu.m
41-4 Dewatering in case of submerged foundation as per Zain Specs. 1 Each
41-5 Additional/Extra price for Submerged Foundation over the model. 1 Each
Location
Site Id
Model41-GF
50mLattice(MOST)
Civi
l
Electro
Mechanical
Model41-GF
50mLattice
(MOST)
-
8/13/2019 Copy of Civil Works-2
4/12
GF-50 MOST
Berri NGL
ARM0665
ModelService
Number
Service
GroupService Items
A.1Applying for SCECO power connection and following up until site is energize
will be paid by ZAIN) .
B.1Submit detailed civil design drawings, Soil Test Report, PCD package, PAT ,
(civil, electrical, telecom & transmission) including As built drawings.
B.2Construction of access road as per approved site layout, (5 X 3 = 15m2) m
as per Zain Specs.
B.3Supply and installation of cable tray (600mm width) from tower to shelter i
and all accessories as per Zain Specs.
B.4
Supply of (3.2 X 2.7 X 2.75)m fully equipped shelter (without DC Power Sys
testing, commissioning and PAT and installation of the shelter on foundation
construction of foundation and pedestals as per ZAIN specs .
B.5
Construction of tower foundation (all types , such as but not limited to ( Dra
Chimney...etc) except Fully Submerged type , including excavationin all ty
per approved Soil Test Report.(Epoxy reinforcement bars, bitumen paint, ba
compaction , final site leveling and gravel spreading as per ZAIN specs.
B.6
Supply and installation for 50m Lattice (MOST) and its vertical ladder, Safe
,Aircraft Warning Light System & antenna mounting poles for GSM & microw
painting the tower, including transportation and all accessories as per Zain
B.7Supply and install complete new PVC chain Link fencing,Ploted area (20 X 2
ates and ad lock as er MOST Zain S ecs.
B.8Construction for SCECO Wall 4 operators. (Only ZAIN Ele
be installed on SCECO wall accommodating the 4 Operators) as per Zain Sp
B.9 construction of concrete slab foundation for (Dual Genset ,& ATS ) as per Zaand a roval.
B.10Construction of concrete slab foundation with reinforced wall for (Fuel Tanks
Zain Specifications and approval.
C.1Supply and install electrical cable 4 core, XLPE, 1000/600volt rated at 90C
connections, cable pull , RGS pipes and ties as necessary, 35 mmC.2 Supply and installation of grounding system as per ZAIN specs and sizes.
C.3 Supply and installation of lightning protection system as per ZAIN specs an
41-3Price for working inside of Saudi Aramco, Royal Commission and other gov
related Boundaries which needs special preparations.
Total of Basic Model # 41
41-1
Additional/Extra price for Excavation on rock for Model as per soil test repor
and approved by Zain to compensate the rock excavation.41-4 Dewatering in case of submerged foundation as per Zain Specs.
41-5 Additional/Extra price for Submerged Foundation over the model.
Location
Site Id
Model41
-GF50mLattice(MOST)
Civil
Electro
Mechanic
al
Model41-
GF50m
Lattice(MOST)
-
8/13/2019 Copy of Civil Works-2
5/12
ModelService
Number
Service
GroupService Items
A.1Applying for SCECO power connection and following up
until site is energized (SCECO fees will be paid by ZAIN) .
B.1
Submit detailed civil design drawings, Soil Test Report,
PCD package, PAT ,& Site folders (civil, electrical, telecom
& transmission) including As built drawings.
B.2Construction of access road as per approved site layout, (5
X 3 = 15m2) min Depth 0.30 m as per Zain Specs.
B.4
Installation of (3.2 X 2.7 X 2.75)m fully equipped shelter
(without DC Power System ) including testing,
commissioning and PAT and installation of the shelter on
B.5
Construction of tower foundation (all types , such as but
not limited to ( Dray Raft, Pad & Chimney...etc) except
Fully Submerged type , including excavationin all types
B.6
Installation for 35m Lattice (MOST) and all accessories
(Like vertical ladder, Safety lock system ,Aircraft Warning
Light System , antenna mounting poles for GSM &
B.7
Supply and install complete new PVC chain Link
fencing,Ploted area (20 X 20 ) m including gates and pad
lock as per MOST Zain Specs.
B.8
Construction for SCECO Wall 4 operators.
(Only ZAIN Electrical MDB will be installed on SCECO wall
accommodating the 4 Operators) as per Zain Specs.
B.9 construction of concrete slab foundation for (Dual Genset,& ATS ) as per Zain Specifications and approval.
B.10
Construction of concrete slab foundation with reinforced
wall for (Fuel Tanks 5000 L ) as per Zain Specifications and
approval.
C.1
Supply and install electrical cable 4 core, XLPE,
1000/600volt rated at 90C, including connections, cable
pull , RGS pipes and ties as necessary, 35 mm
C.2Supply and installation of grounding system as per ZAIN
specs and sizes.
Total of Basic Model # 40
Additional/Extra price for Excavation on rock for Model as
per soil test report and accepted and approved by Zain to
compensate the rock excavation.
Model40-GF35
mLattice(MOST)
Civil
Electro
Mechanical
ems
F35m
ST)
-
8/13/2019 Copy of Civil Works-2
6/12
Dewatering in case of submerged foundation as per Zain
Specs.
Additional/Extra price for Submerged Foundation over the
model.AdditionalI
forModel40-
Lattice(M
-
8/13/2019 Copy of Civil Works-2
7/12
QuantityUnit of
Measure
1 Each
1 Each
1 Each
1 Each
1 Each
1 Set
76 Mt
1 Each
1 Each
1 Each
15 Mt
1 Set
1 cum
-
8/13/2019 Copy of Civil Works-2
8/12
1 Each
Will be mutually discussed on case to
case basis
-
8/13/2019 Copy of Civil Works-2
9/12
ModelService
Number
Service
GroupService Items
A.1
Applying for SCECO power connection and following up
until site is energized (SCECO fees will be paid by
ZAIN) .
B.1
Submit detailed civil design drawings, Soil Test Report,
PCD package, PAT ,& Site folders (civil, electrical,
telecom & transmission) including As built drawings.
B.2
Construction of access road as per approved site
layout, (5 X 3 = 15m2) min Depth 0.30 m as per Zain
Specs.
B.4
Installation of (3.2 X 2.7 X 2.75)m fully equipped
shelter (without DC Power System ) including testing,
commissioning and PAT and installation of the shelter
B.5
Construction of tower foundation (all types , such as
but not limited to ( Dray Raft, Pad & Chimney...etc)
except Fully Submerged type , including excavationin
B.6
Installation for 35m (MOST) Monopole and all
accessories (Like vertical ladder, Safety lock system
,Aircraft Warning Light System , antenna mounting
B.7
Supply and install complete new PVC chain Link
fencing,Ploted area (20 X 20 ) m including gates and
pad lock as per MOST Zain Specs.
B.8
Construction for SCECO Wall 4 operators.
(Only ZAIN Electrical MDB will be installed on SCECO
wall accommodating the 4 Operators) as per Zain
B.9
construction of concrete slab foundation for (Dual
Genset ,& ATS ) as per Zain Specifications and
approval.
B.10
Construction of concrete slab foundation with reinforced
wall for (Fuel Tanks 5000 L ) as per Zain Specifications
and approval.
C.1
Supply and install electrical cable 4 core, XLPE,
1000/600volt rated at 90C, including connections,
cable pull , RGS pipes and ties as necessary, 35 mm
C.2Supply and installation of grounding system as per
ZAIN specs and sizes.
Total of Basic Model # 38
Additional/Extra price for Excavation on rock for Model
as per soil test report and accepted and approved by
Zain to compensate the rock excavation.
Mod
el38-GF35m
(MOST)Mon
opole
Civil
Electro
Mechanical
msfor
ole-
-
8/13/2019 Copy of Civil Works-2
10/12
Dewatering in case of submerged foundation as per
Zain Specs.
Additional/Extra price for Submerged Foundation over
the model.AdditionalIte
35mMostP
Model3
-
8/13/2019 Copy of Civil Works-2
11/12
QuantityUnit of
Measure
1 Each
1 Each
1 Each
1 Each
1 Each
1 Set
76 Mt
1 Each
1 Each
1 Each
15 Mt
1 Set
1 cum
-
8/13/2019 Copy of Civil Works-2
12/12
1 Each
Will be mutually discussed on case to case
basis