converting to meet the need€¦ · assisted living need increase (formerly the inn) 2010 99% to...
TRANSCRIPT
![Page 1: CONVERTING TO MEET THE NEED€¦ · Assisted Living Need Increase (formerly the Inn) 2010 99% to 100% with waitlist 2012 99% to 100% with waitlist 2013 99% to 100% with waitlist 2014](https://reader033.vdocuments.site/reader033/viewer/2022060509/5f24e8cda991e1300b0f4b5a/html5/thumbnails/1.jpg)
MAY 2015CONVERTING TO MEET THE NEED
![Page 2: CONVERTING TO MEET THE NEED€¦ · Assisted Living Need Increase (formerly the Inn) 2010 99% to 100% with waitlist 2012 99% to 100% with waitlist 2013 99% to 100% with waitlist 2014](https://reader033.vdocuments.site/reader033/viewer/2022060509/5f24e8cda991e1300b0f4b5a/html5/thumbnails/2.jpg)
![Page 3: CONVERTING TO MEET THE NEED€¦ · Assisted Living Need Increase (formerly the Inn) 2010 99% to 100% with waitlist 2012 99% to 100% with waitlist 2013 99% to 100% with waitlist 2014](https://reader033.vdocuments.site/reader033/viewer/2022060509/5f24e8cda991e1300b0f4b5a/html5/thumbnails/3.jpg)
![Page 4: CONVERTING TO MEET THE NEED€¦ · Assisted Living Need Increase (formerly the Inn) 2010 99% to 100% with waitlist 2012 99% to 100% with waitlist 2013 99% to 100% with waitlist 2014](https://reader033.vdocuments.site/reader033/viewer/2022060509/5f24e8cda991e1300b0f4b5a/html5/thumbnails/4.jpg)
SNF
AL
3rd Floor - ALIL
![Page 5: CONVERTING TO MEET THE NEED€¦ · Assisted Living Need Increase (formerly the Inn) 2010 99% to 100% with waitlist 2012 99% to 100% with waitlist 2013 99% to 100% with waitlist 2014](https://reader033.vdocuments.site/reader033/viewer/2022060509/5f24e8cda991e1300b0f4b5a/html5/thumbnails/5.jpg)
The NeedIndependent Living Occupancy Decline
2010 89% to 90%2012 80% to 85%2013 74% to 77%2014 slight increase
Assisted Living Need Increase (formerly the Inn) 2010 99% to 100% with waitlist2012 99% to 100% with waitlist2013 99% to 100% with waitlist2014 99% to 100% with waitlist
In need of secured Memory Care Unit6 residents left campus due to lack of memory care vacancyThe Gardensconvert the existing Inn to secured unit (the Gardens)convert independent living wing to assisted living (the Inn)
lighter acuitysmaller roomsenclosed courtyardnew finishes / operational adjustments only
![Page 6: CONVERTING TO MEET THE NEED€¦ · Assisted Living Need Increase (formerly the Inn) 2010 99% to 100% with waitlist 2012 99% to 100% with waitlist 2013 99% to 100% with waitlist 2014](https://reader033.vdocuments.site/reader033/viewer/2022060509/5f24e8cda991e1300b0f4b5a/html5/thumbnails/6.jpg)
The ScopeThe Inn (unlicensed Assisted Living)• Convert third floor of the east wing from Independent Living to catered living• Infill atrium floor for new dining / living spa• Infill floor at exterior window and develop protective railing• Convert corner atrium unit to spa, office, country kitchen and barrier free toilet room• Split three units into six units, revised / add mechanical and electrical, nurse call• Refresh balance of units (cabinets, finishes)• Some reworking of interior doors for lift access / barrier free• Add lockable drawer to each unit (medicine drawer)• Revise / replace lighting in corridor• Update finishes in common spaces• Revise unit lighting outside of bathroom, in closet area• Protect existing balcony
Elevator Lobby Enclosure (serving Independent Living and Assisted Living)• Enclose area (in parking garage) between resident hallway and elevator• Renovation of existing electrical and mechanical as required• Revise sloping floors to comply with ADA / Barrier Free standards• New finishes
![Page 7: CONVERTING TO MEET THE NEED€¦ · Assisted Living Need Increase (formerly the Inn) 2010 99% to 100% with waitlist 2012 99% to 100% with waitlist 2013 99% to 100% with waitlist 2014](https://reader033.vdocuments.site/reader033/viewer/2022060509/5f24e8cda991e1300b0f4b5a/html5/thumbnails/7.jpg)
The NeedIndependent Living Occupancy Decline
2010 89% to 90%2012 80% to 85%2013 74% to 77%2014 slight increase
Assisted Living Need Increase (formerly the Inn) 2010 99% to 100% with waitlist2012 99% to 100% with waitlist2013 99% to 100% with waitlist2014 99% to 100% with waitlist
In need of secured Memory Care Unit6 residents left campus due to lack of memory care vacancyThe Gardensconvert the existing Inn to secured unit (the Gardens)convert independent living wing to assisted living (the Inn)
lighter acuitysmaller roomsenclosed courtyardnew finishes / operational adjustments only
![Page 8: CONVERTING TO MEET THE NEED€¦ · Assisted Living Need Increase (formerly the Inn) 2010 99% to 100% with waitlist 2012 99% to 100% with waitlist 2013 99% to 100% with waitlist 2014](https://reader033.vdocuments.site/reader033/viewer/2022060509/5f24e8cda991e1300b0f4b5a/html5/thumbnails/8.jpg)
![Page 9: CONVERTING TO MEET THE NEED€¦ · Assisted Living Need Increase (formerly the Inn) 2010 99% to 100% with waitlist 2012 99% to 100% with waitlist 2013 99% to 100% with waitlist 2014](https://reader033.vdocuments.site/reader033/viewer/2022060509/5f24e8cda991e1300b0f4b5a/html5/thumbnails/9.jpg)
![Page 10: CONVERTING TO MEET THE NEED€¦ · Assisted Living Need Increase (formerly the Inn) 2010 99% to 100% with waitlist 2012 99% to 100% with waitlist 2013 99% to 100% with waitlist 2014](https://reader033.vdocuments.site/reader033/viewer/2022060509/5f24e8cda991e1300b0f4b5a/html5/thumbnails/10.jpg)
![Page 11: CONVERTING TO MEET THE NEED€¦ · Assisted Living Need Increase (formerly the Inn) 2010 99% to 100% with waitlist 2012 99% to 100% with waitlist 2013 99% to 100% with waitlist 2014](https://reader033.vdocuments.site/reader033/viewer/2022060509/5f24e8cda991e1300b0f4b5a/html5/thumbnails/11.jpg)
![Page 12: CONVERTING TO MEET THE NEED€¦ · Assisted Living Need Increase (formerly the Inn) 2010 99% to 100% with waitlist 2012 99% to 100% with waitlist 2013 99% to 100% with waitlist 2014](https://reader033.vdocuments.site/reader033/viewer/2022060509/5f24e8cda991e1300b0f4b5a/html5/thumbnails/12.jpg)
![Page 13: CONVERTING TO MEET THE NEED€¦ · Assisted Living Need Increase (formerly the Inn) 2010 99% to 100% with waitlist 2012 99% to 100% with waitlist 2013 99% to 100% with waitlist 2014](https://reader033.vdocuments.site/reader033/viewer/2022060509/5f24e8cda991e1300b0f4b5a/html5/thumbnails/13.jpg)
![Page 14: CONVERTING TO MEET THE NEED€¦ · Assisted Living Need Increase (formerly the Inn) 2010 99% to 100% with waitlist 2012 99% to 100% with waitlist 2013 99% to 100% with waitlist 2014](https://reader033.vdocuments.site/reader033/viewer/2022060509/5f24e8cda991e1300b0f4b5a/html5/thumbnails/14.jpg)
![Page 15: CONVERTING TO MEET THE NEED€¦ · Assisted Living Need Increase (formerly the Inn) 2010 99% to 100% with waitlist 2012 99% to 100% with waitlist 2013 99% to 100% with waitlist 2014](https://reader033.vdocuments.site/reader033/viewer/2022060509/5f24e8cda991e1300b0f4b5a/html5/thumbnails/15.jpg)
The Move7 Residents stayed in place at secured memory care unit (now the Gardens)15 Residents moved from the Inn (now the Gardens) to the new Inn2 Independent Living Residents moved to the new Inn5 New Residents at the Inn
The new InnThird Floor, no through traffic (separated)Apartment sized units (now longer just studio units)New Serving Kitchen, Spa, Office, Dining, Living Areas, secure BalconyOriginally 18 IL apartments20 units total
![Page 16: CONVERTING TO MEET THE NEED€¦ · Assisted Living Need Increase (formerly the Inn) 2010 99% to 100% with waitlist 2012 99% to 100% with waitlist 2013 99% to 100% with waitlist 2014](https://reader033.vdocuments.site/reader033/viewer/2022060509/5f24e8cda991e1300b0f4b5a/html5/thumbnails/16.jpg)
ConstructionResidents:
Unit below Kitchen, Spa, Mechanical Areas vacated11 Independent Living residents moved to another IL wing (between two floors)Residents moved into similar units with new finishesRegular resident meetings with contractor / architectPublished construction schedulesElevator lock out (entire third floor of wing off limits)Build resident excitement‘Viewing’ stations in Atrium (while under construction)Minimal shutdown of any serviceLow noise until 9:30am
![Page 17: CONVERTING TO MEET THE NEED€¦ · Assisted Living Need Increase (formerly the Inn) 2010 99% to 100% with waitlist 2012 99% to 100% with waitlist 2013 99% to 100% with waitlist 2014](https://reader033.vdocuments.site/reader033/viewer/2022060509/5f24e8cda991e1300b0f4b5a/html5/thumbnails/17.jpg)
Before
After
Resident Bathrooms
![Page 18: CONVERTING TO MEET THE NEED€¦ · Assisted Living Need Increase (formerly the Inn) 2010 99% to 100% with waitlist 2012 99% to 100% with waitlist 2013 99% to 100% with waitlist 2014](https://reader033.vdocuments.site/reader033/viewer/2022060509/5f24e8cda991e1300b0f4b5a/html5/thumbnails/18.jpg)
Before
After
Resident Kitchenette
![Page 19: CONVERTING TO MEET THE NEED€¦ · Assisted Living Need Increase (formerly the Inn) 2010 99% to 100% with waitlist 2012 99% to 100% with waitlist 2013 99% to 100% with waitlist 2014](https://reader033.vdocuments.site/reader033/viewer/2022060509/5f24e8cda991e1300b0f4b5a/html5/thumbnails/19.jpg)
Resident Rooms
![Page 20: CONVERTING TO MEET THE NEED€¦ · Assisted Living Need Increase (formerly the Inn) 2010 99% to 100% with waitlist 2012 99% to 100% with waitlist 2013 99% to 100% with waitlist 2014](https://reader033.vdocuments.site/reader033/viewer/2022060509/5f24e8cda991e1300b0f4b5a/html5/thumbnails/20.jpg)
Before – 3 story atrium
After – Dining and Common Space
Atrium / Hub
Before – Fluorescent Light ‘Dome’
![Page 21: CONVERTING TO MEET THE NEED€¦ · Assisted Living Need Increase (formerly the Inn) 2010 99% to 100% with waitlist 2012 99% to 100% with waitlist 2013 99% to 100% with waitlist 2014](https://reader033.vdocuments.site/reader033/viewer/2022060509/5f24e8cda991e1300b0f4b5a/html5/thumbnails/21.jpg)
Atrium / Hub
![Page 22: CONVERTING TO MEET THE NEED€¦ · Assisted Living Need Increase (formerly the Inn) 2010 99% to 100% with waitlist 2012 99% to 100% with waitlist 2013 99% to 100% with waitlist 2014](https://reader033.vdocuments.site/reader033/viewer/2022060509/5f24e8cda991e1300b0f4b5a/html5/thumbnails/22.jpg)
Serving Kitchen
![Page 23: CONVERTING TO MEET THE NEED€¦ · Assisted Living Need Increase (formerly the Inn) 2010 99% to 100% with waitlist 2012 99% to 100% with waitlist 2013 99% to 100% with waitlist 2014](https://reader033.vdocuments.site/reader033/viewer/2022060509/5f24e8cda991e1300b0f4b5a/html5/thumbnails/23.jpg)
Atrium / Hub
![Page 24: CONVERTING TO MEET THE NEED€¦ · Assisted Living Need Increase (formerly the Inn) 2010 99% to 100% with waitlist 2012 99% to 100% with waitlist 2013 99% to 100% with waitlist 2014](https://reader033.vdocuments.site/reader033/viewer/2022060509/5f24e8cda991e1300b0f4b5a/html5/thumbnails/24.jpg)
![Page 25: CONVERTING TO MEET THE NEED€¦ · Assisted Living Need Increase (formerly the Inn) 2010 99% to 100% with waitlist 2012 99% to 100% with waitlist 2013 99% to 100% with waitlist 2014](https://reader033.vdocuments.site/reader033/viewer/2022060509/5f24e8cda991e1300b0f4b5a/html5/thumbnails/25.jpg)
Elevator Lobby
![Page 26: CONVERTING TO MEET THE NEED€¦ · Assisted Living Need Increase (formerly the Inn) 2010 99% to 100% with waitlist 2012 99% to 100% with waitlist 2013 99% to 100% with waitlist 2014](https://reader033.vdocuments.site/reader033/viewer/2022060509/5f24e8cda991e1300b0f4b5a/html5/thumbnails/26.jpg)
![Page 27: CONVERTING TO MEET THE NEED€¦ · Assisted Living Need Increase (formerly the Inn) 2010 99% to 100% with waitlist 2012 99% to 100% with waitlist 2013 99% to 100% with waitlist 2014](https://reader033.vdocuments.site/reader033/viewer/2022060509/5f24e8cda991e1300b0f4b5a/html5/thumbnails/27.jpg)
Assisted Living LicensureHome for the Aged
(HFA)Adult Foster Care Large Group
(AFC - L)Unlicensed Assisted Living
rules HFA Licensing RulesHFA Public Health Code
HFA Tech. Assistance HandbookMichigan Building Codes
Licensing for AFC Large GroupAFC Technical AssistanceMichigan Building Codes
Michigan Building Codes
corridor minimum 6'-0" minimum (5'-10.1/2" & 5'-5.1/4" existing) CANNOT MEET
no requirement(Michigan Building Code minimums)
no requirement(Michigan Building Code min.)(same as Independent Living)
ventilation our design meets our design exceeds+ toilet room require forced air ventilation
Michigan Mechanical Code min.(same as Independent Living)
laundry likely need to contract this service adequate provisions no requirement(same as Independent Living)
kitchen likely need to contract this service (or set up separate corp. for kitchen at Lodge I)+ janitor's closet required
provide meals - no reference to where prepared
no requirement
generator required with minimum run time no requirement no requirement
![Page 28: CONVERTING TO MEET THE NEED€¦ · Assisted Living Need Increase (formerly the Inn) 2010 99% to 100% with waitlist 2012 99% to 100% with waitlist 2013 99% to 100% with waitlist 2014](https://reader033.vdocuments.site/reader033/viewer/2022060509/5f24e8cda991e1300b0f4b5a/html5/thumbnails/28.jpg)
Assisted Living LicensureHome for the Aged
(HFA)Adult Foster Care Large Group
(AFC - L)Unlicensed Assisted Living
rules HFA Licensing RulesHFA Public Health Code
HFA Tech. Assistance HandbookMichigan Building Codes
Licensing for AFC Large GroupAFC Technical AssistanceMichigan Building Codes
Michigan Building Codes
corridor minimum 6'-0" minimum (5'-10.1/2" & 5'-5.1/4" existing) CANNOT MEET
no requirement(Michigan Building Code minimums)
no requirement(Michigan Building Code min.)(same as Independent Living)
ventilation our design meets our design exceeds+ toilet room require forced air ventilation
Michigan Mechanical Code min.(same as Independent Living)
laundry likely need to contract this service adequate provisions no requirement(same as Independent Living)
kitchen likely need to contract this service (or set up separate corp. for kitchen at Lodge I)+ janitor's closet required
provide meals - no reference to where prepared
no requirement
generator required with minimum run time no requirement no requirement
lighting + 20 FC - hallways, general resident room, janitor closet+ 30 FC - reading area, bed, hand wash, toilet, shower, staff, laundry, day room+ 30-50 FC - kitchen+ 50 FC - Charting, med+ lens on light in janitor closet
sufficient for reading and other resident activities
typical National Electrical Code
common area sqft (renovations)
15 SF / bed (exceeded) 35 SF per OCCUPANT no requirement
common area sqft(new construction)
30 SF / bed (exceeded) 35 SF per OCCUPANT no requirement
resident room size 80 SF minimum 80 SF minimum no requirement
janitor closet 1 required per floor Michigan Mechanical Code min.
Michigan Mechanical Code min.(same as Independent Living)
code - use group must be reviewed / constructed as an I-2 facility
R-2 is still acceptable
dining A home shall have dining space that can accommodate all residents of the home at the same time.'