  • 8/9/2019 CONTRACTORS ALL RISK INSURANCEPresentation

    1/15

    11

    CONTRACTORS ALL RISK INSURANCECONTRACTORS ALL RISK INSURANCE

  • 8/9/2019 CONTRACTORS ALL RISK INSURANCEPresentation

    2/15

    22

    CAR is designed to protect the interests of thecontractors/principals against unforeseen

    accidents which could occur resulting in

    considerable financial loss, during the course, during the course

    of execution of projects relating toof execution of projects relating toconstruction of buildings and civil engineeringconstruction of buildings and civil engineering

    worksworks

  • 8/9/2019 CONTRACTORS ALL RISK INSURANCEPresentation

    3/15

    33

    The CAR policy provides an allrisk cover

    That means, almost any sudden

    & unforeseen loss or damageoccurring during the period of

    insurance on the construction

    site is indemnified.

  • 8/9/2019 CONTRACTORS ALL RISK INSURANCEPresentation

    4/15

    44

    Insurable property: dwellings, multi storeyed

    buildings, ware houses, hospitals, schools,bridges etc

  • 8/9/2019 CONTRACTORS ALL RISK INSURANCEPresentation

    5/15

    55

    CoveragesCoverages

    Coverage's are divided into two sections

    Section 1 - Material Damage

    The policy covers the property against loss,

    damage or destruction by any cause unless

    until specifically excluded

    Section 2 - Third Party Liability

    The policy covers third party property against

    loss, damage destruction by any cause

  • 8/9/2019 CONTRACTORS ALL RISK INSURANCEPresentation

    6/15

    66

    Section ISection I Material DamageMaterial Damage

    The policy covers the property of the insured against;

    Fire, lightning, explosion, theft, burglary, windstorm,

    flood, inundation, earthquake, land sliding, rock slidingand subsidence

    Constructional Faults collapse etc

    Human Error Lack of skills etc

    Other Perils Malicious damage, air crash, blasting

    Riot and Strike

  • 8/9/2019 CONTRACTORS ALL RISK INSURANCEPresentation

    7/15

    77

    Section II Third Party Liability

    This is an additional cover:

    The term implies legal liability arising out ofproperty

    damage orbodily injury suffered by Third Parties onor near the site.

    The insurers will not indemnify any claims from the

    employees or workmen of the contractoror theprinciple owner or any other firm connected with thecontract work or members of their families.

  • 8/9/2019 CONTRACTORS ALL RISK INSURANCEPresentation

    8/15

    88

    Let us see an example of Third Party LiabilityLet us see an example of Third Party Liability

  • 8/9/2019 CONTRACTORS ALL RISK INSURANCEPresentation

    9/15

    99

  • 8/9/2019 CONTRACTORS ALL RISK INSURANCEPresentation

    10/15

    1010

    ExclusionsExclusions

    Excess stated in the schedule

    Faults or defects which were in existence whenthe insurance was arranged and known to the

    insured.

  • 8/9/2019 CONTRACTORS ALL RISK INSURANCEPresentation

    11/15

    1111

    War, riot, strike or nuclear risks

    Consequential loss of any kind such as penalty

    for delay, non fulfillment of terms of contract

  • 8/9/2019 CONTRACTORS ALL RISK INSURANCEPresentation

    12/15

    1212

    Period of CoverPeriod of Cover

    Cover shall commence from the commencement ofwork after the unloading of the property insured at

    the site, whichever is earlier. The cover expires when the completed part therefore

    is taken over or put into service or the date specifiedin the policy, whichever is earliest.

    In case the work is not completed within the periodspecified in the policy, then the policy can beextended.

  • 8/9/2019 CONTRACTORS ALL RISK INSURANCEPresentation

    13/15

    13

    13

    Check your understanding onCheck your understanding on

    ExclusionsExclusions Mazda is doing a particular project

    Due to some unforeseen condition, one of the

    machines stops functioning and due to whichthe project gets delayed

    Who will bear all the damages incurred to the

    machine?

    What about the cost of the delay in project?

  • 8/9/2019 CONTRACTORS ALL RISK INSURANCEPresentation

    14/15

    14

    14

    All the damages to the machine will be taken

    care by the insurer

    But the cost Mazda incurs due to delay in

    project or the compensatory cost for delay in

    project will not be covered by the insurer

  • 8/9/2019 CONTRACTORS ALL RISK INSURANCEPresentation

    15/15

    15

    15

    Claim SettlementClaim Settlement

    Two types Of losses are considered before

    settling a claim:

    Partial Loss

    Total Loss