Erection contractor Evaluation & AssessmentDate of Issue
tt-01-2012
Page 6 of9
TRUCK / TRAILOR
OIL FILTER MACHINE
FERRULE PRINTING MACHINE
WELDING TRANSFORMERS
WELDING RECTIFIERS
GAS CUTTING SETS
ANGLE CUTTING MACHINE
MAGNETIC DRILL MACHINE
HAMMERING DRILL MACHINE
HS DRILL MACHINE
BLOWER / VACUUM CLEANER
HYDRAULIC CRIPPLING TOOL
ELECTRICIAN TOOLS
FITTER & WELDER TOOLS
KNOCK OUT PUNCH I HOIE SRW
LIFTING TOOLS & TACKLES
ALL OTHER REQUIRED TOOLS
oPERATIoNAL CAPABlLlrlES : Organization Structure submitted additionat Manpower -generally hired as per project requirements.
1' HEAD oFFlcE SET UP (Building, Number of employees at Ho, tnfrastructure etc.)
2' site office establishment ( Type of site office, indoor & outdoor stores, staff & employeeaccommodation, conveyance, health & hygiene)
[ffiXn:3ffii3iJIl?:,(YearlY turnover or the companv ror erection & suppties separatery, Number or jobs
1- Erection (rn Mir BDT): Fy2009: 3.5, Fy 2010:4.2,F y2011:7.1,Y2012: 1.0, Fy2013: 16.5
2 srpply(in Mil. USD), FY2010'0.63, FY2011,0.45, Fy2012,0.51, Fy2013:0.25
\rfi.l(pI-I</ ^-"sbl
ABB Erection contractor Evaluation & AssessmentPrepared by Checked bv Approved by Date of Issue Revision
AKK SPD RS lt-0t-2012
Revised: 2210112014
ERECTION CONTRACTOREVALUATION
&ESSMENT
ffimY/&
Page I of9
rlHry- :i-1{::iq=eeP. rc<E{ l-
ABB Erection contractor Bvaluation & AssessmentPrenared bv Checked bv Approved bv Date of Issue Revision
AKK SPD RS ll-01-2012
Page 9 of9
ABB Erection contractor Evaluation & AssessmentPrepared by Checked bv Anproved bv Date of Issue Revision
AKK SPD RS ll-01-20t2
DECLARATION
l, ...Md. Nurul lslam the undersigned, declare
that the above information is correct & complete to the best of my knowledge and belief.
o^r"4-?/or f ft, Signature of authorised
,,r"" Tleb, .
(With company seal)
Name:Md, Nurulslam
Designation: CEO
AKA) gl
1,.f,
sEcrloN c - EVALUATION & REGOMMENDATION (For ABB use onty):
INSTALLATION MANAGEMENT TEAM'S COMMENT & REMARKS :
RECOMMENDATION: tr RECOMMENDED
DATE OF EVALUATION:
tr NOT RECOMMENDED
SIGNATURE OF INSTALLATION MANAGER
NAME OF INSTALLATION MANAGER
REVIEWER'S (INSTALLATION & SITE MANAGEMENT HEAD) COMMENTS:
CONCLUSION: tr APPROVED tr NOT APPROVED
VALUE OF THE JOB
Below 5 MINR
Page 8 of9
TYPE OF PROJECTS EXECUTED IN PAST:
n orulv LABoUR supply (wrrHour coNSUMABLES)
I corurnncr wrrH coNSUMABLES
I encr ro BAcK (REcErvrNG, uNLoADrNc, sroRAGE, EREcroN,coMMrssroNrNG ASSTSTANCE AND HANDTNG OVER COMPLETE)
I coNrnncr TNcLUDTNG suppy & EREcroN.
LIST OF COMPLETION CERTIFICATES AND CUSTOMER APPRECIATION LETTERS (Documents to beattached, if any) :
1. STEMENS BANGLADESH LTMTTED (COPY ENCLOSED)
DOES CONTRACTOR HAVE ANY SAFETY, ENVIORNMENT, QUALITY POLICY FOR THE ORGNISATION(Documents to be attached, if any) :
1. Not yet (under implementation)
ls CoNTRACTOR CERTTFIED BY ANY REPUTED CERTTF|CATION BODY (QUALITY / SAFETY &ENVIORNMENT) (Documents to be attached, if any) : NOT YET.
DOES CONTRACTOR POSSESS'A'CLASS ELECTRICAL CONTRACTOR'S LICENCE FOR ANY STATE, IFso, ATTAQH DETATL / COpy OF THE VALTD LTCENCE:
Applied for "A" Class Electrical Contractor Licence, which wil! be available withinFebruary, 2014.
Page 4 of9
ABB Erection contractor Evaluation & AssessmentPrenared bv Checked bv Annroved bv Date of Issue Revision
AKK SPD RS rt-01-2012
Page2 of9
SECTION A - BASIC DETAIIS (To be filled by erection contractor)
NAME OF THE COMPANY :
SCIENTECH ENGINEERING ANDSERVICES.
ADDRESS FOR COMMUNICATION :
HOUSE # 67, ROAD # 15, BLOCK # D,DHAKA.I 2{ 3, BANGLADESH
CONTACT PERSON WITHDESIGNATION:
MD. NURUL ISLAM, CEO.
MOBILE & TELEPHONE NUMBERS :
+880 18415 20023+880 28815164
E-MAIL ID & FAxNUMBER:
Nurul. [email protected]+88 02 881 5164
TypE oF coMpANy I tNDUSTRY / FtRM (T|CK AS AppROpRtATE)
n PUBLtc I pRtvATE ! GovERNMENT ! eARTNERSHIe Ednopnrerny
rZCor'rrnACToRS !oTHERS(SPEoIFY)
SECTION B - EVALUATION REQUIREMENTS (To be filled by erection contractor)
TYPE OF ERECTION & INSTALLATION / ENGG SERVTCES WHTCH CONTRACTOR CAN pROVtDE (T|CK ASAPPROPRTATE)
lEfN o u SrR tAL E LEcTRt Ft CAT| O N IE fwrrcHyARD
rz'-rnnrusMrssroN LINE E nunnl ELECTRTFToATToN
I rNsrnuHaENTATtoN f rpc coNTRACTS
lEGxorruEERtNG sERVtcES )E-erre / sroRE /ADMN sERVtcES
r senuces FoR supERvrsroN oF ERECTToN & coMMrssroNrNG woRKS
CIrya",;\Dh4K4\?
;"-.(9
I
Erection contractor Evaluation & Assessment
It-01-20t2
STATUS oF LEGAL coMpLtANCE (Documents to be attached, if any) :
1. pF REGtsTRATtoN : Trade Licence No. 0S - 15437.
2. ESI REGISTRAION',VAT Registration No. 5071040106, Area code: 50202.
3. SERVICE TAX REGISTRAION : TIN CErtifiCAtE - ENCIOSEd.
4. PAN CARD:N/A
5. TtN No : Enclosed
6. Bank Certificate: Enctosed.
CONTRACTOR ORGANISATION -NEED TO PROVIDE DETAILS OF LIST OF EMPLOYEES WORKING IN THE ORGANISATION INCLUDINGENGINEERS, SUPERVISORS, STOREKEEPERS, SAFETY OFF|CERS, reCHrrrrcrnrus, elecrnrcArus,'WELDEER, FlrrERS, RTGGERS ETC (Documents to be attached) :
Organogram
Engr. Md. Nurul lslam, (EEE)Engr. Abdul Baten (EEE)Engr. Md. Nur Jamat Biswas, (ME)Engr. Md. Showkotul lslam (EEE)Engr. Saydur Rahman (EEE)Md. Gulzar Hossain (ACAD Design)Ripon Roy (Dip. Mec.)lmam Hossain Babu, (Dip. Elect.)Jahangir Alam Sr. ForemanAkram Hossain, Sr. Mech. FitterSiddiqur Rahman, Mech. FitterMd. Sharfuddin, Sr. CommercialM. A. Quadir, Administration & StoreMd. Omar Ali, Office Assistance
1.
2.3.4.5.6,7.8.9.10.11.12.13.14.
SPECIFY THE JOB / JOBS, WHERE CUSTOMER IMPOSED PENALTY TO THE CONTRACTOR FOR THEREASONS ATTRIBUTABLE oN ACcoUNT oF THE AGENCY: N/A
LIST OF OWNED ANDrAcKlesll@
Page 5 of9
EXPERIENCE AS ERECTION CONTRACTOR IN THIS FIELD :
LIST OF PROJECTS EXECUTED IN PAST FOR ABB :
SLNO
NAME OF THEPROJECT /LOCATION
NAME OFDtvtstoN NAME OF
BU
VALUE OFTHE JOB
PERIOD OFEXECUTION
MANPOWERDEPLOYED
DUR!NGPEAK
1 N/A
2
3
4
LIST OF PROJECTS EXECUTED IN PAST FOR OTHER CUSTOMERS (OTHER THAN ABB
NAME OF THEPROJECT / LOCATION
VALUE OFTHE JOB
Shahjibazar PowerCo. Ltd., Sylhet
lnstallation of LVPower & control cableand cable trays for100MW Power
BDT 4,200,000usD 630,000
HV/MV Cable supply &lnstallation
50MW Norther PowerCo. Ltd ( A project of
BDT 937,000usD 397,964
Sylhet Plasticlndustries Ltd
BDT 2, 800,000usD s5,000
2011t12
Sitalpur Steel MillsLtd, Chittagong
13Z33kV Substation BDT 3,400,000 2012t13
33/1 1kV 35MVASubstation atCEPZ&DEPZ
BDT 3,034,000
Page 3 of9
SAFETY TRACK RECORD (LIST OF PROJECTS WITH ANY LOST TIME INJURY RECORD FOR PAST THREEYEARS To BE MENTIONED AND RECORDS TO BE ATTACHED ): N/A
PROPOSED EXISTING SITES BY ERECTION CONTRACTOR WHICH ARE OFFERED TO ABB FORINSPECTION:
NAME OF THE SITE /LOCATION
Mr. MohammadAli, ChiefEngineer.
Installation of132t11 kV3OMVA GlSSubstation
Modern Steel Mills,Chittagong
Engr. Md.AsaduzzamanSiemensBangladesh Ltd.orMr. lsmail, GM.Regent Power,Ghorashal.
Regent Power(A Project of SiemensBangladesh Limited)Ghorashal, Narshingdi
lnstallation of230 t11 KV,I5O MVASubstation
REFERENCES (Feedback about the contractor from the customer):
PERSONS REFFERED (Organisation, Name , Designation & Contact number)1. Mr. Asaduzzaman, Div. Head, Energy, Siemens Bangladesh Limited: Mob: +880 17115200262. Mr. Mohammad Ali, Chief Engineer, Modern Steel Mills Limited, mob: +880 1199215497
LATEST CREDENTIALS (On going projects) :
NAME OF THEPROJECT / LOCATION
NAME OFCUSTOMER
BDT.17,803,429us$. 59,000
Regent Energy &Power( A project ofSiemensBangladesh
230 kV Substationincluding 230kVTransmission line for108MW Power plant
2013t14
230 kV U/G Cableincluding outdoorterminations for108MW Power plant
BDT. 2,995,000us$. 194,500
Regent Energy &Power( A project ofSiemensBangladesh
2013t14
,'€
'KoruPage 7 of9