contract times (field) user guide agency

7
CONTRACT TIMES (FIELD) USER GUIDE AGENCY 1 UPDATED 11/20

Upload: others

Post on 24-Oct-2021

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CONTRACT TIMES (FIELD) USER GUIDE AGENCY

CONTRACT TIMES (FIELD) USER GUIDE AGENCY

1 UPDATED 11/20

Page 2: CONTRACT TIMES (FIELD) USER GUIDE AGENCY

2 UPDATED 11/20

slade
Callout
Verify Role.
Page 3: CONTRACT TIMES (FIELD) USER GUIDE AGENCY

3 UPDATED 11/20

slade
Callout
Click "Contract Administration".
Page 4: CONTRACT TIMES (FIELD) USER GUIDE AGENCY

4 UPDATED 11/20

slade
Callout
Enter the contract number.
Page 5: CONTRACT TIMES (FIELD) USER GUIDE AGENCY

5 UPDATED 11/20

slade
Callout
Click the row action button and click "Open".
slade
Line
Page 6: CONTRACT TIMES (FIELD) USER GUIDE AGENCY

6 UPDATED 11/20

slade
Callout
Click "Contract Times".
Page 7: CONTRACT TIMES (FIELD) USER GUIDE AGENCY

 

 

7 UPDATED 11/20

slade
Callout
1. Enter the date in the appropriate Actual Completion field.
slade
Line
slade
Callout
3. Click "Save".
slade
Callout
2. Enter Tentative Dates in the Proj Compt field for that time type.
slade
Line
slade
Line