contract no. st/2008/02 – ma on shan development roads ... · epd, no other external parties i.e....

58
Contract No. ST/2008/02 – Ma On Shan Development Roads, Drainage and Sewerage Works at Whitehead and Lok Wo Sha Phase 1 Quarterly Environmental Monitoring and Audit (EM&A) Summary Report Q1 (October to December 2009) AUES Z:\Jobs\2009\TCS00477 (ST-2008-02)\600\EM&A Quarterly Report\1st Quarterly Oct-Dec 09\R0108v2.doc Action-United Environmental Services and Consulting PROJECT NO.: TCS/00477/09 CEDD CONTRACT NO. ST/2008/02 ROADS, DRAINAGE AND SEWEAGE WORKS AT WHITEHEAD AND LOK WO SHA, PHASE 1 Quarterly Environmental Monitoring and Audit (EM&A) Summary Report No.Q1 (October to December 2009) PREPARED FOR CHINA ROAD & BRIDGE CORPORATION Quality Index Date Reference No. Prepared By Certified By 22 July 2010 TCS00477/09/600/R0108v2 Nicola Hon Environmental Consultant T.W. Tam Environmental Team Leader Version Date Description 1 20 May 2010 First Submission 2 22 July 2010 Amended against IEC’s comments on 21 July 2010

Upload: ledieu

Post on 27-Apr-2018

217 views

Category:

Documents


2 download

TRANSCRIPT

Contract No. ST/2008/02 – Ma On Shan Development Roads, Drainage and Sewerage Works at Whitehead and Lok Wo Sha Phase 1

Quarterly Environmental Monitoring and Audit (EM&A) Summary Report Q1 (October to December 2009)

AUES

Z:\Jobs\2009\TCS00477 (ST-2008-02)\600\EM&A Quarterly Report\1st Quarterly Oct-Dec 09\R0108v2.doc Action-United Environmental Services and Consulting

PROJECT NO.: TCS/00477/09

CEDD CONTRACT NO. ST/2008/02 ROADS, DRAINAGE AND SEWEAGE WORKS AT

WHITEHEAD AND LOK WO SHA, PHASE 1

Quarterly Environmental Monitoring and Audit (EM&A) Summary Report No.Q1 (October to December 2009)

PREPARED FOR CHINA ROAD & BRIDGE CORPORATION

Quality Index Date Reference No. Prepared By Certified By

22 July 2010 TCS00477/09/600/R0108v2

Nicola Hon

Environmental Consultant T.W. Tam

Environmental Team Leader

Version Date Description 1 20 May 2010 First Submission 2 22 July 2010 Amended against IEC’s comments on 21 July 2010

Contract No. ST/2008/02 – Ma On Shan Development Roads, Drainage and Sewerage Works at Whitehead and Lok Wo Sha Phase 1

Quarterly Environmental Monitoring and Audit (EM&A) Summary Report Q1 (October to December 2009)

AUES

Z:\Jobs\2009\TCS00477 (ST-2008-02)\600\EM&A Quarterly Report\1st Quarterly Oct-Dec 09\R0108v2.doc Executive Action-United Environmental Services and Consulting

EXECUTIVE SUMMARY ES.01 The China Road & Bridge Corporation (CRBC) has been awarded the Contract ST/2008/02

Ma On Shan Development – Roads, Drainage and Sewerage Works at Whitehead and Lok Wo Sha Phase 1 (the Project) by the Civil Engineering & Development Department (CEDD) on 18 June 2009. Total project time is expected to be 23 months. Action-United Environmental Services and Consulting (AUES) have been commissioned by CRBC as the ET to implement the relevant EM&A program.

ES.02 This is the 1st Quarterly EM&A summary report for the Project covering the construction

period from 20 October to 25 December 2009.

ENVIRONMENTAL MONITORING AND AUDIT ACTIVITIES

ES.03 Environmental monitoring activities under the EM&A program in this Reporting Quarter are summarized in the following table.

Issues Environmental Monitoring Parameters / Inspection Occasions 1-hour TSP 36 Air Quality 24-hour TSP 12

Construction Noise Leq (30min) Daytime 13 Water Quality Marine Water Sampling 33

ET Regular Environmental Site Inspection 3 Inspection / Audit IEC Monthly Environmental Site Audit 3

BREACH OF ACTION AND LIMIT (A/L) LEVELS

ES.04 In this reporting quarter, no exceedance of construction noise monitoring was recorded. However, one Acton Level exceedance in 24-hour TSP monitoring and 18 A/L Level exceedances in marine water quality monitoring were reported. The statistics of environmental exceedance, NOE issued and investigation of exceedance are summarized in the following table.

Event & Action Environmental Issues

Monitoring Parameters

Action Level

Limit Level Investigation Corrective Actions

1-hour TSP 0 0 - - Air Quality 24-hour TSP 1 0 Not works related N/A

Construction Noise Leq30min Daytime 0 0 - - DO 0 0 - -

Turbidity 3 5 Not works related N/A Water Quality SS 9 1 Not works related N/A

ENVIRONMENTAL COMPLAINT

ES.05 No environmental complaint was recorded or received in this Reporting Quarter. The statistics of environmental complaint are summarized in the following table.

Environmental Complaint Statistics Reporting Period Frequency Cumulative Complaint Nature

20 October - 25 December 2009 0 0 NA NOTIFICATION OF SUMMONS AND SUCCESSFUL PROSECUTIONS

ES.06 No environmental summons or successful prosecutions were recorded in this Reporting Quarter. The statistics of environmental complaint are summarized in the following tables.

Environmental Summons Statistics Reporting Period Frequency Cumulative Complaint Nature

20 October - 25 December 2009 0 0 NA

Contract No. ST/2008/02 – Ma On Shan Development Roads, Drainage and Sewerage Works at Whitehead and Lok Wo Sha Phase 1

Quarterly Environmental Monitoring and Audit (EM&A) Summary Report Q1 (October to December 2009)

AUES

Z:\Jobs\2009\TCS00477 (ST-2008-02)\600\EM&A Quarterly Report\1st Quarterly Oct-Dec 09\R0108v2.doc Executive Action-United Environmental Services and Consulting

Environmental Prosecution Statistics Reporting Period Frequency Cumulative Complaint Nature

20 October - 25 December 2009 0 0 NA REPORTING CHANGE

ES.07 There are no reporting changes in this Reporting Quarter. SITE INSPECTION BY EXTERNAL PARTIES

ES.08 In this Reporting quarter, EPD was visited the site on 24 November 2009 to select the treatment facilities as provided by CRBC for the discharge permit application. Apart from EPD, no other external parties i.e. Agriculture, Fisheries and Conservation Department (AFCD) or Leisure and Cultural Services Department (LCSD) paid a visit during the Reporting Period. FUTURE KEY ISSUES

ES.09 As dry season has approached, construction dust has become a key environmental issue. Construction dust suppression measures should therefore be fully implemented. In addition, the implemented construction dust mitigation measures should also be maintained and improved, as necessary, during dusty works including vehicle movement on dry and windy days.

Contract No. ST/2008/02 – Ma On Shan Development Roads, Drainage and Sewerage Works at Whitehead and Lok Wo Sha Phase 1

Quarterly Environmental Monitoring and Audit (EM&A) Summary Report Q1 (October to December 2009)

AUES

Z:\Jobs\2009\TCS00477 (ST-2008-02)\600\EM&A Quarterly Report\1st Quarterly Oct-Dec 09\R0108v2.doc Table Content Action-United Environmental Services and Consulting

TABLE OF CONTENTS

1 INTRODUCTION 1 1.1 PROJECT BACKGROUND 1 1.2 REPORT STRUCTURE 1

2 PROJECT ORGANIZATION AND CONSTRUCTION PROGRESS 2 2.1 PROJECT ORGANIZATION AND MANAGEMENT STRUCTURE 2 2.2 CONSTRUCTION PROGRESS 2 2.3 SUMMARY OF ENVIRONMENTAL SUBMISSIONS 3

3 SUMMARY OF MONITORING REQUIREMENTS 4 3.1 MONITORING PARAMETERS 4 3.2 MONITORING LOCATIONS 4 3.3 MONITORING FREQUENCY AND PERIOD 5 3.4 METEOROLOGICAL INFORMATION 6 3.5 ENVIRONMENTAL QUALITY CRITERIA 6

4 IMPACT MONITORING RESULTS 7 4.1 RESULTS OF AIR QUALITY MONITORING 7 4.2 RESULTS OF CONSTRUCTION NOISE MONITORING 7 4.3 RESULTS OF MARINE WATER QUALITY OF MONITORING 7

5 WASTE MANAGEMENT 9 5.1 RECORDS OF WASTE QUANTITIES 9

6 SITE INSPECTION 10

7 ENVIRONMENTAL COMPLAINT AND NON-COMPLIANCE 11 7.1 ENVIRONMENTAL COMPLAINT, SUMMONS AND PROSECUTION 11

8 IMPLEMENTATION STATUS OF MITIGATION MEASURES 12

9 CONCLUSIONS AND RECOMMENTATIONS 15 9.1 CONCLUSIONS 15 9.2 RECOMMENDATIONS 15

Contract No. ST/2008/02 – Ma On Shan Development Roads, Drainage and Sewerage Works at Whitehead and Lok Wo Sha Phase 1

Quarterly Environmental Monitoring and Audit (EM&A) Summary Report Q1 (October to December 2009)

AUES

Z:\Jobs\2009\TCS00477 (ST-2008-02)\600\EM&A Quarterly Report\1st Quarterly Oct-Dec 09\R0108v2.doc Table Content Action-United Environmental Services and Consulting

LIST OF ANNEXES Annex A Project Site Layout Plan Annex B Organization Structure and Contact Details of the CRBC and Relevant Parties Annex C Master and Three Months Rolling Construction Programs Annex D Monitoring Locations Designated in the EM&A Manual Annex E Current Impact Monitoring Stations Annex F Graphical Plots of Impact Monitoring – Air, Noise and Marine Water Annex G Meteorological Data of Reporting Month Annex H Monthly Summary Waste Flow Table LIST OF TABLES Table 2-1 Status of Environmental Licenses and Permits Table 3-1 Summary of EM&A Requirements Table 3-2 Location of Air and Noise Quality Noise Monitoring Station Table 3-3 Location of Marine Water Quality Monitoring Stations Table 3-4 Action and Limit Levels for Air Quality Monitoring Table 3-5 Action and Limit Levels for Construction Noise Monitoring Table 3-6 Action and Limit Levels for Water Quality Monitoring Table 3-7 Action Level for Landscape and Visual Impact in Construction Phase Table 4-1 Summary of 24-hour and 1-hour TSP Monitoring Results Table 4-2 Summary of Construction Noise Monitoring Results Table 4-3 Summary of Water Quality Exceedances Table 5-1 Summary of Quantities of Inert C&D Materials Table 5-2 Summary of Quantities of C&D Wastes Table 6-1 Site Observations Table 7-1 Statistical Summary of Environmental Complaints Table 7-2 Statistical Summary of Environmental Summons Table 7-3 Statistical Summary of Environmental Prosecution Table 8-1 Environmental Mitigation Measures

Contract No. ST/2008/02 – Ma On Shan Development Roads, Drainage and Sewerage Works at Whitehead and Lok Wo Sha Phase 1

Quarterly Environmental Monitoring and Audit (EM&A) Summary Report Q1 (October to December 2009)

AUES

Z:\Jobs\2009\TCS00477 (ST-2008-02)\600\EM&A Quarterly Report\1st Quarterly Oct-Dec 09\R0108v2.doc Action-United Environmental Services and Consulting

1

1 INTRODUCTION 1.1 PROJECT BACKGROUND

The China Road & Bridge Corporation (CRBC) has been awarded the Contract ST/2008/02 Ma On Shan Development – Roads, Drainage and Sewerage Works at Whitehead and Lok Wo Sha Phase 1 (the Project) by the Civil Engineering & Development Department (CEDD) on 18 June 2009. Total project time is expected to be 23 months. The Project includes civil engineering infrastructure works for the construction of District Distributors: Road D1(N) & Road D1(W) and Local Road L3 with the associated footpath, cycle tracks, planting areas, drains, sewers, water-mains and landscaping works. There are also one box culvert, one sewage pumping station with pressurized sewers and two site formation works for G/IC and LWS-B areas at Lok Wo Sha to be constructed under the Project. The site layout plan is shown in Annex A. The Project is part of an overall plan approved under a statutory EIA (Register No. AEIAR-068/2002) for a Feasibility Study for Housing Development at Whitehead & Lee On in Man On Shan commissioned by the then Territory Development Department. An Environmental Permit (No. EP-332/2009) for Road D1(N), Road D1(W) and Box Culvert of Whitehead & Lok Wo Sha Phase One Project (EP) has been obtained by the CEDD on 24 March 2009 for the relevant works. According to the Particular Specification (PS) Section 25 and the Environmental Permit No. EP-332/2009, overall scope of environmental monitoring including air quality, construction noise, water quality, and site environmental audit should be undertaken in accordance with the Final Report Environmental Monitoring and Audit Manual [2095/13.3] by an independent Environmental Team (ET). Also, monitoring and audit works for landscaping and visual will be undertaken as part of the EM&A programme. Action-United Environmental Services and Consulting (AUES) has been commissioned by CRBC as the ET to implement the relevant EM&A program. As part of the EM&A program, baseline monitoring is required to determine the ambient environmental conditions. The baseline monitoring program was carried out during the period between 24 August 2009 and 23 September 2009 at the designated monitoring locations by the ET according to the EM&A Manual. The “Baseline Monitoring Report (R0023 Version 2)” had submitted to EPD by the CEDD before commencement of major construction works and approved by the IEC on 5 October 2009. Further to CRBC’s instructions, the EM&A program was commenced on 20 October 2009 and the monitoring schedule had been issued to relevant parties on 17 October 2009. This is the 1st Quarterly EM&A Summary Report (hereinafter “this Report’), covering the first quarter from 20 October to 25 December 2009 (hereinafter “the Reporting Period’).

1.2 REPORT STRUCTURE

The Monthly Environmental Monitoring and Audit (EM&A) Report is structured into the following sections:- SECTION 1 INTRODUCTION SECTION 2 SUMMARY OF IMPACT ENVIRONMENTAL MONITORING AND AUDIT

REQUIREMENTS SECTION 3 MONITORING RESULTS AND BREACHES OF ENVIRONMENTAL QUALITY

CRITERIA SECTION 4 NON-COMPLIANCE, COMPLAINTS, NOTIFICATIONS OF SUMMONS AND

SUCCESSFUL PROSECUTIONS SECTION 5 CONCLUSION

Contract No. ST/2008/02 – Ma On Shan Development Roads, Drainage and Sewerage Works at Whitehead and Lok Wo Sha Phase 1

Quarterly Environmental Monitoring and Audit (EM&A) Summary Report Q1 (October to December 2009)

AUES

Z:\Jobs\2009\TCS00477 (ST-2008-02)\600\EM&A Quarterly Report\1st Quarterly Oct-Dec 09\R0108v2.doc Action-United Environmental Services and Consulting

2

2 PROJECT ORGANIZATION AND CONSTRUCTION PROGRESS 2.1 PROJECT ORGANIZATION AND MANAGEMENT STRUCTURE

Organization structure and contact details of relevant parties with respect to on-site environmental management are shown in Annex B.

2.2 CONSTRUCTION PROGRESS

The master and three month rolling construction programs are enclosed in Annex C and the major construction activities undertaken in this quarter are listed below:- 20 September to 25 October 2009

Erection of hoarding; Tree transplanting; Excavation for the box culvert and the retaining wall; Erect of formwork; and Concreting

26 October to 25 November 2009

Location Forthcoming Activities Nuisances Mitigation Measures

Erection of hoarding Noise generated from erection work

Carry out work within 07:00-19:00, except public holiday/Sunday

Tree transplanting Noise generated from transplanting work

Carry out work within 07:00-19:00, except public holiday/Sunday Portion 1

Pipe installation

Noise generated from the works are included excavation, formwork, steel fixing and concreting etc.

Carry out work within 07:00-19:00, except public holiday/Sunday

Box Culvert

General Excavation Erect formwork Fix steel reinforcement bars Concreting

Noise generated from the works are included excavation, formwork, steel fixing and concreting etc.

Carry out work within 07:00-19:00, except public holiday/Sunday

Retaining Wall at D1(N) & D1 (W)

General Excavation Erect formwork Fix steel reinforcement bars Concreting

Noise generated from the works are included excavation, formwork, steel fixing and concreting etc.

Carry out work within 07:00-19:00, except public holiday/Sunday

26 November to 25 December 2009

Location Forthcoming Activities Nuisances Mitigation Measures

Erection of hoarding Noise generated from erection work

Carry out work within 07:00-19:00, except public holiday/Sunday

Tree transplanting Noise generated from transplanting work

Carry out work within 07:00-19:00, except public holiday/Sunday

Portion 1

Pipe installation

Noise generated from the works are included excavation, formwork, steel fixing and concreting etc.

Carry out work within 07:00-19:00, except public holiday/Sunday

Box Culvert

General Excavation Erect formwork Fix steel reinforcement bars Concreting

Noise generated from the works are included excavation, formwork, steel fixing and concreting etc.

Carry out work within 07:00-19:00, except public holiday/Sunday

Retaining Wall at D1(N) & D1 (W)

General Excavation Erect formwork Fix steel reinforcement bars Concreting

Noise generated from the works are included excavation, formwork, steel fixing and concreting etc.

Carry out work within 07:00-19:00, except public holiday/Sunday

Contract No. ST/2008/02 – Ma On Shan Development Roads, Drainage and Sewerage Works at Whitehead and Lok Wo Sha Phase 1

Quarterly Environmental Monitoring and Audit (EM&A) Summary Report Q1 (October to December 2009)

AUES

Z:\Jobs\2009\TCS00477 (ST-2008-02)\600\EM&A Quarterly Report\1st Quarterly Oct-Dec 09\R0108v2.doc Action-United Environmental Services and Consulting

3

2.3 SUMMARY OF ENVIRONMENTAL SUBMISSIONS

Summary of the relevant permits, licences, and/or notifications on environmental protection for this Project in this Reporting Month is presented in Table 2-1. Table 2-1 Status of Environmental Licenses and Permits

Item Description License/Permit Status 1 Air pollution Control (Construction Dust) Notified EPD on 12 June 09 2 Chemical waste Producer Registration (WPN:

5123-757-C3124-31)

Application date: 16/07/2009 Date approved: 20/8/2009

3 Water Pollution Control Ordinance (Discharge License) Application date: 29/10/2009 Status : In progress

4 Billing Account for Disposal of Construction Waste (Account Number: 700892117)

Application no. :RN/00606 Date approved: 22/6/2009

5 Construction Noise permit (PP-RN0006-09) Application date: 16/11/2009 Approved (CNP no. GW-RN0351-09)

Contract No. ST/2008/02 – Ma On Shan Development Roads, Drainage and Sewerage Works at Whitehead and Lok Wo Sha Phase 1

Quarterly Environmental Monitoring and Audit (EM&A) Summary Report Q1 (October to December 2009)

AUES

Z:\Jobs\2009\TCS00477 (ST-2008-02)\600\EM&A Quarterly Report\1st Quarterly Oct-Dec 09\R0108v2.doc Action-United Environmental Services and Consulting

4

3 SUMMARY OF MONITORING REQUIREMENTS The Environmental Monitoring and Audit requirements are set out in the project EM&A manual. Air quality, construction noise and water quality have been identified to be the key issues during the construction phase of the Project. Also, monitoring and audit works for landscaping and visual will be undertaken as part of the EM&A programme by others during construction period.

3.1 MONITORING PARAMETERS

The EM&A Impact monitoring program covers the following environmental issues: • Air quality; • Construction noise; • Water quality; and • Landscape and visual resources (to be provided by others separately) A summary of the monitoring parameters is presented in Table 3-1 as below. Table 3-1 Summary of EM&A Requirements Environmental Issue Parameters

Air Quality • 1-hour TSP Monitoring by Real-Time Portable Dust Meter; and • 24-hour TSP Monitoring by High Volume Air Sampler.

Noise • Leq(30min) during normal working hours.; and • Leq(15min) during the construction works is undertaken in Restricted Hours.

In-situ Measurements • Dissolved Oxygen Concentration (mg/L); • Dissolved Oxygen Saturation (% ); • Turbidity (NTU); • pH unit; • Salinity (ppt); • Water depth (m); and • Temperature (ºC).

Marine Water Quality*

Laboratory Analysis • Suspended Solids (mg/L)

Landscape and Visual Resources

• Vegetation survey undertaken on an “area” basis to identify representative types and species composition;

• Assessment of landscape character; and • Tree survey report.

* Notes: Since there will be no workshop, vehicle repair area, canteens, workers’ facilities or chemical storage facilities with water discharge points within the site boundaries, no measurements for oil and grease, BOD5 or COD will be necessary based on Section 4.2.2 of the EM&A Manual.

3.2 MONITORING LOCATIONS

Some monitoring locations have been recommended in the EM&A Manual and shown in Annex D. However, as the EM&A Manual was originally approved for a much greater area, some of the monitoring locations have been refined in order to monitor the specific impacts of this Project only. Before the commencement of this EM&A programme, the proposed monitoring locations had been verified by the IEC and endorsed by the EPD. The final Sensitive Receiver where monitoring shall be performed is listed in Table 3-2 and Table 3-3 and shown in Annex E. Table 3-2 Location of Air and Noise Quality Monitoring Station

Env. Aspect Sensitive Receiver Location Air A1 Village house in To Tau near the proposed pumping station

Noise N1 Village house in To Tau near the proposed pumping station

Contract No. ST/2008/02 – Ma On Shan Development Roads, Drainage and Sewerage Works at Whitehead and Lok Wo Sha Phase 1

Quarterly Environmental Monitoring and Audit (EM&A) Summary Report Q1 (October to December 2009)

AUES

Z:\Jobs\2009\TCS00477 (ST-2008-02)\600\EM&A Quarterly Report\1st Quarterly Oct-Dec 09\R0108v2.doc Action-United Environmental Services and Consulting

5

Table 3-3 Location of Marine Water Quality Monitoring Stations Co-ordnance Sensitive

Receiver Monitoring

Station Status East North

Location/Remarks

C1 Control Station 832992 842208 Upstream of sea body located at

north-west of Whitehead developmentM1

(old W1) Impact Station 832550 842525 Near the shore of Cheung Kang

Village M2

(old W2) Impact Station 832798 842541 The shore of To Tau near the proposed

sewage pumping station M3

(old W3) Impact Station 833091 842654 Close to the new box culvert outfall of

the Project.

The Sea Zone of the Project West and North (Tolo Harbour)

M4 (old W4)

Impact Station 833091 842654 The shore of Wo Kwai Sha Tsoi

C2 Control Station 833106 843846 Upstream of sea body located at

Starfish Bay M5

(old W7) Impact Station 832648 843635 Located offshore near the Tolo

Channel in Starfish Bay M6

(old W5) Impact Station 832580 843494 Located at the natural stream outfall in

Starfish Bay M7

(old W8) Impact Station 832791 843514 Located offshore near the Tolo

Channel in Starfish Bay

The Sea Zone of Starfish Bay

M8 (old W6)

Impact Station 832648 843635 Located at the natural stream outfall in

Starfish Bay 3.3 MONITORING FREQUENCY AND PERIOD

The requirements of impact monitoring are stipulated in Sections 2.7, 3.6, and 4.7 of the EM&A Manual and listed as follows. 1-hour TSP Monitoring Parameters : 1-hour TSP monitoring Frequency : 3 times every six days for 1-hour TSP Duration : Throughout out the construction period

24-hour TSP Monitoring Parameters : 24-hour TSP monitoring Frequency : once every 6 days for 24-hour TSP Duration : Throughout out the construction period

Noise Monitoring Parameters : One set of Leq(30min) as 6 consecutive Leq(5min) between 0700-1900 hours

on normal weekdays Frequency : Once every week Duration : Throughout out the construction period Marine Water Quality Monitoring Parameters : In-situ measurements including water depth, temperature, DO, pH, turbidity

and salinity; and Suspended Solids is analyzed by HOKLAS-accreditedlaboratory.

Frequency : Three days a week, at mid ebb and mid flood tides. The interval between 2 sets of monitoring will be more than 36 hours.

Sampling Depth

: (a) Three depths: 1m below water surface, 1m above sea bottom and at mid-depth when the water depth exceeds 6m.

(b) If the water depth is between 3m and 6m, two depths: 1m below water surface and 1m above sea bottom.

Contract No. ST/2008/02 – Ma On Shan Development Roads, Drainage and Sewerage Works at Whitehead and Lok Wo Sha Phase 1

Quarterly Environmental Monitoring and Audit (EM&A) Summary Report Q1 (October to December 2009)

AUES

Z:\Jobs\2009\TCS00477 (ST-2008-02)\600\EM&A Quarterly Report\1st Quarterly Oct-Dec 09\R0108v2.doc Action-United Environmental Services and Consulting

6

(c) If the water depth is less than 3m, 1 sample at mid-depth is taken Duration: : (a) Stations C1, M1, M2, M3 and M4 will be carried out during the

construction works is still on-going after stormwater drainage systems are built and operated or marine works undertaken (in accordance with the Section 4.5.4 EM&A Manual).

(b) Station C2, M5, M6, M7 and M7 will be carried out throughout construction period (in accordance with the Section 4.5.3 EM&A Manual).

3.4 METEOROLOGICAL INFORMATION

The meteorological information during the construction phase is obtained from Tai Po and Shatin Stations of the Hong Kong Observatory (HKO). The meteorological data during this quarter are present in Annex G.

3.5 ENVIRONMENTAL QUALITY CRITERIA

According to the Final Report Environmental Monitoring and Audit Manual [2095/13.3], the air quality, construction noise and water quality criteria with Landscape and Visual Impact were set up, namely Action and Limit levels are listed in Tables 3-4, 3-5, 3-6 and 3-7 as below. Table 3-4 Action and Limit Levels for Air Quality Monitoring

Action Level (μg/m3) Limit Level (μg/m3) Monitoring Stations 1-hour 24-hour 1-hour 24-hour

A1 302 172 500 260 Table 3-5 Action and Limit Levels for Construction Noise

Time Period Action Level in dB(A) Limit Level in dB(A)

0700-1900 hours on normal weekdays When one documented complaint is received > 75* dB(A)

Note: * Reduces to 70 dB(A) for schools and 65 dB(A) during the school examination periods. Table 3-6 Action and Limit Levels for Water Quality

DO (mg/L) (Surface & Mid)

DO (mg/L) (Bottom)

Turbidity (NTU) (Depth Averaged)

SS (mg/L) (Depth Averaged) Monitoring

Location Action Level

Limit Level

Action Level

Limit Level

Action Level

Limit Level

Action Level

Limit Level

M1 2.73 1.61 NA NA 5.73 6.44 8.00 8.77 M2 2.85 1.98 NA NA 6.26 6.45 10.40 14.08 M3 2.51 1.62 NA NA 5.10 5.64 4.00 4.00 M4 2.60 1.74 2.57 1.65 5.32 5.83 5.50 6.27 M5 1.94 1.45 NA NA 8.01 8.7 31.55 48.09 M6 2.36 1.38 NA NA 8.47 9.36 12.00 18.93 M7 1.98 1.57 NA NA 7.11 7.24 7.85 10.31 M8 2.67 1.08 NA NA 6.27 7.19 7.00 11.62

Notes: • “Depth-averaged” is calculated by taking the arithmetic means of reading of all three depths; • For DO, non-compliance of the water quality limits occurs when monitoring result is lower than the limits. • For turbidity and SS, non-compliance of the water quality limits occurs when monitoring result is higher

than the limits. Table 3-7 Action Level for Landscape and Visual Impact in Construction Phase

Parameter Action Level Limit Level Any trespass by the contractor outside the limit of the works, including any damage to existing trees, woodland and vegetation

Non-conformity on one occasion

Repeated non-conformity NA

Contract No. ST/2008/02 – Ma On Shan Development Roads, Drainage and Sewerage Works at Whitehead and Lok Wo Sha Phase 1

Quarterly Environmental Monitoring and Audit (EM&A) Summary Report Q1 (October to December 2009)

AUES

Z:\Jobs\2009\TCS00477 (ST-2008-02)\600\EM&A Quarterly Report\1st Quarterly Oct-Dec 09\R0108v2.doc Action-United Environmental Services and Consulting

7

4 IMPACT MONITORING RESULTS The environmental monitoring results will be compared against the Action and Limit Levels established based on the baseline monitoring results and statutory criteria. In case the measured data exceed the environmental quality criteria, remedial actions will be triggered according to the Event and Action Plan. In the report quarter, the graphical plots of the trends of monitored parameter over the past four months are presented in Appendix F.

4.1 RESULTS OF AIR QUALITY MONITORING

Results of air quality monitoring at the identified locations during the Reporting Period are summarized in Tables 4-1 below. In this quarter period, 42 events of 1-hour TSP and 12 successful events of 24-hour TSP measurements were conducted at designated Location (A1). It is reported that one Action Level exceedance in 24-hour TSP monitoring was recorded during the reporting quarter. Investigation report has conducted and concluded that the exceedance was not related to the works under the Project.

Table 4-1 Summary of 1-hour and 24-hour TSP result 1-hour TSP 24-hour TSP Station

Max Min Mean Max Min Mean A1 204 22 119 178 54 99

Record Date 2 Dec 09 2 Dec 09 42 events 23 Dec 09 11 Nov 09 12 events

4.2 RESULTS OF CONSTRUCTION NOISE MONITORING

Summary of construction noise monitoring at the identified locations during the Reporting Period are summarized in Table 4-2 below. In this reporting quarter, a total of 13 events of construction noise measurement were conducted while no documented construction complaint was received and all the construction noise results were below the Limit level. No NOE or corrective action was recommended for this parameter. Table 4-2 Summary of Construction Noise Monitoring Results

Leq(30min) Station Max Min N1 62.0 53.7

Record Date 2 Nov 09 8 Dec 09 4.3 RESULTS OF MARINE WATER QUALITY OF MONITORING

In this reporting quarter, a total of 33 days of water quality monitoring were conducted. Breaches of water quality A/L levels and statistics of the compliance status during the Reporting Period are summarized in Table 3-6. A summary of exceedances for the three parameters: dissolved oxygen (DO), turbidity and suspended solids is shown in Table 4-3. Table 4-3 Summary of Water Quality Exceedances

DO (Ave of Top &

mid-depth)

Turbidity (Depth Ave.)

SS (Depth Ave) Total ExceedanceStation

Action Limit Action Limit Action Limit Action Limit November 2009

Mid-Ebb M5 0 0 0 0 0 0 0 0 M6 0 0 0 0 0 0 0 0 M7 0 0 0 0 1 0 1 0 M8 0 0 0 1 2 0 2 1

Mid-Flood M5 0 0 0 0 0 0 0 0

Contract No. ST/2008/02 – Ma On Shan Development Roads, Drainage and Sewerage Works at Whitehead and Lok Wo Sha Phase 1

Quarterly Environmental Monitoring and Audit (EM&A) Summary Report Q1 (October to December 2009)

AUES

Z:\Jobs\2009\TCS00477 (ST-2008-02)\600\EM&A Quarterly Report\1st Quarterly Oct-Dec 09\R0108v2.doc Action-United Environmental Services and Consulting

8

M6 0 0 0 1 0 0 0 1 M7 0 0 0 1 0 0 0 1 M8 0 0 0 2 1 1 1 3

December 2009

Mid-Ebb M5 0 0 0 0 0 0 0 0 M6 0 0 0 0 0 0 0 0 M7 0 0 2 0 1 0 3 0 M8 0 0 1 0 2 0 3 0

Mid-Flood M5 0 0 0 0 0 0 0 0 M6 0 0 0 0 0 0 0 0 M7 0 0 0 0 0 0 0 0 M8 0 0 0 0 2 0 2 0

No of Exceedance 0 0 3 5 9 1 12 6

During this reporting quarter, no Action/Limit Levels exceedance is recorded in DO, however, 8 Action/ Limit level exceedances are found in Turbidity; also 10 Action/ Limit levels exceedances are indicated at the SS. NOE was issued to notify EPD, IEC, Contractor and RE upon confirmation of the result. Investigation report was conducted which it was concluded that all exceedances in this Reporting Period were unlikely to be due to the Project as marine discharge was not yet started.

Contract No. ST/2008/02 – Ma On Shan Development Roads, Drainage and Sewerage Works at Whitehead and Lok Wo Sha Phase 1

Quarterly Environmental Monitoring and Audit (EM&A) Summary Report Q1 (October to December 2009)

AUES

Z:\Jobs\2009\TCS00477 (ST-2008-02)\600\EM&A Quarterly Report\1st Quarterly Oct-Dec 09\R0108v2.doc Action-United Environmental Services and Consulting

9

5 WASTE MANAGEMENT Waste management was carried out by an on-site Environmental Officer or an Environmental Supervisor from time to time.

5.1 RECORDS OF WASTE QUANTITIES

All types of waste arising from the construction work are classified into the following:

Construction & Demolition (C&D) Material; Chemical Waste; General Refuse; and Excavated Soil.

The quantities of waste for disposal in this Reporting Period are summarized in Table 5-1 and 5-2 and the Monthly Summary Waste Flow Table is shown in Annex H. Whenever possible, materials were reused on-site as far as practicable.

Table 5-1 Summary of Quantities of Inert C&D Materials

Quantity Type of Waste Oct 09 Nov 09 Dec 09

Disposal Location

C&D Materials (Inert) (m3) 0 0 0 - Reused in this Contract (Inert) (m3) 0 0 0 - Reused in other Projects (Inert) (m3) 0 0 0 - Disposal as Public Fill (Inert) (m3) 0 0 0 -

Table 5-2 Summary of Quantities of C&D Wastes

Quantity Type of Waste Oct 09 Nov 09 Dec 09

Disposal Location

Recycled Metal (kg) 0 0 0 - Recycled Paper / Cardboard Packing (kg) 0 0 0 -

Recycled Plastic (kg) 0 0 0 - Chemical Wastes (kg) 0 0 0 General Refuses (m3) 17.2 6.4 7.72 SENT Landfill

5.01 There was no site effluent discharged but the estimated volume of surface runoff was less than

50m3 in this monthly period.

Contract No. ST/2008/02 – Ma On Shan Development Roads, Drainage and Sewerage Works at Whitehead and Lok Wo Sha Phase 1

Quarterly Environmental Monitoring and Audit (EM&A) Summary Report Q1 (October to December 2009)

AUES

Z:\Jobs\2009\TCS00477 (ST-2008-02)\600\EM&A Quarterly Report\1st Quarterly Oct-Dec 09\R0108v2.doc Action-United Environmental Services and Consulting

10

6 SITE INSPECTION According to the Final Report Environmental Monitoring and Audit Manual [2095/13.3], the environmental site inspection should been formulation by ET Leader. Regular environmental site inspections had been carried out by the ET to confirm the environmental performance. The site inspection was carried out on 20 October, 4 November and 2 December 2009 with the Representatives of the Engineer and the Contractor to evaluate the site environmental performance in this Reporting quarter. No non-compliance was noted. Observations for the site inspections and monthly audit within this Reporting Month are summarized in Table 6-1. Table 6-1 Site Observations

Date Findings / Deficiencies Follow-Up Status 20 October 2009 N/A N/A

4 November 2009 Dust generation was observed during concrete breaking,

The Contractor is reminded to provide water spraying for dust control.

2 December 2009 The stockpile of construction materials is observed no cover with plastic sheet to prevent dust emission.

The Contractor is reminded to provide water spraying or well compact the surface for dust control

Contract No. ST/2008/02 – Ma On Shan Development Roads, Drainage and Sewerage Works at Whitehead and Lok Wo Sha Phase 1

Quarterly Environmental Monitoring and Audit (EM&A) Summary Report Q1 (October to December 2009)

AUES

Z:\Jobs\2009\TCS00477 (ST-2008-02)\600\EM&A Quarterly Report\1st Quarterly Oct-Dec 09\R0108v2.doc Action-United Environmental Services and Consulting

11

7 ENVIRONMENTAL COMPLAINT AND NON-COMPLIANCE 7.1 ENVIRONMENTAL COMPLAINT, SUMMONS AND PROSECUTION

No environmental complaint, summons and prosecution was received in this reporting period. The statistical summary table of environmental complaint is presented in Tables 7-1, 7-2 and 7-3.

Table 7-1 Statistical Summary of Environmental Complaints

Environmental Complaint Statistics Reporting Period Frequency Cumulative Complaint Nature

20 October - 25 December 2009 0 0 NA

Table 7-2 Statistical Summary of Environmental Summons Environmental Summons Statistics Reporting Period

Frequency Cumulative Complaint Nature 20 October - 25 December 2009 0 0 NA

Table 7-3 Statistical Summary of Environmental Prosecution

Environmental Prosecution Statistics Reporting Period Frequency Cumulative Complaint Nature

20 October - 25 December 2009 0 0 NA

Contract No. ST/2008/02 – Ma On Shan Development Roads, Drainage and Sewerage Works at Whitehead and Lok Wo Sha Phase 1

Quarterly Environmental Monitoring and Audit (EM&A) Summary Report Q1 (October to December 2009)

AUES

Z:\Jobs\2009\TCS00477 (ST-2008-02)\600\EM&A Quarterly Report\1st Quarterly Oct-Dec 09\R0108v2.doc Action-United Environmental Services and Consulting

12

8 IMPLEMENTATION STATUS OF MITIGATION MEASURES The environmental mitigation measures that recommended in the Final Report Environmental Monitoring and Audit Manual [2095/13.3] covered the issues of dust, noise and waste and they are summarized as following: Dust Mitigation Measure (a) The contractor shall frequently clean and water the site to minimize fugitive dust

emissions. (b) Effective water sprays shall be used during the delivery ad handling of aggregate, and other

similar materials, when dust is likely to be created and to dampen all sited material during dry and windy weather.

(c) Watering of exposed surfaces shall be exercised as often as possible depending on the circumstance.

(d) Areas within the site where there is regular movement of vehicles must be regularly watered as often as necessary for effective suppression of dust or as often as directed by the Engineer.

(e) Where dusty materials are being discharged to vehicle from a conveying system at a fixed transfer point, a three-sided roofed enclosure with a flexible curtain across the entry shall be provided. Exhausted fans shall be provided for this enclosure and vented to a suitable fabric filer system.

(f) The Contractor shall restrict all motorized vehicles within the site, excluding those on public roads, to a maximum speed of 15km per hour and confine haulage and delivery vehicles to designated roadways inside the site.

(g) Wheel washing facilities shall be installed and used by all vehicles leaving the site. No earth, mud, debris, dust and the like shall be deposited on public roads, water in wheel cleaning facility shall be changed at frequent intervals and sediments shall be removed regularly. The Contractor shall submit detailed proposals for the wheel cleaning facilities to the Engineer prior to construction of the facility. Such wheel washing facilities shall be usable prior to any earthworks excavating activity in the site.

(h) Any material dropped in the roads will need to be cleaned up immediately to prevent dust nuisance.

Noise Mitigation Measure

(a) Noisy equipment and activities should be sited by the Contractor as far from close-proximity sensitive receivers as practical. Prolonged operation of noisy equipment close to dwellings and schools should be avoided.

(b) The Contractor should minimise construction noise exposure to the schools (especially during examination periods) as much as possible. The Contractor should liaise with the school and the Examination Authority to ascertain the exact dates and times of all examination periods during the course of the contract and to avoid noisy activities during these periods.

(c) Noisy plant or processes should be replaced by quieter alternatives where possible. Silenced diesel and gasoline generators and power units, as well as silenced and super-silenced air compressors should be used.

(d) Noisy activities should be scheduled to minimise exposure of nearby sensitive receivers to high levels of construction noise. For example, noisy activities can be scheduled for midday, or at times coinciding with periods of high background noise (such as during peak traffic hours).

(e) Idle equipment should be turned off or throttled down. Noisy equipment should be properly maintained and used no more often than is necessary.

(f) The power units of non-electric stationary plant and earth-moving plant should be quietened by vibration isolation and partial or full acoustic enclosures for individual noise-generating components.

(g) Construction activities should be planned so that parallel operation of several sets of equipment close to a given receiver is avoided, thus reducing the cumulative impacts

Contract No. ST/2008/02 – Ma On Shan Development Roads, Drainage and Sewerage Works at Whitehead and Lok Wo Sha Phase 1

Quarterly Environmental Monitoring and Audit (EM&A) Summary Report Q1 (October to December 2009)

AUES

Z:\Jobs\2009\TCS00477 (ST-2008-02)\600\EM&A Quarterly Report\1st Quarterly Oct-Dec 09\R0108v2.doc Action-United Environmental Services and Consulting

13

between operations. The numbers of operating items of powered mechanical equipment should be minimised.

(h) Construction plant should be properly maintained (well-greased, damage and worn parts promptly replaced) and operated. Construction equipment often has silencing measures built in or added on, e.g. bulldozer silencers, compressor panels, and mufflers. Silencing measures should be properly maintained and utilised. Where possible, rubber or damping materials should be introduced between metal panels to avoid rattle and reverberation of noise.

(i) Equipment known to emit sound strongly in one direction, should where possible, be oriented so that the noise is directed away from nearby NSRs.

(j) Material stockpiles and other structures (such as site offices) should be effectively utilised, where practicable, to screen noise from on-site construction activities. Alternatively, noise barriers having a surface density of 10 kg/m2 should be used to\ protect nearby NSRs if necessary.

(k) The Contractor should devise, arrange methods of working and carry out the works insuch manner as to minimise noise impacts on the surrounding environment, andshould provide experienced personnel with suitable training to ensure that thesemeasures are implemented properly.

Waste Mitigation Measures

(a) The Contractor shall observe and comply with the Waste Disposal Ordinance (WDO) and its subsidiary regulations.

(b) The Contractor shall submit to the Engineer for approval a Waste Management Plan with appropriate mitigation measures including the allocation of an area for waste segregation and shall ensure that the day-to-day site operations comply with the approved waste management plan.

(c) The Contractor shall minimise the generation of waste from his work. Avoidance and minimisation of waste generation can be achieved through changing or improving design and practices, careful planning and good site management.

(d) The reuse and recycling of waste shall be practised as far as possible. The recycled materials shall include paper/cardboard, timber and metal etc.

(e) The Contractor shall ensure that Construction and Demolition (C&D) materials are sorted into public fill (inert portion) and C&D waste (non-inert portion). The public fill which comprises soil, rock, concrete, brick, cement plaster/mortar, inert building debris, aggregates and asphalt shall be reused in earth filling, reclamation or site formation works. The C&D waste which comprises metal, timber, paper, glass, junk and general garbage shall be reused or recycled where possible and, as the last resort, disposal of at landfills.

(f) The Contractor shall record the amount of wastes generated, recycled and disposed of (including the disposal sites). The Contractor shall use a trip ticket system for the disposal of C&D materials to any designated public filling facility and/or landfill.

(g) In order to avoid dust or odour impacts, any vehicles leaving a works area carrying construction waste or public fill shall have their load covered.

(h) To avoid the excessive use of wood, reusable steel shutters shall be used as a preferred alternative to formwork and falsework where possible.

(i) The Contractor shall observe and comply with the Waste Disposal (Chemical Waste) (General) Regulation. The Contractor shall apply for registration as chemical waste producer under the Waste Disposal (Chemical Waste) (General) Regulation when chemical waste is produced. All chemical waste shall be properly stored, labeled, packaged and collected in accordance with the Regulation.

CRBC had been implementing the required environmental mitigation measures according to the Final Report Environmental Monitoring and Audit Manual [2095/13.3] subject to the site condition. Environmental mitigation measures generally implemented by CRBC in this Reporting Month are summarized in Table 8-1.

Contract No. ST/2008/02 – Ma On Shan Development Roads, Drainage and Sewerage Works at Whitehead and Lok Wo Sha Phase 1

Quarterly Environmental Monitoring and Audit (EM&A) Summary Report Q1 (October to December 2009)

AUES

Z:\Jobs\2009\TCS00477 (ST-2008-02)\600\EM&A Quarterly Report\1st Quarterly Oct-Dec 09\R0108v2.doc Action-United Environmental Services and Consulting

14

Table 8-1 Environmental Mitigation Measures

Issues Environmental Mitigation Measures Water Quality

• Wastewater were appropriately treated by treatment facilities; • Drainage channels were provided to convey run-off into the treatment facilities; and • Drainage systems were regularly and adequately maintained.

Air Quality • Regular watering to reduce dust emissions from all exposed site surface, particularly during dry weather;

• Frequent watering for particularly dusty construction areas and areas close to air sensitive receivers;• Cover all excavated or stockpile of dusty material by impervious sheeting or sprayed with water to

maintain the entire surface wet; • Public roads around the site entrance/exit had been kept clean and free from dust; and • Tarpaulin covering of any dusty materials on a vehicle leaving the site.

Noise • Good site practices to limit noise emissions at the sources; • Use of quite plant and working methods; • Use of site hoarding or other mass materials as noise barrier to screen noise at ground level of

NSRs; • Use of shrouds/temporary noise barriers to screen noise from relatively static PMEs; • Scheduling of construction works outside school examination period in critical area; and • Alternative use of plant items within one worksite, where practicable.

Waste and Chemical Management

• Excavated material should be reused on site as far as possible to minimize off-site disposal. Scrap metals or abandoned equipment should be recycled if possible;

• Waste arising should be kept to a minimum and be handled, transported and disposed of in a suitable manner;

• The Contractor should adopt a trip ticket system for the disposal of C&D materials to any designed public filling facility and/or landfill; and

• Chemical waste shall be handled in accordance with the Code of Practice on the Packaging, Handling and Storage of Chemical Wastes.

General The site was generally kept tidy and clean.

Contract No. ST/2008/02 – Ma On Shan Development Roads, Drainage and Sewerage Works at Whitehead and Lok Wo Sha Phase 1

Quarterly Environmental Monitoring and Audit (EM&A) Summary Report Q1 (October to December 2009)

AUES

Z:\Jobs\2009\TCS00477 (ST-2008-02)\600\EM&A Quarterly Report\1st Quarterly Oct-Dec 09\R0108v2.doc Action-United Environmental Services and Consulting

15

9 CONCLUSIONS AND RECOMMENTATIONS 9.1 CONCLUSIONS

This is the 1st Quarterly EM&A summary report for the Project covering the construction period from 20 October to 25 December 2009. No noise complaint (which is an Action Level exceedance) was received and no construction noise measurement results that exceeded the Limit Level were recorded in this Reporting Month. No NOEs or the associated corrective actions were therefore issued. In this reporting quarter, no 1-hour TSP monitoring results that triggered the Action or Limit Levels were recorded but 1 Action Level exceedance in 24-hour TSP monitoring was registered. Investigation report was concluded the exceedance was not related to the works of the Project. For marine water quality, 12 Action and 6 Limit Level exceedances were recorded in this reporting quarter. NOE was issued and investigation concluded that the exceedances were not project related. No documented complaint, notification of summons or successful prosecution was received. Three event of site inspection were carried out by ET in this reporting quarter. No non-compliance was observed during the inspection. In general, it was reminded that good house keeping practice should be maintained. The environmental performance of the Project was therefore considered satisfactory. In this Reporting quarter, EPD visited the site on 24 November 2009 to select the treatment facilities as provided by CRBC for the discharge permit application. No other external parties i.e. Agriculture, Fisheries and Conservation Department (AFCD) or Leisure and Cultural Services Department (LCSD) paid a visit during the Reporting Period.

9.2 RECOMMENDATIONS

As dry season is approaching, special attention should be paid to provide air quality mitigation measures including wheel wash facilities, watering of haul roads and covering of dusty materials with tarpaulin sheet, etc. Moreover, mitigation measures to avoid ingress of surface runoff into nearby water bodies from the construction site should be properly maintained. To control the site performance on waste management, the CRBC shall ensure that all solid and liquid waste management works are fully in compliance with the relevant license/permit requirements, such as the effluent discharge licence and the chemical waste producer registration. CRBC is also reminded to implement the recommended environmental mitigation measures according to the Final Report Environmental Monitoring and Audit Manual [2095/13.3]. Baseline monitoring of air quality, noise and water quality was conducted during typical Hong Kong wet season (April to October). It is important that influence of the seasonal changes is taken into account when interpreting monitoring data of all environmental issues obtained in the coming dry season. Review of the baseline conditions may need to be conducted regularly in particular during times of seasonal changes. If the baseline changes are evident, the environmental performance criteria should be re-established under agreement of the ER and IEC and submitted to the EPD for endorsement.

Contract No. ST/2008/02 – Ma On Shan Development Roads, Drainage and Sewerage Works at Whitehead and Lok Wo Sha Phase 1

Quarterly Environmental Monitoring and Audit (EM&A) Summary Report Q1 (October to December 2009)

AUES

Z:\Jobs\2009\TCS00477 (ST-2008-02)\600\EM&A Quarterly Report\1st Quarterly Oct-Dec 09\R0108v2.doc Annex Action-United Environmental Services and Consulting

Annex A

Project Site Layout Plan

Contract No. ST/2008/02 – Ma On Shan Development Roads, Drainage and Sewerage Works at Whitehead and Lok Wo Sha Phase 1

Quarterly Environmental Monitoring and Audit (EM&A) Summary Report Q1 (October to December 2009)

AUES

Z:\Jobs\2009\TCS00477 (ST-2008-02)\600\EM&A Quarterly Report\1st Quarterly Oct-Dec 09\R0108v2.doc Annex Action-United Environmental Services and Consulting

Annex B

Organization Structure and

Contact Details of the CRBC & Relevant Parties

Contract No. ST/2008/02 – Ma On Shan Development Roads, Drainage and Sewerage Works at Whitehead and Lok Wo Sha Phase 1

Quarterly Environmental Monitoring and Audit (EM&A) Summary Report Q1 (October to December 2009)

AUES

Z:\Jobs\2009\TCS00477 (ST-2008-02)\600\EM&A Quarterly Report\1st Quarterly Oct-Dec 09\R0108v2.doc Annex Action-United Environmental Services and Consulting

Environmental Management Organization

CEDD

Environmental Team (the ET)

Independent Environmental Checker EDMS

Environmental Team Leader AUES

T.W. Tam

Environmental Team Supervisor AUES

Ben Tam

General Public

Environmental Officer CRBC

L. C. Ling

Project Manager CRBC

Raymond Mau

Project Engineer AECOM

Joanna Wong

Environmental Supervisor CRBC T.B.A.

Site Agent CRBC

Felix Chan

Site Foreman & Supervisors CRBC

Cheng Pui Ming

Sub-Contractors’ Project Managers

Sub-Contractors

Site Engineers CRBC

Lam Wai Hong Xia Yu

Ng Ka Ying Environmental Consultant AUES

Ben Tam Nicola Hon

Resident Engineer AECOM

Angus Law

Safety Officer CRBC

John Choi

Contract No. ST/2008/02 – Ma On Shan Development Roads, Drainage and Sewerage Works at Whitehead and Lok Wo Sha Phase 1

Quarterly Environmental Monitoring and Audit (EM&A) Summary Report Q1 (October to December 2009)

AUES

Z:\Jobs\2009\TCS00477 (ST-2008-02)\600\EM&A Quarterly Report\1st Quarterly Oct-Dec 09\R0108v2.doc Annex Action-United Environmental Services and Consulting

Contact Details of Key Personnel

Organization Project Role Name of Key Staff Tel No. Fax No.

CEDD Employer Mr. Dennis Mok 2301 1398 2721 8630

AECOM Engineer’s Representative Mr. Angus Law 2631-7796 2631-7226

EDMS Independent Environmental Checker Mr. James Choi 2869-6018 3007-8556

CRBC Project Director Mr. Wang Yanhua 2283-1688 2283-1689

CRBC Project Manager Mr. Raymond Mau 9048-3669 2631-8993

CRBC Site Agent Mr. Felix Chan 5182-9660 2631-8993

CRBC Site Engineer Mr. Lam Wai Hong 2631-8823 2631-8993

CRBC Site Engineer Mr. Xia Yu 2631-8823 2631-8993

CRBC Site Engineer Ms. Ng Ka Ying 2631-8823 2631-8993

CRBC Environmental Officer Mr. L.C. Ling 9858-1378 2631-8993

CRBC Environmental Supervisor TBA

CRBC Safety Officer Mr. John Choi 2631-8823 2631-8993

AUES Environmental Team Leader Mr. T.W. Tam 2959-6059 2959-6079

AUES Environmental Consultant Mr. Ben Tam 2959-6059 2959-6079

AUES Environmental Consultant Ms. Nicola Hon 2959-6059 2959-6079

AUES Environmental Site Inspector Mr. Ben Tam 2959-6059 2959-6079

Legend: CEDD (Employer) – Civil Engineering and Development Department AECOM (Engineer) – AECOM CRBC (Main Contractor) – China Road and Bridge Corporation EDMS (IEC) – EDMS Consulting Limited AUES (ET) – Action-United Environmental Services & Consulting

Contract No. ST/2008/02 – Ma On Shan Development Roads, Drainage and Sewerage Works at Whitehead and Lok Wo Sha Phase 1

Quarterly Environmental Monitoring and Audit (EM&A) Summary Report Q1 (October to December 2009)

AUES

Z:\Jobs\2009\TCS00477 (ST-2008-02)\600\EM&A Quarterly Report\1st Quarterly Oct-Dec 09\R0108v2.doc Annex Action-United Environmental Services and Consulting

Annex C

Master and Three Months Rolling Construction Programs

Contract No. 5T/2008//02Ma On Shan Development - Road, Drainage and Sewerage Works at Whitehead and Lok Wo Sha Phase 1

Master Programme (Rev. 1.0)

ID læk Name Duration Sta¡t Finish lredecessors 2mslzorolzottlzotza lJunlJul hudseoloctl o llecllan +ú¡rhnl

^ honllothuJs.olo.tl o lo."ll-h.úunlnorl .l¡unl¡ul,q,ods.oloctl o bedJantrbMarlApd a llunllut

cl):02):03)Io: 04 )

?a

I's officeffrce

IUU

,a\

and delivery

's and setting out Site boundæies

on in the vicinity of the Site

M)

rcological survey and approval

Apply License to Excavate and Search for AntiquitiesCarry out archaeological survey

Backfill the confirmatory trial pitSubmission of Draft A¡chaeological survey report for AMO's comn

Submission of Final Archaeological survey report

Envi¡onmental worksSubmit EMP and WMP for approval

Propose website layout for reporting of EM&A information fo¡ app

Propose specialist for baseline monitoring and approval

Propose Methodology of baseline and approval

Carry out baseline monitoringSubmission of Baseline report for ICE s endorsement

Obtain consent from EPD for designated Non Woodland fueaErect hoarding a¡ound the fung shui woodland at DlErection of protective hoæding a¡ound Wu Kai Sha Village Well at

Erection of protective measures around existing grave at Dl(W)Iandscape works

Propose specialist for üee survey and approval

Carry out tree survey

Propose methodology for tree transplanting works for approval

Submission of tree survey report and LMP for IEC's endorsement

Obtain consent from EPD for designaæd Woodland Proþt AreaXP application at Sha On Street

Preparation of planting area for transplanted trees

Ground Investigation WortsProoose soecialist and methodolosv for SI works

1065 days

705 days

700 days

1065 days

700 days

700 days

700 days

1065 days

700 days

256 days

0 days

7 days

14 days

30 days

14 days

7 days

30 days

30 days

20 days

15 days

30 days

90 days

59 days

45 days

7 days

7 days

256 days

30 days

70 days

45 days

7 days

90 days

14 days

162 days

40 days

20 days

l0 days

60 days

30 days

12 days

12 days

14 days

14 days

l0 days

168 days

14 days

60 days

30 days

30 days

60 days

45 days

30 days

Thu 09/6/18

Thu 09/ll8Thu 09/6/18

Thu 09/6/18

Thu 09/6/18

Thu 09/6/18

Thu 09/6/18

Thu 09/6/18

Thu 09/6/18

Thu 09/6/18

Thu 09/6/18

Thu 09/6/18

T\u0916125

Tltuú1719Thu0916125

T\u@1719Thu 09fl16T\u@fi116Sat 09/8/15

Fn0919l4Sat 09/8/15

Sat 09/8/15

T\tt09,ll19T\u@1719

Sun 09/8/23

Sun 09/8/30

Thu 09/6/18

Thu 09/6/18

Sat 09/7/18

Satú19126Tue 09/l 1/10

Tue 09/11/17

Mon 10/2/15

Thu 09/6/18

Thu 09/6/18

TrcC9.Í7128

Thu 09/6/18

Sun 09/6/28

Thu09l8l27SatC!.19126

Thu 09/10/8

Trc09110120

Tue 09/11/3

TueúlllllTThu 09/d18Thu 09/6/18

TltuWl712T\uß1712

Mon 09/8/31

Wed 09/9/30

Sat @/9/19

Tue 09/11/3

Thu 09/d18Thu 09/6/18

T\llAflI1Monlll5l23Wed ll/5/18"Iltu l2l5l17

Wed 1ll5/18Wed 1l/5/18Wed ll/5/18Tltu I2l5ll7wed ll/5/18

Sun 10/2/28

Thu 09/6/18

Wed091612412

Wed 09tl8 13

FtLWlSn AWed 09fll8 13

Wed 09fll15 16

FrrWlSll4lTFri 09/8/14 l8SS

Thu09/9/3 19,18

Fn09l9l1820Sun09/9/13 19

Thu 09/11/12 19

Sat 0919/5

Satú1812214Satú1812925

Sat09.191526

Sun 102/28FnWnln nFnWl9l2529

Mon 09/11/9 30

Mon @/11/16 3lS:u¡,l0l2ll432Sunl0l2l2833

TltuCf.llll26Mon09[71I712Sun @/8/16 36

Satú1612712Wedt9l8l2638

FnWl9l2539WedWlI}n 40

Mon 09/10/19 41

Mon0P.llll242Mon 09/11/16 43

]Jtuú11U2644wdwtvn

WedCF.nllnSun 09/8/30 47

Fnúnß1,47TueC9.1912948

Sat 09/1 1/28 50

Mon09.lIll22lWedWllUz52

Thu 09/1210TueCf.19l1512

176 days

90 davs

)3

4

5

61

8

9

t0ut2r3

I4l5l6t7l8l920

21

22

23

24

25

26

27

28

29

30

31

32

JJ

34

35

36

37

38

39

40

4t42

43

44

45

46

47

48

49

50

5l52

53

54

55

sT/2008/02Task Milestone a Ro[ed Up Critical Tæk Split , , Group By Summary

Critical Tæk Summary Rolled Up Milestone O Exþmal Tæks Deadline {,

Rolled Up Task Rolled Up Prog¡essProgress Proþt Summary

Page 1

Contract No. 5T/2008//02Ma On Shan Development - Road, Drainage and Sewerage Works at Whitehead and Lok Wo Sha Phase 1

Master Programme (Rev. 1.0)

ID tæk Name Duration Staft Finish lPredecessors z(xD I zoto I zott | .2012, h,rnll''l lAuJs lenlocr o Tan Jul o

56 Mobilization of plants and set up

Carry out SI worksADH4ADH5ADH6ADHTADH2ADH3ADHI

Submission of draft and final report

Section I Works (Works at Portion 1)glgrþ ¿¡ esraining Wall no. 6

Tree Transplant - 23nos

Mobilization of plants

Tree - Crown pruning

Tree - Root pruning lst stage - Pruning

Tree - Root pruning lst stage - WaitTree - Root pruning 2nd stage - Pruning

Tre¿ - Root pruning 2nd stage - WaitTree - Transplant

RW6 (CH0.00 - CH104.40 )Bay RW6-3 (CH29.70 - CH65.70)

Bay RW64 (CH65.70 - CH80.70)

Bay RW6-5 (CH80,70 - CH93.40)

Bay RW6-2 (CH14.70 - CH29.70)Bay RW6-6 (CH93.40 - CH104.40)

Bay RW6-l (CHO.ffi - CHl4.70)Works at Box Culvert

Tree Transplant - 20nos

Tree - Crown pruning

Tree - Root pruning lst strge - Pruning

Tree - Root pruning lst stage - WaitTree - Root pruning 2nd stage - Pruning

Tree - Root pruning 2nd stage - WaitTree - Transplant

Slope WorksProvision of temp. access for Lot STI 1033 and 1588

Cut existing road and form proposed slope

Slope inspection and verification works

Construction of æsociate surface drain system, berm and railir

7 days

49 days

7 days

7 days

7 days

7 days

7 days

7 days

7 days

30 days

ó47 days

185 days

101 days

14 days

5 days

5 days

28 days

5 days

28 days

7 days

84 days

20 days

20 days

12 days

12 days

l0 days

l0 days

581 days

71 days

5 days

5 days

28 days

5 days

28 days

5 days

229 days

14 days

180 days

90 days

90 days

5 days

581 days

6 days

40 days

35 days

35 days

35 days

40 days

35 days

35 days

35 days

35 days

35 days

35 days

35 days

Wed 09/9/16

wdúDn3WedWl9l23Wed 09/9/30

Wed 09/10/7

Wed 09/10/14

Wed 09/10/21

Wed 09/10/28

Wed 09/11/4

Wed 09/ll/11Sat 09Æ/15

Mon09/8ßlMon 09/8ß1Mon 09/8/31

Mon 09/9/14

Mon 09/9/14

Sat 09/9/19

Sat 09/10/17

Tttu09ll0l22T1lt09ll2l3

Thu 09/1210Thu 09/12l10

Wed 09/12130

Tue 10/1/19

Sun l0/l/31Fn l0l2ll2

Monl0l2l22Tue 09/10/20Sun 09/1129Sun 09/11/29

Fnæll2l4Fn09lI2l4Fri 10/l/l

Wed 10/l/6Wed,l0l2l3

Mon 10/l/25Mon 10/l/25Mon 10/2/8

Sun 10/5/9

Tue 10/6/8

Mon 10/9/6

Tue 09/1020Tue 09/10/20

Mon 09/10/26

SatúllA5Sat l0/1/9

Sat 10/2/13

Mon09l10126Sarúll2l5Sat 10/l/9

Sat 10/?13Sat 10/3/20

Sa¡1014124

Sarl0l5l29Sat l0f//3

Tueú1912255Tuc 09/ll/10

TueC9.1912956

Tue 09/10/6 58

Tue 09/10/13 59

Tue 09/10/20 60

Tueúll0l27 6ITueúllll362

Tue 09/l l/10 63

Thu 09/12110 64

Mon 11/5/23

Wed 10ßßwedænu9

Sun 09/9/13 49,48

FrA9Mß69Fri 09/9/18 69

Fri 09/10/16 71

Wed,09ll0l2l72wed 09/11/18 73

Wed091121914,53

Wed 10/3/3

Tueú11A2975Mon l0/l/18 77

Sat l0/l/30 78

T1t.t l0l2lIl79Sun 10/2/21 80

Wed 10/3/3 8lMorlll5l23

Sun 10/2/lT\t@ll2l35lTue 09/178 85

Thu09/12131 85

Tue 10/l/5 87

Tuel0l2l288Sun l0/2fl 89,53

Fri 10D/10Sun l0/2fr 90FF

Fri 10/8/6 90,92

Fri 10/8/6 93FS-90 days

Sun 10/9/5 94FS-60 days

Fri 10/9/10 95

Mon 11/5/23

Sun09ll0l25 42

FnWlI2l498Fri l0/l/8 99

Fnl0l2ll2lffiFri 10/3/19 101

Fn09lIA498Fri 10/l/8 103

Fnl0l2lI2lMFri 10/3/19 105

Fri 10/4/23 106

Fri 10/5/28 107

FnrcnDI08Fri 10/8/6 109

Misc. works

Construction of Box CulvertMobilization of plant

Bav 22(CH315.00 - CH330.00)

Bay 23 (CH330.00 - CH345.00)

Bay 24 (CH345.00 - CH360.00)

Bay 25 (CH360.m - CH375.00)

Bav 32(CH465.00 - CH480.00)

Bay 31 (CH450.m - CH465.00)

Bay 30 (CH435.00 - CH450.m)Bav 29 (CH420.00 - CH435.00)

Bay 28 (CH405.00 - CH420.00)

Bay 27 (CH390.m - CH405.00)

Bay 26 (CH375.m - CH390.00)

Bav 2l (CH300.00 - CH315.00)

I

ñ57

58

59

60

6l62

63

64

65

66

67

68

I

!I

69

70

71

72

13

74

15

76

77

78

79

80

81

82

83

84

¡ì-vlì-v

T

It

85

86

87

88

89

90

9t92

93

94

95

96

97

¡L

98

99

100

0l I

!t-02

03

M05 I06

07

108

109

110

sTt2008t02Tæk Milestone O Rolled Up Critic¿l Tæk Split , Group By Summary

Critical Tæk Summary Rolled Up Milestone Ô External Tasks Deadline +

Rolled Up Tæk Rolled Up ProgressProgress Proþt Summary

Page2

Contract No. 5T/2008//02Ma On Shan Development - Road,

Master Programme (Rev. 1.0)Drainage and Sewerage Works at Whitehead and Lok Wo Sha Phase I

ID læk Name Duration Staft Finish hedecessors 2ff)g 2010 20t1 2012

a lJunlJul lAudS ieolOc o DeclJan .e 'rh¡"Jnntl t lunllul huJsenloc n ln""llrn h"¡h¡r.lnn.l t lunllut hudseolo.tl o becl¡unF*Mal¡rl a ln¡nll¡lll Bay 20 (CH285.00 - CH300.00) s

Bay l9 (CH270.00 - CH285.00) s

Bay l8 (CH255.00 - CH270.00) s

Bay l7 (CH2,10.00 - CH255.00) s

Bay 16(CH225.00 - CH240.00) s

Bay 15 (CH210.00 - CH225.00) s

Bay 14 (CH195.00 - CH210.00) s

Bay I (CH0.00-CH15.00)

Bay 2 (CH15.00 - CH30.00)

Bay 3 (CH30.00 - CH45.00)

Bay 4 (CH45.00 - CH60.00)

Bay 5 (CH60.00 - CH75.00)

Bay 6 (CH75.00 - CH90.00)

Bay 7 (CH90.00 - CH105.00)

Bay 8 (CH105.00 - CH120.m)Bay 9 (CH120.00 - CH135.00)

Bay 10 (CH135.00 - CH150.00)

Bav ll (CH150.00 - CH165.00)

Bay 12 (CH165.00 - CHl80.m)Bav 13 (CHl80,m - CH195.m)Oufall (CH480.00 - CH493.285)

Completion of Box CulvertRe-alignment of existing road

Tree Transplant - 5nos

Mobilization of plants

Tree - Crown pruning

Tree - Root pruning lst stage - Pruning

Tree - Root pruni¡g lst stage - WaitTree - Root pruning 2nd stage - Pruning

Tree - Root pruning 2nd stage - WaitTree - Transplant

Road WorksUtility coordination meeting

Diversion of existing CLP transformer

Laying of l200dia. Concreæ pþMinor Earthwork for road formationConst¡uction of watermain (beside proposed road)

Construction of proposed concrete road

Implement of TTAConnection of proposed road to existingCuring time for last pour concrete road surface

Open to public

Construction of watermain ( existing road)

Pressure test and swabbing of watermain

Sterlization and water sample

Connection of watermain bv WSDMisc. works

Worls at Dl(N) Road

Tree Transplant - 20nos

Tree - Crown pruning

Tree - Root pruning lst stage - Pruning

Tree - Root pruning lst stage - WaitTree - Root pruning 2nd stage - Pruning

Tree - Root pruning 2nd stage - WaitTree - Transplant

45 days

45 days

40 days

40 days

40 days

40 days

40 days

30 days

30 days

30 days

30 days

30 days

30 days

30 days

30 days

30 days

30 days

30 days

30 days

30 days

40 days

0 days

289 days

101 days

14 days

5 days

5 days

28 days

5 days

28 days

7 days

289 days

45 days

90 days

12 days

35 days

30 days

30 days

3 days

14 days

14 days

3 days

l0 days

7 days

14 days

30 days

7 days

502 days

73 days

5 days

5 days

28 days

5 days

28 days

7 days

Sat l0/8flTue l0l9l2lFri l0/ll/5

Wed l0/lUl5Mo¡ lIlll24

Sat 1l/3/5Thu l1/4/14Sat 10/3/20

Mon 10/4/19

Wed 10/5/19

Fri 10/6/18

Sun 10fll18Tue 10/8/17

Thu 10/9/16

Sat 10/10/16

Mon 10/11/15

Wed l0/12l15Fn lllll14

Sun ll/2/13Tue 1l/3/15Thu ll/4/14Mon lll5l23Sat 09/8/15

Mon 09/8/31

Mon 09/8/31

Mon09l9l14Mon 09/9/14

Sat 09/9/19

Sat 09/10/17

TlttC9.ll0l22TltuúlI2l3Sat 09/8/15Sat 09/8/15

Tue09l9l29Fri 09/l 1/13

Wedúllll25Wed 09/12130

Tue 10/l/19Thu 10/218

Sun 10/2/21

Sun 10/3/7

Sun 10/3/21

Wedl0l3l24Sat 10/4/3

Sat 10/4/10

Sat I0l4l24Monl0l5l24

Tue 09/1020Sun 09/1129Sun 09/l l/29Sun 09/l 1/29

FnWlW4Fri 10/1/1

Wed 10/1/6

WedßU3

Mon 10/920 9l

Thu l0/ll/4 ITue l0ll2ll4l

Sun ll/1/23 IFn lll3l4I

Wed 1l/4/l3lMon 11/5/23 ISun 10/4/18 1l

Tue 10/5/18 IThu 10/6/17 ISat l0r7l17 1l

Mon l0/8/16 llWed 10/9/15 l:Fri 10/10/15 l:

Sun l0/11/14 llTue l0ll2ll4l'Thu ll/1/13 1l

Sat lIl2ll2I'Mon 1l/3/14 llWed 1ll4/13 l:Mon ll/5/23IiMon 1l/5/23 liSun 10/5/30

\rdwlragSun 09i9l13 4'

Fri 09/9/18 l'Fri 09/9/18 l.

Fri 09/10/16 1.

Wed 09/10/21 l.Wed 09/11/18 1,

Wei@ll2l9I'Sun 10/5ß0Mon 09/9/28 1l

SunC'4.ll2l27I'Ttrcúllll242:Tueúll2l29l,Thu 10/1/28 1,

WedI0l2ll7 I'Sarl0l2l20lSat 10/3/6 l,

Sat 10/3/20 1.

Tve l0l3l23l.Fnl0l4l2LFn l0l4l9l.

Ft l0l4l23 L

Sun 10/5/23 1:

Sun 10/5/30 1:

Sat 1lßl5Tuel0l2.ll)

T\uúl|2l35TltuWll2l35

Thu09/12131 ltTue l0/l/5 ltTue l0l2l2ltTue I0l2l9lt

],1 l0I12

t3

t4

r5

t6

)2

t8

t9

¿0

¿1

¿2

,.3

¿4

t5

¿6

t't¿8

z9

l011,1 17

),48

l5l5ttl8l910,53

r3

lt5,14tFS-15 dt6[TFS-10 days,

t8

f9t0ilt2t3

t4t5

r6

It2

t3

A,53

J 5n3

t2r3

t4l5l6r7l819

20

2l22

23

24

25

26

21

28

29

30

3l32

JJ

34

35

36

)t38

39

40

4t42

!

7

k

I

+Tìv]-\I

43

44

45

46

47

r48

r4950

r5l52

153

t54155

56

57

58 I

59

60

6l162

r63T&165

sT/2008/02Tæk Milestone a Roled Up Critical Tæk Split Group By Summary

Critical Task Summary Rolled Up Milestone O External Tasks Deadline O

Rolled Up Tæk Rolled Up Prog¡essProgress ProþtSummary

Page 3

Contract No. 5T/2008//02Ma On Shan Development - Road, Drainage and Sewerage Works at Whitehead and Lok Wo Sha Phase 1

Master Programme (Rev. 1.0)

ID Iæk Name Duration Start Finish ledecessors 2W I 2010 201 I 2Û12

a llunllul lnupls ieoloct o Ian rebh4arlAorl a IunlJul o lo."ll-h.uhr¡.J¡o.l . hunl¡u hodseoloctl o bec[mh*Molen ] a lrunlrult66 RW4 (CH123.00 - CH290.00)

Bay RW4-18 (CH159.00 - CHl7l,00)Bay RW4-19 (CH171.00 - CH183.00)

Bay RW4-22 (CH207.m - CH220.00)

Bay RW4-23 (CH220,00 - CHr2.m)Bay RW4-24 (CH232.N -CH244.m)Bay RW4-25 (CH244.00 - CH256.00)

Bay RW4-20 (CH183.00 - CH195.00) CLPBay RrrlV4-21 (CH195.00 - CH207.00) CLPBay RW4-17 (CH147.00 - CH159.00)

Bay RW4-16 (CH139.00 - CH147.00)

Bay RW4-15 (CH13l.00 - CH139.00)

Bay RW4-14 (CHlæ.m - CH131.00)

Bay RW4-26 (CH256.m - CH266,00)

Bay RW4-27 (CH266.m - CH278.00)

Bay RW4-28 (CH278.00 - CH290,00)

RW2 (CH0.00-CH91.00)

Cofirmation of RW2Bay RW2-l (CH0.00 - CH12.00)

Bay RW2-2 (CH12.00 - CHl7.00)Bay RW2-3 (CH17.00 - CH26.50)

Bay RW2-4 (CH26.50 - CH36.00)

Bay RW2-5 (CH36.m - CH45.00)

Bay R'ü2-6 (CH45.00 - CH54.00)

Bay RW2-7 (CH54.00 - CH63.00)

Bay RW2-8 (CH63.00 - CH71.m)Bay R'ü2-9 (CH?l.m - CH8l.00)Bay RW2-10 (CH81.00 - CH91.00)

Road WortsUtility detection and reporting

Utility coordination and diversion if necessary

Chainage From CH 300 to CH 564

Earthworks

Construction of stormwater drain

Construction of sewerage

Proposed water main layingPressure test and swabbing

Construction of proposed road surface

Public lightineUtilities laying

Gas main

CLP Cable

PCCW

CATVHKBN

Installation of street furmture

Construction of footpath

113 days

15 days

14 days

14 days

14 days

14 days

14 days

14 days

14 days

14 days

12 days

12 days

12 days

12 days

1l days

1l days

113 days

53 days

12 days

12 days

12 days

12 days

12 days

12 days

12 days

12 days

12 days

12 days

5û2 days

7 days

50 days

495 days

120 days

120 days

90 days

60 days

14 days

40 days

30 days

115 days

45 days

20 days

40 days

30 days

30 days

15 days

50 days

50 days

10 days

342 days

70 days

Tue 09/10/20Tue 09/10/20

Wed 09/l l/4Wed 09/l l/18wúwn2t2

Wedæll2l16Wed09lW30Wed 10/l/13WedI0lIl2T

Wed 09/11/18

WedWlI2l2MonúlI2l14

SatC9.l12126

Thu l0/1flTue 10/l/19Sat l0/l/30

Tue 09/10/20Tue 09/10/20

Sat09llU12T\u09112124

Tue l0/l/5Sun 10/l/17

Fn l0lll29Sat09lI2l12

Tlttúll2l24Tue l0/l/5

Sun 10/l/17Fn I0lIl29

Tue 09/1020TueC.9.lI0l20

Tue09lI0l27Tveú[email protected]

WedßH24Sat 10/4/10

Wed 10/6/9

Tue 10/5/25

Wed 10/6/9

FNrcNDFnnnlg

Fri 10/8/13

Sat 10/8/28

Fn l0l9lI7Sat 10/10/2

Mon 10/11/lTue 10/11/16

Wed ll/l/5Tltu l1l2l24

we/JL0utoWed 10/2/10

Tue l02DTueúllIl3 42

TueCf.lllll7167Tue 09/1/1 168

Tueúll2ll5169TteúllU29 fiOTae l0llll2lTlTue 1011126172,196

Tue L0l2l9l'13Tue 09/1211 168

Sun 09/12113 175

Fn09ll2l25176Wed,101116l'17

Mon 10/1/18178

Fn l0lll29 179

Tue 10/2/9 180

Tuel0l2l9Fn0gll2lIl42

Wed09ll2l23l83Mon l0/l/4 184

Sat 10/1/16 185

Thu 10/1/28 186

Tue l0l2l9I87WedWllUz3183

Mon l0/l/4 189

Sat 10/l/16 190

Thu 10/l/28 191

Tw I0l2l9l92Sat 1l/3/5

Monú11012642Tue 09/12115 195

Sat ll/3/5Tue 1012123195

Sat l0l4l24 198FS-60 days

Mon l0l 5 124 l99FS-60 days

Tue 10/6/8 200FS45 days

Tue 1016122201

Sat 10frl3 200,119,156

Thu 10fil8 201

Sun 10/10/31

Sunl0l8l222MWed 10/9/1 206FS-10 days

Wed 10/10/6 207FS-5 days

Sat 10/10/16 208FS-20 days

Sun 10/10/31 209FS-15 days

Mon l0/11/15 210

Tue Illll42ILWedlll2l232l2

Sat lll3l5 213

Mon 1l/1/17Tw l0l4l20 165,174,181,188

Construction of surface drain and cycle track

Misc. works

Chainage From CH 100 to CH 300Earthworks

I

!I

I

-

t67

tì.:-v]--r:l!,lLlztrf.Elr

168

69

70

7t72

73

74

75

76

77

78

79

80

8l82

kT¡

I't-!Iì

ùI

Ùì

83

u185

186

187

188

189

90

91

92

93

94

95

¡-!96

9',7

)b

198

t99 v- !!

TTE

2N201 tL202203

2M205

206247

208

2W2t02tr2122t3214

215

2t62t7 Construction ofstormwaterdrain 70 days Sun l0/3r7 Sat 10/5/15 216FS45 days

Constructionof risingmain 4Odays Monl0l4/26 Fri l0/6/42l7FS-20daysPressure test and swabbing 7 days Sat 10/6/5 Fri 10/6/11 218

Proposed water main laying 40 days Mon 1014126 Fn 101614 217FS-20 davs

2182t9220

sT/2008/02Tæk Milestone a Ro[ed Up Critical Task Split ' , Group By Summary

Critical Tæk Summary Rolled Up Milestone O Extemal Tasks Deadline +

Rolled Up Task Rolled Up ProgressProgress Proþt Summa¡y

Page 4

Contract No. 5T/2008//02Ma On Shan Development - Road, Drainage and Sewerage Works at Whitehead and Lok Wo Sha Phase 1

Master Programme (Rev. 1.0)

ID læk Name Duration Start Finish Predecessors 2(X\slZOIOlZOnl20t2, h,tnll'l lAuJs"nlo"r o lD""lJrn ,e fr¡nlnn/ a llonlJul ffi llunl lot lnodsrolo.tl o loæl¡-h¡Mu.l¡p.l u ll*llol

221 Pressure t€st

Construction of proposed road surface

Public lightingUtilities laying

Gæ main

CLP Cable

PCCW

CATVHKBN

Installation of street furnitureConstn¡ction of footpath

Construction of surface drain and cycle track

Misc. works

Access Road to CHEUNG KANGForming Road embedment for access road

Construction of concrete access road

Curing time for læt pour concrete road surface

Misc. works

Open to public

Works at Dl(W) Road

Tree Transplant - Mixed Woodland (37nos)

Tree - Crown pruning

Tree - Root pruning lst stage - Pruning

Tree - Root pruning lst stage - WaitTree - Root Þruning 2nd stage - Pruning

Tree - Root pruning 2nd stage - WaitTree - Transplant

Tree Transplant - Fung Shui Woodland (59noÐ

Tree - Crown pruning

Tree - Root pruning lst stage - Pruning

Tree - Root pruning lst stage - WaitTree - Root pruning 2nd stage - Pruning

Tree - Root pruning 2nd stage - WaitTree - Transplant

Construction of Retaining WallRW4 (CH0.00 - CH123.00)

Site Preparation works and clearance

Bay RW4-l (CH0.00 - CH8,00)

Bay RW4-2 (CH8.00 - CHl6.00)Bay RW4-3 (CH16.00 - CH23.00)

Bay RW44 (CH23.00 - CH3l.00)Bay RW4-5 (CH31.00 - CH41.00)

Bay RW4-13 (CHl15.00 - CHl23.m) TBay RW4-12 (CH107,00 - CHl15.00) TBay RW4-11 (CH95.m - CH107.00) T/æcBay RW4-10 (CH83.00 - CH95.00) T/arcBay RW4-9 (CH?l.m - CH83.00) T/arc

Bay RW4-8 (CH59.00 - CH71.00) TBay RW4-7 (CH51.00 - CH59.m) ABay RW4-6 (CH41.00 - CH5l.00) A

RW2 (CH91.00 - CHl9l.00 )Site Preparation works and clearance

Bay RW2-21 (CHl8l.00 - CHl9l.00)Bay R'ü2-20 (CH171.m - CH181.00)

Bav R'lV2-19 (CH161.00 - CH171.00)

7 days Sat 10/6/5

45 days Sat 10/6/12

20 days Sat 10/6/5

9Odays FnlUff2s35 days Fn 1016125

14 days Fnl0nl2328 days Fri 10/8/6

20 days Tue \0l8l2420 days Fri 10/9/3

30 days T\u l0l9l2340 days Sat 10/10/23

40 days T\u l0ll2l27 days Tue 1l/1/11

168 days Wed 10U1045 days Wed 10/2/10

30 days Sarl}l3l2l14 days Mon1014126

3 days Mon 10/5/10

1 day Tue l0t7l21541 days Sun09/1129

80 days Sun 09/11/297 days Sun 09/ll/297 days Sun 09/11/29

28 days Sun 09/1216

7 days Sun 10/1/3

28 days Sun l0/l/1010 days Sun 10/2fl

91 days Sun09/11/2910 days Sun 09/11/29

l0 days Sun 09/ll/2928 days Wed09ll2l910 days Wed 10/1/6

28 days Sat 10/l/1615 days SarI}l2ll3

269 days Sun 09/1129269 days Sun 09/11/29

10 days Sun 09/11/29

14 days Wed09.ll2l914 days WedúlIA2314 days Wed 10/1/6

14 days Wed 10/l/2014 days Wed 10/2/3

14 days Wed l0l2ll114 days Wed 10/3/3

14 days WeÀ,l0l3ll714 days Wed 10/3/31

14 days Wedl0l4ll414 days Wedl0l4l2814 days Wedrcnl2914 days Wed 10/8/11

269days Sun09/112910 days Sun 09/ll/2914days WdWllUg14 days WedWllU2314 davs V/ed 10/1/6

Fn 1016111220

Mon 10t7126219,221

T\u1016124220wdrcDnzT\ul0fll29223Thu 10/8/5 225FS-7 days

TÏtul0l9l2226Sun 10/9/12 227FS-10 days

W eð, l0l9 122 228FS- l0 days

Frr 10110122229

Wed 10/1211230

Mon ll/l/10231Monllllll7 232

Tue I0l'1127

Ftr 1013126188,193

Sun 1014125235

Sun 10/5/9 236

Wed 1015112231

T ue l0f7 I 27 238,203,222

Monlll5f23Tue I0f2ll6Sat 09/1215 5lSat 09/1215 5 I

Sat |0lll2243Sat 10lll9 244

Sat101216245

Tue 1012116246,53

Sat I0l2I27Tue 09/1218 5lTue 09/1218 5lTue 10/l/5 250

Fn l0l1lI525lFo l0l2lI2252Sat l0l2l2'l 253,53

Tve l0l8l24Tuel0l84¿4Tue 09/1218 51

TueCP.112122257

Tue l0/l/5 258

Tue l0lll19 259

Tue 101212260

Tue10lAß261Tue 101312247,262

Trc 1013116263

Tue 10131302(4,34

Tue 1014113265

Tue l0l4l27 266

Tw l0l5lll267Tue 1018110239,268

Tue 1018124269

Tuel0l8D4Tue 09/lZ8 51

Ttrcú11422272Tue l0lIl5273

Tue 1011119274

222

223

224

225

226227

228

229

230

23r232

233

234

T235

236

237

238

239

2q

a

,

h rtrt

241

242

243

244

245

246

247

248

249

250

25r252253

254

255

256

?-4.

ì

257

258

259

2ñ261

262

263

2g265

26267

268

269

270

27t

h-vlìtvI

272

n3274

275

sT/2008t02Task Milesrone a Ro[ed Up Critical Tæk Split ' , Group By Summa¡y

Critical Task Summa¡y Rolled Up Milestone O Extemal Tasks Deadline i;Rolled Up Task Rolled Up Proefesshogress Proþt Summary

Page 5

Contract No. 5T/2008//02 Master Programme (Rev. 1.0)Ma On Shan Development - Road, Drainage and Sewerage Works at Whitehead and Lok Wo Sha Phase 1

ID lask Name Duration St¿rt Finish Jredecessors 2UD I 2010 20il I 2012

, hunllul huds ienlchr o lo."lr"n h.l rhr¡rJno.l ^ ll*llot tudseoloc o loer I^n hot#úrtilnJ a Iunl Jur huJs.nlcrtl o loolrunHu[,taJ¿.ml a llunl¡u

276 Bay RW2-18 (CHl54.m - CHl6l.00)Bay RW2-17 (CH147.00 - CH154.00)

Bay RW2-16 (CH137.00 - CH147.00) TBay RW2-15 (CH127.00 - CH137.00) TBay RW2-14 (CHlt9.00 - CH127.00) TBay RW2-13 (CHlll.00 - CHI19,00) TBay RW2-12 (CHl0l.00 - CHll1.00) T/ABay Rrff2-ll (CHgl,m - CHl0l.00) T/A

RWl (CH0.m - CH110.00 )Site Preparation works and clearance

Utility coordination and temp. protection

Modification of Existing Retaining rüall for connection

Bay RWI-Il (CHl02.m - CHl10,00) TBay RWl-10 (CH94.00 - CHI02,00) TBay RWI-9 (CH86.m - CH94.m) TBay RWI-8 (CH78.00 - CH86.00) TBay RWl-7 (CH69.00 - CH78.00) TBay RWI-6 (CH60.m - CH69.00) TBay Rrü1-5 (CH48.00 - CH60.00) TBay RWl4 (CH36.00 - CH48.00) TBay RWl-3 (CH24.00 - CH36.00) TBay RWI-2 (CH12.00 - CH24.00) TBay RWI-l (CH0.00 - CHl2,00) T

RW3 (CH0.00 - CH76.00 )Site Preparation works and cleæance

Bay RW3-7 (CH68.00 - CH76.00) TBay RW3-6 (CH60.00 - CH68.00) TBay RW3-5 (CH48.00 - CH60.00) TBay RW34 (CH36.00 - CH48.00) TBay RW3-3 (CH24.00 - CH36.00) TBay RW3-2 (CH12.00 - CH24.00) TBay RW3-l (CH0.00 - CHl2.m) T

Road ConsEuction

Earthworks

Construction of stormwater drainage works

Construction of rising main

Pressure test of Rising main

Swabbing of Rising MainProposed water main laying

Pressure test of water main

Swabbing of water main

Sterilization of whole water main system

Final connætion by others

Construction of proposed road Dl(W)Installation of Irrigation system and test

Misc. wo¡ks

Public lighting and street furnitureUtilities laying

Gæ main

CLP Cable

PCC'Itr

14 days Wed l0/l/2014 days Wedl0l?314 days WdIjU|T14 days Wed 10/3/3

14 days WeÀ l0l3ll714 days Wed 10/3/31

14 days Wed Ljnnï14days \ryed l0/8/ll

165 days Sun09/11297 days Sun09/11/29

45 days Sun 09/1216

20 days Wed 10/1/20

14 days Sun 10/?2812 days Sun 10/3/14

12 days Ftr 1013126

12 days Wed l0l4n12 days Mon 10/4/19

12 days Sat 10/5/1

12 days Sun 10/3/14

12 days Ftr 1013126

12 days Wed l0l4n12 days Mon 10/4/19

12 days Sat 10/5/1

149 days Sun 09/ll/297 days Sun 09/11/29

16 days Sun 10/2/28

14 days Tue 10/3/16

14 days Tue 10/3/30

14 days Tue t0/4/1314 days Tue 10/3/16

14 days Tue 10/3/30

14 days Tue I0l4l13376 days Thu 10/5/13

120 days Thu 10/5/13

120 days Tae 1016122

60 days Thu 10/9/30

14 days Mon 10/l l/297 days Mon 10/1?13

60 days Thu 10/9/30

14 days Mon 10/l l/297 days Mon 10/lZl3

2l days Monl0ll2l2030 days Mon I l/1/1090 days Mon l0/12l1360 days Sun ll/3/1312 days T\ulll1ll240 days Mon I0llll29

I42days Fnl0lI0ngS0days FnI0ll0l2925 days Mon10112/649 days Sun 10112126

Tue 101212275

Tue 1012116276

Tue 10131227'1,24'7

Tue 1013116278

Tue 1013130279

Tue 10/4/13 280

Tue 10/8/10239,281

Trc1018124282wd l0/5/r2

Sat 09/1215 5 ITue 10/1/19 285

Mon 10/2/8 286

Sat 10/3/13 254,281

Thu 10/3/25 288

Tue 101416289

Sun 10/4/18 290

Ft 1014130291

Wedl0l5l12292Thu 10/3/25 288

Tue 101416294

Sun 10/4/18 295

Fn 1014130296

Wedl0l5l12297Mon1014126

Sat 09/1215 5lMon 10/3/15 300,254

Mon 10/3/29 301

Mon 1014112302

Mon 1014126303

Mon 10/3/29 301

Mon 10/4/12 305

Mon1014126306

Mon 11/5/23

Thu 10/9/9 298,307,2'l 1FF

Tue 10/10/19 309FS-80 days

Sun 10/11/28 3l0FS-20 days

Sun 10/lZl2 3llSun l0/12l19 312

Sun 10/l 1/28 3l0FS-20 days

Sun l0ll2ll23I4Sun l0/12l19 315

Sun 1l/1/9316Tue lll7S3l'lSat lll3ll23I2,3l5

Wed 11/5/11319

Monlll5l23320FnIUn 314

Sat 1ll3/19Fn IÙllAn 3l4FS-31 days

Thu 10/12130 324FS-12 days

Sar Il l2l 12 325FS-5 davs

aì---üa

tI

rt

277

278279

280

281

282283

2U285

286287

288

289

290

29r292293

294

295

296297

298

299

300

301

302303

3U305

306

307

308

30s

J 0

IJ 2

J J

4

J 5

3t63t7318

319

320

32t322

323

324

325

326

327 CATV 35 days Mon lllll24 Sun Ill2l27 326FS-20 days

HKBN 35 days Sun 11/2/13 Sat ll/3/19 327FS-15 days

Construction offootpath 70 days Sun 1l/2/13 SatIll4l23 328FS-35 days,i

Construction of surface drain and cycle track 50 davs Mon lll4l4 Mon Lll5l23 329FS-20 davs

328

329

330

sTt2008t02Tæk Milestone a Rolled Up Critical Tæk Split Group By Summary

Critic¿l Task Summary Rolled Up Milestone O Exæmal Tasks Deadline +

Rolled Up Task Rolled Up ProgressProgress Proþt Summary

Page 6

Contract No. 5T/2008//02 Master Programme (Rev. 1.0)Ma On Shan Development - Road, Drainage and Sewerage Works at Whitehead and Lok Wo Sha Phase 1

ID Iask Name Du¡ation Start Finish ?redecessors 2.rnslzorolzorrlnt2a llunllu lnuds eoloct o becllanþel iltrJlnt

^ h,,nl]ul hudseoloctl o loecllan rebhMarlAorl a lJunlJul hudSeolOctl o DælJanRlMarlAprl a llunlJul

331 Completion of Section IWorts at Acccss Road o Pump Housc

Laying of sewerage pipe

laying of rising main

Pressure test of rising main along access road

laying of water main

Pressure test and swabbing of water main along access road

Connection water main to Main pipe line along Dl(N)Utility layingConstruction of concrete and græscrete access road to pump house

Misc. works

Construction of sewerage piæ along Sha on SteetApplication of Excavation Permit for gravity sewer pipe at Sha On

lmplement of TTA scheme and trial run

Utility detection and reporting

Construction of gravity sewerage pipe

Reinstatement of existing carriageway

Misc. works

Section IA WorksPossession of Site

Soiling for landscape soft works

Landscape soft work in Portion I (Exclude Section IÐMisc. works

Completion of Section IASection IB Works

Possession of Site

Establishment works in Portion I ( Excluded Section IVA)Completion of Section IB

Section II Works (Portion 2A and Portion 2B)Commencement Date

Works in Portion 24, Site G/ICPossession of Portion 2A & 2B ( Excision No: I )Mobilization of plants and set up

Site cleæance

Site formation wo¡ks

Construction of surface drain

Proposed fence erection

Misc. works

Works in Portion 28, Site LWS-BMobilizatron of plants and set up

Site clearance

Site formation works

Construction of surface drain

Proposed fence erection

Misc. works

Completion of Section IISection Itr Works @ortion 3)

Commencement Date

Possession of Portion 3 ( Excision No:2 )Tree Transplant - L3 (4nos)

Tree - Crown pruning

Tree - Rootpruning lst stage - Pruning

Tree - Root pruning lst søge - WaitTree - Root pruning 2nd stage - Pruning

Tree - Root pruning 2nd staee - Wait

0 days

220 dzys90 days

90 days

14 days

90 days

14 days

5 days

50 days

40 days

10 days

46,1days

180 days

30 days

14 days

180 days

180 days

20 days

700 days

0 days

30 days

30 days

5 days

0 days

1065 days

0 days

365 days

0 days

695 days

0 days

392 days

0 days

7 days

14 days

120 days

90 days

140 days

2l days

395 days

7 days

14 days

120 days

100 days

140 days

14 days

0 days

700 days

0 days

0 days

ó4 days

2 days

2 days

28 days

2 days

28 days

Mon 1l/5/23Sat 10/10/16

Sat 10/10/16

Mon l0/11/15

Sun ll/Zl3Mon l0/ll/15

Sun 1l/213Sun lll2l27Sun 1l/213Mon l1/4/4Sat ll/5/14

Tue 09/10/20Tue 09/10/20

Sun 10/4/18

Tue 10/5/18

Tue 10/6/1

Sun 10/7/11

Fri IIlll7Thu 09/6/18

Thu 09/6/18

Tue lt/3/15T\u 1ll4ll4Sat 11/5/14

tiled I l/5/18Thu 09/6/18

Thu 09/6/18

Thu ll/5/19T\tu l2l5l17Thu 09/6/18

Thu 09/6/18

Tue 10/4/13

Tue l0l4ll3Wed 10/4/14

Wed l0l4l2IWed 10/5/5

Tttu10l9l2Wed 10/12llWedlll4l20wedt0t4tr4Wedl0l4l14Wedl0l4l2lWed 10/5/5

Thul0l9l2Sat l0/12lll

Sat 1l/4/30Fri 11/5/13

Thu 09/6/18

Thu 09/6/18

Tue 10/4/13

wedt0t4n4Wed l0l4ll4Wedl0l4lI4

Fn 1014116

Fri 10/5/14

Sun 10/5/16

Mon I l/5/23 330,321

Mon 1l/5/23ThulIlLlI3124Sat lIl2lI2 333SS+30 days

Sar LI|U26334Sat lll2ll2 333SS+30 days

Sat 1112126336

T\ulll3l3337Sun 1l/4/3 336

Fri 11/5/13 339

Mon I l/5/23 340

wedturn6Satl0l4lI7 42

Mon l0l5l|1 343

Mon 10/5/31 344

Sarl0llrl21345Thu I l/1/6 34655+40 days

WedIlll12634'lWed 1l/5/18Thu 09/6/18

W ed lll4l 13 350,32955+30 c

Fri ll/5/13 351

Wed 1l/5/18 352

Wed I l/5/18 353

T\ttl2l5ll7Thu 09/6/18

Thu l2l5l11 356,353

Tltu l2l5l17 357

Fri l1/5/13Thu 09/6/18

Tue l1/5/10Tue I0l4ll3 36055+300 day

Tue 1014120362

Tue 101514363

Wed 10/9/1 364

Tue 10/l 1/30 365

Tue lIl4ll9 366Tue Ill5ll,0367Fri 11/5/13

Tue 1014120362

Tue 101514370

Wed 10/9/1 371

Fn l0ll2ll0372Fn 1ll4l29 373Fn lll5ll3 374Fri ll/5/13 375,368

Wed ll/5/18Thu 09/6/18

Tue 10/4/13 37833+300 day

wd 10/6/16

Thu 10/4/15 379,51

T\ul0l4l15379Thu 10/5/13 381

Sat 10/5/15 383

Sat10161123M

a 5n3332333

334335

336337

338

339

3N341

342343

3U345

346347

348349

350

351

352

5/18

353

354

35s l-<1.-6118-

J 5n7

356

35',1

358

359

360

361

362

363

3&365

366367

368

369

370371

372

373

374

375

376 t 5/13

377

t3378

379

380

381

382383

3U385

sTt2008102Task Milesrone a Rolled Up Critical Tæk Split ' ' Group By Summary

Critical Task Summary Rolled Up Milestone O External Tasks Deadline {'

Rolled Up Task Rolled Up ProgressProgress Proþt Summary

Page 7

Contract No. 5T/2008//02 Master Programme (Rev. 1.0)Ma On Shan Development - Road, Drainage and Sewerage Works at Whitehead and Lok Wo Sha Phase 1

ID fask Name Duration Start Finish lredecessors 2CfDlZOIOlZOttl20t2, llunllut hudslenloctl o ln."ll-þ"tlvtJlorl a llunl lut lnudseoloctl o loecllanÞeúr¡arlnorl a lunl Jrl huJseoìcl"tl o lo..lr-heuhvtarlturl a llunl¡ul

386 Tre¿ - Transplant

Road Works ConstructionMobilization of plants and set up

Site clearance

Backfill and compaction works

Construction of storm drain works at Road L3

l¿ying of water main at road L3

Pressure test and swabbing of water main along L3 road

Connection of water main to Main pipe line along Dl(N)Construction of proposed road L3

Erection of proposed fence

Misc. works

Public lighting and street furnitureUtilitiss laying

Gas main

CLP Cable

PCCW

CATVHKBN

Construction of footpath

Completion of Section IIISection W Works (Sewage Pumping Station)

Possession ofPortion IInstruction by the Engineer ( Excision No:3 )E&M design and submission for approval

Order and Delivery of E&M material

Minor Earthwork for pump house ( Below +10.3 mPD )Construction of pump house ( below +10.3 mPD )Backhll and compaction adjacent to pump house

Connection of rising main and sewerage to pump house

Construction of superstructure

Metal work and intemal finishing to pump house

Installation of E&M system

Testing and commission of system

Misc. works and irrigation system at roof of pump house

Construction of boundary wallExternal cladding system and finishing for pump house

Road work inside pump house

I-andscaping works

Misc. works

Completion of Section IVSection IVA Worts (Sewage h¡mping Slation)

Possession of Portion I

Instruction by the Engineer ( Excision No:4 )Establishment works

Completion of Section IVASection V Worls (Presenation and proæction of existing tess)

PossessionofPortion IPropose methodology of tree preservation and protection

Approval of methodology by the ER

Carry out fee preservation and protection within site boundary

Completion of Section V

4 days

400 days

7 days

14 days

120 days

60 days

45 days

2l days

5 days

75 days

40 days

13 days

20 days

79 dzys28 days

15 days

21 days

15 days

15 days

60 days

0 days

700 days

0 days

0 days

180 days

220 days

15 days

70 days

35 days

35 days

75 days

50 days

185 days

31 days

50 days

90 days

70 days

35 days

30 days

20 days

0 days

1065 days

0 days

0 days

365 days

0 days

700 days

0 days

30 days

16 days

580 days

0 davs

Sun 10/6/13

Wd 10/,+/14

Wed 10/4/14

wedl0l4l2lWed 10/5/5

Thu 10/9/2

Mon l0/11/lThu l0/12l16

Thu l1/l/6Tue ll/l/11Sun ll/3/27

Fri 11/5/6

Sat 10/12ll IFrLl0llZ3lFn l\lIU3ISun ll/1i23Monlll2lT

Wedlll2l23Sat 1l/3/5

Sun ll/3/20Wed 1l/5/18Tru 09/6/18

Thu 09/6/18

Wed 09/8/19

wed 09/8/19

Mon 10/2/15

Fn10l2ll2Sat I0l2J27

Sat 10/5/8

Sat 10/5/8

Sat 10/6/12

Thu 10/8/26

Fri 10/10/15

Mon l1/4/18Thu 10/8/26

Thu 10/8/26

Wed l0/11/24WedIll2l2Wed ll/3/9

Fri ll/4/8Wed 1l/5/18Thu 09/6/18

Thu 09/6/18

Wed 09/8/19

Thu ll/5/19T\ul2l5l17Thu 09/6/18

Thu 09/6/18

Mon 09/8/31

Wed 09/9/30

Fri 09/10/16

Wed ll/5/18

Wed 10/6/16 385

Wed 1l/5/18Tae 1014120379

Tue 10/5/4388Wed l0/9/l 389

Sun 10/10/3 1 365,372,390

Wed l0/12l15 391

Wed,lIl115392Mon I l/1/10 393

Sat 1113126394

Thu l1/5/5 395

Wed 11/5/18 396

Thu 10/12130 392FS-5 days

Sat 1lßl19Tltt IIlIl2'1 398

Sun I l/2/6 400FS-5 days

Sw lll2l27 401

Wed I l/3/9 402FS-5 days

Sat 11/3/19 403FS-5 days

Wed 11/5/18 404

Wed ll/5/18 405,397

Wed l1/5/18Thu 09/6/18

Wed 09/8/19 408

Sun 10/2/14,109

Wedl0l9l22410Fn 1012126 409,80

Fnrclsn 412Fri 10/6/11 413

Fn 1016111 413

Wed 10/8/25 415,414

Thu 10/10/14 416

Sun ll/4/17 417,411

Wed l1/5/18 418

Thu 10/10/14416Trc l0llll23 416

Tue lIl2ll421Tue IIl3l8 422

Tltulll4t7 423

Wedlll4l2T 424

Wed 11/5/18 419,425

T\ulAflúThu 09/6/18

Wedú18119428Tlt¡tI2l5lI7 426,429

Thu 12l5ll1 430

Wed 11/5/18

Thu 09/6/18

TueC9.19129 433,48

Thu 09/10/15 434

'üed l115/18 435

Wed l1/5/18 436

€+\

o-6ft$'v

387

388

389

390

391

392393

394

a 5/18

r8

395

396397

398

3W400

40r

N2q3ß4405

406

407

408

4æ4104

4 2

4 )4 44 5

4 6

4 7

4 8

4 9

420

421

422

423

424

425

426

427

428

429

430a 5tr7431

432

a 5/18

433

434

435

436

437

sTt2008t02Tæk Milesrone a Rolled Up Critical Tæk Split , ' Group By Summary

Critical Tæk Summary Rolled Up Milestone O External Tasks Deadline Õ

Rolled Up Task Rolled Up Prog¡essProgress Proþt Summary

Page 8

Contract No. ST/2008/02 – Ma On Shan Development Roads, Drainage and Sewerage Works at Whitehead and Lok Wo Sha Phase 1

Quarterly Environmental Monitoring and Audit (EM&A) Summary Report Q1 (October to December 2009)

AUES

Z:\Jobs\2009\TCS00477 (ST-2008-02)\600\EM&A Quarterly Report\1st Quarterly Oct-Dec 09\R0108v2.doc Annex Action-United Environmental Services and Consulting

Annex D

Monitoring Locations Designated in the EM&A Manual

Contract No. ST/2008/02 – Ma On Shan Development Roads, Drainage and Sewerage Works at Whitehead and Lok Wo Sha Phase 1

Quarterly Environmental Monitoring and Audit (EM&A) Summary Report Q1 (October to December 2009)

AUES

Z:\Jobs\2009\TCS00477 (ST-2008-02)\600\EM&A Quarterly Report\1st Quarterly Oct-Dec 09\R0108v2.doc Annex Action-United Environmental Services and Consulting

Annex E

Current Impact Monitoring Stations

Contract No. ST/2008/02 – Ma On Shan Development Roads, Drainage and Sewerage Works at Whitehead and Lok Wo Sha Phase 1

Quarterly Environmental Monitoring and Audit (EM&A) Summary Report Q1 (October to December 2009)

AUES

Z:\Jobs\2009\TCS00477 (ST-2008-02)\600\EM&A Quarterly Report\1st Quarterly Oct-Dec 09\R0108v2.doc Annex Action-United Environmental Services and Consulting

Annex F

Graphical Plots of Impact Monitoring

1. Air 2. Noise 3. Marine Water

Contract No. ST/2008/02 – Ma On Shan Development Roads, Drainage and Sewerage Works at Whitehead and Lok Wo Sha Phase 1

Quarterly Environmental Monitoring and Audit (EM&A) Summary Report Q1 (October to December 2009)

AUES

Z:\Jobs\2009\TCS00477 (ST-2008-02)\600\EM&A Quarterly Report\1st Quarterly Oct-Dec 09\R0108v2.doc Annex Action-United Environmental Services and Consulting

Air Quality

Contract No. ST/2008/02 – Ma On Shan Development Roads, Drainage and Sewerage Works at Whitehead and Lok Wo Sha Phase 1

Quarterly Environmental Monitoring and Audit (EM&A) Summary Report Q1 (October to December 2009)

AUES

Z:\Jobs\2009\TCS00477 (ST-2008-02)\600\EM&A Quarterly Report\1st Quarterly Oct-Dec 09\R0108v2.doc Annex Action-United Environmental Services and Consulting

Impact Monitoring 1-hour TSP Results at A1

0

100

200

300

400

500

600

16-Oct-09

21-Oct-09

26-Oct-09

31-Oct-09

5-Nov-09

10-Nov-09

15-Nov-09

20-Nov-09

25-Nov-09

30-Nov-09

5-Dec-09

10-Dec-09

15-Dec-09

20-Dec-09

25-Dec-09

Date

TSP (ug/m3)1st hour 2nd hour 3rd hour

Dust Ave. of 3 hours Action Level Limit Level

24-hour TSP Monitoring Results at A1

0

50

100

150

200

250

300

350

16-Oct-09

21-Oct-09

26-Oct-09

31-Oct-09

5-Nov-09

10-Nov-09

15-Nov-09

20-Nov-09

25-Nov-09

30-Nov-09

5-Dec-09

10-Dec-09

15-Dec-09

20-Dec-09

25-Dec-09

Date

24-hour TSP, μg/m3

24-hour TSP Action Limit

Contract No. ST/2008/02 – Ma On Shan Development Roads, Drainage and Sewerage Works at Whitehead and Lok Wo Sha Phase 1

Quarterly Environmental Monitoring and Audit (EM&A) Summary Report Q1 (October to December 2009)

AUES

Z:\Jobs\2009\TCS00477 (ST-2008-02)\600\EM&A Quarterly Report\1st Quarterly Oct-Dec 09\R0108v2.doc Annex Action-United Environmental Services and Consulting

Construction Noise

Contract No. ST/2008/02 – Ma On Shan Development Roads, Drainage and Sewerage Works at Whitehead and Lok Wo Sha Phase 1

Quarterly Environmental Monitoring and Audit (EM&A) Summary Report Q1 (October to December 2009)

AUES

Z:\Jobs\2009\TCS00477 (ST-2008-02)\600\EM&A Quarterly Report\1st Quarterly Oct-Dec 09\R0108v2.doc Annex Action-United Environmental Services and Consulting

Impact Noise Monitoring (N1))

30.0

35.0

40.0

45.0

50.0

55.0

60.0

65.0

70.0

75.0

80.0

85.0

90.0

20-O

ct-0

9

25-O

ct-0

9

30-O

ct-0

9

04-N

ov-0

9

09-N

ov-0

9

14-N

ov-0

9

19-N

ov-0

9

24-N

ov-0

9

29-N

ov-0

9

04-D

ec-0

9

09-D

ec-0

9

14-D

ec-0

9

19-D

ec-0

9

24-D

ec-0

9

Date

Noi

se L

evel

(dB

(A))

Corr. Leq30min Limit Level Leq 30min

Contract No. ST/2008/02 – Ma On Shan Development Roads, Drainage and Sewerage Works at Whitehead and Lok Wo Sha Phase 1

Quarterly Environmental Monitoring and Audit (EM&A) Summary Report Q1 (October to December 2009)

AUES

Z:\Jobs\2009\TCS00477 (ST-2008-02)\600\EM&A Quarterly Report\1st Quarterly Oct-Dec 09\R0108v2.doc Annex Action-United Environmental Services and Consulting

Marine Water

Contract No. ST/2008/02 – Ma On Shan Development Roads, Drainage and Sewerage Works at Whitehead and Lok Wo Sha Phase 1

Quarterly Environmental Monitoring and Audit (EM&A) Summary Report Q1 (October to December 2009)

AUES

Z:\Jobs\2009\TCS00477 (ST-2008-02)\600\EM&A Quarterly Report\1st Quarterly Oct-Dec 09\R0108v2.doc Annex Action-United Environmental Services and Consulting

DO Conc. (Depth Ave. of Surface and Middle Layer) - Mid-

Ebb

2.00

4.00

6.00

8.00

10.00

12.00

14.00

16.00

18.00

20.00

20-O

ct-0

9

26-O

ct-0

9

1-N

ov-0

9

7-N

ov-0

9

13-N

ov-0

9

19-N

ov-0

9

25-N

ov-0

9

1-D

ec-0

9

7-D

ec-0

9

13-D

ec-0

9

19-D

ec-0

9

25-D

ec-0

9

Date

mg/L

C2 M5 M6 M7 M8

DO Conc. (Dep th Ave. o f Surface and Midd le Layer) -Mid -Flood

2.00

5.00

8.00

11.00

14.00

20-O

ct-0

9

26-O

ct-0

9

1-N

ov-0

9

7-N

ov-0

9

13-N

ov-0

9

19-N

ov-0

9

25-N

ov-0

9

1-D

ec-0

9

7-D

ec-0

9

13-D

ec-0

9

19-D

ec-0

9

25-D

ec-0

9

Date

mg/L

C2 M5 M6 M7 M8

Contract No. ST/2008/02 – Ma On Shan Development Roads, Drainage and Sewerage Works at Whitehead and Lok Wo Sha Phase 1

Quarterly Environmental Monitoring and Audit (EM&A) Summary Report Q1 (October to December 2009)

AUES

Z:\Jobs\2009\TCS00477 (ST-2008-02)\600\EM&A Quarterly Report\1st Quarterly Oct-Dec 09\R0108v2.doc Annex Action-United Environmental Services and Consulting

Turb id ity (Dep th Average) - Mid -Ebb

0.00

3.00

6.00

9.00

12.00

15.00

20-O

ct-0

9

26-O

ct-0

9

1-N

ov-0

9

7-N

ov-0

9

13-N

ov-0

9

19-N

ov-0

9

25-N

ov-0

9

1-D

ec-0

9

7-D

ec-0

9

13-D

ec-0

9

19-D

ec-0

9

25-D

ec-0

9

Date

NTUL

C2 M5 M6 M7 M8

Turb id ity (Dep th Average) - Mid-Flood

0.00

1.50

3.00

4.50

6.00

7.50

9.00

10.50

12.00

13.50

15.00

20-O

ct-0

9

26-O

ct-0

9

1-N

ov-0

9

7-N

ov-0

9

13-N

ov-0

9

19-N

ov-0

9

25-N

ov-0

9

1-D

ec-0

9

7-D

ec-0

9

13-D

ec-0

9

19-D

ec-0

9

25-D

ec-0

9

Date

NTUL

C2 M5 M6 M7 M8

Contract No. ST/2008/02 – Ma On Shan Development Roads, Drainage and Sewerage Works at Whitehead and Lok Wo Sha Phase 1

Quarterly Environmental Monitoring and Audit (EM&A) Summary Report Q1 (October to December 2009)

AUES

Z:\Jobs\2009\TCS00477 (ST-2008-02)\600\EM&A Quarterly Report\1st Quarterly Oct-Dec 09\R0108v2.doc Annex Action-United Environmental Services and Consulting

Suspended So lids (Dep th Average) - Mid-Ebb

0.00

3.00

6.00

9.00

12.00

15.00

18.00

21.00

24.00

27.00

30.00

20-O

ct-0

9

26-O

ct-0

9

1-N

ov-0

9

7-N

ov-0

9

13-N

ov-0

9

19-N

ov-0

9

25-N

ov-0

9

1-D

ec-0

9

7-D

ec-0

9

13-D

ec-0

9

19-D

ec-0

9

25-D

ec-0

9

Date

mg/L

C2 M5 M6 M7 M8

Suspended So lids (Dep th Average) - Mid -Flood

0.00

3.00

6.00

9.00

12.00

15.00

18.00

20-O

ct-0

9

26-O

ct-0

9

1-N

ov-0

9

7-N

ov-0

9

13-N

ov-0

9

19-N

ov-0

9

25-N

ov-0

9

1-D

ec-0

9

7-D

ec-0

9

13-D

ec-0

9

19-D

ec-0

9

25-D

ec-0

9

Date

mg/L

C2 M5 M6 M7 M8

Contract No. ST/2008/02 – Ma On Shan Development Roads, Drainage and Sewerage Works at Whitehead and Lok Wo Sha Phase 1

Quarterly Environmental Monitoring and Audit (EM&A) Summary Report Q1 (October to December 2009)

AUES

Z:\Jobs\2009\TCS00477 (ST-2008-02)\600\EM&A Quarterly Report\1st Quarterly Oct-Dec 09\R0108v2.doc Annex Action-United Environmental Services and Consulting

Annex G

Meteorological Data of Reporting Month

Contract No. ST/2008/02 – Ma On Shan Development Roads, Drainage and Sewerage Works at Whitehead and Lok Wo Sha Phase 1

Quarterly Environmental Monitoring and Audit (EM&A) Summary Report Q1 (October to December 2009)

AUES

Z:\Jobs\2009\TCS00477 (ST-2008-02)\600\EM&A Quarterly Report\1st Quarterly Oct-Dec 09\R0108v2.doc Annex Action-United Environmental Services and Consulting

Meteorological Data – October 2009

Tai Po Wind Speed & Direction use Shatin Station)

Date Weather Total

Rainfall (mm)

Mean Air Temp. (°C)

Wind Speed (km/h)

Mean Relative Humidity (%)

Wind Direction

Mon 19 Cloudy / rain / moderate / fresh 2 25.7 8 74.5 E/SE Tue 20 Cloudy / rain / fresh /strong 0 23.8 10 86.5 E/NE Wed 21 Cloudy / moderate 0 24.7 9.7 78 E/NE Thu 22 Fine / haze/ moderate 0 25.1 7.2 77.5 N/NE Fri 23 Fine / dry / hazy / light winds 0 25.3 6 74 N/NE Sat 24 Fine and dry with some haze. Light winds. Trace 26.5 6 70 E/NE Sun 25 NA 0 25.1 Maintenance

Contract No. ST/2008/02 – Ma On Shan Development Roads, Drainage and Sewerage Works at Whitehead and Lok Wo Sha Phase 1

Quarterly Environmental Monitoring and Audit (EM&A) Summary Report Q1 (October to December 2009)

AUES

Z:\Jobs\2009\TCS00477 (ST-2008-02)\600\EM&A Quarterly Report\1st Quarterly Oct-Dec 09\R0108v2.doc Annex Action-United Environmental Services and Consulting

Meteorological Data – November 2009

Tai Po Wind Speed & Direction use Shatin Station)

Date Weather Total

Rainfall (mm)

Mean Air

Temp. (°C)

Wind Speed (km/h)

Mean Relative

Humidity (%)

Wind Direction

Mon 26-Oct-09 Holiday Tue 27-Oct-09 Mainly fine. Moderate easterly winds, fresh over offshore waters. 0 24.9 10.5 70 E/SE

Wed 28-Oct-09 Mainly fine. Moderate easterly winds, occasionally fresh over offshore waters and on high ground. Trace 24.6 8.5 66.2 E/NE

Thu 29-Oct-09 Mainly fine and dry. Moderate easterly winds. 0 24.9 9 68.5 E/SE

Fri 30-Oct-09 Mainly fine. Some haze tomorrow. Temperatures will range between 23 and 28 degrees. Moderate easterly winds 0 24.8 7.5 74.5 E/SE

Sat 31-Oct-09 Mainly fine and dry. Moderate easterly winds 0 25.9 7.7 70.5 N/NE Sun 1-Nov-09 Fine and dry, Strong northerly winds 0 26.4 13 58 N/NE Mon 2-Nov-09 It will be dry. Mainly fine in the afternoon. Cloudy tonight. Moderate

to fresh north to northeasterly winds 0 22.7 19 36.5 N/NE

Tue 3-Nov-09 It will be dry. Cloudy overnight. Sunny periods tomorrow with a

maximum temperature of around 23 degrees. Moderate to fresh northeasterly winds.

0 17.1 12 47.5 N/NE

Wed 4-Nov-09 Mainly fine and dry. Moderate northeasterly winds, occasionally fresh over offshore waters. 0 19.7 6.7 56 N/NE

Thu 5-Nov-09 Cloudy. Sunny periods in the afternoon. Moderate east to northeasterly winds. 0 22.4 6.5 68.5 N/NE

Fri 6-Nov-09 Mainly fine in the afternoon. Cloudy tonight. Moderate easterly winds 0 23.7 7.5 80.5 E/SE Sat 7-Nov-09 Cloudy overnight. Sunny periods tomorrow. Moderate easterly

winds. 0 25.2 8.2 77.5 E/SE

Sun 8-Nov-09 Mainly cloudy with one or two showers. Moderate east to southeasterly winds. Trace 251 6.2 85.2 E/NE

Mon 9-Nov-09 Mainly cloudy with one or two showers overnight. Moderate southeasterly winds, becoming light winds tomorrow. Trace 25.9 6.2 83.5 E/SE

Tue 10-Nov-09 Mainly fine in the afternoon. Cloudy periods overnight. Light winds. Trace 26.4 8.2 79.5 S/SW Wed 11-Nov-09 Becoming cloudy with a few rain patches. Moderate southeasterly

winds, freshening from the east later. Trace 25.6 11.7 83 E/SE

Thu 12-Nov-09 Cloudy with occasional rain. Appreciably cooler tonight. Moderate to fresh southeasterly winds, becoming fresh northerlies later. 5.2 23.8 9 85.2 S/SE

Fri 13-Nov-09 Sunny periods tomorrow with a maximum temperature of around 21 degrees. Fresh northerly winds, occasionally strong over offshore

waters and on high ground. 0.2 17.4 13.5 76.5 N/NW

Sat 14-Nov-09 Dry with sunny intervals this afternoon. Cloudy tonight. Moderate north to northeasterly winds Trace 14.3 9 73 N

Sun 15-Nov-09 Mainly cloudy with a few rain patches. 20.2 17.4 7.7 86 N Mon 16-Nov-09 Mainly cloudy with a few rain patches overnight. Moderate to fresh

northerly winds. 34.8 14.5 11.5 87.5 N/NW

Tue 17-Nov-09 Cloudy. Dry with sunny intervals in the afternoon. Fresh northerly winds, strong over offshore waters and on high ground at first. 0 10.4 17 68.7 N/NW

Wed 18-Nov-09 Mainly cloudy. Cold in the morning. Dry during the day. Moderate to fresh northerly winds. 0 10.6 14.5 67.2 N/NW

Thu 19-Nov-09 Mainly cloudy and rather cool overnight. Moderate to fresh northerly winds. Trace 14 12 61 N/NW

Fri 20-Nov-09 Fine and dry this afternoon. Cloudy tonight. Fresh northerly winds, occasionally strong over offshore waters and on high ground. 0 14.5 12 56 N/NW

Sat 21-Nov-09 Cloudy and dry with sunny intervals. Fresh northerly winds, occasionally strong over offshore waters and on high ground at first. 0 13.9

Sun 22-Nov-09 Fine apart from some haze at first. Light winds, becoming moderate east to north easterlies tomorrow. 0 15 6.5 56.5 N/NE

Mon 23-Nov-09 Fine. Hazy at first. Light winds, becoming moderate east to north easterlies later. 0 17.4 7 66.5 N/NE

Tue 24-Nov-09 Fine. Hazy at first. Light winds, becoming moderate easterlies later. 0 19.6 6 79 N/NE Wed 25-Nov-09 Sunny periods in the afternoon. Cloudy tonight. Moderate to fresh

easterly winds. 0 20.3 5.5 81.7 N/NE

Contract No. ST/2008/02 – Ma On Shan Development Roads, Drainage and Sewerage Works at Whitehead and Lok Wo Sha Phase 1

Quarterly Environmental Monitoring and Audit (EM&A) Summary Report Q1 (October to December 2009)

AUES

Z:\Jobs\2009\TCS00477 (ST-2008-02)\600\EM&A Quarterly Report\1st Quarterly Oct-Dec 09\R0108v2.doc Annex Action-United Environmental Services and Consulting

Meteorological Data – December 2009

Tai Po Wind Speed & Direction use Shatin Station)

Date Weather Total

Rainfall (mm)

Mean Air

Temp. (°C)

Wind Speed (km/h)

Mean Relative

Humidity (%)

Wind Direction

Thu 26-Nov-09 Sunny periods. Moderate east to northeasterly winds. 0 21.1 7 80.7 E/SE

Fri 27-Nov-09 Sunny periods in the afternoon. Mainly cloudy overnight. Moderate east to northeasterly winds. 0 22.5 6.5 77 N/NE

Sat 28-Nov-09 Mainly fine and dry. Fresh easterly winds, occasionally strong over offshore waters and on high ground 0 21.2 9.5 74.2 E/SE

Sun 29-Nov-09 Fine but hazy. Dry during the day. Moderate northeasterly winds Trace 20.4 7.2 73.5 E/NE

Mon 30-Nov-09 Fine but hazy. Moderate north to northeasterly winds. Trace 19.1 6.7 68.5 NE

Tue 1-Dec-09 Mainly fine but hazy. Moderate northeasterly winds, becoming fresh northerlies tonight. 0 17.8 6.7 72 E/NE

Wed 2-Dec-09 Fine and dry. Moderate to fresh north to northeasterly winds. 0 19.3 6.5 73 N/NE

Thu 3-Dec-09 Fine and dry. Cool in the morning. Moderate to fresh north to northeasterly winds. 0 17.3 16.7 56.5 N/NE

Fri 4-Dec-09 Fine and dry apart from some haze. Cool overnight. Moderate east to northeasterly winds, fresh at times. 0 16.2 7.2 69.7 N/NE

Sat 5-Dec-09 Very dry in the afternoon. Moderate northerly winds, becoming fresh easterlies later. 0 16.4 7 57.5 NE

Sun 6-Dec-09 Cloudy. Fresh easterly winds, occasionally strong over offshore waters. Trace 17.5 82 64.7 N/NE

Mon 7-Dec-09 Mainly cloudy with a few rain patches. Moderate northeasterly winds. 5.5 17.8 8.7 85.7 N

Tue 8-Dec-09 Mainly cloudy with a few rain patches. Moderate north to northeasterly winds. 14.1 18.1 8.2 90 N

Wed 9-Dec-09 Mainly fine apart from relatively low visibility at first. Light to moderate north to northeasterly winds 0.4 18.1 7.2 92.7 N/NE

Thu 10-Dec-09 Mainly fine apart from some haze Trace 20.7 7.5 84.2 E/NE

Fri 11-Dec-09 Sunny periods. Visibility relatively low at first. Light winds, becoming moderate easterlies tonight. Trace 20.7 8.2 84.5 N/NE

Sat 12-Dec-09 Sunny periods. Moderate to fresh easterly winds. Trace 20.6 7 83 E/SE

Sun 13-Dec-09 Cloudy with a few rain patches. Moderate easterly winds, becoming fresh northerlies later in the afternoon. 0 22.1 7.3 75.2 E/NE

Mon 14-Dec-09 Mainly cloudy. Visibility rather low. Moderate to fresh easterly winds. 1 19.7 9.2 85 E

Tue 15-Dec-09 Moderate northerly winds, occasionally fresh over offshore waters. 9.6 17.1 9.5 91 E

Wed 16-Dec-09 Cloudy with a few rain patches at first. It will be cold. Fresh northerly winds. 3.8 13 11.5 79.2 N

Thu 17-Dec-09 Sunny intervals and dry tomorrow with a maximum temperature of around 15 degrees. Trace 11.4 10.4 70.5 N/NW

Fri 18-Dec-09 Mainly cloudy and cold. Dry during the day. Trace 11 10.3 71 N/NWSat 19-Dec-09 Cold and dry. Cloudy at first. Sunny periods during the day. . 0 12.7 10.3 69 NE Sun 20-Dec-09 Mainly cloudy. Very dry with sunny periods in the afternoon. 0 12.9 10.8 42.4 N/NE Mon 21-Dec-09 Cloudy and dry. Sunny periods during the day. 0 14.2 8.5 51 N/NE Tue 22-Dec-09 Sunny periods. Moderate easterly winds. 0 15.9 8.5 70.5 E/SE Wed 23-Dec-09 Cloudy. Sunny periods tomorrow. Moderate easterly winds. 0 18 8.2 72.7 E/NE Thu 24-Dec-09 Mainly fine. Moderate easterly winds. 0 19.7 6.1 84 NE Fri 25-Dec-09 Holiday

Contract No. ST/2008/02 – Ma On Shan Development Roads, Drainage and Sewerage Works at Whitehead and Lok Wo Sha Phase 1

Quarterly Environmental Monitoring and Audit (EM&A) Summary Report Q1 (October to December 2009)

AUES

Z:\Jobs\2009\TCS00477 (ST-2008-02)\600\EM&A Quarterly Report\1st Quarterly Oct-Dec 09\R0108v2.doc Annex Action-United Environmental Services and Consulting

Annex H

Monthly Summary Waste Flow Table

Name of Department: CEDD Contract No. ST/2008/02

Disposed as Public

FillImported Fill

(in '000M3) (in '000M3)

Jan

Feb

Mar

Apr

May

Jun 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

Sub-Total 0 0 0 0 0 0 0 0 0 0 0

Jul 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

Aug 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.0033

Sep 0.000 0.000 0.000 0.000 0.000 0.106 0.000 0.000 0.000 0.000 0.0022

Oct 0.000 0.000 0.000 0.000 0.000 3.048 0.000 0.000 0.000 0.000 0.0172

Nov 0.000 0.000 0.000 0.000 0.000 3.8205 0.000 0.000 0.000 0.000 0.0064

Dec 0.000 0.000 0.000 0.000 0.000 0.598 0.000 0.000 0.000 0.000 0.00772

Total 0.000 0.000 0.000 0.000 0.000 7.573 0.000 0.000 0.000 0.000 0.037

Total Quantity

Generated

Hard Rock and

Large Broken

Reused in the

Contract

Reused in other

projects

Disposed as

Public FillImported Fill Metals

Paper /

cardboard

Plastics (See

Note 3)Chemical Waste

Others, e.g.

general refuse

(in '000m³) (in '000m³) (in '000m³) (in '000m³) (in '000m³) (in '000m³) (in '000kg) (in '000kg) (in '000kg) (in '000kg) (in '000m³)

0.00 8.00 3.00 5.00 0.00 4.50 2.00 1.00 1.00 0.00 5.00

Notes: (1) The performance targets are given in PS Clause 1.100(14).

(2) The waste flow table shall also include C&D materials that are specified in the Contract to be imported for use at the site.

(3) Plastics refer to plastic bottles / containers, plastic sheets / foam from packaging material.

* (4) The Contractor shall also submit the latest forecast of the total amount of C&D materials expected to be generated from the Works, together with a breakdown of the natrue where the total amoun

C&D materials expected to be generated from the works is equal to or exceeding 50,000m³.

(in '000M3)

MetalsPaper/ Cardboard

packaging

Plastics (see note

3)Chemical Waste

Others, e.g.

General refuse

Monthly Summary Waste Flow Table for December 2009

Month

Actual Quantities of Inert C & D Materials Generated Monthly Actual Quantities of C & D Wastes Generated Monthly

Total Quantitiy

Generated

(in '000KG) (in '000KG) (in '000KG) (in '000KG)

Forecast of Total Quantities of C&D Materials to be Generated from the Contract*

Hard Roack and

Large Broken

Concrete

Reused in the

Contract

Reused in other

Projects

(in '000M3) (in '000M3) (in '000M3) (in '000M3)