PT. KATEXINDO CITRA MANDIRI EXISTING ROOF SURVEY AND CHECKING STRENGTH REPORT RZAR consultans desain.survey.drawings Document No. KATEXINDO FABRIC ROOF Rev. 01 RPT-KF-0812-01 Page Number 1 of 22 CLIENT CLIENT : PT. PT. KATEXINDO CITRA MANDIRI KATEXINDO CITRA MANDIRI JOB DESCRIPTION JOB DESCRIPTION : ENGINEERING SURVEY & CHECKING ROOF STRUCTURE ENGINEERING SURVEY & CHECKING ROOF STRUCTURE PROJECT NAME PROJECT NAME : KATEXINDO ENGINEERING SURVEY KATEXINDO ENGINEERING SURVEY LOCATION LOCATION : Kawasan Berikat Nusantara (KBN), Jalan Jawa Blok Kawasan Berikat Nusantara (KBN), Jalan Jawa Blok D no. 29 D no. 29 01 09/08/12 CHECK EXISTING PURLIN AM BS REV DATE DESCRIPTION PREP’D CHK’D APP’D

Upload: bakti20

Post on 29-Oct-2014

128 views

Category:

Documents


0 download

DESCRIPTION

Laporan hasil survey dan re-calculation of existing building

TRANSCRIPT

PT. KATEXINDOCITRA MANDIRIDocument No.RPT-KF-0812-01

EXISTING ROOF SURVEY AND CHECKING STRENGTH REPORT

RZAR consultansdesain.survey.drawings

Rev. 01

KATEXINDO FABRIC ROOF

Page Number 1 of 20

CLIENT

:

PT. KATEXINDO CITRA MANDIRI

JOB DESCRIPTION

:

ENGINEERING SURVEY & CHECKING ROOF STRUCTURE

PROJECT NAME

:

KATEXINDO ENGINEERING SURVEY

LOCATION

:

Kawasan Berikat Nusantara (KBN), Jalan Jawa Blok D no. 29

01 REV

09/08/12 DATE

CHECK EXISTING PURLIN DESCRIPTION

AM PREPD

BS CHKD APPD

PT. KATEXINDOCITRA MANDIRIDocument No.RPT-KF-0812-01

EXISTING ROOF SURVEY AND CHECKING STRENGTH REPORT

RZAR consultansdesain.survey.drawings

Rev. 01

KATEXINDO FABRIC ROOFTable of Contents

Page Number 2 of 20

1.

INTRODUCTION 1.1. Purpose and Direction 1.2. Works Metode

2.

Survey 2.1. General Information 2.2. Survey Data 2.3. Summary of Survey

Report

3.

CALCULATION REPORT of ROOF STRUCTURE 3.1. Resume Existing Roof 3.2. Recomendation

APPENDIX Documentation

PT. KATEXINDOCITRA MANDIRIDocument No.RPT-KF-0812-01

EXISTING ROOF SURVEY AND CHECKING STRENGTH REPORT

RZAR consultansdesain.survey.drawings

Rev. 01

KATEXINDO FABRIC ROOF

Page Number 3 of 20

1.

INTRODUCTION

1.1. Purpose and Direction As per requset from PT. Katexindo Citra Mandiri by an e-mail datel July 27th 2012, to do existing roof survey and checking the strength of the roof structure for PT. Katexiondo fabric, be located at Kawasan Berikat Nusantara, blok D no.29. The direction of this job to find out the maximum load can be support with the existing roof structure, and the limit of additional load can be added. 1.2 Work Methode In order to make the purpose and direction will be sucess, we do an angeneering survey at site, for collecting actual data and find out the conditon of the building. The survey methode with measuringthe steel members dimension and compare with the drawing as we received before. Make a skceth, estimate the loading data as per exisitng equipment. And make the documentation for calculation reference. To make engineering calculation we use computer program, that is ETABS and Micrisoft Excel for spread sheet. 2. GENERAL INFORMATION : Pabrik Tekstil : Kawasan Berikat Nusantara, blok D no.29, Cakung Jakarta : Zone 3 (SNI 03-1726-2002) : Soft soil (SNI 03-1726-2002) : 15@6m = 90 m : 6m : 18@5,5m + 5m= 104m : 11,8 m : 16 : N/A : N/A : BJ-37 and BJ-41 (correspond to ASTM A36) : 1 unit : 94 kolom : Report Sheet of Katexindo r.01.doc : Perencanaan gording_r1.xls

Building Function Location Seismic zone Soil type Total Length of Building Spacing Bay width Heigth (Max) Roof slope Foundation type Re-bar grade Structural steel grade Number of Building Number of Column Word file Excel file

Cylinder concrete grade, fc : N/A

PT. KATEXINDOCITRA MANDIRIDocument No.RPT-KF-0812-01

EXISTING ROOF SURVEY AND CHECKING STRENGTH REPORT

RZAR consultansdesain.survey.drawings

Rev. 01

KATEXINDO FABRIC ROOF

Page Number 4 of 20

Fabric Layout :

Fabric Layout

PT. KATEXINDOCITRA MANDIRIDocument No.RPT-KF-0812-01

EXISTING ROOF SURVEY AND CHECKING STRENGTH REPORT

RZAR consultansdesain.survey.drawings

Rev. 01

KATEXINDO FABRIC ROOF

Page Number 5 of 20

2.2 SURVEY DATA Site Location

-

Dimension and column spacing is similar with the drawing from client; Total Length Spacing Bay width Height (Max) : 15@6m = 90 m : 6m : 18@5,5m + 5m= 104m : 11,8 m : Profil H 346 x 174 x 6 x 9 : Profil H 346 x 174 x 6 x 9 : Lip Channel 125 x 50 x 20 x 2,3 : 1500mm : Diameter 10 mm per jarak 3 m : Profil WF 150 x 75 x 5 x 7

-

Column Dimension Rafter Dimension Purlin Dimension Purlin spacing Trekstang Lintel Beam

Indicate of stiffener plate each distance 4 m of rafter.

PT. KATEXINDOCITRA MANDIRIDocument No.RPT-KF-0812-01

EXISTING ROOF SURVEY AND CHECKING STRENGTH REPORT

RZAR consultansdesain.survey.drawings

Rev. 01

KATEXINDO FABRIC ROOF

Page Number 6 of 20

3.

CALCULATION REPORT of ROOF STRUCTURE 3.1 Resume of EXISTING ROOF

ETABS Out Put

Steel Strees Check Rafter

PT. KATEXINDOCITRA MANDIRIDocument No.RPT-KF-0812-01

EXISTING ROOF SURVEY AND CHECKING STRENGTH REPORT

RZAR consultansdesain.survey.drawings

Rev. 01

KATEXINDO FABRIC ROOF

Page Number 7 of 20

Display Roof Load , unit kN-m

PT. KATEXINDOCITRA MANDIRIDocument No.RPT-KF-0812-01

EXISTING ROOF SURVEY AND CHECKING STRENGTH REPORT

RZAR consultansdesain.survey.drawings

Rev. 01

KATEXINDO FABRIC ROOF

Page Number 8 of 20

Resume : The existing roof construction is strong enough to support roof material. The loading assumed

PT. KATEXINDOCITRA MANDIRIDocument No.RPT-KF-0812-01

EXISTING ROOF SURVEY AND CHECKING STRENGTH REPORT

RZAR consultansdesain.survey.drawings

Rev. 01

KATEXINDO FABRIC ROOF

Page Number 9 of 20

PT. KATEXINDOCITRA MANDIRIDocument No.RPT-KF-0812-01

EXISTING ROOF SURVEY AND CHECKING STRENGTH REPORT

RZAR consultansdesain.survey.drawings

Rev. 01

KATEXINDO FABRIC ROOF

Page Number 10 of 20

3.2 RECOMENDATION :If the existing purlin to be added maximum 5 kg/m2 (for roof material), so:

PT. KATEXINDOCITRA MANDIRIDocument No.RPT-KF-0812-01

EXISTING ROOF SURVEY AND CHECKING STRENGTH REPORT

RZAR consultansdesain.survey.drawings

Rev. 01

KATEXINDO FABRIC ROOF

Page Number 11 of 20

PT. KATEXINDOCITRA MANDIRIDocument No.RPT-KF-0812-01

EXISTING ROOF SURVEY AND CHECKING STRENGTH REPORT

RZAR consultansdesain.survey.drawings

Rev. 01

KATEXINDO FABRIC ROOF

Page Number 12 of 20

Whereas recomendation the additional load maximum until 15kg/m2 , for roof material, the purlin material shall be changed to be use C 125.50.20.3,2, with the calcualtion as below:

PT. KATEXINDOCITRA MANDIRIDocument No.RPT-KF-0812-01

EXISTING ROOF SURVEY AND CHECKING STRENGTH REPORT

RZAR consultansdesain.survey.drawings

Rev. 01

KATEXINDO FABRIC ROOF

Page Number 13 of 20

Output Program ETABS

PT. KATEXINDOCITRA MANDIRIDocument No.RPT-KF-0812-01

EXISTING ROOF SURVEY AND CHECKING STRENGTH REPORT

RZAR consultansdesain.survey.drawings

Rev. 01

KATEXINDO FABRIC ROOF

Page Number 14 of 20

Steel Strees Check Rafter

Display roof load , unit kN-m

PT. KATEXINDOCITRA MANDIRIDocument No.RPT-KF-0812-01

EXISTING ROOF SURVEY AND CHECKING STRENGTH REPORT

RZAR consultansdesain.survey.drawings

Rev. 01

KATEXINDO FABRIC ROOF

Page Number 15 of 20

APPENDIX

Existing Roof Indoor Elevation

PT. KATEXINDOCITRA MANDIRIDocument No.RPT-KF-0812-01

EXISTING ROOF SURVEY AND CHECKING STRENGTH REPORT

RZAR consultansdesain.survey.drawings

Rev. 01

KATEXINDO FABRIC ROOF

Page Number 16 of 20

Measuring the Purlin Spacing

PT. KATEXINDOCITRA MANDIRIDocument No.RPT-KF-0812-01

EXISTING ROOF SURVEY AND CHECKING STRENGTH REPORT

RZAR consultansdesain.survey.drawings

Rev. 01

KATEXINDO FABRIC ROOF

Page Number 17 of 20

Measuring the Rafter Dimension

PT. KATEXINDOCITRA MANDIRIDocument No.RPT-KF-0812-01

EXISTING ROOF SURVEY AND CHECKING STRENGTH REPORT

RZAR consultansdesain.survey.drawings

Rev. 01

KATEXINDO FABRIC ROOF

Page Number 18 of 20

Measuring the Rafter Dimension

PT. KATEXINDOCITRA MANDIRIDocument No.RPT-KF-0812-01

EXISTING ROOF SURVEY AND CHECKING STRENGTH REPORT

RZAR consultansdesain.survey.drawings

Rev. 01

KATEXINDO FABRIC ROOF

Page Number 19 of 20

Measuring Purlin Dimension

PT. KATEXINDOCITRA MANDIRIDocument No.RPT-KF-0812-01

EXISTING ROOF SURVEY AND CHECKING STRENGTH REPORT

RZAR consultansdesain.survey.drawings

Rev. 01

KATEXINDO FABRIC ROOF

Page Number 20 of 20

RESUME :

-

The Existing Roof Structure is strong enough to support the loading of roof cover and hanging material, but susceptible to be over strength and over bending if added load until maximum 5 kg/m2 for roof cover material.

-

Especially for the purlin that use Channel 125 x 50 x 20 x 2,3; regarding the technical calculation indicate susceptible to be over strength and over bending if added load until maximum 5 kg/m2 for roof cover material.

-

Recomendation for purlin if will be added with roof cover material load until 15kg/m2 shall be used Lip Channel 125 x 50 x 20 x 3,2. When the loading of roof structure to be added 5 kg/m2 until 15 kg/m2, the column indicate slenderness, that can be solve with added stiffener plate each 2m betwen web and flange, use plate 6mm thickness.