continuous climb operations ( cco )

15
Continuous Climb Operations ( CCO ) 1 Instructor: [email protected]

Upload: walker-ortiz

Post on 30-Dec-2015

35 views

Category:

Documents


14 download

DESCRIPTION

Continuous Climb Operations ( CCO ). Lead Instructor: [email protected]. Learning Objectives. By the end of this presentation you should understand: What is a CCO CCO Design possibilities CCO Design Considerations CCO Implementation Process. CCO Manual. ICAO Doc 9993. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Continuous Climb Operations ( CCO )

1

Continuous Climb Operations

( CCO )

Lead Instructor: [email protected]

Page 2: Continuous Climb Operations ( CCO )

2

Learning Objectives

✈ By the end of this presentation you should understand:

✈What is a CCO

✈CCO Design possibilities

✈CCO Design Considerations

✈CCO Implementation Process

Page 3: Continuous Climb Operations ( CCO )

3

CCO Manual

ICAO Doc 9993

Page 4: Continuous Climb Operations ( CCO )

CCO Defined

CCO is an aircraft operating technique made possible by

1. appropriate airspace and procedure design2. appropriate ATC clearances

enabling the execution of a flight profile optimized to the performance of the aircraft, allowing the aircraft to attain initial cruise flight level at optimum air speed with climb engine thrust settings set throughout the climb, thereby reducing total fuel burn and emissions during the whole flight.

Page 5: Continuous Climb Operations ( CCO )

CCO & CDO Design Methods

• Where a trade-off between CCO and CDO is unavoidable, the local analysis and decision making should take into account that a level segment for an aircraft in descent would normally burn less fuel than for the same duration of level segment for an equivalent aircraft in climb.

• Often there is far more unnecessary level flight in the descent phase than in the climb phase.

• The balance will depend on local characteristics such as the extent of level flight in both phases, the significance of noise in the areas affected etc.

BALANCE:

Page 6: Continuous Climb Operations ( CCO )

6

Profile Interaction

SAMPLE CHART ONLY: SIMILAR GRAPHS SHOULD BE DEVELOPED FOR EACH IMPLEMENTATION DEPENDING ON FLEET

CDOCCO

Page 7: Continuous Climb Operations ( CCO )

Profile Interaction

Page 8: Continuous Climb Operations ( CCO )

Profile Interaction

Page 9: Continuous Climb Operations ( CCO )

Basic CCO

9

Page 10: Continuous Climb Operations ( CCO )

Multi-runway CCO Departures

10

Page 11: Continuous Climb Operations ( CCO )

CCO vs Inbound Traffic

11

Page 12: Continuous Climb Operations ( CCO )

Multiple Performance CCO

12

Page 13: Continuous Climb Operations ( CCO )

Multiple Performance CCO

13

Page 14: Continuous Climb Operations ( CCO )

CCO Roadmap

14

Page 15: Continuous Climb Operations ( CCO )

15

QUESTIONS?