content - apppexpo 上海广印展 room application 02/03/2018 email/fax organizer contact p52...
TRANSCRIPT
2018 Shanghai international Lighting EXPO
- 1 -
CONTENT
Foreword | 03
Services List and Deadline Information | 04
SECTION 1 Exhibition Information
1. Exhibition Name | 05 2. Exhibition Venue | 05
3. Exhibition Date | 05 4. Organizer | 05
5. Website | 05 6. Wechat Public Account | 05
7. Exhibition Layout Plan | 06 8. Booth Parameter | 06
9. Organizer Contacts | 07 10. Official Service Providers | 07
11. Banking Information | 09 12. Build-up and Break-up | 09
13. Exhibition Map | 10
SECTION 2 Rules and Regulations
1. Exhibitor Badge | 11 2. Construction Permit | 11
3. Loading Zone Vehicle Permit | 12 4. Booth Operation | 13
5. Presentation of Exhibits | 13 6. Sound Control | 14
7. Booth Cleaning | 14 8. Liability and Insurance | 14
9. Damages & Compensations | 15 10. Intellectual Property Right Protection| 15
11. Force Majeure | 16 12. Authority of Premises | 16
13. Unforeseen Circumstances | 16 14. Safety Guidelines | 16
15. Fire Protection Guidelines | 16 16. Electricity Guidelines | 18
- 2 -
SECTION 3 Booth Design and Construction
1. Official Standfitting Contractor | 21 2. Standard Booth | 22
3. Special Booth Design and Construction
Regulations | 24
4. Special Booth Structure Drawing Inspecting
Process and Instruction | 25
5. Construction Management Fee and
Construction Deposit of Special Booth | 27
Payment and Refund of Construction Management
Fee and Construction Deposit | 28
7. Overtime Charge during Build-up & Break-up | 28 8. Exhibition Equipment Rental | 29
9. Exhibition Facilities Rental | 30 10. Booth Decoration Services | 32
11. Safety Notice for water, Electricity and Gas | 34 12. The Guide of Dismantling | 36
SECTION 4 Shipping Guideline & Official Tariff
1. Contact Information | 38 2. Consignee Information | 38
3. Document and Schedules | 39 4. Documents | 39
5. Customs Clearance | 40 6. Quarantine Requirements | 40
7. Hand Carried Exhibits| 40 8. Sold Exhibits | 40
Insurance | 41 10. Dangerous Goods | 41
11. Heavy/Oversized Exhibits | 41 12. Case Marking and Packing | 41
Services & Handling Tariff | 42 Payment Terms & Business Conditions | 46
SECTION 5 Exhibition Services
1. Exhibitors Company Info on Show Directory | 47 2. Award Activity | 48
3. Ad-Posting | 49 4. Meeting Room Rental Application | 53
5. Information of Appointed Hotel | 56 6. WI-FI Service of Smart Stand | 59
APPENDIX 1:Safety Responsibility Agreement of NECC| 60
APPENDIX 2:Special Notice | 61
APPENDIX 3:Value Added Tax Invoice Information Collection Table | 62
2018 Shanghai international Lighting EXPO
- 3 -
FOREWORD
Dear Exhibitors and Contractors:
Welcome to the 13th Shanghai International Lighting Exhibition, as well as Shanghai International Smart and Innovative Home Exhibition and Shanghai international Screen Exhibition
To make sure you have more effective exhibiting preparation and to get familiar with exhibition facilities and requirements, please read the manual carefully. It offers guidelines of going through exhibiting pro-cedures effectively.
1. Forms
We attach all related forms that you must fill out in the appendix section of the Manual. Please log in our website and submit the completed forms before deadline. If you are not available to complete the online forms, you have another option of submitting forms directly. Please find download link below,
http://www.apppexpo.com/2/CN/Download
2. Safety Responsibility
All exhibitors shall strictly comply with the management regulations and instructions during the exhibition. The exhibitor is responsible for supervising appointed contractors and forwarders to study relevant regu-lations in the Manual. All exhibitors and contractors shall submit signed “Safety Responsibility Agree-ment” before exhibition starts. Please find download link below,
http://www.apppexpo.com/2/CN/Download
3. Exceptions Clause
Though we would try our best to meet your requests, please note that exhibition show management dis-claim the following responsibilities:
A. The problems that arise from wrong information show in the submitted forms and files;
B. Late submission after specified deadline may cause delay and / or inability to provide the service;
C. Optional orders which are subject to availability;
D. Late orders which are subject to surcharge;
E. Changes and / or inability to provide services due to non-compliance of rules & regulations set by the
venue and the Organizers;
F. Transactions directly between exhibitors and the official vendors.
If you have any further question or request after reading this manual, please visit our website at
http://www.apppexpo.com or contact us directly. We will respond promptly.
- 4 -
Services List and Deadline Information
P.S:All application forms (except the one being submitted via on-line) would be able to download
from link:http://www.apppexpo.com/2/CN/Download
Service Deadline Submission Contact Person Page
Publication Information 02/02/2018 Online Exhibition Contact P47
Awards Collection 28/02/2018 Online/Email/Fax CSA Contact P48
Hotel Registration
Application 01/03/2018 Email/Fax
Official Service Provider
Contact P54
Safety Responsibility
Agreement 02/03/2018 Email/Fax Hall Contractor Contact P58
Facility Rental 02/03/2018 Online/Email/Fax Hall Contractor Contact P30
Equipment Rental 02/03/2018 Online/Email/Fax Hall Contractor Contact P29
Special Booth Design
Review 02/03/2018 Online/Email/Fax Hall Contractor Contact P25
Booth Title Confirmation 02/03/2018 Online/Email/Fax Hall Contractor Contact P23
Conference Room
Application 02/03/2018 Email/Fax Organizer Contact P52
Advertisement Release
Application 02/03/2018 Email/Fax Organizer Contact P49
Shipping Delegation 16/03/2018 Email/Fax Forwarder Contact P39 / P42
Overtime Application Before 14:00 of the On Site Hall Contractor Contact P28
Special request for Elec-
tricity Use Application
Before 14:00 of the
Exhibiting Day On Site Hall Contractor Contact -
24 Hours Electricity
Application
Before 14:00 of the
Exhibiting Day On Site Hall Contractor Contact -
Dismantling Application
of Earth Leakage Protec-
tive Device of Distribu-
tion Box
Before 14:00 of the
Exhibiting Day On Site Hall Contractor Contact -
2018 Shanghai international Lighting EXPO
- 5 -
SECTION 1 Exhibition Information
1. Exhibition Name:
Shanghai International Lighting Expo
In Conjunction with:
Shanghai International Smart and Innovative Home Exhibition
Shanghai international Screen Exhibition
2. Exhibition Venue:
National Exhibition and Convention Center (Shanghai)
Address: No. 333, Songze Avenue, Shanghai, China
Tel:(86)21-6700 8888 Fax:(86)21-6700 8877/8642
3. Exhibition Date:
28/03/2018-31/03/2018
4. Organizers:
Shanghai Yun Expo Co., Ltd.
Shanghai Modern International Exhibition Co., Ltd.
Shanghai Gray Exhibition Co., Ltd.
5. Website:
http://www.apppexpo.com/
6. Wechat Public Account:
LightingExpo
- 6 -
Hall No. 1H 2H 3H 4.1H 5.1H 6.1H 7.1H 8.1H NH
Clear Height (m) 32 32 32 12 12 12 12 12 18
Scale Height (m) ±0.00
Freight Entrance(m) 8 × 6.5 (width×height)
Building Maximum
Height (m) 6m
Floor Loading(ton/
m2) 5 3.5 5
Lighting Level(LX) 300
Shipping Method Vehicles which enter red line has height limitation of 4.5m; Truck route reach each hall; Vehicles which enter 2nd floor has length limitation (include upper part of car) of 17.5m
and total weight limitation (include cargo) of 30 ton.
7. Exhibition Layout Plan
8. Booth Parameter
2018 Shanghai international Lighting EXPO
- 7 -
9. Organizers Contacts ● Shanghai Modern International Exhibition Co., Ltd
Address: 18th Floor, No. 8, Shengze Road, Shanghai, China
Contact Person:Eveline Luo E-mail:[email protected]
Telephone No. :+86-21-6328 8899 Fax No.:+86-21-6374 9188
● Shanghai Gary Exhibition Co., Ltd
Address: Room 407, No. 1438, North Shanxi Road, Shanghai, China
Contact Person:Jin Yin E-mail:[email protected]
Telephone No. :+86-21-5252 0202 Fax No.:+86-21-6299 8196
10. Official Service Provider
10.1 Standfitting Contractor:
Display Plan Department, Shanghai Modern International Exhibition Co., Ltd.
General Leader:Han Ding Tel No.:+86-21-6328 8899 ext 116
Contacts of each hall:
10.2 Drawing Inspecting Company for Out of Standard Booth: Shanghai Ya Hai Heng Xin Exhibition Co., Ltd
Tel No.:(86)21-6700 8483 E-mail:[email protected]
Contacts:Mr. Wan Shuobin , +86 15802110258(For Hall 1H/2H/3H/4.1H/NH)
Ms. Liu Tao, +86 18217660611(For Hall 5.1H/6.1H)
Hall Name Tel No. Extension Mobile No. Email Address
1H Jiang Huidong +86 21-28906522 21 +86 13524103220 [email protected]
2H Shen Feng +86 21-63288899 139 +86 15802134087 [email protected]
Ma Weidong +86 21-63288899 163 +86 13901994369 [email protected] 3H
Shen Wenyu +86 21-63288899 825 +86 15900877586 [email protected]
4.1H Xie Lizhang +86 21-63288899 803 +86 13524110301 [email protected]
Zhang Rong +86 21-63288899 182 +86 13701785178 [email protected]
5.1H Zhuang Yong +86 21-63288899 171 +86 13818080658 [email protected]
6.1H Chen Yinsheng +86 21-28906187 19 +86 15901628507 [email protected]
NH Jiang Huidong +86 21-28906522 21 +86 13524103220 [email protected]
- 8 -
10.3 Raw Space Booth Design Construction Company(Recommended List)
● Display Plan Department, Shanghai Modern International Exhibition Co., Ltd.
Floor 17, No. 8, Shengze Road, Shanghai, China , 200002
Contact Person: Han Ding
Tel No. +86-21-6328 8899 ext 116 / 142
● Shanghai Sunrise Expo Service Co., Ltd
Contact Person: Shu Guobao/ Wang Tao
Tel No. +86-21-28906186/6187 *17/18 Fax:+86-21-28906186/6187 *15
Email: [email protected] Website: www.sunexpo.com.cn
10.4 Official Exhibit Transport Forwarder
● For Hall 2H, 3H, 4.1H, 5.1H, 6.1H, NH: Shanghai Zhanshun International Logistics Company
General Leader:Hong Chen Mobile No.:+86 13801694001
Tel No.:+86-21- 63077991 Fax :+86-21-63242414
Email :[email protected]
● For Hall 1H:Shanghai ITPC International Transportation Co. Ltd
Contact Person:Lingmin Meng Mobile No. :+86 13795307591
Tel No.:+86-21-6380 3151 Email :[email protected]
Hall Com-
pany
Contact
Person Tel No. Mobile No. Email
1H
Meng
Ling min +86 21-6380 3151 +86 13795307591 [email protected]
ITPC Yang
Jian +86 21-6380 3317 +86 15721577794 [email protected]
2H
Zhan
shun
Dai Zixin +86 21-63939755*8006 +86 13381797088 [email protected]
3H Wang
Sulian +86 21-63939755*8003 +86 13501706046 [email protected]
4.1H Wang
Sulian +86 21-63939755*8003 +86 13501706046 [email protected]
5.1H Huang
Peijun +86 21-63939755*8012 +86 13501748472 [email protected]
6.1H Huang
Peijun +86 21-63939755*8012 +86 13501748472 [email protected]
NH Dai Zixin +86 21-63939755*8006 +86 13381797088 [email protected]
2018 Shanghai international Lighting EXPO
- 9 -
10.5 Business Reception
Shanghai branch of Beijing Times International Exhibition and Conference Service Co., Ltd
Address:No. 501, Tower C, No. 70, Caobao Road, Shanghai, China
Contact Person:Hu Zhonglin / Lin Qianqian Tel No.:021-64705363
Mobile No.:+86 15214353324 Fax:021-64705383 Email:[email protected]
11. Account for Remittance and Payment Instruction(for equipment and facility rental only)
Remittance account for equipment and facility rental of “the 26th Shanghai International Ad & Sign
Technology and equipment Exhibition” :
For 2H / 3H / 4.1H
Account Name:Shanghai Modern International Exhibition Co., Ltd
Bank Name:Banking dept.of Shanghai Branch, Bank of China Account No.:444259214551
For 1H / 5.1H / 6.1H / NH
Account Name:Shanghai Sunrise Expo Service Co., Ltd
Bank Name:Huamu Sub-branch of China Construction Bank
Account No.:31001523212050002152
12. Build-in and Break-up Timetable
1. The Committee will check with exhibition center before exhibition starts about the offered time infor-
mation. The offered time are subject to final confirmation on-site.
2. The written application for overtime must be submitted to exhibition contractor before 14:00 the same
day if exhibitors intend to work after working hours. Overdue order will be charged extra 50% service
fee. Extra overtime application that apply on the exhibiting day will be charged extra 50% service fee
as well..
Build-in Break-up Date
Mar 25th Mar 26th Mar 27th Mar 31st
Exhibitor Registration 09:00-17:30 ——
Standard Booth
Build-up
Hall 1H / 2H / 3H / 4.1H / NH —— 09:00-18:00 ——
Hall 5.1H / 6.1H —— —— 09:00-18:00 ——
Raw Space
Build-up
Hall 1H / 2H / 3H / 4.1H / NH 09:00-18:00 ——
Hall 5.1H / 6.1H —— 09:00-18:00 ——
Exhibitor Break-up —— —— —— 14:00-18:00
2018 Shanghai international Lighting EXPO
- 11 -
SECTION 2 Rules and Regulations
1. Badge 1.1 Exhibitor‟s Badge will be issued as entry permits for entering the exhibition halls and business processing. should be worn whenever you are inside the exhibition hall during the move-in, exhibition and move-out periods. The identification system is corresponding to the identification system by means of access
control and photographic recording. Badges resale / transfer are strictly prohibited.
1.2 Pre-application
The exhibitors are requested to complete on-line application through http://www.apppexpo.com be-fore 1st Mar 2018.
1.3 On-site application
If exhibiting company fail to do pre application, or need more badges can go to the reception counter of National Exhibition and Convention Center (Shanghai) to get free exhibitor badges by providing the in-voice of the total booth fee, the copy of bank slip and company business card during build -up period.
1.4 Exhibitors shall wear the badge and assist the safe guard to check when entering into the halls. The exhibitors can take the exhibitor badge to come into the hall for booth layout, but they are not allowed to participate in the construction. Once discovered, they will be expelled from the exhibition hall.
2. Construction Permit
2.1 Real Name Certification
The new constructors and transporters should issue the permits which have one year
valid period. The expired permit can be renewed by the Venue.
2.2 Required Materials
● The original ID card of responsible person in construction company
● Two copies of ID card (with two sides) of responsible person in construction company (with
seal)
● Two copies of business license (with official seal) ● The form of real name certification ● National Exhibition & Convention Center (Shanghai) Safety Responsibility Agreement (for Access Permit Issuing Office)
2.3 On-site process
Responsible person in construction company shall bring his/her original ID card as well as the original card of all constructors who need to make permits to Access Permit Issuing Office. Any certificate which prove that he/she is allowed to enter the exhibition, shall show during permit-making. The certificate could be badge, deposit receipt, official standfitting contractor approval, official transport forwarder approval.
2.4 Online appointment
The responsible person in construction company must on-line fill in all contractors information and submit one one-inch photo for each person. Export the completed application forms, print it and make signature on it. The responsible person shall make permits with mentioned forms and ID cards in the Ac-cess Permit Issuing Office. Any certificate which has function of proving one is allowed to enter the exhibi-tion center should also be submitted.
- 12 -
3. Loading Zone Vehicle Permit
3.1 Application process
1) During build-up and break-up period, Exhibitor‟s vehicles shall pour into P2 for the first waiting in
the queue. In there, drivers will receive waiting number vouchers from the staff. Vehicles without number
voucher are not allowed to enter venue.
2)Vehicles with number voucher are allowed to enter North square parting lot for second waiting in
the queue. When entering the halls, the voucher shall be returned.
3)During the second time waiting in the queue,exhibitors shall go to Access Permit Issuing Office
(on the 2nd floor of north hall) to make Loading Zone Vehicle Permit and Loading Zone Vehicle Guide
Permit. Any certificate being able to prove one is allowed to enter the exhibition center, together with vehi-
cle license plate number, should be submitted.
4)After getting the permit, all vehicles must follow instructions and enter halls with permit in turn.
5)Loading Zone Vehicle Permit include a certificate and a IC card . All vehicles shall stamp the card
whenever go in or out of the exhibition venue in order to make a record of start time and end time.
6)After the vehicles leaving the venue, the exhibitors could refund the deposit in Access Permit Is-
suing Office with loading zone vehicle permit, loading zone vehicle guide permit and permit deposit re-
ceipt.
2018 Shanghai international Lighting EXPO
- 13 -
3.2 The permit price includes 30RMB for nominal fee, 20RMB for management cost, 300RMB for deposit.
When the permit has been done, nominal fee and management cost do not return. There is no replacement if any loss of the permit. After completing loading, deposit could be refunded with return of loading zone vehicle
permit and loading zone vehicle guide permit. The deposit will not be returned if vehicle permit lost. 50RMB
will be charged if guide permit lost. The permit is only for single entry into loading zone. The total loading time is 90 minutes. The deposit will all be returned if vehicle leave loading area within 90 minutes. If timeout 30 min-utes, 100RMB will be charged; If timeout 31-60 minutes, 200RMB will be charged; If timeout above 60 minutes, no any refund of the deposit
3.3 During build-up and break-up period, vehicles entering the loading zone must load cargo within
specified area. Vehicles must leave the loading zone right away after all cargos being loaded.
4. Booth Operation
Exhibitors / Contractors should be responsible for the safety of booth. An “Safety Responsibility Sheet” must be signed and returned to the official standfitting contractor before 2 Mar 2018.
4.1 Exhibitor‟s name on fascia board should be same as exhibitor‟s registered name. Stand resale/transfer/re-rent total or partially of exhibiting area, office, conference room or store room is prohibited.
4.2 Fake commodities are not allowed to exhibit. Exhibitors are not allowed to present or promote products for which they are not agent without written permission sheet. The organizers reserve right to keep above mentioned products out of public sight.
4.3 During exhibition, booths shall be full staffed and with smooth operation. People under 18 years old are not allowed to wear badge or appear during build-up and break-up period as well as the show. Be-fore closure of exhibition, all exhibits should be on show. It‟s prohibited to end up exhibition beforehand.
4.4 Organizers of exhibition reserve the rights to re-locate the layout and position of booth, if the or-ganizers confirm the booth relocation is beneficial for the exhibition and all exhibitors.
5. Presentation of Exhibits
Exhibitor intending to present and / or demonstrate equipment, exhibits or products at his booth must:
5.1 Exhibitors shall submit detailed written materials of exhibits they want to present, including mov-ing parts, flammable materials, laser and other hazardous materials. And they shall get approval before exhibition starts.
5.2 Ensure that all moving machines be fitted with safety devices when machines are in operation. Their safety devices may be removed only when machines are disconnected from the source of power.
5.3 Ensure that any moving machines displayed shall only be demonstrated within booth area, oper-ated by qualified persons and shall not be left running without the proper supervision of such persons.
5.4 Safely install and guard all working exhibits to prevent slippage and position the exhibit within the actual booth area and in a way that would not be hazardous or cause any injury to all persons, whether visitors, staff or contractors.
5.5 Isolate starting devices to prevent operation by any visitor or other unauthorized person.
5.6 Ensure that toxic fumes, exhaust or other irritants caused by the exhibits /products are not re-leased into the Exhibition hall. Prior approval from the relevant controlling authority, in addition to that of the Organizers, must be obtained for such purpose.
5.7 Ensure that gas cylinders, naked flames and welding demonstrations are not exposed in the Ex-hibition hall and booths. Prior Fire Safety Bureau (FSB) approval must be obtained and their conditions for such purpose fully met and satisfied before any demonstration is carried out.
5.8 Ensure that adequate protection is catered to prevent damage to the Hall flooring, carpet and fa-cilities. Any damages caused will be at the responsibility of the Exhibitor concerned.
5.9 Ensure that any product or display like roofing, awning, ceiling or lighting pellet must be high-lighted in the respective booth plan and submitted to the Organizers for the Fire Safety Bureau (FSB) ap-proval. Without this FSB approval, no such product or display will be permitted in this Exhibition by the FSB.
- 14 -
5.10 Only with the approval by the local relevant ministry of government administration and the re-quired conditions, are the exhibitors allowed to demonstrate electronics, wireless communications, and satellite transmission equipment.
5.11 Make sure that the exhibitors can only demonstrate the products of their agencies and distribu-tors. If there is any dispute between the exhibitors, the organizers will reserve the ruling Power.
5.12 Make sure that volume from the booth does not interfere with other exhibitors and visitors. Only with the approval by the organizers can any demo caused the high volume or any interference factors be demonstrated at a certain time. The organizers have the right to require the exhibitors turn down or off the audio equipment. If there is any dispute, the decision of the organizers holds the ultimate efficiency.
5.13 Only with the approval by the organizers, are the exhibits, posters, brochures and other relevant pro-
motion materials covering the exhibition subject allowed to display during the daily exhibition. If there is any vio-
lation of this rule, the organizers can remove the exhibits, posters, brochures and any attachment of the exhibits
from the exhibitors.
5.14 Not removal of any exhibits is allowed during exhibition period.
5.15 The exhibitors are not allowed to place stickers, sign notice or posters outside the booth, stick-ing area of paid advertising poster, and adverting board area. The exhibitors also not allowed to hand out brochure, invitation sheet or any similar in the exhibition access, entry and exit area. It‟s prohibited to use any remote control flyers. Only when getting approval from the Organizer that helium balloon and hot air balloon can be used.
5.16 Not 502 glue or super glue could be used on the not-carpeted floor. Any action that cause rule
breaking will result in penalty.
6. Sound Control
Noise level coming from the booth must not exceed 70dB (A) at the booth boundary. During the pres-entation of exhibits or special shows the general noise level in halls may exceeded by 5dB (A) for a brief period. Loudspeakers must be directed towards the inside area of the booth. The exhibitor should submit the project of demonstrate or performance of products to the Organizer in the two weeks before the open-ing of the exhibition and subject to the Organizer‟s suggestion. Loudspeaker of every booth should be placed inside booth. If loudspeaker is found towards outside area of the booth, the Organizer has the rights of stopping providing power for booth before it does the reform. The sound controller of every booth should be on his position when the loudspeaker is working. If the loudspeaker‟s sound is found lost con-trol because the absent of the sound controller, the Organizer has the rights of stopping providing power for that booth directly. If the booth is often complained by other booths because their sound is too high over a long period, and that is proved by the Organizer, the organization can stop its power in part time.
7. Booth Cleaning
The exhibitors are required to keep booth inside tidy and the cleanness of exhibits. The Organizing Committee will arrange for the general cleaning of the Exhibition hall and booths, which include cleaning of carpet/flooring and rubbish disposal before the Exhibition opens in the morning and after the Exhibition closes in the evening. Booth contractors are for maintaining their own booth in a tidy condition at all times.Exhibitors with lockable offices are requested to place refuse outside the office/booth space before departure each evening, for disposal. Exhibitors may contact the Official Cleaning Contractor for quota-tion, should additional cleaning services be required.
8. Liabilities and Insurance
8.1 The Organizers will not be responsible for the safety of any kind brought into exhibition by the
Exhibitors which includes their agents, contractors, visitors or any other person whosoever. The exhibitors are suggested to insure in advance for exhibits transport and all periods between booth build-up till break-
2018 Shanghai international Lighting EXPO
- 15 -
8.2 The exhibitors shall compensate Organizer for any loss or other consequences caused by any act or default of the exhibitor, his agents, contractors or invitees.
Reminder:As it is easer to lost small size valuables during build-up, please make sure the
booth is always being took care before moving out/packaging portable items or returning rented
equipments and facilities to suppler.
9. Damages & Compensations
9.1 Exhibitors are responsible for the damage or dilapidation to the Exhibition hall caused by them-selves, their agents, contractors or any person employed or engaged on their behalf.
9.2 Exhibitors occupying standard booths are also responsible for the damage to the contractor‟s booth structures, floor coverings, light fittings and any other hired items, whether caused by themselves, their agents, contractors or by any person employed or engaged on their behalf.
10. Intellectual Property Right Protection
10.1 The exhibitors should own independent intellectual property right or intellectual property licens-ing of all their exhibits. There shall be no infringement. Without permission of the exhibitors, the exhibition site is strictly prohibited to take photos.
10.2 If there is the infringement, the exhibitors should remove the relevant exhibits and assist the or-ganizers and related legal institutions do the investigation. The exhibitors have no right to ask the organiz-ers to return the booth fee for the reason of the exhibits removing.
10.3 Shanghai Justeam Law Firm was assigned as senior legal & IP affairs advisor to this Expo.
The instruction of Shanghai Justeam Law Firm (hereinafter referred to as :Justeam”)
Justeam was set up in 2011 with the headquarter in Shanghai. Since the foundation, it has been the Legal Counsel of “Shanghai International Ad & Sign Technology and equipment exhibition for 7 straight years.
Adhering to the notion that Justeam renders you career success, Justeam assembles a group of elite lawyers with sound legal knowledge, abundant practical experience, and outstanding professional ability. All the lawyers in Justeam graduated from top-ranking colleges at home and abroad. Most of them having received the LL.M. degree or the Juris Doctor degree. Some of the lawyers are professors, doctoral tutor and doctor candidates from well-known universities.
Justeam has diverse range of business, which includes intellectual property rights, corporate securi-
ties, litigation and arbitration and others. Take intellectual property rights business as an example, we as-semble many experienced expert. They provide professional services to clients in the world.
Justeam have clients in all over the world,they are from the field of advertisement, quickly eliminate
translation, exhibition and presentation, bank, internet, software, education and etc. Justeam meet global standard. Every operating department coordinates with each other to utilize all the internal and ex-ternal resources to achieve brilliant services and provide intellectual supports for clients with passion, effi-ciency and attentiveness.
Contact Person:Zhao Yaorong MP:+86 13564843140
Add:RM 811, Building 3, No.1800, Huangxing Road, Yangpu District, Shanghai, China , 200433
Tel :021-65026165 Fax:+86 21-65026165 Website:www.justeamlaw.com
- 16 -
11. Force Majeure
In the case of force Majeure - i.e. any cause whatsoever beyond the control of the organizers-the Or-ganizers reserve the right to alter the timing and/or duration of the Exhibition. The Organizers shall not be held responsible for any loss sustained by the Exhibitor, which is directly or indirectly attributed to a so -called “Act of God” such as fire, flood, earthquake, windstorm or other natural disasters, act of any sover-eign government, and any law and judgment relating to labor disputes. In the event of such circum-stances,
12. Authority of Premises
In the event of any problems or disputes on-site, the decision of the Organizers, being lessee of the premises, will be final. The Organizers also reserve the right to amend any earlier decision made in order to meet and satisfy any unforeseen or prevailing circumstance for the Exhibition and concerned parties.
13. Unforeseen Circumstances
In the event of any occurrence not foreseen in these „Rules and Regulations‟ and the terms of con-tract stated in the contract, the decision of the Organizers shall be final.
14. Security Guidelines
The exhibition has brought in security guards. But the exhibition will not take any responsibility if any loss or damage of exhibitors‟ property from build-up till the end of break-up.
14.1 All the exhibitors should arrange a person as a part-time security staff to assist the organizers and the Venue on security. This person must come into the halls with the contractors during the built -up time to supervise and inspect each security work
14.2 All participants must give education regarding safety management to their staff, strengthen staff's safety awareness and ensure a safe exhibition. The standfitting contractors entering for construc-tion are not allowed to get involve into activities which has nothing to do with construction. Otherwise the Organizer will blacklist him and disqualified him from construction in the hall. For very serious case, the person will be disqualified from construction forever.
14.3 During the expo, the exhibitor is allowed to carry the samples out the venue only with the move-out certificate approved by the organizers.
14.4 Keep samples, documents and belongings properly to prevent them being lost or stolen. All samples must be registered in special list and be managed by assigned person. The exhibitors must take effective measures to keep important samples properly. During move in and out and daily venue closing, the exhibitors must lock all important documents, valuable samples and belongings in the exhibition counter or in the safe or take other effective measures and assign specific person to be in charge of it.
14.5 It is strictly prohibited to carry any explosive and other dangerous chemicals into the venue; Virulent, explosive and radioactive and other exhibits must be replaced by the generic substitutes.
14.6 During the expo, any item you have picked up must be sent to the security department. It is not allowed to take care of them by your own hands.
15. Fire Protection Guidelines
15.1 Responsibility for Fire Safety
1) Smoking is strictly prohibited in the exhibition venue.
2) All the exhibitors, contractors, staff, agencies and service people must obey “Fire Control Law” and fire control regulations of Shanghai New International Expo Center.
2018 Shanghai international Lighting EXPO
- 17 -
3) Leader of each exhibitor has full responsibility of fire control for their own booth. Any person who sees the fire should start fire alarm; try to extinguish or control fire, and to evacuate all of nearby items.
4) The following circumstances should be approved by Shanghai Fire Bureau in written form:
● Presenting and operating heating, barbecue grill, heat or open flame devices, candles, lanterns, torches, welding equipment, or other raw tobacco materials.
● Presenting and operating any dangerous electric power, mechanical, or chemical apparatus. Any question or any apparatus which is likely to be confirmed as dangerous, please contact the relevant departments for approval.
● Toxic or hazardous materials, including flammable liquids, compressed gases, or dangerous chemicals. It must be noted that there should be no obstacles and blocks for the fire protection sys-tem, air conditioning systems, mechanical ventilation, fire safety equipment, hose cabinets, fire han-dle fastening devices and interior lighting control system.
15.2 Keep Clear for Emergency Exits
1) The man fire exit of the single hall and the upper of the double hall is 12 meters and the one in
the lower of the double hall is 8 meters. The minimum width of the emergency exit is 3 meters; the booth against the wall should be located no less than 0.5 meter from the wall.
2) During the move-in and move out, all kinds of decorative materials and exhibiting samples cannot
be stacked at the door of the halls or the entrances to prevent them blocking the emergency exits. Pack-age materials or brochures cannot be stacked in the area behind the booth panel and other special ser-vice areas. Keep the interior of the hall and its surrounding emergency exits clear. If not, the organizers and fire department reserve the right to deal with them as the unknown waste. Any loss and penalty will be taken by the exhibitors.
3) The items improperly placed will be cleared and relocated by the security management staff. Any loss and cost will be taken by the owner.
15.3 Prohibited and Restricted Use of Dangerous Materials
1) It is prohibited to use the fire and the temporary gas lamps in the venue.
2) It is prohibited to use explosive, flammable, corrosive and other hazardous materials.
● Compressed air: According to Shanghai Public Security Bureau “Pavilion Safety Ordi-nance”: air compressor must be placed outside the halls. Regulations must be strictly en-
forced.
● Industry gas:It is prohibited to use any flammable, corrosive gas for any display inside the halls.
● Radioactive materials: it is prohibited to use any radioactive materials at any time.
● Display needing strong illumination: It is prohibited to use any strong illumination devices without exterior covering in the halls at any time.
● Corrosive materials (waste): corrosive materials (waste) are not allowed to place in the halls.
● Compressed gas container: It is prohibited to bring container which are filled with helium, com-pressed air, argon, carbon dioxide, etc into exhibition venue.
3) All decorative materials should be made of non-combustible or flame retardant materials; It is pro-hibited to use the stretch fabrics.
4) If you decorate the booth with wooden structure, you should use fireproof materials and fire retar-dant coating on it. Various transformers may not be directly installed in the combustible object.
5) Only non-combustible carpets could be used. (Only “B1” level non-combustible carpets meet fire regulations.)
- 18 -
15.4 The Normal Operation of Fire Facilities
1) All exhibitors should take care of various fire facilities in the halls and keep them in proper order.
2) Don‟t stack any items 1.5 meters before the fire hydrants and firefighting equipment. It is prohib-
ited that non-blocking, occupy, damage and misappropriation of fire equipment
3) The height of all the booth structure (including exhibits and light boxes etc) inside of the
hall should be controlled less than 6 m. If the height is over 4.5 meters, the exhibitors should pro-
vide the drawings to be checked. The length and width shall not exceed the specified size.
4) It is strictly prohibited for indoor exhibition stands to adopt enclosed type ceilings.
15.5 Doing the clearing-up before the daily venue closing
1) Before the daily venue closing, the exhibitors should assist the safeguards to do the clearing -up.
2) The main contents of clearing-up: Prevent hazards of combustible debris in the halls; Cut off the
electric power of your own booth; Keep your valued property.
3) Before closing time, exhibitors and contractors (except those getting permission to use 24
hours non-stop electricity) must power off all lightening power and power equipment of the booth.
15.6 Electrical equipment installation must comply with the fire safety requirements.
1) The Installment of Electrical equipment must comply with the relevant national technical regula-
tions on fire prevention.
2) Before entering the halls, the subcontractors should inform the appointed main contractors about
the electricity load for their approval. After completion of construction, the power will be supplied only af-ter checked by the electrician assigned by the organizer.
3) You are required to bring yourself a secondary electrical box with leakage protection. We recom-
mend you to bring famous brand products, (like Schineder、ABB、Siemens and etc), electricity box
(including components)shall be qualified and reliable.
4) The exhibitors should use non-combustible cables with metal covers or non-combustible covers
certified by Fire Prevention Bureau (with certificates or signs) and connect the grounding system accord-ing to requirements if they want to install electric devices for their booths. The cables which will go through the sidewalks, carpets and decorative materials must be properly covered by pipes and there should be no joints in the pipes.
5) The minimum height of neon is 2.5 meters. Please use glass tube to cover the joint part. Don't
use combustible materials; don‟t conceal it
6) It is prohibited to use fire (welding, gas welding, etc.) during construction and mechanical opera-
tion.
16. Electricity Guidelines
16.1 Responsibilities & Duty on Site
Enforce the principles of “The person who is in charge should take responsibility”. The exhibitors and contractors affiliated with special booths should be responsible for safely using the electricity and being obliged to obey what is regulated in this notice. During the exhibition, special booth will assign an onsite electrician who is responsible for turning on and off the lights and cutting the power supply and inform the onsite management office about the electrician‟s name, contact phone number and on duty place for re-cord.
2018 Shanghai international Lighting EXPO
- 19 -
16.2 Safety Regulations of using electrical materials and facilities during built -up
1) The applied electrical materials and facilities should be consistent with the state quality standard
and fire prevention requirements.
2) The distribution box must be equipped with 30mA leakage protector.
3) ZR-BVV cables and cables with protecting covers must be used.
4) Metal protective pipes and metal components must be electrically bridged and safely grounded.
5) Each electric circuit should have a specific protective earth wire and be connected with all metal
components with possibility of leakage.
6) Down lamps and quartz lamps should be protected by asbestos padding; inside the advertise-
ment lamp boxes and posts there should be convective cooler holes. The rectifiers and triggers of the lamps should have certificates issued by Fire Prevention Bureau.
7) Caloric power lamps should be additionally equipped with protective cover (i.e. iodine tungsten
lamp over 100W). It is prohibited to use iodine tungsten lamp over 100W.
8) The exhibitors must apply for using electricity on the booth. It is prohibited to connect electricity
with distribution box and sockets of the exhibition hall discretionarily.
16.3 Safety regulation of using electricity in special booths
1) It is prohibited to block or cover the distribution boxes for lighting, power and telephone
wires of the exhibition halls when built-up.
2) Regulations of using electricity must be strictly enforced. The electrician must have effec-
tive operation permit (photocopy or electronic version are invalid) and obey the procedures of safely using electricity. Otherwise, the special booth exhibitors are not allowed to enter the halls
to construct.
3) Two stage electric box which contractors bring to the exhibition shall be smaller than or
equal to renting electric box.
4) Two stage electric box which contractors bring to the exhibition must be equipped with
electric leakage protection.
5) Only five core cable could be used when two stage electric box which contractors bring to
the exhibition connect to renting electric box.
6) The contractor should be onsite when official exhibition electrician power on the booth.
And they shall connect renting electric box according to electricity regulations of the exhibition
venue,
7) Exhibitors and contractors are not allowed to open or turn over exhibition facilities and
equipment (including the trench cover)
8) When powering on trench of the hall, if there is any request on moving trench cover,
please apply to the official exhibition standfitting contractor. It’s not allowed to open it without permission. Anyone breaking rules must take full responsibility and be fined 500RMB for each time
opening the cover.
- 20 -
16.4 Safety regulation of using electricity in standard booths
1) Building-up and dismantling contractors are not allowed to dismantle, move, add or reduce all
fixing electric devices and lightings in the halls. The sockets applied for must be used strictly within the maximum load of 500W and are not allowed to connect any electric devices exceeding the maximum load.
It is prohibited to concatenating jack panels. Punishment will be meted out.
2) If the exhibitors have to use electricity more than stipulated, they must submit application to the
organizers 20 days in advance and are allowed to begin construction only after approval.
3) Only certified electricians are allowed to install electric devices, lamps, etc. It is prohibited to use
plastic parallel lines, flexible cords and aluminum wires and to use combustible materials
for covering the lamp box.
16.5 Safety regulation of using electricity for arranging exhibited samples
1) All installed lamps must be at least 30cm away from the exhibited samples. The exhibitors should
install junction boxes and cables are not allowed to go out of the boxes.
2) Distribution boxes and plugs cannot be concealed in the exhibited samples but must be installed
in obvious and safe positions.
16.6 Safety regulations of exhibited electric samples
1) It is strictly prohibited to use high power electric heating devices (i.e. electric water kettle,
electric oven, etc.). If the exhibitors need to use electricity, they have to submit application to organizers and they are allowed to use electricity only after the organizers approve the application.
2) If exhibited samples or facilities need power the whole day or in advance, the exhibitor must re-
port to Display and Design Department of Shanghai Modern International Exhibition Co., Ltd before Mar 2,
2018 to get approval. Only with the approval could exhibitor go with power supply formality. The cost for
onsite duty will be borne by the exhibitor.
16.7 Penalties
1) If exhibitors use electricity and connect electric appliances discretionarily without application for
using electricity, the organizers will cut power supply of this booth. Double cost of used
electricity will be charged to the exhibitors.
2) Double cost of damaged electric appliances will be charged to the exhibitor who damaged the
electric appliances.
3) The electricians assigned by the organizers reserve the right to request the exhibitors who
failed to report used electricity honestly to compensate the cost.
4) If organizers find any exhibitors who use electricity against management regulations or safety re-
quirements and lead to hidden trouble, organizers will cut the power supply and request the exhibitors to rectify or remove.
5) Regarding the booths in which accidents occur because of unapproved electricity using, the or-
ganizers reserve the right to ascertain where the responsibility lies until to pursue legal
actions to concerned people and company principal depending on the seriousness.
2018 Shanghai international Lighting EXPO
- 21 -
SECTION 3 Booth Design and Construction
1. Official Standfitting Contractor
Shanghai International Ad & Sign Technology and Equipment Exhibition Committee appointed Dis-
play Plan Department of Shanghai Modern International Exhibition Co., Ltd to be official contractor.
1.1 General Information
Display Plan Department, Shanghai Modern International Exhibition Co., Ltd.
General Leader:Ding Han Tel No.:+86 21-63288899*142
Address:17th Floor, No. 8, Shengze Road, Shanghai, China Zip No.:200002
1.2 Person in-charge Contacts Information of Hall Equipment Application
1.3 Account for Remittance and Payment Instruction
1)Account for Remittance
Hall
No. Name Tel No.
Exten-
sion MP No. Email Address
1H Jiang Hui-
dong +86 21-28906522 21 +86 13524103220 [email protected]
2H Shen Feng +86 21-63288899 139 +86 15802134087 [email protected]
Ma Wei-
dong +86 21-63288899 163 +86 13901994369 [email protected]
3H Shen
Wenyu +86 21-63288899 825 +86 15900877586 [email protected]
4.1H Xie Lizhang +86 21-63288899 803 +86 13524110301 [email protected]
Zhang Rong +86 21-63288899 182 +86 13701785178 [email protected]
5.1H Zhuang
Yong +86 21-63288899 171 +86 13818080658 [email protected]
6.1H Chen
Yinsheng +86 21-28906187 19 +86 15901628507
chenyin-
NH Jiang Hui-
dong +86 21-28906522 21 +86 13524103220 [email protected]
Hall No. 2H 3H 5.1H 1H 6.1H NH
Account Name Shanghai Modern International Exhibition Co.,
Ltd Shanghai Sunrise Expo Service Co., Ltd
Bank Name Banking dept.of Shanghai Branch, Bank of China Huamu Sub-branch of China Construction Bank
Account No. 444259214551 31001523212050002152
- 22 -
2) Payment Instructions
● The exhibitors must full-paid all of the orders to specified bank account.
● An extra 50% fee would be charge for those orders receiving after deadline or onsite.
● In order to have affordable price, please make sure to fax us the order sheet and bank transfer sheet before deadline. Or apply on-line through the official website.
● For those order which do not pay on time, we will regard it as order that applying on exhibition onsite.
3) Invoice-making Instructions
To ensure accuracy of invoices, please fill in billing information carefully. Please fax us the completed
billing information sheet with signature and stamp. Fax No. +86 21-63749188. There will be no replace-
ment or return of the invoice once we make out the invoice base on provided information from exhibitors.
The related costs will be on the exhibitors if due to their own reasons, they want to return or change.
Please click the invoice type that you want and make handwriting clear enough.
● Value Added Tax Invoice( )
● Vat Special Invoice( )
Marks:1. Exhibitor who filling above form shall provide with taxpayer certificate.
2. If providing with uncompleted information or do not provide with above information, we
will regard it as exhibitor requesting on issuing value added tax invoice.
3. Please make sure the handwriting is clear enough. We do not accept personal remit
tance, Alipay or Wechat Transfer.
4. The exchange rate is subject to the exchange rate of the day.
Company Name
Company Name
Taxpayer‟s Registration
Address
Telephone No.
Bank Name
Account No.
2018 Shanghai international Lighting EXPO
- 23 -
2. Standard Booth
2.1 Normal Standard Booth
2.2 Special Standard Booth
2.3 Fascia Board
Fascia board information should be submitted to official standfitting contractor before 2nd Mar 2018 .
The show management make fascia board base on the application. Any change without their approval is not allowed.
2.4 Instructions
1) Any items in the booth is not allowed to exceed the height of 2.4 meter and extend beyond the
boundaries of booth stand.
2) No nailing, drilling, sponge rubber or fixture of any kind is allowed on the partitions or any
structure of standard booth.
3) Exhibitor is not obliged to paint and paste wallpaper on the booth walls. Without permission, ex-
hibitors and any party who is responsible for booth build-up are prohibited to dismantle, change or remove fitted equipments (include fascia board).
4) No refund will be given for the package items not utilized by the exhibitor.
Chinese Name
English Name
Contact Person Booth No.
● Booth Specification: Covering 3m×3m, Height 2.4m
● Booth Materials: Eight prism aluminium profile
● Booth equipment: fascia board, 1 information counter, 2 folding chairs,
2 spot lights, full carpet, 1 waste basket, 1 socket (220V/500W)
● Booth Specification:
Covering 3m×3m, Height 3.5m (Partition height 2.48m)
● Booth Materials: 40 Column aluminium profile
● Booth equipment: fascia board, 1 information counter, 1 glass round
table, 4 leather chairs, 1 bar stool, 6 spot lights, full carpet, 1 waste
basket, 1 socket (220V/500W)
- 24 -
3. Special Booth Design & Construction Regulations
3.1 Booth Construction Height Limit
1) Max. 4.5 meter for single deck booth (under 36 sqm)
2) Max. 6 meter for single deck booth (equal to or more than 36 sqm)
3) Max. 6 meter for double deck booth
3.2 The design and build-up of special booth, the vertical orthographic projection is not allowed to beyond limit of rental raw space. Any booth structure or exhibits (including company name, sign, posters, light box, etc) is prohibited to beyond boarder of booth area. The illegal build-up will be ordered to remove and exhibitors and contractors must take full responsibility.
3.3 The off-limited backboard and the walls facing to main passage of adjacent booths and audience passenger must be decorated properly. If any one violate the terms or has no abilities to restructure, the Organizer will appoint the official contractor to assist with it. The cost of restructure will be deducted from construction deposit. It‟s no allowed to hinder fire hydrant, plant room door, warning bell or other fire fight-ing device. The passage should keep smooth without any obstructions.
3.4 In order that visitors can easily locate an exhibitor in the venue, the design of each booth should
include the display of booth number and company name. Please note that the entire booth number (i.e. the hall number and the booth number, e.g. 1H-A001) should be displayed at a prominent position on each aisle frontage.
3.5 NECC do not provide with hanging points services.
3.6 No air-conditioners of any kind could be installed in the booth.
3.7 Exhibitors or their contractors should not destroy hall building structure or any assorted facilities
by any way. No shelter or cover on any lighting electric box, power electric box or telephone line box. On-site use of cutting machine, electric saw or paint spray is prohibited. All the decoration materials for booth must be fireproof. Elastic cloth and Tungsten lamp over 150w are prohibited in anytime. Exhibitors or their contractors shall take all responsibilities and liable for all consequences and obligations for any damage.
3.8 Use and storage requirement for special materials of booth construction
1) No use of explosive goods, fossil oil and inflammable, toxic, corrosive or radioactive materials.
2) The storage of hazardous substance shall not exceed use volume of 1 day, which shall be stored
at special container at government or hall management approved place.
3) Toxic waste material shall be stored in sealed containers with marks, which should be managed
by the rules of the government.
3.9 To avoid hidden danger of climbing work, herringbone ladder below 2 meters is allowed to use
onsite. The climbing work between 2 and 3 meter can use mobile scaffold with fixed casters, closed cross supporter and level scaffold. Operating floor shall have guardrail. If the climbing work exceed 3 meter, reliable climbing facilities and safety measurement shall be used abide by the government regulations. All climbing works shall be guarded by appointed staff and isolated by warning label if necessary. The hall management reserve the right to suspend standing construction if exhibitors or their contract violate above regulations. The exhibitors have the responsibility to maintain the stand during exhibition periods.
3.10 Please check up carefully the facility location,and fill in the form correctly. During the construc-
tion, do not put display equipment or build exhibition stand. A movable plate should be reserved on the trench cover of the facility for operating and maintaining. It‟s not allowed to open the trench cover of exhi-bition hall and use trench as electric wire paving.
2018 Shanghai international Lighting EXPO
- 25 -
3.11 Booth that has an area of 90sqm or above 90sqm with four sides open, shall keep all sides of
the booth open. If it need to be sealed, the sealing length could not exceed half of the side length. But the side close to main passage could not be sealed.
3.12 The official standfitting contractors only inspect whether the drawing has violate exhibition regu-
lations. The exhibitors and contractors must ensure the building safety and fire safety. The venue, fire authority or related department reserve the right of final auditing of booth design.
4. Special Booth Structure Drawing Inspecting Process and Instruction
4.1 Drawing Inspecting Process
1) For raw space and special booth which has indoor single deck booth height of less than 4.5 me-
ter . and single deck booth which sealing-top area do not exceed 50% of booth area.
- 26 -
2) For indoor single deck booth which has height of 4.5 or above, and single deck booth which
sealing-top area exceed 50% of booth area or above; For double deck booth and outdoor booth.
● Contact Information of Official Exhibition Structure Drawing Inspecting Company:
Shanghai Ya Hai Heng Xin Exhibition Co., Ltd
Address: East side, the 3rd Floor, Hall 1, No. 333, Songze Avenue, Qingpu District, Shanghai,
China, 201702
Contact Person:Wan Shuobin +86 15802110258(for Hall 1H/2H/3H/4.1H/NH)
Liu Tao +86 18217660611(for 5.1H/6.1H)
4.2 Instructions
1) The drawing that appoint the Organizer MIE and the official drawing inspecting company to in-
spect must specify dimensions in Arabic numbers. Please avoid to specify with grid line . Otherwise the
drawing will be returned. The exhibitors and contractors must take responsibility if it make overdue.
2) The provided documents from the constructors shall be in both Chinese and English version. All
drawings must be drawn to scale and specify detailed dimensions . The faxed submission will be objected.
3) If construction design drawing of the outdoor booth or double deck booth doesn‟t get approval
from registered structural engineer and the Organizer, the Organizer, the venue and related drawing in-specting company have the rights to prohibit it from construction in exhibition venue.
4) For those who doesn‟t make full payment of inspecting fee, the Organizer, the venue and related
drawing inspecting company have the rights to prohibit from construction in exhibition venue.
5) The inspecting contents do not include fire audit. The fire audit is subject to onsite inspection by
fire authority.
6) The required drawing and documents shall submit to drawing inspecting company 20 working
days before booth build-up. The emergency fee will be charge for overdue submission.
7) Exhibitors and contractors must take responsibilities for problems caused by overdue submission
of booth design drawing, delayed entry or temporary restructure due to admission formalities on-site.
2018 Shanghai international Lighting EXPO
- 27 -
5. Construction management fee and construction deposit of Special Booth 5.1 Constructing Management Fee
1) Special booth shall pay 28RMB/sqm/exhibition period as constructing management fee.
2) Area calculating method of double deck booth: the real constructed area of upper deck × 2 + the
real constructed area of bottom deck. (Considering cost saving and safety issue, the Organizer suggest exhibitors to avoid setting up a upper deck. 5.2 Construction Deposit In order to have effective management of booth construction, cargo loading and booth cleaning, all contractors must pay construction deposit. See price list below,
5.3 Construction deposit penalty rules
Exhibitors and contractors must Obey stated rules, otherwise they would be deducted the deposit. See below list,
Note:Exhibitors and contractors must restructure accordingly, otherwise electricity will be cut off till finishing restruc-
ture.
Booth Area Price (RMB)
≤ 72 m2 5000
> 72 m2 10000
No. Construction deposit penalty rules Deduction
1 Electrical construction person operate without certificate will be ordered to stop operations. 500RMB
2 Don‟t open trench cover to transfer electricity. Otherwise operation will be ordered to stop. 500RMB
3 Do not power off after exhibition close. 300RMB
4 Real booth design and structure do not conform to construction drawing or violate related regulations. 100%
5 Booth structure exceed stated booth height limit. 100%
6 Any death or injury caused by booth structure or safety issue, or there is safety risk and the exhibitors
do not restructure on time or make delay 100%
7 During the build-up and break-up period, do not clear up constructed materials that be placed outside
of booth within specified time. 50%
8 Illegally connect electricity supply or the used electricity exceed it‟s due consumption. 50%
9 Booth structure, decoration and furniture, exhibits beyond limit of booth rental. 50%
10 No covering on the off-limited backboard which higher or face to adjacent booths and main aisle. Or
covering materials of the backboard is not clean. 50%
11 Use hall or adjacent booth‟ structure to fasten your own booth or be the use of decoration 50%
12 Exposing any constructed materials, empty box, display board, wood and tools out of booth. 50%
13 Damaging exhibition facilities (like wall, gate, floor and etc.)
Base on
real situa-
tion
- 28 -
6. Paying and refund of construction management fee and construction deposit
6.1 Date and Location
1) Handling before the Exhibition
Date:Before 24/03/2018
Location:W2-B4, No. 2345, Longyang Road, Shanghai, China
Tel:+86-21-2890 6186/6187
2) Handling on-site
Date:25/03/2018-27/03/2018
Location:service center of west hall of NECC
6.2 The Return of Construction Deposit
If special booth exhibitors do not violate any rules, damage any facilities or equipments from build-up
till break-up, move all stuff within specified period, and getting approval of security guards and related
staff. The exhibitors will be returned the construction deposit with signed and stamped deposit receipt.
1) On-site
Date:31/03/2018 Location:service center of west hall of NECC
2) Exhibition return
Time:within 15 working days after exhibition close
Location:W2-B4, No. 2345, Longyang Road, Shanghai, China
Tel :+86-21-2890 6186/6187
7. Overtime Charge During Build-up & Break-up
7.1 The written application for overtime must be submitted to exhibition contractor before 14:00 the
same day if exhibitors intend to work after working hours. Overdue order will be charged extra
50% service fee.
7.2 Booth with size below 1,000 sqm will be charged as 1,000 sqm to pay the overtime charges.
7.3 The application for prolonging extra overtime will be charged extra 50% service fee.
7.4 Charge standard
Hall Number Date Time Price
1H / 2H / 3H / 4.1H / NH 25th Mar-31st Mar 18:00-22:00 1100 RMB/hr/1000sqm
Contract Period 5.1H / 6.1H 26th Mar-31st Mar
22:00 to 08:00 of
next day 2200 RMB/hr/1000sqm
Beyond Contract Period
22:00 to 08:00 of
next day 2200 RMB/hr/1000sqm
22:00 to 08:00 of
next day 4400 RMB/hr/1000sqm
2018 Shanghai international Lighting EXPO
- 29 -
8. Exhibition Equipment Rental
8.1 Equipment Rental Application Form(Application and Payment Deadline:02/03/2018)
8.2 Rental Requirement and Payment 1) Receipt must be submitted before deadline while Rental transactions must be reserved and made pay-
ment before 02/03/2018.
2) Due to the large amount of facilities used in NECC , it may cause the exceed of the maximum load of
the exhibition hall. The on-site application will be carried out according to the technical conditions of the exhi-bition. Please estimate the number of your equipments before exhibition starts. 3) The above booking facilities are for use only during the exhibition period. For those who illegally install electric power, the electricity would be cut off until all illegal facilities or equipment being uninstalled.
4) Overtime rental:Renting on-site on 10th Mar 2018 would be charged 1.5 fold of original rental price.
5) It‟s not allowed to cancel order form and change items in it upon it has been submitted to official con-structor. There‟s no refund if change or cancel order onsite. Except other notices, above prices are valid dur-ing the exhibition. 6) All costs must be transferred fully to specified account. Related invoices must be issued before two months after the exhibition. Late will not be accepted.
Number Item and Specification(mm) Unit Price (RMB) Quantity Remark
M21 Air Compressor≤0.4 m3/min., DN15mm, 8bar 3500
M22 Air Compressor≤0.9 m3/min., DN20mm, 8bar 4200
M23 Air Compressor≥ 1.0 m3/min., DN25mm, 8bar 4900
M27 15Amp/380V(Power/Electric Box Rental) 1100
M28 30Amp/380V(Power/Electric Box Rental) 1650
M29 60Amp/380V(Power/Electric Box Rental) 2670
M30 100Amp/380V(Power/Electric Box Rental) 4430
M31 150Amp/380V(Power/Electric Box Rental) 6410
M32 200Amp/380V(Power/Electric Box Rental) 9930
M35 Water Connector for Stand(DN15mm, Indoor Hall) 2970
M36 Water Connector for Equipment(DN20mm, Outdoor Hall) 4400
Application Confirmation Sheet
Company Name Booth No.
Contact Phone No.
Transfer Account No. Company Stamp
Please return standfitting contractor the stamped completed form or log in website www.apppexpo.com/2/CN/Login,
click exhibitor login and access with account name and pin number ; And click option “equipment” and complete it;
Then “submit the order” to finalize the process.
- 30 -
9. Exhibition Facilities Rental
9.1 Facilities Rental Application Form(Deadline for Application and Payment:02/03/2018)
Number Item and Specification(mm) Unit Price(RMB) Quantity Remark
A-1 Information Counter L1000*W500*H800 150
A-2 Lockable Cupboard L1000*W500*H800 200
A-3 Square Table 660*660*H710 150
A-4 Glass Round Table Φ790*H700 150
A-5 Bar Counter 740*740*800 150
B-1 Conference Chair(Leather Chair) Black 70
B-2 Gray Folding Chair 40
B-3 Bar Stool Black 150
C-1 Low Glass Cupboard L1000*W500*H1000 350
C-2 High Glass Cupboard L1000*W500*H2200 500
D-1 Low Showcase 500*500*H500 150
D-2 High Showcase 500*500*H1000 200
E-1 Shelf L1000*W240 50
E-2 Hanging Stand L1100~1800*H980~1500 150
E-3 Hanging Stand (SS) L1000*H(1000~2000) 100
E-4 Folding Door W1000*H2000 200
E-5 1m White Panels W1000*H2500 100
F-1 Aperture Board W975*H1415 180
F-2 Wiremesh W800*H1200 60
F-3 Long Spot Light 100
F-4 10w Poles with 1m Chain 50
F-5 Plasma Screen 55 Inch | 66 Inch 1200 | 1800
F-6 Refrigerator(Double Door) 174L
| Refrigerator(Single Door) about 80L
800 | 500
F-7 Waste Bucket 40
F-8 Brochure Shelf 120
F-9 Drinking Fountain(and a barrel of water) 150
F-10 Socket(500W/220V) 80
2018 Shanghai international Lighting EXPO
- 31 -
9.2 Rental Regulations and Payment Notice
1) Please submit the receipt before the deadline and all the rental items should be ordered and be paid
before March 2nd of 2018. 2) For the late orders, a surcharge of 50% will be imposed on late orders (March 10, 2018) at exhibition venue on site for emergency. 3) All the above mentioned prices will still be available during the show and the items which have not listed will be separately quoted. 4) All orders must be made with full remittance to the bank account specified by the organizers. It is not allowed to issue the invoice beyond two months after the show.
B-2 灰色折椅
Number Item and Specification(mm) Unit Price(RMB) Quantity Remark
F-11 fluorescent lamps 120
Order Form
Name of Applicant Booth No
Contact Person Tel
Accountant No Company Seal
Note: Please fill out this form and sign it to the official contractor or go to www.apppexpo.com/2/CN/Login to click the button of Exhibitors and
enter into the user name and keyboards and then click the button of Furniture to choose the right item and amount to finish the application.
- 32 -
10. Booth Decoration Service
10.1 If you need booth decoration service, you can do contact the following person:
Design Department of Shanghai Modern International Exhibition Co., Ltd (The official con-
structor of APPPEXPO)
Contact Person:Mr. Han Ding Mobile Phone:13472757194
Tel:+86-21-6328 8899 ext.142 E-mail:[email protected]
Address:17/F No.8 Sheng Ze Road Zip:200002
Company Profile:The company has been the first to obtain the class A certificate of Exhibi-
tion Engineering from Shanghai Exhibition Industry and the company has also got the class A certificate of Ex-
hibition Engineering from China Association for Exhibition Centers. We have served APPPEXPO for over 20
years with a wealth of experience in booth design and stand construction and can provide the exhibitors the
following services:
1)The personalized booth design and construction services (New design concept, green building material, pro-
fessional building team. 2)Efficient and convenient supporting services (drawing declaration, equipment and
facilities (water and electricity) application, logistics & transportation, overtime application, etc.)
10.2 Successful Cases
2018 Shanghai international Lighting EXPO
- 33 -
NO:M01 NO:M02 NO:M03
NO:M04 NO:M05 NO:M06
NO:M07 NO:M08
With the concept of Green Exhibition, Environmentally-friendly Construction, there is a special booth design plan with middle and small section bar for the exhibitors who rent 2 to 8 booths. The sample of 6000*6000(4 booths) is as below. For other sizes, please contact the right per-
son of the design department of Shanghai Modern International Exhibition Co.,Ltd.
- 34 -
11. Safety Notice for Water, Gas and Electricity
11.1 Water Safety
1) If the installation of water in the booth does not conform to the relevant state regulations, standards, requirements
or hidden dangers of water safety, the Venue has the right to order its immediate rectification. The exhibitor or the con-
structor who doesn‟t correct the hidden troubles will bear all the consequences of water break by the Venue. The acci-
dents and economic losses may have been caused will taken by the exhibitor or the constructor.
2) The Venue will stop the water supply to the booth with no water application, disorderly connection and installation
without permission.
3) Discarded liquid isn‟t allowed to fallen into the booth and should be poured into the own closed containers of the
exhibitor or the ones prepared by the Organizer and then all the containers will be placed at the designated place by the
Organizer. It is prohibited to pour the discarded liquid into the waterway of the exhibition hall and the bathroom sink and s o
on. Once dumping carelessly is found, the exhibitor or the constructor will be punished.
4) When the water supply pipeline passes through the aisle, it must need a bridge board for safety protection.
11.2 Gas Safety
1) It is not allowed to store and use pressurized pressure vessels in the exhibition hall. Compressed air source is pro-
vided centrally in the exhibition halls and the outlet pressure is the general compressed air of 0.6 -0.8Mpa. The exhibitor
can install the dryer, filter and other adaptors according to the condition of their own equipment. The exhibitor, who needs
the special requirement of gas supply, should apply to the Venue 30 days in advance.
2) If the exhibitor or the constructor doesn‟t have the gas application and makes disorderly connection, the Venue has
the right to ask the exhibitor or the constructor order its immediate rectification. The exhibitor or the constructor who doe s-
n‟t correct the hidden troubles will bear all the consequences of water break by the Venue. The accidents and economic
losses may have been caused will taken by the exhibitor or the constructor.
3) The Exhibitor should ensure the booth safety before apply electric power or gas supply to the Organizer. After re-
ceiving the application from the Organizer, the Venue will do the booth safety inspection together with the Organizer and
the Exhibitor. The Venue will supply the electric power or gas with the Exhibitor who has got the approval after the safety
inspection.
4) No gas equipment can be directly connected to the pipeline of the exhibition hall, and the valve should be installed
at the intake port.
5) The gas supply pipeline must have a bridge board for safety protection when it passes through the aisle.
11.3 Electric Power Safety
1) Electrical installations must conform to the standard rules of national electric power industry, in strict accordance
with specification for design of low voltage distribution (GB50054-95) "," construction site temporary electrical safety tech-
nical specification (JGJ 46-2005 J 405) "," the construction of electrical engineering construction quality acceptance speci-
fication (GB50303-2002) "," general electric power distribution equipment design specification (GB5005594) "and other
safety regulations by the Venue. According to the plan drawings approved by the exhibition hall, the general control elec-
tric box must use the metal material electric box.
2) Three phase five wire system of low voltage power supply system is adopted in the venue and its voltage level
380V/220V, 50Hz. The distribution should be made of three phase five wire system or single phase three wire system. If
the voltage and frequency required by the exhibitor are different from that of the venue, the exhibitor or contractor shall
take the power conversion device to solve it.
3) The exhibitor or contractor should keep the electricity safety on the site. All the electricians should carry their qu ali-
fied certificate with them when they do the work during the construction. The one who doesn‟t have the certificate will be
punished by RMB 500 and will be stopped to work.
4) The electric box of the booth with the electric leakage protection switch is connected to the electric box provided by the
Venue (the electric leakage current is not more than 30mA).
Under special circumstances, if the Exhibitor needs to remove the leakage protector for special reasons, the Organizer / Official
Constructor must submit the application of the leakage protection device for the demolition of the trench distribution box before the
application of the electricity load.
2018 Shanghai international Lighting EXPO
- 35 -
The exhibitor or constructor should apply the lighting and power electricity separately. The lighting circuit needs to be
equipped with the leakage protection. The electricity doesn‟t need the leakage protection, if the exhibitor or constructor
has applied to remove it according to the above procedures. If the power equipment is equipped with a switch and less
than 80% load of the switch of the electric box, the electric box provided by the exhibition hall can be connected to one by
one. If a few power equipments share one electric box, the booth must carry the general electric box, and the equipment
can not directly access to the electric box provided by the venue.
5) For temporary during set-up time, the application form of power supply in advance/special power supply must be
submitted the official contractor to designate a electric box. It is not allowed to use the socket supply in the wall of toil ets.
6) The Electricity Regulations are as follows:
● All electric boxes must be placed on the ground or suspended by an insulated pad. It is not allowed to directly
place on the ground.
● Only one cable is allowed to connect to the electric box of the venue, Five core wire must be used and four core
wire added grounding wire and core for decorative chains are not allowed.
● All cable carrying capacity must be large than the rate current of the applied switch. The cable passing through
the passage must use the bridge board.
● All power boxes must be equipped with earthing and all grounding in the booth must be extracted from the
ground. All metal support and equipment shell must be grounded, otherwise, it will be ordered to stop the con-
struction.
● The lighting and power circuit must be separated.
● All the cable wires must use the terminal or the switch.
● The stand must be equipped with a general electric control box and the distribution box must be equipped with
30mA leakage protector. ZR-BVV cables and cables with protecting covers must be used.
● Metal protective pipes and metal components must be electrically bridged and safely grounded.
● Each electric circuit should have a specific protective earth wire and be connected with all metal components
with possibility of leakage. Down lamps and quartz lamps should be protected by asbestos padding; Inside the
advertisement lamp boxes and posts there should be convective cooler holes. The rectifiers and triggers of the
lamps should have certificates issued by Fire Prevention Bureau.
● Caloric power lamps should be additionally equipped with protective cover (i.e. iodine tungsten lamp over 100W).
It is prohibited to use iodine tungsten lamp over 150W.
● The exhibitors must apply for using electricity on the booth. It is prohibited to connect electricity with distribution
box and sockets of the exhibition hall discretionarily.
● It is not allowed/suitable to install the 30mA leakage protector in the circuit of the special power supply such as
mechanical power use and silicon controlled stage dimming equipment, the exhibitor or the constructor will sign
safety responsibility agreement for the Venue‟s approval and the organizer or the official constructor summits the
application form of dismantling the leakage protection device in the trench to apply the electric load and bear all
the responsibilities arising therefrom.
7) It is strictly forbidden to uncover the cover plate of the trench without permission for electric supply or operation.
8) Civilized construction is conducted during set up and move-out period. If any damage of the facilities and equip-
ment in the venue, the constructor or the exhibitor will pay the cost.
9) In case of accident such as tripping and electrical fire, the organizer/the official constructor, the exhibitor, the
venue/the service suppliers should confirm the details of accident record and the letter of settlement. The tripping caused
by the exhibitor, the Venue/the service supplier will have the right to stopping the electric power supply.
10) During set-up and daily exhibition, the power of each stand should be cut off.
11) The space only must need the electrician‟s inspection to ensure failure in time and supply safety.
● The reform notice covered all the above mentioned regulations will be sent by the Venue/service suppliers to the
exhibitor or constructor who is against the construction rules and the electric power supply will be stopped.
- 36 -
● The power supply is stopped during reform and it will be restored within one hour after the inspection. Any delay
loss caused by this will be taken by the company not by the organizer/service suppliers.
12) The Electric Power Safety for Standard Booth
● It is not allowed to remove and increase/decrease the fixed electrical equipment and lighting fixtures in the halls.
The maximum capacity of the power outlet is 500W and it is not allowed to insert electric equipment beyond the al-
lowable capacity. The violator is regarded as a blackout treatment for the hidden danger of safety power supply. The
organizer has the right to stop and confiscate the lamps and sockets and to investigate the responsibilities of the ex-
hibitor.
● Any special requirement of construction form from the constructor, it should be submitted to the organizer and the
official constructor.
● The licensed electrician installs electrical equipment and lamps according to the regulations. It is strictly prohibited
to use plastic parallel lines, core and aluminum core wire. Fireproof material must be used on the outer cover of the
lighting box.
13) Safety Regulation of Using Electricity for Arranging Exhibited Samples.
● All installed lamps must be at least 30cm away from the exhibited samples. The exhibitors should install junction
boxes and cables are not allowed to go out of the boxes.
● Distribution boxes and plugs cannot be concealed in the exhibited samples but must be installed in obvious and
safe positions.
14) Safety Regulation of Using Electricity in Special Booths
Building-up and dismantling contractors are not allowed to dismantle, move, add or reduce all fixing electric devices
and lightings in the halls. The sockets applied for must be used strictly within the maximum load of 500W and are not al-
lowed to connect any electric devices exceeding the maximum load. If the exhibitors have to use electricity more than
stipulated, they must submit application to the organizers 20 days in advance and are allowed to begin construction only
after approval.
15) Penalties
● The exhibitors use electricity and connect electric appliances discretionarily without application for using electricity,
the organizers will cut power supply of this booth. Double cost of used electricity will be charged to the exhibitors.
● Double cost of damaged electric appliances will be charged to the exhibitor who damaged the electric appliances.
● The electricians assigned by the organizers reserve the right to request the exhibitors who failed to report used
electricity honestly to compensate the cost.
● If organizers find any exhibitors who use electricity against management regulations or safety requirements and
lead to hidden trouble, organizers will cut the power supply and request the exhibitors to rectify or remove.
● Regarding the booths in which accidents occur because of unapproved electricity using, the organizers reserve the
right to ascertain where the responsibility lies until to pursue legal actions to concerned people and company principal
depending on the seriousness.
12 The Guide of Dismantling
12.1 It is not allowed for the exhibitors to dismantling or removing the stand structure, goods and exhibitors before
the exhibition closing with the formal approval of the organizer.
12.2 The exhibitor should remove all the exhibits, building materials and waste in a truck to the place beyond the
venue. Manual or cart is not allowed.
12.3 Any item placed at the ground including passage of the venue is regarded as the waste. The organizer will clean
it and the cleaning fee will be deducted from the construction deposit.
12.4 The exhibitor or the constructor cannot clean the stand in time and put the space in order, the organizer will ask
the official constructor do the cleaning and confiscate the construction deposit.
12.5 The exhibitor need the extensive power supply during move-out should apply from the official constructor before
10:00 a.m. of March 31 of 2018 to avoid any damage of the equipment.
- 38 -
1.CONTACT INFORMATION
Shanghai Shunexpo Logistics Co., Ltd.
Rm407 4/F Long Jiang Building, No.260, Nan Xun Road, Shanghai, P.R.China
Tel: +86-21-63939755 Fax: +86-21-63242414
E-mail: [email protected] (domestic)/[email protected] (oversea)
Attn: Mr. Zixin Dai / Ms. Sue Wang
2. CONSIGNEE INFORMATION
Sea Shipment Consignee:
Shanghai Shunexpo Logistics Co., Ltd
Rm407 4/F Long Jiang Building, No.260, Nan Xun Road, Shanghai, P.R.China
Tel: +86-21-63939755 Fax: +86-21-63242414
Attn: Ms. Sue Wang
Notify Party:
Shanghai Shunexpo Logistics Co., Ltd
Rm407 4/F Long Jiang Building, No.260, Nan Xun Road, Shanghai, P.R.China
Tel: +86-21-63939755 Fax: +86-21-63242414
Attn: Ms. Sue Wang
C/O: The 26th Shanghai Int‟l Ad&Sign Technology & Equipment Exhibition
Air Shipment Consignee on Master Air Waybill:
UNI-GLORY International Logistics Co., Ltd
Rm. B628, No.1333, Wenju Rd., Pudong International Airport, Shanghai, China
Tel: +86-21-68851550
Fax: +86-21-68851552
Air Shipment Consignee on House Air Waybill:
Shanghai Shunexpo Logistics Co., Ltd
Rm407 4/F Long Jiang Building, No.260, Nan Xun Road, Shanghai, P.R.China
Tel: +86-21-63939755 Fax: +86-21-63242414
Notify Party:
Shanghai Shunexpo Logistics Co., Ltd
Rm407 4/F Long Jiang Building, No.260, Nan Xun Road, Shanghai, P.R.China
Tel: +86-21-63939755 Fax: +86-21-63242414
Attn: Ms. Sue Wang
C/O: The 26th Shanghai Int‟l Ad & Sign Technology & Equipment Exhibition
2018 Shanghai international Lighting EXPO
- 39 -
3. DEADLINE AND SCHEDULES
Cargo arriving after our deadlines will incur a 30% late arrival surcharge.
Cargo arriving during move-in days will incur a 50% late arrival surcharge.
All storage fee before move-in will be charged as cost.
4. DOCUMENTS
CATALOGUES AND PUBLICITY MATERIALS-CENSORING
It is stipulated by the Chinese Customs Authority that:
„Advertising materials and technical materials including films, lantern slides, recording tapes, video tapes, records,
photos, maps, illustrations, directions and other publicity materials shall be allowed for display or use at the exhibition
only after exhibitors have presented before handing the above mentioned material to Customs Officers for inspection
and approval. Therefore, exhibitors shall not make use of these materials before censoring. For this purpose, exhibi-
tors should send samples of literature (3 copies) and give-away (3 copies) to us before exhibition opening. All
these materials will be handed over to the customs for inspection in advance. CD, VCD or DVD is not allowed to be
imported as exhibition goods according to new regulation from Chinese Customs.
Please note that, for give-away items, duties may be levied.
Cargo Direct arrived in Shanghai Sea Port By Sea LCL Mar. 08. 2018
Cargo Direct arrived in Shanghai Sea Port By Sea FCL Mar. 08. 2018
Cargo Direct arrived in Shanghai By Air Mar. 12. 2018
List of Exhibits Feb. 25. 2018
A Shipping Advice (Form B)
Once shipment has been made by Sea/Air, please advice Shun by faxes or
E-mail with the following details (see form B). Please fax or E-mail a copy of the B/L
or AWB
B. Bills of Lading To Shun 7 days before vessel arrives
AWB Copy To Shun 2 days before flight arrives
C. List of Exhibits (Form A)
The Chinese Customs Authorities approve this form and as such is the only invoice for-
mat accepted for exhibition cargo. Every exhibitor must submit this form to us without
exception.
A detailed and accurate description of exhibits, including major components and serial
numbers must be declared on the list. The quantities and values of exhibits must be
specified exactly.
- 40 -
5. CUSTOMS CLEARANCE
We shall handle the Customs formalities on your behalf, however, on some occasions the presence of exhibitors will be required. As Customs requires the official forwarder to be responsible for the control of all exhibits, should not allow their exhibits to be taker away from the show ground without prior arrangement with Customs through Shun.
6. QUARANTINE REQUIREMENTS
According to the rule of Chinese Government, if cargoes are shipped from India, Japan, Korea, USA and EU Coun-
tries to China, it is much better to provide us the Official Quarantine Certificate and Fumigation Certificate for cargoes
packed with wooden materials, at least, there must be the “IPPC” mark on the wooden cases, or shipper‟s declara-
tion of “Non-Wooden Packing” for those packed with non-wooden materials; otherwise, goods are not allowed to im-
port to China.
Sample of IPPC Mark
In accordance to the law of People‟s Republic of China, all plant/food products must be subject to quarantine authori-
zation before shipment to China and on-site sanitary inspection.
7. HAND CARRIED EXHIBITS
We do not recommend that you hand carry exhibits into China. However, if you cannot avoid using this method and
your exhibits are detained by customs, please hand over the detention receipt and List of Exhibits to Shunexpo. We
will handle Customs Clearance and arrange collection of your goods from the airport. It takes two working days to
complete Customs formalities and pick-up procedures.
8. SOLD EXHIBITS
All sold exhibits will be repacked at the close of show and removed to a customs bonded warehouse until the neces-sary domestic customs formalities have been completed. From the time your exhibits are placed in bonded storage, Shunexpo will not be able to assist in the hand-over protocol of sold commodities. Your buyer will be responsible for the presentation of the necessary documents to customs so that temporary status can be converted to a permanent customs entry.
There are only a small number of Chinese companies that are granted with import/export licenses; there-
fore it is advisable that exhibitors check whether or not their potential buyer is allowed to trade with them
directly. If not, the Chinese buyer must use a licensed broker to be his trading agent. Your buyer should
be aware of the import requirements such as import tax, import permit, etc.
2018 Shanghai international Lighting EXPO
- 41 -
9. INSURANCE
Please note that our freight charges do not include insuring your exhibits and all work is undertaken by Shunexpo at
owners‟ risk. Therefore exhibitors should arrange a proper round-trip (including exhibition period) all risk insurance for
their exhibits.
10. DANGEROUS GOODS
Exhibitors need to send us a special form (form B) for dangerous goods. These forms will be provided upon request
and the completed forms should reach un before shipment is dispatched. There will be surcharged 100% for han-
dling such exhibits.
11. HEAVY / OVERSIZED EXHIBITS
Any single exhibit in excess of 3,000kg and 300cm(L) X 220cm(W) X 220cm(H) requires the use of a forklift or mobile
crane for installation will be surcharged as specified in our handling tariff.
12. CASE MARKING AND PACKING
Exhibitors shall be responsible for the consequences of improper packing.
A. Protection against Damage and Rain
As the exhibits are repeatedly loaded and unload during transportation, shocking/bumping will sometimes be inevitable. Exhibits will be placed outdoors many times, including open-air storage at the exhibition center before and after the exhibition. Therefore, exhibitors must take necessary precautions against damage and rain, since we will not assume any responsibility for the damage, especially when the return exhibits are to be packed with original packing materials, which might be damaged already during un-packing.
B. The Case
The case must be strong enough to avoid damage during transportation as well as unpacking and in particular be suitable for re-packing and for sale or return movement after the exhibition. It is advisable that the gross weight of individual packages between a few hundred kilograms and 2 tons-smaller case will be handled manually and therefore has more chances to get damaged; while too heavy a case will cause heavy lift surcharges.
C. The following marking must be painted on two opposite sides of each case
The 26th
Shanghai Int’l Ad&Sign Technology & Equipment Exhibition
Hall & Stand No.: Net Weight: kgs
Gross Weight: kgs
Dimensions: L x W x H (cm)
2018 Shanghai international Lighting EXPO
- 45 -
Important notes for exhibitors:
As the Yangshan seaport was commenced to use, all the cargoes berthed on Yangshan seaport will be levied at
RMB1,040.00/20’ & RMB1440.00/40’.
LCL THC in Yangshan seaport will be levied at RMB280.00/CBM (MIN: 3CBM)
The container surcharge will be added both inbound and outbound if exhibitors use FCL transportation.
- 46 -
Notes on Tariff
1. Full container loads will be charged at a minimum of 23cbm/20‟GP, 25cbm/20‟HQ,FR & 46cbm/40‟GP, 50cbm/40‟HQ,FR.
2. The volume/weight rotifer airfreight cargo will be calculated at 6:1 and charged based on whichever yields the greater.
3. All LCL/HAWB shipments will incur additional terminal handling and agency fees.
4. Above rates are based on general cargoes only, for specialized cargoes, e.g. dangerous cargo, 100% additional charges will be
levied. The surcharge for handling of dangerous cargo will be given upon request.
5. Above rates exclude destination LCL charges, airport terminal/handling charges, overtime storage dues in pier, airport terminal or in
freight forwarder‟s warehouse, these will be charged in accordance with actual outlay, also exclude any duty/tax payable to Chinese
Government.
6. Cargo that arrives earlier than specified, all storage dues will be another charged as:
14. PAYMENT TERMS AND CONDITIONS OF BUSINESS
Inbound Movement and Opening Services:
We kindly ask exhibitors to make sure that the full amount of our handling charges for inbound movement and opening services is paid before one week prior to the exhibition opening.
Outbound Movement and Closing Services:
Charges for outbound movement and closing service should be paid before exhibits leave Shanghai.
Remittance of Payment:
For shipment arrives in Shanghai directly, please remit to:
Bank of China, Shanghai Branch, LV Shun Sub-Branch
Account No. 00000446859299969
Swift Code: BKCHCN BJ300
Shanghai Shunexpo Logistics Co., Ltd
Remark or Message: Charges for
The 26th Shanghai Int’l Ad&Sign Technology & Equipment Exhibition
For shipment arranged through our overseas agents, please contact the agents for details of remitting payment.
All work is undertaken at owner‟s risk and otherwise in accordance with our terms & conditions of trading, Insurance is not in-cluded.
2018 Shanghai international Lighting EXPO
- 47 -
SECTION 5 Exhibition Services
1. Exhibitor’s Company Info on Show Directory
In order to provide the exhibitors better services and promote the company images well, the organizers
will supply the exhibitors with the free show directory services which include exhibition info, venue map,
exhibitor list, booth no, contact info and product info etc.
1.1 Upload the Exhibitor Info
The exhibitors can upload the company info via internet. The steps are as follows:
Step 1: click the official website: www.apppexpo.com and choose the button of Shanghai Int‟l Ad & Sign
Expo
Step 2:click the button of Exhibitor which is on the right side of the page and enter into the user name and
password (The details, please contact the sales team directly)
Step 3: enter into the following info: company name in CH and EN, booth no, company address in CH and
EN, Zip, Tel, Fax, Email, website, product info in CH and EN and the product category
Step 4: double check all the info and upload them then.
1.2 The deadline is February 2nd, 2018
1.3 Word Limit:No more than 75 word s in Chinese and no more than 150 characters in English
(including punctuation). Exceeding the word limit, it will be charged by advertising fee. Otherwise, the or-
ganizers have the right to cancelling the excess and finalize the draft to print.
1.4 IE6+, google chrome, firefox, safari and Opera are usually recommended and keep Browser
cookie support open.
1.5 Any question, you can do contact the relevant sales team via +86-21-6328 8899 / 5252 0202.
- 48 -
2. Award Activity
In order to promote the friendly communication between the upstream and downstream of advertising equipment and equipment
industries, to carry out the mutual sharing of resources and effectively set up an exchange platform for manufacturers of advertis-
ing equipment materials, advertising production, advertising applications, advertising media and etc, the Shanghai Advertising
Equipment Suppliers Association (CSA) In conjunction with the Shanghai International Advertising FestivalCommittee(SHIAF
committee) jointly organized the "2017 China Advertising Equipment Value List • Zhi Zao Innovation Award" competition, in order
to select leading outstanding advertising equipment enterprises who have courage to bring forth new ideas. CSA will, at the same
time, hold "Shanghai International Advertising Award · the 2nd China Advertising Ingenuity Competition" selection, with creative
works as a carrier, showing the innovative technology companies and superb technology.
2.1 Activity Background
SHIAF will be grandly opened on March 28, 2018. It is an annual world-class advertising festival activity which hold under the di-
rect guidance of Shanghai Municipal Party Committee and Municipal Government, Propaganda Department of Shanghai Munici-
pal Party Committee, Shanghai Industry and Commerce Bureau and SHIAF. SHIAF Awards is the official award which is designed
to honor individuals, businesses and teams who lead the world and truly apply the concepts of innovation and creativity to busi-
ness operations and public welfare activities. SHIAF has now established cooperation with advertising association of Japan, South
Korea, Thailand, Argentina, Brazil, Chile and other 16 countries.
2.2 Awards Organization
China Advertising Equipment Industry Annual Awards Committee, CSA, SHIAF and APPPEXPO Committee. This selection invited
experts from domestic and international advertising equipment industry to form an expert panel of judges. Adhering to the principle
of "fairness and openness", the materials submitted by participating enterprises were objectively assessed. The list of winners will
be finalized after preliminary screening, public voting, and expert grading.
2.3 Selection Object and Range
Enterprises which has legal personality and engaged in digital printing, advertisement making, advertising supplies, exhibition
displays, signage, engraving applications, LED lighting and digital signage can all participate in the competition.
2017 China Advertising Equipment Value List • Zhi Zao Innovation Prize: select outstanding enterprises based on the enterprise
scale, product patent number, annual output, turnover, market share, core technology, internal management system of the partici-
pating companies.
Shanghai International Advertising Festival Awards · The 2nd China Advertising Ingenuity Craft Competition: The enterprises shall
submit innovative applications. The jury will consider the originality and innovation of the works, the degree of completion of the
works and the application value of the works as Criteria for review.
2.4 Prize Setting
1) A total of 60 winners of "2017 China Advertising Equipment Value List • Zhi Zao Innovation Award" will be officially an-
nounced on March 28, 2018 at the Shanghai International Advertising Technology & Equipment Exhibition. The medals and
certificates will be presented at the same time.
2)” The SHIAF AWARDS · The 2nd China Advertising Ingenuity Competition” consists of gold, silver and bronze medals. The en-
tries will be presented for free at the Shanghai Guangyin Exhibition Site after their final entry. After final assessment, the final
grade will be awarded. The awards will be presented at the Shanghai International Advertising Festival Awards Ceremony held at
the InterContinental Hotel.
2018 Shanghai international Lighting EXPO
- 49 -
2.5 Participation Ways
All participating enterprises must submit the complete application materials to the jury (email: [email protected]) within the stipulated
deadline. The materials include:
1) Award registration form. Enterprises can visit APPPEXPO official website (www.apppexpo.com) or Shanghai International Ad-
vertising Festival official website (www.shiaf.org) to download the form. The enterprises are required to return the completed form.
2) Scanned Business license
3) To attend China Advertising Ingenuity Competition, you also need to submit the renderings of the entries by e-mail.
2.6 Sign Evaluation Stage
1) "2017 China Advertising Equipment Value List • Zhi Zao Innovation Award": October 25, 2017 - February 28, 2018.
2) SHIAF AWARDS · The 2nd China Advertising Ingenuity Competition: October 25, 2017 - January 31, 2018.
2.7 Award Rules
Detailed rules for awards can be found on the official website of Shanghai Advertising Equipment and Supplies Association
(www.sadsa.cn).
2.8 Contact Information
Shanghai Advertising Equipment Suppliers Association
Address: Block H, 17th Floor, No. 8, Shengze Road, Huangpu District, Shanghai, China 200002
Contact Person: Wang Huiyi Tel: +86 21-63282770-819, +86 13564487433
Fax: +86 21-63361226 E-mail: [email protected]
3. Ad-posting
3.1 Ads on Digital Media
- 50 -
No Item Measurement Quantity Cost
A1 Rotating Banner on the home-
page 725(W)×290(H) px 4
RMB10,000/piece/3
months
A2 Banner on the page of visitor
online registration 665(W)×185(H) px 1
RMB10,000/piece/3
months
A3 Banner on the page of visitor
online registration at Wechat 1000(W)×333(H) px 1
RMB10,000/piece/3
months
A4 Newsblast via Wechat before
and after the show words+pics+video No Limit RMB 3000/article
A5 Newsblast via Wechat during
the show words+pics+video No Limit RMB 10000/article
A6 Banner at the bottom of Wechat 900(W)×500 (H) px 1 RMB10,000/piece/
month
A7 SMS 70 words including punc-
tuation
1000 at
least RMB1000
A8 Newsletter words+pics+video 5000 at
least RMB 5000
A9 Overseas Social Medias words+pics No Limit RMB 3000/3 articles
2018 Shanghai international Lighting EXPO
- 51 -
3.3 Sponsorship
3.2 Ads on Prints
No Item Measurement Quantity Cost
B1 Back Cover on Show Directory 13cm (W)×21cm(H) 1 RMB15,000/page
B2 Inside Front and Back Cover on
Show Directory 13cm (W)×21cm(H) 2 RMB10,000/page
B3 Inside Page on Show Directory 13cm (W)×21cm(H) No Limit RMB6,000元/page
B4 Back Cover on Visitor Guide 14cm (W)×21cm(H) 1 RMB20,000元/page
B5 The First Page, Inside Front and
Back Cover on Visitor Guide 14cm (W)×21cm(H) 3 RMB15,000元/page
B6 Inside Page on Visitor Guide 14cm (W)×21cm(H) No Limit RMB8,000元/page
B7 Added Value Item on Visitor Guide LOGO+Company
Name+pics No Limit RMB1,000元/piece
B8 Ad on Visitor Invitation 21cm (W)×9cm(H) 10,000 at
least
RMB8,000/10,000
pieces
No Item Measurement Quantity Cost
C1 Visitor Badge(The top part of
front page) 50mm(H)×105mm(W) 1 RMB40,000
C2 Visitor Badge (The top part of back 50mm(H)×105mm(W) 1 RMB30,000
C3 Visitor Badge (The bottom part of 75mm(H)×105mm(W) 1 RMB40,000
C4 The Visitor Sling 950mm x 12mm RMB80,000
C5 The Hand Bag 420mm(H)×350mm(W) 30,000
C6 Outer Packing of Water - - Negotiable
C7 Gifts - - Negotiable
- 52 -
3.4 On– site Ads
No Item Measurement Location Cost
D1 Billboard Wall at 6M(W)×3M(H) Exit 4,5 RMB1,000 /sq.m
D2 Billboard Wall at MTR 6M(W)×3M(H) Exit 6 RMB1,000 /sq.m
D3 Billboard Wall at North 8M(W)×4M(H) North Square RMB900 /sq.m
D4 Billboard Wall at West 8M(W)×4M(H) West square RMB1,000 /sq.m
2018 Shanghai international Lighting EXPO
- 53 -
4. Meeting Room Rental Application
If the exhibitors intend to hold the forums, seminars, purchase fairs during the show, they should
apply the order to the organizers.
No Item Measurement Location Cost
D5 Billboard Wall at SouthSquare 8M(W)×4M(H) South Square RMB800 /sq.m
D6
Billboard Wall at
both sides of escalator of West -
Square
8M(W)×4M(H) Both sides of Escalator
of West Square RMB1,000 /sq.m
D7 Ground Sticker Actual dimension Inside of the halls RMB700 /sq.m
D8 Banner Ads in NH 10M(W)×10M(H) NH RMB800 /sq.m
D9 Banner Ads in 1H/2H/3H 8M(W)×12M(H)/side×2
1H/2H/3H RMB800 /sq.m
Less than8M(W)×12M(H)/side RMB2,500/point+600/sq.m
D10 Banner Ads in 4.1H/5.1H/6.1H 6M(W)×4M(H)/side×2
4.1H/5.1H/6.1H RMB800 /sq.m
Less than 6M(W)×4M(H)/side RMB2,500/point+600/sq.m
D11 Two-side Billboard Wall 8M(W)×4M(H)side×2 West Platform RMB1,000 /sq.m
D12 8M(W)×4M(H)/side West Platform RMB1,000 /sq.m
D13 Billboard Wall 8M(W)×12M(H) West Platform RMB800 /sq.m
D14 Column Ad 1.5M(W)×3M(H) West Hall RMB16,000/set/4 pieces
D15 Lighting-box Ads 1.7M(W)×2.2(H) West Hall RMB900 /sq.m
D16 Billboard Wall 6M(W)×3M(H) Courtyard of WH RMB800 /sq.m
D17 Hanging Ads 12M(W)×3M(H) West Platform RMB800 /sq.m
D18 Lighting-box Ads 4M(W)×2.2M(H) Roadway of 0 meter
layer RMB800 /sq.m
D19 Billboard Wall 8M(W)×4M(H)×2 Roadway of 0 meter
layer RMB800 /sq.m
D20 Lighting-box Ads 17M(W)×4M(H) Exits of WH RMB80,000/piece
LED Screens
30 pieces(53 sides)
5 s
Each exit of 0 meter
layer/8meter layer
180 times/day
RMB 50,000/sets/period
D21 10s RMB80,000/sets/period
15s RMB120,000/sets/period
3.5 The Deadline: March 2nd, 2018
3.6 Contact Info: Mr.Jin Wen Jie, Tel:8621-63288899 ext.137
- 54 -
4.1 Timetable
4.2 Conference Room List of the Venue
Date Morning Afternoon
March 28-30,2018 9:30-12:00 13:30-16:00
March 31,2018 9:30-12:00 -
No Sq.m
Measurement
Type Device Configuration
Furniture
Cost
H L W Table Chair
M1-02 231 2.60 21.0 11.0 Theater 2 wireless microphone, 2 sets
of fixed gooseneck micro-
phone, projector, one 120 inch
projection screen, with sound
14 112 RMB6,500 /time/room
M1-03 231 2.60 21.0 11.0 Theater 14 112 RMB6,500 /time/room
M1-04 231 4.00 21.0 11.0 Theater 14 112 RMB6,500 /time/room
M2-02 231 2.60 21.0 11.0 Theater 2 wireless microphone, 2 sets
of fixed gooseneck micro-
phone, projector, one 120 inch
projection screen, with sound
14 112 RMB6,500 /time/room
M2-03 231 2.60 21.0 11.0 Classroom 50 100 RMB6,500 /time/room
M2-04 231 4.00 21.0 11.0 Theater 14 112 RMB6,500 /time/room
B0-01 468 5.50 26.0 18.0 Theater 2 wireless phones, 7 confer-
ence phones, 1 projectors, 1
pairs of 200 inch projection
screens with sound
24 272 RMB12,000 /time/room
B0-02 468 5.50 26.0 18.0 Classroom 88 208 RMB12,000 /time/room
M3-02 184 2.80 16.7 11.0 Theater 2 wireless microphone, 2 sets
of fixed gooseneck micro-
phone, projector, one 120 inch
projection screen, with sound
14 112 RMB4,600/time/room
M3-03 176 2.80 16.0 11.0 Theater 14 112 RMB4,600/time/room
M3-04 165 3.60 15.0 11.0 Theater 14 112 RMB4,600/time/room
M4-02 176 2.70 16.0 11.0 Theater 2 wireless microphone, 2 sets
of fixed gooseneck micro-
phone, projector, one 120 inch
projection screen, with sound
14 112 RMB4,600/time/room
M4-03 176 2.70 16.0 11.0 Classroom 50 100 RMB4,600/time/room
M4-04 165 3.60 15.0 11.0 Theater 14 112 RMB4,600/time/room
A0-01 468 5.50 26.0 18.0 Theater 2 wireless phones, 7 confer-
ence phones, 1 projectors, 1
pairs of 200 inch projection
screens with sound
24 272 RMB12,000 /time/room
A0-02 468 5.50 26.0 18.0 Classroom 88 208 RMB14,500 /time/room
2018 Shanghai international Lighting EXPO
- 55 -
Note:
1) All the details of conference room rental, please see the above list. Additional furniture,
please do contact the organizers;
2) The deadline is March 2, 2018 and the late orders are not allowed.
3) The procedures of conference room rental are as below:
A. Contact the organizers which rooms are available and any other questions ;
B. Confirm the order and apply the form to the organizers;
C. Get the room finalization from the organizers;
D. Pay the fee within 5 days after applying the form;
E. Successfully hold the room after the payment.
4.3 Contact Info:
Shanghai Modern International Exhibition Co., Ltd.
Address:18/F No. 8 Sheng Ze Road. Contact Person:Ms. Fu
TEL:+86-21-6328 8899*140 FAX:+86-21-6374 9188
No Sq.m
Measurement
Type Device Configuration
Furniture
Cost
H L W Table Chair
M5-02 176 2.80 16.0 11.0 Theater 2 wireless microphone, 2 sets
of fixed gooseneck micro-
phone, projector, one 120 inch
projection screen, with sound
14 112 RMB4,600/time/room
M5-03 176 3.00 16.0 11.0 Theater 14 112 RMB4,600/time/room
M6-02 176 2.80 16.0 11.0 Theater 14 112 RMB4,600/time/room 2 wireless microphone, 2 sets
of fixed gooseneck micro-
phone, projector, one 120 inch
projection screen, with sound M6-03 176 3.00 16.0 11.0 Classroom 50 100 RMB4,600/time/room
M7-02 176 2.70 16.0 11.0 Theater 2 wireless microphone, 2 sets
of fixed gooseneck micro-
phone, projector, one 120 inch
projection screen, with sound
14 112 RMB4,600/time/room
M7-03 176 2.70 16.0 11.0 Theater 14 112 RMB4,600/time/room
M7-04 165 4.00 15.0 11.0 Theater 14 112 RMB4,600/time/room
M8-02 176 2.70 16.0 11.0 Theater 2 wireless microphone, 2 sets
of fixed gooseneck micro-
phone, projector, one 120 inch
projection screen, with sound
14 112 RMB4,600/time/room
M8-03 176 2.70 16.0 11.0 Classroom 50 100 RMB4,600/time/room
M8-04 165 3.80 15.0 11.0 Theater 14 112 RMB4,600/time/room
- 56 -
5. Information of Appointed Hotel
Times Exhibition Services is the official hotel agency to help all the exhibitors and visitors order
the rooms in the following hotels.
2018 Shanghai international Lighting EXPO
- 57 -
Notes:
All hotel bookings are subject to availability. To ensure your reservation successful, please send back your reservation form be-
fore March 01.
You can also reserve hotel online at: www.sdlm.cn/En/HotelReservation.aspx?ExCode=509
As hotel requested, all your cost will be paid in advance by T/T or PayPal once you book.
Any changes or cancellations are not allowed, your payment will fully guarantee all your rooms and nights.
If you need other services such as flight ticket, car rental, tourism, translator etc., please feel free to contact us.
Hotel Reservation Form
Please make a copy for your own file and return to:
Contact: Georgina Lin
Times Hotel Management Co., Ltd.
Tel: 021-64705363
Fax: 021-64705383
Mobile: 15214353324
E-mail: [email protected]
Website: www.sdlm.cn
2018 Shanghai international Lighting EXPO
- 59 -
6. WI-FI Service of Smart Stand
The exhibitors can get the personal smart WI-FI service during the show. The items are as be-
low:
● WI-FI service for visitors and staff
● WI-FI service for the equipment drive in the stand
● WI-FI service for mini games of stand marketing ( new product promotion)
The Stand Data Analysis (Visitor Flow Chart , Peak Time Index, Number Ratio), Customization needs further discussion .)
Service Item Cost
(Yuan) Service Content Description
Smart Stand (A) RMB 45,000
Smart Network Solution for the Stand
WBBW is 60 MB
The Turnkey Project to meet all require-
ment of equipment drive, staff and visitor‟s
surfing the internet
Interactive Mini Games for Stand
Marketing Mini Games Making
The In-depth Analysis of Stand
Data(Standard Edition)
Monitor the Basic Exhibition Data and
Monitor and Analysis the Stand Data
Smart Stand (B)
Smart Network Solution for the Stand
WBBW is 30 MB
The Turnkey Project to meet all require-
ment of equipment drive, staff and visitor‟s
surfing the internet RMB 32,000
An Analysis of Stand Data
(Standard Edition)
Monitor the Basic Exhibition Data and
Monitor and Analysis the Stand Data
Smart Stand (C) RMB15,000 Smart Network Solution for the Stand
WBBW is 15 MB
The Turnkey Project to meet all require-
ment of equipment drive, staff and visitor‟s
surfing the internet
Smart Stand (D) RMB10,000 Smart Network Solution for the Stand
WBBW is 10 MB
The Turnkey Project to meet all require-
ment of equipment drive, staff and visitor‟s
surfing the internet
- 60 -
APPENDIX I:Safety Responsibility Agreement of NECC
In order to keep public facilities safety and construction safety of NECC hereinafter referred to the Venue), effectively prevent
various insecurity factors during build-up and move-out, keep the staff‟s personal safety, clean the venue environment, we will
obey the Venue and strictly follow the provisions as below:
1. Obey all the rules and regulations by the national, Shanghai relevant safety departments and follow the supervision and direc-
tion from the Venue during the construction.
2. The constructors need the safety production training and get the qualification certificate to do the work on the site. Safety hel-
mets must be brought in the construction, and safety belts must be fastened during the operation at the height of more than 2 me-
ters. Supervise the builders to comply with the safety regulations and take the necessary safety and fire protection measures in
accordance with the regulations. Designate the site safety officer, responsible for daily safety inspection and supervision, and
wear obvious signs.
3. All the rules of operation inside and outside the halls must be strictly obeyed and the constructors should follow the direction of
the relevant staff of the Venue.
4. All the safety and fire prevention management system must be strictly observed during the construction period, If there is any
violation, the constructor is willing to take all the responsibilities and consequences.
5. It is not allowed to put the goods in the fire engine access and keep it unblocked.
6. Fire prevention and explosion protection. No smoking in the venue. It is not allowed to bring inflammable and explosive items
(such as paint, l lacquer thinner, two potassium benzene, etc.)
7. During the high altitude operation, the constructors have to have the permission of the elevation operation or the corresponding
qualification certificate, and do a good job of safety. In the event of a problem, the constructor will bear all the responsibilities and
all the consequences arising therefrom.
8. It will keep the buildings, structure, facilities & equipment, and parts in the halls clean and safe during the construction. If there
is damage or pollution, the constructor must compensate according to the set price by the Venue.
9. It is not allowed to use the decoration materials and facilities which the State has publicly ordered to be obsolete, shal l be for-
bidden.
10. During the construction, it is not allowed to damage the building structure of the venue and use safety.
11.The contractors are not allowed to undertake the construction services which is irrelevant to their own stands without permis-
sion.、
12. It is not allowed to subcontract the construction or dismantling of the stall to private companies, individuals without legal per-
sons and related qualifications.
Exhibiting Company Name Constractor Company Name
Booth No. Booth No.
Person in-charge Name and MP Person in-charge Name and MP
Stamp Stamp
2018 Shanghai international Lighting EXPO
- 61 -
APPENDIX 2:Special Notice
Dear exhibitors and booth contractors:
To ensure the smooth progress of this exhibition and to avoid any personal or property damage caused by the construction and
use of booths, we hereby advise on the following:
1.Exhibitors or booth contractors appointed by the exhibitors must submit their booth plans to MIE and Shanghai Yahaihengxin
Exhibition Co., Ltd. And the booth plans should be inspected or reviewed by above two corporations (hereinafter collectively re-
ferred to as the auditing unit). Booth construction design drawings detailed in Annex 3 "Special Equipment Exhibition booth con-
struction management rules." Before the related drawings are unverified, please do not carry out off-site construction or on-site
construction first.
2.After the construction drawings submitted by exhibitors or exhibitors' booth contractors are approved, they shall be constructed
strictly in accordance with the structure drawings and the requirements of the "Rules and Regulations for the Construction and
Management of Large-scale Exhibition Stands". It‟s prohibited to have unauthorized changes of booth structure requirements or
set up with unqualified ones Construction materials. The exhibitors and booth contractor must take full responsibility for any booth
safety accident resulting from it.
3.Exhibitors should choose qualified booth contractor to complete the booth construction. Exhibitors are obliged to require contrac-
tors to construct in compliance with the relevant national standards and construction specifications, and implementing safety re-
sponsibility measures.
4.Though the booth plans have been approved by authority, in order to protect the safety of construction and exhibitions, to elimi-
nate the hidden dangers of accidents, auditors will also be assigned to the professional structural engineers and safety inspectors
from time to time on-site Inspect. If there is any violation of the requirements stated in Article 2 of the booth construction, the audit-
ing unit will submit a written rectification opinion to the booth contractor entrusted by the exhibitor or the exhibitor and copy it to the
Organizer at the same time.
5.In order to facilitate timely communication, even if without the written notice of the exhibitors, all the documents related to booth
construction (including but not limited to "rectification notice", "on-site construction safety commitment "," Confirmation of Respon-
sibility ") which was signed by booth contractor who is commissioned by the exhibitors and their staff , are deemed to have been
authorized by the exhibitor.
After receiving the rectification notice, booth contractor commissioned by the exhibitor or exhibitor shall promptly complete the
rectification in accordance with the rectification requirements and notify the audit unit to confirm. If exhibitors or the appointed
booth contractor neglect carrying out rectification obligations, audit units and the Organizers will order to have related booth con-
struction suspended until the illegal construction demolish, the exhibitors shall bear all the consequences of illegal construction.
RECEIPT
Shanghai Modern International Exhibition Co., Ltd:
We hereby confirm that our company has received the above-mentioned "Special Notification" and "Detailed Rules and Regula-
tions for Construction of Special Exhibition Stands". The Company fully understands the contents of the "Special Notification" and
the "Rules and Regulations for Construction of Special Exhibition Stands".
(Booth contractor stamp) Date:
- 62 -
Appendix 3 VAT invoice information collection table
Dear Exhibitors:
To ensure accuracy of invoices, please fill in billing information carefully and fax us the completed bill-
ing information sheet with signature and stamp. (Fax No. +86 21-63749188). There will be no replace-
ment or return of the invoice once we make out the invoice base on provided information from exhibitors.
The related costs will be on the exhibitors if due to their own reasons, they want to return or change
the invoice.
Please click the invoice type that you want and make handwriting clear enough.
● Value Added Tax Invoice( )
● Vat Special Invoice( )
1) If a special VAT invoice has been issued last year, you do not need to fill in the following form.
2) If billing information of your company has changed, please be sure to fill in below form.
Note: Exhibitors who fill out the above form must also provide the proof of general taxpayers.
Signature of contacts:
Mobile Number:
Stamp
Company Name
Company Name
Taxpayer’s Registration No.
Address
Telephone No.
Bank Name
Account No.