consulting corporation€¦ · mr. weaver on behalf of cec and the municipal electrical utilities....

2
www.thermoguy.comlblog [email protected] ( consulting corporation March 15, 2013 Ms. Erica Hamilton Commission Secretary British Columbia Utilities Commission Sixth Floor - 900 Howe Street Vancouver, BC V6Z 2N3 Via email: [email protected] Re: Reconsideration or Consideration on Application For Exhibit C17-24 Hello Erica, It is important that this letter get to the Commission Panel, Gordon Fulton & Interveners ASAP this morning. This refers to Exhibit C17-24 which is the Public Utility Commission of Texas Report filed by Mr. Weaver on behalf of CEC and the Municipal Electrical Utilities. ( In his application, Mr. Weaver referenced Volume 6 of the transcripts and my question on line 5 of Page 1196 regarding the Texas PUC Safety Sheet and then line 20 response by Mr. Loski. My reference to the Texas PUC Safety Sheet on line 5 has nothing to do with Exhibit C17-24. The Texas PUC Safety Sheet I refer to is Exhibit C19-4 and the link on Page 6 of 7. http://www.thermoguy.com/pdfs/Texas Senate Committee Meeting on Smart Meters.pdf That link takes you to the written testimony I was asked to provide for the Texas Senate Committee on Business & Commerce on October 9,2012. The Texas PUC Customer Facts on Smart Meter Safety is on page 8 of 11. This is the page I refer to on page 1196 on line 5. The Texas PUC Safety Sheet only considered the smart meter as an end use device, left out the coverage areas confirmed by Oncor lawyers as well as the bio electricity of human organisms. Compound that with the biological killing field of the coverage area and the Texas PUC Safety Sheet is limited as well as baseless science. Their admissions and measurements of power densities confirm an electrical load is being induced in humans that would change cellular voltages of -70 mV. That -70 mV was confirmed by Dr. Bailey during my cross examination. The Texas PUC and Mr. Bailey should have applied Ohm's Law documenting voltage changes in the cell. The voltage changes are only one electrical consideration in the flawed PUC safety sheet. ( "Bringing the Invisible to Light Since 1979" C19-18

Upload: others

Post on 08-Oct-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: consulting corporation€¦ · Mr. Weaver on behalf of CEC and the Municipal Electrical Utilities. (In his application, Mr. Weaver referenced Volume 6 of the transcripts and my question

www.thermoguy.comlblog [email protected]

(consulting corporation

March 15, 2013

Ms. Erica HamiltonCommission SecretaryBritish Columbia Utilities CommissionSixth Floor - 900 Howe StreetVancouver, BC V6Z 2N3

Via email: [email protected]

Re: Reconsideration or Consideration on Application For Exhibit C17-24

Hello Erica,

It is important that this letter get to the Commission Panel, Gordon Fulton & Interveners ASAPthis morning.

This refers to Exhibit C17-24 which is the Public Utility Commission of Texas Report filed byMr. Weaver on behalf of CEC and the Municipal Electrical Utilities.

( In his application, Mr. Weaver referenced Volume 6 of the transcripts and my question on line5 of Page 1196 regarding the Texas PUC Safety Sheet and then line 20 response by Mr.Loski.

My reference to the Texas PUC Safety Sheet on line 5 has nothing to do with Exhibit C17-24.The Texas PUC Safety Sheet I refer to is Exhibit C19-4 and the link on Page 6 of 7.http://www.thermoguy.com/pdfs/Texas Senate Committee Meeting on Smart Meters.pdf

That link takes you to the written testimony I was asked to provide for the Texas SenateCommittee on Business & Commerce on October 9,2012. The Texas PUC Customer Facts onSmart Meter Safety is on page 8 of 11. This is the page I refer to on page 1196 on line 5.

The Texas PUC Safety Sheet only considered the smart meter as an end use device, left outthe coverage areas confirmed by Oncor lawyers as well as the bio electricity of humanorganisms. Compound that with the biological killing field of the coverage area and the TexasPUC Safety Sheet is limited as well as baseless science. Their admissions and measurementsof power densities confirm an electrical load is being induced in humans that would changecellular voltages of -70 mV. That -70 mV was confirmed by Dr. Bailey during my crossexamination. The Texas PUC and Mr. Bailey should have applied Ohm's Law documentingvoltage changes in the cell. The voltage changes are only one electrical consideration in theflawed PUC safety sheet.

(

"Bringing the Invisible to Light Since 1979"

C19-18

markhuds
FORTISBC INC ADVANCED METERING INFRASTRUCTURE
Page 2: consulting corporation€¦ · Mr. Weaver on behalf of CEC and the Municipal Electrical Utilities. (In his application, Mr. Weaver referenced Volume 6 of the transcripts and my question

www.thermoguy.comlblog [email protected]

When the application for C17-24 was brought up at the oral hearings, I did not have access tothe internet or the document and represented no position on the document.