CONSULTANCY SERVICES FOR DESIGN WORK OF ARCHITECTURAL CIVIL, MEP WORKS, DESIGN DEVELOPMENT, PROCUREMENT OF CONSTRUCTION CONTRACT, SUPERVISION DURING CONSTRUCTION AND DLP OF BUILDINGS AT TRUCK TERMINAL WADALA
COMMON SET OF DEVIATION - 2
Page 1 of 21 Bidder MMRDA
Sr. No.
Volume No. Ref. Clause
No.
Page No
Description Existing Amendment
1 Appendix- D 2.1 B-
Stage-II 98 & 107
Fees & Payment Schedule
Activity No.
Description of Work Total fees payable for
stage
Fees payable for the sub
stage of
work 1
(i) On appointing the required
staff as mentioned in
Appendix- C andtheir
acceptance of such
assignment.
5% 0.5%
(ii) Submission of bio data of
the staff as appointed and
submission of their permanent
address and telephone
numbers, mobile numbers etc.
along with pass port size
colour photograph.
0.5%
(iii) On maintaining following
instruments on site and
0.5%
Activity No.
Description of Work Total fees payable for
stage
Fees payable for the sub
stage of
work 1
(i) On appointing the required
staff as mentioned in
Appendix- C andtheir
acceptance of such
assignment.
3% 0.25
%
(ii) Submission of bio data of
the staff as appointed and
submission of their permanent
address and telephone
numbers, mobile numbers etc.
along with pass port size
colour photograph.
0.25
%
(iii) On maintaining following
instruments on site and
submission of their details to
0.25
%
CONSULTANCY SERVICES FOR DESIGN WORK OF ARCHITECTURAL CIVIL, MEP WORKS, DESIGN DEVELOPMENT, PROCUREMENT OF CONSTRUCTION CONTRACT, SUPERVISION DURING CONSTRUCTION AND DLP OF BUILDINGS AT TRUCK TERMINAL WADALA
COMMON SET OF DEVIATION - 2
Page 2 of 21 Bidder MMRDA
submission of their details to
the MMRDA ;
a) Theodoliteand
Dumpy level with
staff(s);
b) Vernier caliper;
c) Measuring tapes of
5m, 10m, 15m and
30m length;
d) Measuring tapes of
steel of 3m, 5m and
10m length;
e) Helmets of standard
size and make for the
staff of PMC and also
for inspecting
officers of MMRDA.
f) Micrometers.
g) Camber plates.
h) Magnets, etc.
i) Computer with
highest caliber with
web camera and with
the MMRDA ;
a) Theodoliteand
Dumpy level with
staff(s);
b) Vernier caliper;
c) Measuring tapes of
5m, 10m, 15m and
30m length;
d) Measuring tapes of
steel of 3m, 5m and
10m length;
e) Helmets of standard
size and make for the
staff of PMC and also
for inspecting
officers of MMRDA.
f) Micrometers.
g) Camber plates.
h) Magnets, etc.
i) Computer with
highest caliber with
web camera and with
internet connection.
CONSULTANCY SERVICES FOR DESIGN WORK OF ARCHITECTURAL CIVIL, MEP WORKS, DESIGN DEVELOPMENT, PROCUREMENT OF CONSTRUCTION CONTRACT, SUPERVISION DURING CONSTRUCTION AND DLP OF BUILDINGS AT TRUCK TERMINAL WADALA
COMMON SET OF DEVIATION - 2
Page 3 of 21 Bidder MMRDA
internet connection.
(iv) On maintaining records
and submission of Xerox
copies of following records to
MMRDA;
1) Attendance register
of PMC staff and
Bio-Data;
2) Labour attendance
register;
3) Work order book.
4) Foundation passing
register;
5) Anti termite
treatment register;
6) Register of Material
broughtby contractor
on site of work in
terms of No. of
vehicle, date,
quantity, etc.
7) Ghani register for
concreting work.
0.5%
(iv) On maintaining records
and submission of Xerox
copies of following records to
MMRDA;
1) Attendance register
of PMC staff and
Bio-Data;
2) Labour attendance
register;
3) Work order book.
4) Foundation passing
register;
5) Anti termite
treatment register;
6) Register of Material
broughtby contractor
on site of work in
terms of No. of
vehicle, date,
quantity, etc.
7) Ghani register for
concreting work.
8) Cement testing
register.
0.25
%
CONSULTANCY SERVICES FOR DESIGN WORK OF ARCHITECTURAL CIVIL, MEP WORKS, DESIGN DEVELOPMENT, PROCUREMENT OF CONSTRUCTION CONTRACT, SUPERVISION DURING CONSTRUCTION AND DLP OF BUILDINGS AT TRUCK TERMINAL WADALA
COMMON SET OF DEVIATION - 2
Page 4 of 21 Bidder MMRDA
8) Cement testing
register.
9) Cement consumption
register;
10) Steel consumption
register;
11) Steel testing register
12) Concrete cube testing
register.
13) Deviation register;
14) Accident register;
15) Safety precaution
register.
(v) On maintaining following
books on site and submission
of details of the same to
MMRDA;
a) Standard
specifications(Vol.Iand
II);
b) MORTH
specifications of latest
edition;
c) National Building
0.5%
9) Cement consumption
register;
10) Steel consumption
register;
11) Steel testing register
12) Concrete cube testing
register.
13) Deviation register;
14) Accident register;
15) Safety precaution
register.
(v) On maintaining following
books on site and submission
of details of the same to
MMRDA;
a) Standard
specifications(Vol.Ia
nd II);
b) MORTH
specifications of latest
edition;
c) National Building
Code of latest edition;
d) IS: 456
0.25
%
CONSULTANCY SERVICES FOR DESIGN WORK OF ARCHITECTURAL CIVIL, MEP WORKS, DESIGN DEVELOPMENT, PROCUREMENT OF CONSTRUCTION CONTRACT, SUPERVISION DURING CONSTRUCTION AND DLP OF BUILDINGS AT TRUCK TERMINAL WADALA
COMMON SET OF DEVIATION - 2
Page 5 of 21 Bidder MMRDA
Code of latest edition;
d) IS: 456
e) IS: 13920
f) IS: 1893
g) IS: 800
h) SP : 16, 20, 36
i) IS : 10260
j) PWD – Civil
Engineering Handbooks
k) Central Public Health
Engineering Manual
l) Any other IS code or
book as may be required;
etc
(vi) PMC shall prepare
Quality Assurance Manual
(QAM) indicating the
methodology of execution of
various items of work and
submit the same to MMRDA.
0.5%
(vii) On establishing and
submission of details of site
laboratory by contractor to
0.5%
e) IS: 13920
f) IS: 1893
g) IS: 800
h) SP : 16, 20, 36
i) IS : 10260
j) PWD – Civil
Engineering Handbooks
k) Central Public Health
Engineering Manual
l) Any other IS code or
book as may be required;
etc
(vi) PMC shall prepare
Quality Assurance Manual
(QAM) indicating the
methodology of execution of
various items of work and
submit the same to MMRDA.
0.25
%
(vii) On establishing and
submission of details of site
laboratory by contractor to
MMRDA. If the contractor
fails to establish site
laboratory as mentioned in the
0.25
%
CONSULTANCY SERVICES FOR DESIGN WORK OF ARCHITECTURAL CIVIL, MEP WORKS, DESIGN DEVELOPMENT, PROCUREMENT OF CONSTRUCTION CONTRACT, SUPERVISION DURING CONSTRUCTION AND DLP OF BUILDINGS AT TRUCK TERMINAL WADALA
COMMON SET OF DEVIATION - 2
Page 6 of 21 Bidder MMRDA
MMRDA. If the contractor
fails to establish site
laboratory as mentioned in the
tender document in full
working condition within 15
days from the date of work
order then PMC shall establish
the laboratory and claim the
expenses and deduct the
amount from the bill of
contractor.
(viii) Maintain the
Measurement Books (MB)
issued by MMRDA for
recording the measurement of
steel and all hidden
measurements. Hidden
measurements will include
foundations, WBM, BBM and
other layers of road
work,Underground water lines
etc. The certified Xerox copy
of this MB shall be submitted
along with the PMC’s bill.
0.5%
tender document in full
working condition within 15
days from the date of work
order then PMC shall establish
the laboratory and claim the
expenses and deduct the
amount from the bill of
contractor.
(viii) Maintain the
Measurement Books (MB)
issued by MMRDA for
recording the measurement of
steel and all hidden
measurements. Hidden
measurements will include
foundations, WBM, BBM and
other layers of road
work,Underground water lines
etc. The certified Xerox copy
of this MB shall be submitted
along with the PMC’s bill.
0.25
%
(ix) PMC should check the
mix design for various grades
of concrete to be used on work
1%
CONSULTANCY SERVICES FOR DESIGN WORK OF ARCHITECTURAL CIVIL, MEP WORKS, DESIGN DEVELOPMENT, PROCUREMENT OF CONSTRUCTION CONTRACT, SUPERVISION DURING CONSTRUCTION AND DLP OF BUILDINGS AT TRUCK TERMINAL WADALA
COMMON SET OF DEVIATION - 2
Page 7 of 21 Bidder MMRDA
(ix) PMC should check the
mix design for various grades
of concrete to be used on work
and cast trial cubes as per the
mix design obtained and
verify at least 7 days results
and subsequently for 28 days
results. PMC should calculate
the cement consumption and
maintain the record. This
activity shall be repeated for
each change in mix design.
Note:
This amount will be paid on
completion of R.C.C. work
and satisfactory report of all
NDT of concrete.
1%
2 (i) Complete day to day
supervision of the project
work, Contractor’s bill will be
paid in proportion to the actual
work done by the contractor.
PMC shall submit the certified
27%
and cast trial cubes as per the
mix design obtained and
verify at least 7 days results
and subsequently for 28 days
results. PMC should calculate
the cement consumption and
maintain the record. This
activity shall be repeated for
each change in mix design.
Note:
This amount will be paid in
proportionate of progress of
R.C.C. work and satisfactory
report of all NDT of concrete.
2 (i) Complete day to day
supervision of the project
work, Contractor’s bill will be
paid in proportion to the actual
work done by the contractor.
PMC shall submit the certified
copies of all registers and
documents maintained by him
at site.
PMC shall also submit the
29%
CONSULTANCY SERVICES FOR DESIGN WORK OF ARCHITECTURAL CIVIL, MEP WORKS, DESIGN DEVELOPMENT, PROCUREMENT OF CONSTRUCTION CONTRACT, SUPERVISION DURING CONSTRUCTION AND DLP OF BUILDINGS AT TRUCK TERMINAL WADALA
COMMON SET OF DEVIATION - 2
Page 8 of 21 Bidder MMRDA
copies of all registers and
documents maintained by him
at site.
PMC shall also submit the
compliance of inspection
notes issued by MMRDA
during the construction period
since last bill of the
Contractor. Bill will be paid
only after receipt of the data as
above.
Note:
a) Check, certify and
forward the bill to the
MMRDA (either
Running Account i.e. RA
or Final Bill) prepared by
contractor, after due
recording in M.B.
b) Check, certify and
forward the escalation
bill of the contractor
after due recording in
M.B. if clause of
compliance of inspection
notes issued by MMRDA
during the construction period
since last bill of the
Contractor. Bill will be paid
only after receipt of the data as
above.
Note:
a) Check, certify and
forward the bill to the
MMRDA (either Running
Account i.e. RA or Final
Bill) prepared by
contractor, after due
recording in M.B.
b) Check, certify and
forward the escalation
bill of the contractor
after due recording in
M.B. if clause of
escalation included in
contract.
c) PMC or his engineer
shall not indulge in any
way in preparation of the
CONSULTANCY SERVICES FOR DESIGN WORK OF ARCHITECTURAL CIVIL, MEP WORKS, DESIGN DEVELOPMENT, PROCUREMENT OF CONSTRUCTION CONTRACT, SUPERVISION DURING CONSTRUCTION AND DLP OF BUILDINGS AT TRUCK TERMINAL WADALA
COMMON SET OF DEVIATION - 2
Page 9 of 21 Bidder MMRDA
escalation included in
contract.
c) PMC or his engineer
shall not indulge in any
way in preparation of the
bill of the contractor.
d) The main
responsibility of the
PMC is getting the work
executed as per the
tender specifications and
drawings and maintain
the desired quality and
workmanship of work.
PMCshall not
recommend and forward
bill of the contractor if
the work is not done
as per the desired
specifications and
quality. If contractor’s
bill is submitted for
payment by the PMC it
will be assumed that the
bill of the contractor.
d) The main
responsibility of the
PMC is getting the work
executed as per the
tender specifications and
drawings and maintain
the desired quality and
workmanship of work.
PMCshall not
recommend and forward
bill of the contractor if
the work is not done
as per the desired
specifications and
quality. If contractor’s
bill is submitted for
payment by the PMC it
will be assumed that the
work is being done as per
the desired
specifications, quantity
and quality with
specified workmanship.
For assurance of
CONSULTANCY SERVICES FOR DESIGN WORK OF ARCHITECTURAL CIVIL, MEP WORKS, DESIGN DEVELOPMENT, PROCUREMENT OF CONSTRUCTION CONTRACT, SUPERVISION DURING CONSTRUCTION AND DLP OF BUILDINGS AT TRUCK TERMINAL WADALA
COMMON SET OF DEVIATION - 2
Page 10 of 21 Bidder MMRDA
work is being done as per
the desired
specifications, quantity
and quality with
specified workmanship.
For assurance of
quality PMC should be
that 30% test shall be
carried out in Govt.
lab.& 70% test in other
lab. And also frequency
of the test shall be strictly
observed.
e) PMCshall certify
whether the work for
which payment is
recommended by him is
being executed as per the
specifications, quality
and as per the tender
drawings in the
prescribed format by the
MMRDA.
f) PMC shall notify to
quality PMC should be
that 30% test shall be
carried out in Govt.
lab.& 70% test in other
lab. And also frequency
of the test shall be strictly
observed.
e) PMCshall certify
whether the work for
which payment is
recommended by him is
being executed as per the
specifications, quality
and as per the tender
drawings in the
prescribed format by the
MMRDA.
f) PMC shall notify to
the MMRDA whose
signature on his behalf on
various documents such
as bills of contractor etc.
is to be accepted by
MMRDA as authorized
signatory. Such signature
CONSULTANCY SERVICES FOR DESIGN WORK OF ARCHITECTURAL CIVIL, MEP WORKS, DESIGN DEVELOPMENT, PROCUREMENT OF CONSTRUCTION CONTRACT, SUPERVISION DURING CONSTRUCTION AND DLP OF BUILDINGS AT TRUCK TERMINAL WADALA
COMMON SET OF DEVIATION - 2
Page 11 of 21 Bidder MMRDA
the MMRDA whose
signature on his behalf on
various documents such
as bills of contractor etc.
is to be accepted by
MMRDA as authorized
signatory. Such signature
shall specify the name of
the signatory on the
document and date.
3 (i) PMCshall obtain requisite
certificates, viz., plinth
checking certificate, tree
cutting certificate, fire
NOC.Certificates for drainage,
storm water disposal, sewage
disposal, source of drinking
water and other certificates as
may be required from local
statutory authorities during
construction period.
(ii) PMC shall have to visit
the site of work, office of the
10% 2%
2%
shall specify the name of
the signatory on the
document and date.
3 i) PMCshall obtain requisite
certificates, viz., plinth
checking certificate, tree
cutting certificate, fire
NOC.Certificates for drainage,
storm water disposal, sewage
disposal, source of drinking
water and other certificates as
may be required from local
statutory authorities during
construction period.
(ii) PMC shall have to visit
the site of work, office of the
MMRDA, office of the unit
Commander, user, the various
other offices of the Statutory
bodies etc. as and when
required for which no
traveling or daily allowances
or other expenses are payable.
10% 2%
2%
CONSULTANCY SERVICES FOR DESIGN WORK OF ARCHITECTURAL CIVIL, MEP WORKS, DESIGN DEVELOPMENT, PROCUREMENT OF CONSTRUCTION CONTRACT, SUPERVISION DURING CONSTRUCTION AND DLP OF BUILDINGS AT TRUCK TERMINAL WADALA
COMMON SET OF DEVIATION - 2
Page 12 of 21 Bidder MMRDA
MMRDA, office of the unit
Commander, user, the various
other offices of the Statutory
bodies etc. as and when
required for which no
traveling or daily allowances
or other expenses are payable.
Note:
Fees prescribed for this stage
will be paid after completion
of the project.
(iii) PMC shall ensure the
visit of Structural PMCas per
Appendix – I to the site who
should personally inspect and
certify in writing the
suitability offoundation strata,
reinforcement checking of
columns, beams and floor
slabs, anchor of bar at column
/ beam junction,required
length of top bar at column
support provided for
seismic/windmomentetc. and
1%
Note:
Fees prescribed for this stage
will be paid after completion
of the project.
(iii) PMC shall ensure the
visit of Structural PMCas per
Appendix – I to the site who
should personally inspect and
certify in writing the
suitability offoundation strata,
reinforcement checking of
columns, beams and floor
slabs, anchor of bar at column
/ beam junction,required
length of top bar at column
support provided for
seismic/windmomentetc. and
other important structures
such as Under Ground Water
Tank, Elevated Storage
Reservoir, Heavy loaded /
Longer span of Beam / Slab,
Overhead water tank, etc. and
all other RCC structures under
such Building infrastructure
1%
CONSULTANCY SERVICES FOR DESIGN WORK OF ARCHITECTURAL CIVIL, MEP WORKS, DESIGN DEVELOPMENT, PROCUREMENT OF CONSTRUCTION CONTRACT, SUPERVISION DURING CONSTRUCTION AND DLP OF BUILDINGS AT TRUCK TERMINAL WADALA
COMMON SET OF DEVIATION - 2
Page 13 of 21 Bidder MMRDA
other important structures
such as Under Ground Water
Tank, Elevated Storage
Reservoir, Heavy loaded /
Longer span of Beam / Slab,
Overhead water tank, etc. and
project.
CONSULTANCY SERVICES FOR DESIGN WORK OF ARCHITECTURAL CIVIL, MEP WORKS, DESIGN DEVELOPMENT, PROCUREMENT OF CONSTRUCTION CONTRACT, SUPERVISION DURING CONSTRUCTION AND DLP OF BUILDINGS AT TRUCK TERMINAL WADALA
COMMON SET OF DEVIATION - 2
Page 14 of 21 Bidder MMRDA
all other RCC structures under
such Building infrastructure
project.
(iv) PMC shall arrange at
least weekly visit of
Architectas per Appendix – III
to the project and check the
specifications adopted and
advise contractor over the
quality, workmanship,
modification of design,
planning if necessary as per
site condition of the R.C.C.
work and other finishing
works etc.
Note:
If it is observed that Architect
has not visited the work as per
Appendix – III ,then the fees
of PMC will be deducted at
the penal rate i.e. double the
fee as mentioned in the
agreement between them.
2%
(iv) PMC shall arrange at
least weekly visit of
Architectas per Appendix – III
to the project and check the
specifications adopted and
advise contractor over the
quality, workmanship,
modification of design,
planning if necessary as per
site condition of the R.C.C.
work and other finishing
works etc.
Note:
If it is observed that Architect
has not visited the work as per
Appendix – III ,then the fees
of PMC will be deducted at
the penal rate i.e. double the
fee as mentioned in the
agreement between them.
(v) PMC shall approve various
samples according to the
contract agreement with the
contractor during the course of
execution and certify the RA
2%
2%
CONSULTANCY SERVICES FOR DESIGN WORK OF ARCHITECTURAL CIVIL, MEP WORKS, DESIGN DEVELOPMENT, PROCUREMENT OF CONSTRUCTION CONTRACT, SUPERVISION DURING CONSTRUCTION AND DLP OF BUILDINGS AT TRUCK TERMINAL WADALA
COMMON SET OF DEVIATION - 2
Page 15 of 21 Bidder MMRDA
(v) PMC shall approve various
samples according to the
contract agreement with the
contractor during the course of
execution and certify the RA
Bills of the contractor by
referring thechapter of list of
approved materials mentioned
in tender document.
The certificate shall clearly
mention whether the entire
work has been carried out as
per the tender drawings and
specifications mentioned in
tender.
(vi) All other PMCs shall also
visit the project during the
period while the particular
activity is going on. Visits of
the
PMC along with his name,
date of report shall be notified
to the MMRDA by the PMC
through M.P.R.
2%
1%
Bills of the contractor by
referring thechapter of list of
approved materials mentioned
in tender document.
The certificate shall clearly
mention whether the entire
work has been carried out as
per the tender drawings and
specifications mentioned in
tender.
(vi) All other PMCs shall also
visit the project during the
period while the particular
activity is going on. Visits of
the
PMC along with his name,
date of report shall be notified
to the MMRDA by the PMC
through M.P.R.
1%
CONSULTANCY SERVICES FOR DESIGN WORK OF ARCHITECTURAL CIVIL, MEP WORKS, DESIGN DEVELOPMENT, PROCUREMENT OF CONSTRUCTION CONTRACT, SUPERVISION DURING CONSTRUCTION AND DLP OF BUILDINGS AT TRUCK TERMINAL WADALA
COMMON SET OF DEVIATION - 2
Page 16 of 21 Bidder MMRDA
Note : A) Report of Electrical
Consultant about material,
material quality, specification,
design load, test report, etc,
andsubmission of completion
certificate.
B) Report of water supply and
drainage PMC about material,
material quality, specification,
test report, design calculation
etc., and submission of
completion certificate.
4 (i) On completion of work and
obtaining the completion
certificate from competent
client, ensuring drainage
connection, water connection,
electrical connection and
finally completion and
Occupation Certificate and
other approvals from all
statutory bodies.
5% 3%
4
Note : A) Report of Electrical
Consultant about material,
material quality, specification,
design load, test report, etc,
andsubmission of completion
certificate.
B) Report of water supply and
drainage PMC about material,
material quality, specification,
test report, design calculation
etc., and submission of
completion certificate.
(i) On completion of work and
obtaining the completion
certificate from competent
client, ensuring drainage
connection, water connection,
electrical connection and
finally completion and
Occupation Certificate and
other approvals from all
statutory bodies.
5%
3%
CONSULTANCY SERVICES FOR DESIGN WORK OF ARCHITECTURAL CIVIL, MEP WORKS, DESIGN DEVELOPMENT, PROCUREMENT OF CONSTRUCTION CONTRACT, SUPERVISION DURING CONSTRUCTION AND DLP OF BUILDINGS AT TRUCK TERMINAL WADALA
COMMON SET OF DEVIATION - 2
Page 17 of 21 Bidder MMRDA
Note:The actual charges,
deposits and all other dues,
etc. towards obtaining the
various connections will be
paid by the contractor or the
MMRDA as the case may be.
Note:The actual charges,
deposits and all other dues,
etc. towards obtaining the
various connections will be
paid by the contractor or the
MMRDA as the case may be.
CONSULTANCY SERVICES FOR DESIGN WORK OF ARCHITECTURAL CIVIL, MEP WORKS, DESIGN DEVELOPMENT, PROCUREMENT OF CONSTRUCTION CONTRACT, SUPERVISION DURING CONSTRUCTION AND DLP OF BUILDINGS AT TRUCK TERMINAL WADALA
COMMON SET OF DEVIATION - 2
Page 18 of 21 Bidder MMRDA
(ii) Actual handing over of
the project to the User
Department and taking the
same on the Printed Register
of Buildings (PRB) of the
PWD.
(iii) Projects for which
maintenance will be done
other than PWD in that case
PMC shall prepare
Maintenance Manual and
Draft for Maintenance
Agreement between user
department and maintenance
agency.
2% (ii) Actual handing over of
the project to the User
Department and taking the
same on the Printed Register
of Buildings (PRB) of the
PWD.
(iii) Projects for which
maintenance will be done
other than PWD in that case
PMC shall prepare
Maintenance Manual and
Draft for Maintenance
Agreement between user
department and maintenance
agency.
2%
CONSULTANCY SERVICES FOR DESIGN WORK OF ARCHITECTURAL CIVIL, MEP WORKS, DESIGN DEVELOPMENT, PROCUREMENT OF CONSTRUCTION CONTRACT, SUPERVISION DURING CONSTRUCTION AND DLP OF BUILDINGS AT TRUCK TERMINAL WADALA
COMMON SET OF DEVIATION - 2
Page 19 of 21 Bidder MMRDA
5 Preparation and submission of
AsBuilt Drawings to the
MMRDA alongwith the
multianglecoloured
photographs of A4 size in five
sets and VDO in Pen drive.
3%
3%
5 Preparation and submission of
AsBuilt Drawings to the
MMRDA alongwith the
multianglecoloured
photographs of A4 size in five
sets and VDO in Pen drive.
3%
3%
CONSULTANCY SERVICES FOR DESIGN WORK OF ARCHITECTURAL CIVIL, MEP WORKS, DESIGN DEVELOPMENT, PROCUREMENT OF CONSTRUCTION CONTRACT, SUPERVISION DURING CONSTRUCTION AND DLP OF BUILDINGS AT TRUCK TERMINAL WADALA
COMMON SET OF DEVIATION - 2
Page 20 of 21 Bidder MMRDA
III) Payment of fees during actual execution The fee of 50% of total fees for Consultancy, for the post tender activity shall be divided into two categories and paid in the following manner and ratio. a)Time related fees = 70% b) Progress related fees = 30 %
Deleted
iv) Time related fees 1. The time related fees shall be payable as below:
2. Fee to be paid every month = 70 x 50 x Total fees for consultancy 100 100 Original scheduled period of
completion for work in month+ variation period.
3. The monthly fee shall be payable to the consultant as per the above formula for the scheduled period of completion. If the construction work is completed within stipulated time limit, full 70% fees shall be payable.
Deleted
CONSULTANCY SERVICES FOR DESIGN WORK OF ARCHITECTURAL CIVIL, MEP WORKS, DESIGN DEVELOPMENT, PROCUREMENT OF CONSTRUCTION CONTRACT, SUPERVISION DURING CONSTRUCTION AND DLP OF BUILDINGS AT TRUCK TERMINAL WADALA
COMMON SET OF DEVIATION - 2
Page 21 of 21 Bidder MMRDA
v) Progress Related Fees The progress related fees would be paid as below: Fee to be paid every month = 30 x 50 X % progress of the work X
100 100 Total fees for consultancy Note: The cost of the work done by agency will exclude the payment made towards price escalation, Mobilization Advance and Machinery Advance. Similarly the recovery of Mobilization Advance and Machinery Advance will not be reflected in working out the fees due to the consultant. In case of time overrun in the construction work, progress related fees shall not be paid beyond the base completion period plus variation period of the consultancy work. The clause no 3 given below shall come into existence for payment during the extended period ( beyond variation period) of the consultancy work.
Deleted