![Page 1: Construction Updatem3mprive73.com/assets/constructionUpdates/M3M... · Today Callidora CHD Avenue 71 ILC Sattva West side back filling in progress Water tank roof casted. 1. Ground](https://reader034.vdocuments.site/reader034/viewer/2022052005/60184733411b3e6c3721dc8c/html5/thumbnails/1.jpg)
Construction UpdateJan, 2020
Sector- 73, Gurgaon
Architecture & Design by::UHA London – the principal architect of this architectural masterpiece possess notably expertise in high rise structure and large scale mixed use developments.
![Page 2: Construction Updatem3mprive73.com/assets/constructionUpdates/M3M... · Today Callidora CHD Avenue 71 ILC Sattva West side back filling in progress Water tank roof casted. 1. Ground](https://reader034.vdocuments.site/reader034/viewer/2022052005/60184733411b3e6c3721dc8c/html5/thumbnails/2.jpg)
DG area casted
M3M Experia Sales Gallery
Tower crane installed to speedup the execution.
Filling up to Lower Ground floor Completed
![Page 3: Construction Updatem3mprive73.com/assets/constructionUpdates/M3M... · Today Callidora CHD Avenue 71 ILC Sattva West side back filling in progress Water tank roof casted. 1. Ground](https://reader034.vdocuments.site/reader034/viewer/2022052005/60184733411b3e6c3721dc8c/html5/thumbnails/3.jpg)
Today CallidoraILC SattvaCHD Avenue 71
West side back filling in progress
Water tank roof casted
![Page 4: Construction Updatem3mprive73.com/assets/constructionUpdates/M3M... · Today Callidora CHD Avenue 71 ILC Sattva West side back filling in progress Water tank roof casted. 1. Ground](https://reader034.vdocuments.site/reader034/viewer/2022052005/60184733411b3e6c3721dc8c/html5/thumbnails/4.jpg)
1. Ground floor casted.
2. Upper Ground floor shuttering and steel binding in progress.
Architecture & Design by::