CONSTRUCTION PLANNINGCONSTRUCTION PLANNING
PLANNING
WHAT
CONTROL
PLANNING PROCESS
COSTRUCTION PLANNING
CONSTN ACTIVITIES
BAR CHART ARROW NETWORKG
LOB
CASHFLOW
ECONOMICSECTOR
AGRI, MANUFACTRINGSERVICES, TOURISM,
CONSTRUCTION
CONSTRUCTIONSECTOR
SOCIALS, POLITICS, ECONOMY, PUBLIC AND PRIVATE SECTOR,
FINANCE
CONSTRUCTION PROJECT
CONSTRUCTIONPROJECTS
TYPE OF PROJECTS, PUBLIC AND PRIVATE,FINANCE, PROJECT MANAGEMENT,
TYPE OF PROCUREMENTS CONSTRUCTION MANAGEMENT
CONSTRUCTIONMANAGEMENT
CONSTRUCTION INPUT/OUTPUT,CONSTRUCTION RESOURCES,
BURUH, MESIN, BAHAN2CONSTRUCTION PLANNING
CONSTRUCTIONPLANNING
PROJECT PLANNING, SITE PLANNINGSCHEDULING, PROGRAMMING;
BAR CHARTARROW NETWORKING
LINE OF BALANCE (LOB)PRECEDENCE DIAGRAM
CONTRACTORS CASHFLOW
PERANCANGANPERANCANGAN“PERANCANGAN IALAH PROSES PEMBUATAN KEPUTUSAN TERDAHULU TERHADAP APA YANG PERLU DIBUAT DAN BAGAIMANA”
K&R 478
IA MELIBATKAN MISSI KESELUROHAN, KENALPASTI PENYELESAIAN UTAMA, TENTUKAN OBJEKTIF, KEMBANGKAN POLISI, PROGRAM, PROSEDUR UNTUK MEMCAPAINYA.
CIRI-CIRI:MASA DEPANTINDAKANPLAN TINDAKAN/PENCAPAIAN
FASARAMALAN
FASAPERANCANGAN
FASAPELAKSANAAN
DATA/MAKLUMAT
ASAS
PERANCANGANJGKA PANJANG
JGKA SEDERHANAJGKA PENDEK
KAWALAN/MANTAUAN
SEMAKAN
PROSES PERANCANGAN
PERANCANGAN BINAANPERANCANGAN BINAAN
IALAH PROSES PEMBUATAN KEPUTUSAN TERDAHULU TERHADAP AKTIVITI-AKTIVITI PROJEK BINAAN DAN CARA BAGAIMANA AKTIVITI2 TERSEBUT PERLU DIJALANKAN BAGI PENCAPAIAN OBJEKTIF PROJECK.
PERANCANGAN KAWALAN/PEMANTAUAN
PEMBETULANSELEWENG
PERANCANGAN DAN PEMBETULANPERANCANGAN DAN PEMBETULAN
ID Task Name Duration
1 Start 0 days
2 Site Clearing 5 days
3 Excavation 7 days
4 Footing 10 days
5 Column Stump 10 days
6 Ground Beam 15 days
7 Column 15 days
8 Suspended Beam 20 days
9 Roof Structure and Roofing 20 days
10 Ground Floor Slab 10 days
11 Brick Wall 15 days
12 Doors and Windows 10 days
13 Finishes 20 days
14 External Works 10 days
15 Project Compleltion 0 days
3/16
8/11
SMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTMar 12, '06Mar 19, '06Mar 26, '06Apr 2, '06Apr 9, '06Apr 16, '06Apr 23, '06Apr 30, '06May 7, '06May 14, '06May 21, '06May 28, '06Jun 4, '06Jun 11, '06Jun 18, '06Jun 25, '06Jul 2, '06 Jul 9, '06 Jul 16, '06Jul 23, '06Jul 30, '06Aug 6, '06Aug 13, '06Aug 20, '06Aug 27, '06Sep 3, '06Sep 10, '06
BAR/GANTT CHART
Site Clearing
Start: 3/16/06 ID: 2
Finish: 3/22/06 Dur: 5 days
Res:
Excavation
Start: 3/23/06 ID: 3
Finish: 3/31/06 Dur: 7 days
Res:
Footing
Start: 4/3/06 ID: 4
Finish: 4/14/06 Dur: 10 days
Res:
Column Stump
Start: 4/17/06 ID: 5
Finish: 4/28/06 Dur: 10 days
Res:
Column
Start: 5/22/06 ID: 7
Finish: 6/9/06 Dur: 15 days
Res:
Brick Wall
Start: 6/12/06 ID: 11
Finish: 6/30/06 Dur: 15 days
Res:
Doors and Windows
Start: 7/3/06 ID: 12
Finish: 7/14/06 Dur: 10 days
Res:
Finishes
Start: 7/17/06 ID: 13
Finish: 8/11/06 Dur: 20 days
Res:
Ground Floor Slab
Start: 5/22/06 ID: 10
Finish: 6/2/06 Dur: 10 days
Res:
Suspended Beam
Start: 6/12/06 ID: 8
Finish: 7/7/06 Dur: 20 days
Res:
Roof Structure and Roofing
Start: 7/10/06 ID: 9
Finish: 8/4/06 Dur: 20 days
Res:
External Works
Start: 7/3/06 ID: 14
Finish: 7/14/06 Dur: 10 days
Res:
Project Compleltion
Milestone Date: Fri 8/11/06
ID: 15
Ground Beam
Start: 5/1/06 ID: 6
Finish: 5/19/06 Dur: 15 days
Res:
Start
Milestone Date: Thu 3/16/06
ID: 1
NETWORK DIAGRAM
TAWARANTAWARAN
PROJEK BINAAN – SATU PROSES
• CLIENT INTENTION• LAND MATTERS• ACQUISITION• CONVERTION• AMALGAMATION MARKET STUDY FEASIBILITY STUDY DESIGN CONCEPT
•PENGURUS PROJEK•JURUNILAI•JRUUKUR TANAH•JURUUKUR BAHAN•ARKITEK•PLANNER•RESEARCHER
PENGURUS PROJEK
JURUUKUR BAHAN
ARKITEK
PLANNER
DRAWINGS BILL OF QUATITIES SPECIFICATION RATES CALL FOR TENDER SUBMISSION OF TENDER EVALUATION OF TENDER AWARD OF CONTRACT
LAYOUT PLAN ARCHITECTURAL
DESIGN C & S DESIGN DETAILINGS M & E DESIGN LANDSCAPE DESIGN AUTHORITIES
APPROVAL – o PLANNING– o SUB-DIVISIONS– o BUILDING DESIGNS– o STRUCTURAL
DESIGN M & E DESIGN
PENGURUS PROJEK
JURUNILAI
JRUUKUR TANAH
JURUUKUR BAHAN
ARKITEK
PLANNER
RESEARCHER
TAKE OVER SITE MOBILIZATION OF RESOURCES
– o MANPOWER– o CONSTRUCTION MATERIAL AND
COMPONENTS– o CONSTRUCTION PLANT AND
EQUIPMENT ACTUAL CONSTRUCTION PRACTICAL COMPLETION OBTAINED O.C.
PENGURUS PROJEK
JURUUKUR BAHAN
ARKITEK
C & S
M & E
CONTRAKTOR
– HANDING OVER– DEFECT LIABILITY PERIOD
(DLP)– FINAL ACCOUNT PENGURUS PROJEK
JURUUKUR BAHAN
ARKITEK
C & S
M & E
CONTRAKTOR
• COST
• TIME
• QUALITY
• SATISFACTION
PROSES PELBAGAI INPUTPROSES PELBAGAI INPUT
BINAAN LEPAS BINAANPRA BINAAN
PERANCANGAN SEMASA PERANCANGAN SEMASA TENDERTENDER
PERANCANGAN PEMBINAAN PERANCANGAN PEMBINAAN PERSEDIAAN PEMBINAAN PERSEDIAAN PEMBINAAN
“FASA YANG MERANGKUMI BERMULANYA PENENTUAN HARGA DALAM SESUATU PROJEK
OLEH KONTRAKTOR SEHINGGALAH TARIKH PENGAMBILALIHAN TAPAK OLEH KONTRAKTOR.”
SKOP KERJA:SKOP KERJA:
• PERANCANGAN TAPAK• PERANCANGAN BAHAN BINAAN• PERANCANGAN TENAGA KERJA• PERANCANGAN LOJI DAN PERALATAN • PROGRAM KERJA• PERANCANGAN KOS• PERATURAN DAN UNDANG-UNDANG
MANAGING CONSTRUCTION MANAGING CONSTRUCTION RESOURCESRESOURCES
MANPOWERMANPOWER MATERIALS AND COMPONENTS MATERIALS AND COMPONENTS
PLANT AND EQUIPMENT PLANT AND EQUIPMENT TIME TIME
MONEY MONEY
MaterialsMaterialsWhatWhatWhenWhenWhereWhere
CONSTRUCTION PRODUCTIONINFORMATION
THE PROSES
CONVERSION PROCESS OUTPUTINPUT
TYPE OF PLANT
COMPRESSOR
DELIVERY TRUCK
TOWER CRANE
EXCAVATOR
LORRIES
MONTH1 2 3 4 5 6 7 8 REMARKS
PROVIDE WTH N METRES OF HOSE AND 2 GUN
MAINTAIN IN 6 MONTH
MOBILE CRANE TO OFFLOAD + FITTER TO ASSEMBLE
HIRED IN FROM ABC CO.
HIRED FROM ABC CO.
A TYPICAL PLANT SCHEDULE
Analysis Of M/power Requirement
Investigation Of Sources
Utilisation On Site
Operating Within The Law
MANPOWER SCHEDULE
TYPE OF M/POWER
TECHNICAL STAFF
GENERAL WORKERS
BRICKLAYER
CONCRETOR
SCAFFOLDERS
MONTH1 2 3 4 5 6 7 8 REMARKS
OWNED
OWNED WORKERS
SUB-CONTRACTOR
HIRED IN FROM XYZ CO.
HIRED FROM ABC CO.
A TYPICAL MANPOWER SCHEDULE
PROGRAMMING AND SCHEDULING PROGRAMMING AND SCHEDULING TECHNIQUES:TECHNIQUES:
BAR CHARTARROW NETWORKINGCRITICAL PATH METHODPRECEDENCE DIAGRAMRESOURCE AGGREGATION & LEVELLINGLINE OF BALANCE
PROGRAMMING AND SCHEDULING PROGRAMMING AND SCHEDULING TECHNIQUES:TECHNIQUES:
COMPUTER SOFTWARES:
MICROSOFT PROJECT PRIMAVERA