Jenin Hospital

-BOQ-

Construction of the First and Second floor in Jenin Hospital

-BOQ-

Consultants:

-AL-Ta'meer engineering office for studies and consultants Joint Venture with

-Kittani E/M Consultants

Civil 1/19

Page 2: Construction of the First and Second floor in Jenin · PDF fileJenin Hospital-BOQ-Construction of the First and Second floor in Jenin Hospital-BOQ-Consultants:-AL-Ta'meer engineering

Jenin Hospital

-BOQ-

Section -BOQ- Unit QTY Unit Rate Total

1 Preliminary works prior to the construction of the new

floor* The contractor shall, when pricing the rates of this

bill, take into consideration to include and allow for

the costs or expenses of all requirements stipulated

herein below or in the preambles, drawings and the

specification of the tender.

* The contractor should visit the site to verify the amount of

work and consider all other works for the proper

construction of the new floor.

* The disposal& demolished materials shall be carried out

from the construction zones through special

arrangements to external hospital yards to avoid

disturbances/ noises or dust spreading down the floors or

neighboring areas. the contractor is responsible for the

disposal of all demolished and removed materials from

the site to a dump site approved by the municipality.

* The contractor should coordinate with the client for any

possible material or elements that need to be preserved

and handed over to the client stores.

* The preserved elements such as steel doors& widows,

steel grills, steel hand rails, steel steps and metal

protections for fans shafts& service openings shall be re

installed for the new construction as directed by theinstalled for the new construction as directed by the

engineer. while the other materials should be handed over

to the client stores.

* The contractor should take all measures to protect the

hospital belongings from any damage or disturbance to

it’s functioning systems and to ensure the safety of the

hospital users during the construction stage,

The contractor shall protect the underneath floors from

leakage or penetration of rain water from the roof above

which the new floor will be constructed.

Therefore, special arrangement and protection zone shall

be erected in full coordination with the hospital directorate

and the engineer.

* The contractor should also protect all existing mechanical,

drainage systems and electrical networks . This include

the conduct of any necessary arrangements to ensure

continuous functioning of these systems during

construction stage.

* The contractor should also take all necessary shoring

measures to protect the existing building elements during

all stages of work until safely completing all new

construction work.

* The contractor should submit a clear methodology for the

proposed stages of work and protection and shoring

methods for the Engineers approval prior to

commencement of works.

* Careful demolishing and reinstatement of existing

structural elements for proper construction of the new

floor works; all as sown in the demolishing plan and in

accordance with the engineer's instructions. The work

includes but not limited to : includes but not limited to :

Civil 2/19

Page 3: Construction of the First and Second floor in Jenin · PDF fileJenin Hospital-BOQ-Construction of the First and Second floor in Jenin Hospital-BOQ-Consultants:-AL-Ta'meer engineering

Jenin Hospital

-BOQ-

Section -BOQ- Unit QTY Unit Rate Total

1.1 Demolishing and removal of all elements covering the

steel reinforcement for the columns starters on the

existing roof, such concrete, blocks, stone, filling

materials....etc, including the preserving and cleaning of

steel reinforcement for proper erection of the new

columns (this is true for all existing columns including

perimeter columns).

LS 1

1.2 Demolish and removal of concrete roof slabs for existing

elevators shafts (roof & floor) including the protection and

preservation of all existing finishing works, and all other

electrical& mechanical utilities, fittings and equipments,

machines. …etc.

The work also includes cuttings/ making new openings for

elevators doors through the existing concrete walls to

match the new proposed locations of the elevators and

perform concrete filling/ patching/adjustment of the

existing doors openings at the roof. the voids for the

elevators shall be protected by rigid formwork or

scaffolding through out the construction stage.

M2 12

1.3 Demolishing and removal of the existing concrete/ block

walls partitions, or external stone walls. The unit price

shall include cost of demolishing of the other wall finishes

L.S 1

shall include cost of demolishing of the other wall finishes

in the machinery room at the existing roof level. The unit

price shall also include dismantling and preserving the

existing windows and doors . All as directed by the

Engineer. as shown on detailed drawing S02

1.4 Demolishing and removal the finishing layers on top of the

existing roof slabs including the sloped light weight

concrete, and machine foundations. All as directed by the

Engineer. (provisional)

M2 50

1.5 Dismantling and demolishing parts of the existing stone

roof parapet, including the preservation of stone courses

and existing steel reinforcement as shown on drawing S02

M2 100

1.6 ditto, but only 30cm height as shown in drawings S04,

detail 1'-1'.

MR 26

1.7 Careful dismantling and removal of the existing stone

coping for the roof parapet and preservation for use in the

construction of new stone parapet. All as directed by the

Engineer.

MR 140

1.8 Enlarging the existing doors opening on grids (T - S /16)

to be at the dimension of 2.2m wide and to the full height(

from the ground level up to the suspended ceiling level),

as shown on the plans. The unit rate includes cost of

demolishing and the required finishing works around the

opening. The unit rate shall also include cost of and

dismanteling and removal of the existing doors. (D10)

No 1

Civil 3/19

Page 4: Construction of the First and Second floor in Jenin · PDF fileJenin Hospital-BOQ-Construction of the First and Second floor in Jenin Hospital-BOQ-Consultants:-AL-Ta'meer engineering

Jenin Hospital

-BOQ-

Section -BOQ- Unit QTY Unit Rate Total

1.9 Ditto, but for door on grids( j/19-20) to be at the

dimension of 2.05m wide and the full height from the

ground level up to the suspended ceiling level. The unit

rate shall also include cost of dismantling and preserving

the existing door for re-use type D AL) as shown on the

drawings.

No 1

1.10 Make new doors openings, demolishing, and cutting doors

in the wall on grids horizontally and grids vertically as

mentioned below. The unit rate shall include cost of

demolishing and finishing work complete and treatment

around the opening.

a Opening doors in the first and second floor level on grids

(S/27-28) to be at the dimension of 1.7 m width and

height of 2.3m ( D09)

M2 8

b opening doors in the first floor level on grids (T-S/16) at

the dimension of 2.2 width and height from ground level to

up to the suspended ceiling level. (D10)

M2 6

c. Opening window at the second floor on grids (T/17-19)

and (T-U/19) to beat the dimensions of 2.0m*2.5m

(W13)+(W12)

M2 8

1.11 enlarging the door at the first floor level and the window in

the second floor level on grids (J/17-18) to be a door at

the dimension of 2.05 width, and height from the ground

level up to the suspended ceiling level. (D10), and

preserving any existing mechanical work.

L.S. 1

1.12 Demolish the existing concrete slab to construct the new L.S. 11.12 Demolish the existing concrete slab to construct the new

foundations for the escape staircase of dimension

5.10×1.9 m. The contractor shall be responsible for any

damage of the mechanical pipes inside and outside the

shaft. as shown on drawing

L.S. 1

1.13 Excavation for the foundations of the escape staircase;

in any kind of soil, to the dimensions shown on the

drawings and to the Engineer’s instructions.

Price shall include cost of backfilling, with in 20cm layers

and compaction to 95% according to modified AASHTO

Density Test T-80,as shown on drawing

m3 10

1.14 Ditto, but only backfilling and compaction and with

imported approved filling material.

M3 10

1.15 Perform soil test to determine the soil bearing capacity of

the soil above which the foundation of the existing building

rest. The test shall be carried out using core drill around

the existing building and in accordance with the Jordanian

code and Standards.

L.S 1

Total of preliminary works carried to summary sheet

Civil 4/19

Page 5: Construction of the First and Second floor in Jenin · PDF fileJenin Hospital-BOQ-Construction of the First and Second floor in Jenin Hospital-BOQ-Consultants:-AL-Ta'meer engineering

Jenin Hospital

-BOQ-

Section -BOQ- Unit QTY Unit Rate Total

2 Concrete Works

The contractor shall, when pricing the rates of this bill,

take into consideration including and allow for the costs or

expenses of all requirements stipulated in the preambles,

drawings and technical specification of the tender.

All concrete works includes the supply of ready mix

concrete, placing& casting, formwork & supports,

reproping, shuttering, vibration, curing, testing and

whatever needed for the completion of the works all in

accordance to the standards, codes, specifications and as

details shown in drawings.

2.1 Supply and cast reinforced concrete B300 for columns of

various dimensions and locations, maximum size of

aggregate 20mm as shown on drawings.

M3 120

2.2 Supply & cast concrete B300 for 36cm thick ribbed slabs

including light weight block "ETONG" filling and drop

beams as shown on drawings. The unit rate shall include

cost of connecting the existing structural elements and the

new slabs; including demolition stone works, cutting the

existing stone in the areas where the new slabs are joined

with the old slabs, making openings in the existing

concrete walls, fixing steel plates and angles

L90×90×11mm plate, bolts M12@15cm Hilti HSL,

M2 2980

L90×90×11mm plate, bolts M12@15cm Hilti HSL,

applying an approved bonding agent such as

NITOPONDEP,and all other the required work to make

proper and sound connections. All in accordance with the

drawings and engineer's instructions.

2.3 Ditto, but for 20 cm thick solid slab for elevator M2 12

2.4 Supply and cast reinforced concrete B300 for walls of

various thickness, dimensions and different locations. The

price includes cost of connecting the existing structural

elements with the new walls including cost of bonding

agents and other necessary works. All as shown on

drawing S04 and the specifications.

M3 280

2.5 Ditto, but for 1 m high walls in bathrooms, price include

reinforcement network 1Ø8mm@20cm vertical and

horizontal.

M3 8

2.6 Supply and cast concrete B300 behind stone for backing

the stone works, including concrete for stone lintels and

where needed; all in accordance with the engineer

instructions.

M3 53

2.7 Supply and cast plain concrete Grade 'B 200' for 10cm

thick blinding under foundations for steel staircase.

M2 10

2.8 Supply and cast reinforced concrete Grade 'B 300' for

steel staircase foundations.

M3 3

Civil 5/19

Page 6: Construction of the First and Second floor in Jenin · PDF fileJenin Hospital-BOQ-Construction of the First and Second floor in Jenin Hospital-BOQ-Consultants:-AL-Ta'meer engineering

Jenin Hospital

-BOQ-

Section -BOQ- Unit QTY Unit Rate Total

2.9 Making dowels for connecting the steel reinforcement of

the existing structural elements and the steel

reinforcement of the new structure, where required and as

per drawings and the engineer instructions. The unit rate

shall include all the associated costs, such as :

Drilling, injection, and anchorage steel reinforcing bars

using approved bonding agents such as "Lokfix" material

from Fosrock company. All per drawing S04 and the

engineer's instructions; for the following work items:

a. Ø10 mm bars steel reinforcement, holes diameter

14mm at 20cm depth. the quantity of "Lokfix" shall be at

19.6ml)/bar)

No 80

b. Ø12 mm bars steel reinforcement, holes diameter

16mm and 30cm depth. (the quantity of lokfix shall be at

45.8ml/bar)

No 40

c. Ø16 mm bars steel reinforcement, drilling diameter

20mm and at 30cm depth( the quantity of lokfix

58.2ml/bar).

No 30

2.10 Supply, and fix deformed high yield steel bar

reinforcement of various diameters, characteristic strength

FY=420N/mm2 for concrete reinforcement. All as shown

TON 140

FY=420N/mm2 for concrete reinforcement. All as shown

on drawings and according to specifications.

2.11 Supply and cast B300 Concrete for lintels above the block

walls.

M3 50

2.12 Supply and cast concrete B300 for the machine

foundations as shown on drawing No A39. The unit rate

shall also include all necessary materials such as cork

and steel angels.

M3 15

Total of Concrete Works carried to civil summaryTotal of Concrete Works carried to civil summary

Civil 6/19

Page 7: Construction of the First and Second floor in Jenin · PDF fileJenin Hospital-BOQ-Construction of the First and Second floor in Jenin Hospital-BOQ-Consultants:-AL-Ta'meer engineering

Jenin Hospital

-BOQ-

Section -BOQ- Unit QTY Unit Rate Total

3 Stone Works

The contractor shall, when pricing the rates of this bill,

take into consideration including and allow for the costs

and expenses of all requirements stipulated in the

preambles, drawings and technical specification of the

contract. The price includes scaffolding, formworks,

supports, cutting, trimming, chamfering, galvanized

anchors& pins, angles as specified and flush pointing

works composed of cement and sand (1/2) with approve

additive for better workability, tightness and water

proofing. The stone finishing and dressing for the new

stone works shall be similar to that rendered at the lower

floors of the existing hospital building. The unite rate shall

also include cost of all required stone pieces, (such as

windows and doors jambs, sills, lintels, corners, key

stones, any other special stone pieces etc..); all as per

the stone works rendered in the lower floors of the

existing hospital and to the engineer instructions.

Accordingly, no separate cost allowance for the stone

pieces.

The unit rate shall also include the cost of pointing the

stone work.

3.1 Supply and install 5 cm thick 30 cm wide Taltish or

Mattabah stone courses from first quality Jama'een as

M2 500

Mattabah stone courses from first quality Jama'een as

shown on detailed drawings.

3.2 Ditto, but 4 cm thick for stone cladding. The rate includes

cost of B200 concrete backing, anchors and 6 mm steel

mesh. The rate includes all anchoring details as shown on

drawings.

M2 1200

3.3 Supply and install 8-10 cm thick stone coping , 35-40 cm

wide, for the roof parapet copping "Jama'en stone" . The

price includes stone pointing.

MR 50

3.4 Re-install the stone coping which was dismantled and

preserved from the existing parapet.

MR 300

Total of Stone Works carried to civil summaryTotal of Stone Works carried to civil summary

Civil 7/19

Page 8: Construction of the First and Second floor in Jenin · PDF fileJenin Hospital-BOQ-Construction of the First and Second floor in Jenin Hospital-BOQ-Consultants:-AL-Ta'meer engineering

Jenin Hospital

-BOQ-

Section -BOQ- Unit QTY Unit Rate Total

4 Block Work:

The contractor shall, when pricing the rates of this bill,

take into consideration including and allow for the costs or

expenses of all requirements stipulated in the preambles,

drawings and technical specification of the contract.

4.1 Supply and construct 10cm hollow concrete block in

cement and sand mortar (1:4). The price includes cost of

cutting, anchors, bonding, jointing, utilities openings

complete as per drawings, specifications and as directed

by the engineer.

M2 3100

4.2 Ditto, but 20 cm hollow concrete block . M2 1000

4.3 Ditto, but 15 cm hollow concrete block . M2 450

4.4 Supply and cast B300 concrete lintels or griddles and

dummy columns above block works at door or window

level across the whole length of block walls and in places

as directed by the engineer. The price including

shuttering and the supply & installation of steel

reinforcement 4nos of 12mm dia. and with stirrups 8mm

@ 20 cm c/c

M3 50

4.5 Supply and install 3 cm "Randopan" extruded polystyrene

boards for external stone walls, of density 24 kg/m3 as

shown on drawings.

M2 450

shown on drawings.

Total of Block Works Carried to Summary SheetTotal of Block Works Carried to Summary Sheet

Civil 8/19

Page 9: Construction of the First and Second floor in Jenin · PDF fileJenin Hospital-BOQ-Construction of the First and Second floor in Jenin Hospital-BOQ-Consultants:-AL-Ta'meer engineering

Jenin Hospital

-BOQ-

Section -BOQ- Unit QTY Unit Rate Total

5 Plastering Works:

The contractor shall, when pricing the rates of this bill,

take into consideration including and allow for the costs or

expenses of all requirements stipulated in the preambles,

drawings and technical specification of the contract.

5.1 Supply and install internal plastering for walls, columns,

arches drop beams, softies of slabs & beams, shaft walls

etc ,composed of 3 coats, a bond coat 1:1, base coat 1:4,

and finish coat 1:5 as specified. The price includes the

corner beads, casing beads, metal lath, scaffoldings,

shuttering, bonding agents and the requirements as

specified .

M2 4250

5.2 Ditto, but supply and install internal plastering for ceiling M2 930

5.3 Ditto but supply and install external plastering for parapet

wall, external walls or shafts and wherever needed

composed of 3 coats a bond coat 1:1, a base coat 1:4 and

a finish coat 1:2 with water proofing materials all as

specified.

M2 400

Total of Plastering Works carried to SummaryTotal of Plastering Works carried to Summary

Civil 9/19

Page 10: Construction of the First and Second floor in Jenin · PDF fileJenin Hospital-BOQ-Construction of the First and Second floor in Jenin Hospital-BOQ-Consultants:-AL-Ta'meer engineering

Jenin Hospital

-BOQ-

Section -BOQ- Unit QTY Unit Rate Total

6 Flooring and Covering Works:

The contractor shall, when pricing the rates of this bill,

take into consideration including and allow for the costs or

expenses of all requirements stipulated in the preambles,

drawings and technical specification of the contract.

6.1 Supply and install 30x30x3cm Terrazzo floor tiles similar

to Halonim # 75 or equally approved. Rate includes 30cm

x 10cm x 1 cm skirting, 3 cm cement sand mortar (1:3 ),

sand fill materials , cuttings, fittings, trims, grouting with

cement and polishing, all in accordance with the

specifications and applicable Standards.

M2 2000

6.3 Supply and install 20x20cm glazed ceramic class (A) tiles

of different colors, as per UNDEFA, ROCA make-Spain or

equal, for walls cladding . The tiles shall be laid and fixed

to the walls in patterns, style and forms of grouting&

jointing as directed by engineer using approved adhesive

materials. The price also includes the cost of surface

preparation to receive tiles, which shall include two coats

of cement plaster (scratch and float coat), approved

adhesive materials, grouting, aluminum protection angles

as approved by the engineer.

M2 1000

6.4 Ditto, but 30x60cm ceramic tiles class (A) for walls M2 12006.4 Ditto, but 30x60cm ceramic tiles class (A) for walls

cladding, as per HDC, GAYA make-Spain or equal. The

tiles shall be laid and fixed to the walls in patterns, style

and forms of grouting& jointing as directed by the

engineer using approved adhesive materials. Price

includes the cost of surface preparation to receive tiles,

which shall include two coats of cement plaster (scratch

and float coat), approved adhesive materials, grouting,

protection angles as approved by the engineer.

M2 1200

6.5 Ditto, but anti bacteria ceramic 20x20cm class (A)

closured wall tiles for surgery& sterile stores using special

adhesive materials and anti fungus grouting materials as

per manufacturer instructions and in accordance with the

MOH requirements and related Standards.

M2 900

6.6 ditto, but for floor 7mm thick. M2 400

6.7 Supply and install non slip ceramic floor tiles class (A)

20x20*0.8cm of different colors, as per UNDEFA, ROCA-

Spain or equal. The price includes the mortar (1:3) with

water proofing materials, the sand white cement fill

material, cutting& trimming around floor utilities and

pointing as specified. the tiles shall be laid and fixed in

patterns, style and forms of grouting& jointing as directed

by the Engineer.

M2 250

6.8 Ditto, but 30*30*0.8 cm granite porcelain floor tiles of

different colors as made by TAU, VENATTO ceramic,

Matt finish or equivalent, the tiles shall be laid and fixed in

patterns, style and forms of grouting& jointing as directed

M2 500

patterns, style and forms of grouting& jointing as directed

by the Engineer.

Civil 10/19

Page 11: Construction of the First and Second floor in Jenin · PDF fileJenin Hospital-BOQ-Construction of the First and Second floor in Jenin Hospital-BOQ-Consultants:-AL-Ta'meer engineering

Jenin Hospital

-BOQ-

Section -BOQ- Unit QTY Unit Rate Total

6.9 Supply and fill special filling material made of "sand and

Etong gravel" for the areas of deep fill under the floor

tiling( in the first floor). All as directed by the engineer and

according to the drawings.

M3 50

6.10 Supply and install 2cm thick "Perlato" marble for cladding

the elevator walls. The rate include cuttings, recesses for

utilities, cut pieces, rounding, jointing& polishing,

anchoring& all fixing accessories.

M2 10

6.11 Supply and install 3cm thick local marble, and the width

according to door frame width, local polished cut stone for

window thresholds with mitered edge as shown on

drawings.

M2 20

6.12 Supply and install anti static PVC flooring type

"Teraclean", 2mm thick or equivalent for surgery room

and for sterile stores. The price includes the installation of

skirting and copper mesh under tiles every 30cm using

1cm wide copper strip. This mesh should be connected

with the earth system of the building. The pvc flooring

should be fixed using conductive adhesive and complete

seal of joints all in accordance to manufacturer

instructions and MOH regulations standards. The

Installations for pvc flooring, skirting, terminations with

walls/outer& inner corners shall be strictly implemented by

M2 250

walls/outer& inner corners shall be strictly implemented by

professional and in accordance to the manufacturer's

recommendation.

6.12 Ditto, for sterile area but without copper strips. M2 20

6.13 Supply and install VINYL Anti static flooring type

Armstrong 2mm thick or equivalent for surgery rooms,

sterile stores and as directed. The price includes the

installation of skirting and copper mesh under tiles every

30cm using 1cm wide copper strip . This mesh should be

connected with the earth system of the building. The pvc

flooring should be fixed using conductive adhesive and

complete seal of joints all in accordance to manufacturer

instructions and MOH standards.

M2 50

6.14 Ditto, for sterile area but with out copper strips. M2 20

Total of wall and floor cladding Works carried to

Summary SheetSummary Sheet

Civil 11/19

Page 12: Construction of the First and Second floor in Jenin · PDF fileJenin Hospital-BOQ-Construction of the First and Second floor in Jenin Hospital-BOQ-Consultants:-AL-Ta'meer engineering

Jenin Hospital

-BOQ-

Section -BOQ- Unit QTY Unit Rate Total

7 Water Proofing

The contractor shall, when pricing the rates of this bill,

take into consideration including and allow for the costs or

expenses of all requirements stipulated in the preambles,

drawings and technical specification of the contract.

7.1 Supply and install water proofing membrane 5mm thick

covered with quartz granules, Pazkar or equivalent, for

main roof, machines roofs, stairs roofs, parapet walls and

where required the price includes the application of primer

coat GS474 at a rate of 25 kg /m2, installation of 15*15cm

angle fillet, grooves, groove sealant, groove cover, joints

over lapping, backing sheets or pieces all around

external& internal corners, roof drains, machines

foundations or up stands, roof door thresholds and silver

paints along the joints and all necessary material and

workmanship to complete the works as shown in the

drawings and as per manufacturer instructions and the

specifications.

M2 1900

7.2 Supply and apply three coats of bitumen (25/75) at rate of

500g/m2 for each layer with two layers of fiberglass

including primer coat GS474. The price includes 5*5cm

angle fillet with smooth sand cement mortar(1:3) and 5cm

thick sand cement screed with water proofing agent

(surface preparation layer before applying the water

M2 150

(surface preparation layer before applying the water

proofing coats).

7.3 Supply & install aluminum metal sheet flashing to cover

the vertical and horizontal expansion joints including

polystyrene filler, sealant , rubber packing rod, fixing with

galvanized screws every 30cm and all accessories.

M.R 200

7.4 Supply and cast light weight foam concrete of density

1000kg/m3 for forming the roof slopes. The unit rate shall

include cost of applying 2 cm cement screed layer above

the light weight concrete.

M2 1300

7.5 Supply and apply two coats of water-proofing coats,

similar to "Bonzal" or equally approved, on the concrete

surfaces of the stone work backing (or on concrete walls

behind stone cladding). The unite rate shall include

preparing the concrete surface to receive required water

proofing coats.

M2 1400

Total of Water Proofing carried to summary Sheet

Civil 12/19

Page 13: Construction of the First and Second floor in Jenin · PDF fileJenin Hospital-BOQ-Construction of the First and Second floor in Jenin Hospital-BOQ-Consultants:-AL-Ta'meer engineering

Jenin Hospital

-BOQ-

Section -BOQ- Unit QTY Unit Rate Total

8 Carpentry Works

The contractor shall, when pricing the rates of this bill, take into

consideration including and allow for the costs or expenses of

all requirements stipulated in the preambles, drawings and

technical specification of the contract.

8.1 Fabricate, supply and install the following wooden doors

complete with the metal frames, all necessary fixing

accessories, glazing, heavy duty roller hinges, stoppers,

louvers, grills, the required hydraulic closures, hardware,

protection panels and ironmongery , painting of the frame and

the exposed wooden surfaces of the door panels, the unit rate

shall also include all the works described herein below:

* The wooden door leaf shall be 45mm thick with required filling,

and glasses, class A plywood facing on each side, the hard

wood "Zan" 52*35 mm for the exposed surfaces tongued and

grooved in the internal wooden fillings, sealing strips around

door panel, and door closure German made where shown and

required on the drawings, all as shown on the drawings.

* Supply and install of heavy duty hinges, locks, cylinders are

"Yardini" or equivalent. locks to toilets-vacant/ occupied "Yardini

" type 7008 all doors shall be provided with master key system.

The hierarchy shall be specified before the supply of lock sets.

* Door handles shall be steel handles similar to Hewi type* Door handles shall be steel handles similar to Hewi type

zg1113bb and type fbg 1113 or equivalent. The color to be

selected by the Engineer.

* Supply and installation of formed galvanized steel frame 1.5mm

thick of required width according to the wall thickness, buckets

for cylinders& locks, recess for hinges with backing plates ,

rubber knobs, side anchoring& bottom bracing and concrete

filling as specified in drawings. The frames shall be fabricated

and assembled by specialized manufacturer with all required

accessories.

* Door protection 1.5 mm thick stainless steel U shape for the

both sides as shown on drawings.

* Doors protections (where needed as per drawings of 2mm

"Deco sheet" SPM or equivalent) including all necessary fittings

& fixings complete as per manufacture recommendations, the

color will be as per Eng. approval.

* Supply and installation of PVC inflammable 'Taraflex' or

equivalent 2mm thick cladding on both sides of the door panels.

* All exposed edges , louvers and door frames are" Zan" wood

and should be painted with 3 coats of liquor paint. the metal

doors frames shall be painted with primer coat of meginol

special gray 270-004 and two coats of polyour matt oil. the color

shall be selected by the engineer.

* Door filling material should not be less than 80%.

* Rate for smoke proof doors include 100% filling , sealing strips

around door panel including the bottom of panel. All as per the

Standard.

8.1.1 D01 ( 1.20 * 2.10 m) No. 31

8.1.2 D02 ( 1.00 * 2.10 m) No. 11

8.1.3 D03 ( 0.85 * 2.10 m) No. 30

8.1.4 D04 ( 0.85 * 2.10 m) No. 98.1.4 D04 ( 0.85 * 2.10 m) No. 9

Civil 13/19

Page 14: Construction of the First and Second floor in Jenin · PDF fileJenin Hospital-BOQ-Construction of the First and Second floor in Jenin Hospital-BOQ-Consultants:-AL-Ta'meer engineering

Jenin Hospital

-BOQ-

Section -BOQ- Unit QTY Unit Rate Total

8.1.5 D05 ( 0.85 * 2.10 m) No. 17

8.1.6 D06 ( 0.80 * 2.10 m) No. 4

8.1.7 D07 ( 0.85 * 2.10 m) No. 7

8.1.8 D09 ( 1.80 * 2.10 m) No. 6

8.1.9 D10 ( 2.40 * 2.75 m) operate electrically with door closure. No. 6

8.1.10 Ditto, but D10 ( 2.05 * 2.75 m) No. 2

8.1.11 Ditto, but ( 2.20 * 2.75 m) No. 2

8.1.12 Ditto, but ( 2.15 * 2.75 m) No. 1

8.1.13 Ditto, but ( 2.30 * 2.75 m) No. 1

8.2.12 Wooden door as per drawing plan No A19 for the

electrical room.

No. 1

8.2 Nurse station ,and kitchen desks and cabinets

Fabricate, supply and install the following units, as per

drawings with all fixing accessories, drawers, shelves,

hardware, and ironmongery with a master key and made

of:

18mm or 30mm thick plywood for wall hung and lower

cabinets, plastic laminated " top quality from outside and

laminated with regular Formica from inside, 12mm thick

sandwich panel for shelves laminated with regular

Formica. For dimensions refer to detailed drawings.

8.2.1.a Room No. 166&251 kitchen lower and upper cabinets

including granite counter top "Local marble" with top&

bottom skirting, beads, polishing, rounding, jointing…etc

and all preparatory woks for the installation of the required

sink and sanitary fixtures..

No. 2

8.2.1.b Ditto, but for Room No.207 No. 1

8.2.1.c Ditto, but for Room No.146 No. 1

8.2.1.d Ditto, but for Room No.246 No. 1

8.2.2 Ditto, but for Nurse Station As shown in Drawing

A20,A21,A22

8.2.2.a Information's Desk Room No. 110 No. 1

8.2.2.b Nurse station Room No. 139 No. 1

8.2.2.c Nurse station Room No. 210 No. 1

8.2.2.d Nurse station Room No. 244 No. 1

8.2.2.e Nurse station Room No. 155 No. 1

8.2.2.f Nurse station Room No. 154 No. 1

8.2.2.g Nurse station Room No. 216 No. 1

8.2.2.h Electrical cabinets of different sizes. No. 16

Total of Carpentry Works Carried to Summary Sheet

Civil 14/19

Page 15: Construction of the First and Second floor in Jenin · PDF fileJenin Hospital-BOQ-Construction of the First and Second floor in Jenin Hospital-BOQ-Consultants:-AL-Ta'meer engineering

Jenin Hospital

-BOQ-

Section -BOQ- Unit QTY Unit Rate Total

9 Suspended ceiling

The contractor shall, when pricing the rates of this bill,

take into consideration including and allow for the costs or

expenses of all requirements stipulated in the preambles,

drawings and technical specification of the contract. Rates

for all suspended ceilings works includes suspension

system with anchors to the structure, L& Z, main& main

profiles, omega profiles. clips, gaskets and all necessary

fittings in accordance to the manufacture technical data

and related standards covering this type of works, The

rate includes also cutting and preparation for installing

lighting fixtures, ceiling recess, maintenance openings,

grills, ceiling utilities... etc.

9.1 Supply and install suspended ceiling for bathroom, utilities

and wet areas made from 30cm non perforated formed

galvanized metal trays of 0.6mm thick and 45mm high.

The trays should be supplied pre painted and oven cured.

The unit rate shall also include acoustic rock wool mats,

25mm thick and 25kg/m3 density, wrapped in black non

inflammable dust proof sags in accordance with

specifications and the related Standards.

M2 160

9.2 Ditto, but perforated sheets(12%-20%) perforation and of

40cm wide. The unit rate shall include cost of the of

25mm thick rock wool.

M2 700

25mm thick rock wool.

9.3 Supply and install 60*60cm suspended ceiling for

operating room, ECOPHONE HYGIENE Type Protect "A"

(non perforated). The price should include galvanized

suspension system with anchors to the structure, bacterial

resistant, moisture resistant, with standing relative

humidity up to 95% at 30c fire resistant tiles, including

access panels, fittings, fixing, installation of a closed cell

gasket between the grid and panel including retention

clips to insure good seal , complete all as specifications

and drawings.

M2 200

9.4 Ditto, but for clean room areas type "Clima Plus USG"

class 100 ceilings or equivalent.

M2 170

9.5 Ditto, but 60x60cm acoustic tiles suspended ceiling, type

Armstrong Georgian drop type or equivalent.

M2 925

9.6 Supply and install vertical and horizontal gypsum boards

12mm thick for walls and ceiling cladding and for other

decorative works. The price shall include all decorative

beams, edges, recessed slab, squares, cuts,

suspension& structural profiles-- etc to any shape and

patterns to complete the works as approved by the

engineer.

M2 60

9.7 Supply and install 60x60cm fiber glass ceiling tiles, coated

with pvc type F4 in the drawing, acoustic tiles suspended

ceiling, Armstrong or equitant. The unit rate shall include

galvanized suspension system with anchors including

access panels, fixing, fittings and all accessories complete

M2 220

Total of Suspended Ceiling Works carried to Total of Suspended Ceiling Works carried to

Summary Sheet

Civil 15/19

Page 16: Construction of the First and Second floor in Jenin · PDF fileJenin Hospital-BOQ-Construction of the First and Second floor in Jenin Hospital-BOQ-Consultants:-AL-Ta'meer engineering

Jenin Hospital

-BOQ-

Section -BOQ- Unit QTY Unit Rate Total

10 Painting Works:

The contractor shall, when pricing the rates of this bill,

take into consideration including and allow for the costs or

expenses of all requirements stipulated in the preambles,

drawings and technical specification of the contract.

Type of paint shall be in accordance with the specification

and the applicable Standards. The contractor should allow

in his pricing that the engineer will use as many different

colors or combination of colors to meet an approved color

scheme.

All paint works should conform to manufacturer instruction

regarding number of coats , rate of application or drying

time

10.1 Supply and apply cement sand filling layer to the ceiling

and walls above false ceiling level. (provisional)

M2 3780

10.2 Supply and apply emulsion paint on plastered walls

composed of two coats of putty and 3 coats of "

supercryel " emulsion paint.

M2 200

10.3 Supply and apply polysid paint. M2 780

10.4 Supply and apply oil paint for walls composed of two

coats of putty, one coat of under coat and 2 coats of "

polyour".

M2 3800

polyour".

Total of Painting Works carried to Summary Sheet

Civil 16/19

Page 17: Construction of the First and Second floor in Jenin · PDF fileJenin Hospital-BOQ-Construction of the First and Second floor in Jenin Hospital-BOQ-Consultants:-AL-Ta'meer engineering

Jenin Hospital

-BOQ-

Section -BOQ- Unit QTY Unit Rate Total

11 Metal Works:

The contractor shall, when pricing the rates of this bill,

take into consideration including and allow for the costs or

expenses of all requirements stipulated in the preambles,

drawings and technical specification of the contract.

11.1 Aluminum Works

Fabricate supply and install the following powder coated

aluminum doors & windows made of "Napco 4500"

profiles, or equivalent, for the side hung casement or

bottom hung windows. Napco profile 7700 for sliding

windows three rails Napco or equivalent, Napco profile

2200 complete with double glazing 4:9:4 mm, silicone,

handles, locks and oplite fly screen. Shop drawings must

be submitted. All as shown in drawings and approved by

the Engineer .

11.1.1 Aluminum windows W1, 7700 of overall dimensions

130x165cm, the lower part is fixed and the upper part

sliding as shown on drawings.

No. 67

11.1.2 Aluminum windows W1', 7700 of overall dimensions

130x195cm, the lower and upper parts are fixed and the

middle part is sliding as shown on drawings.

No. 4

11.1.3 Aluminum windows W2, 7700 of overall dimensions

110x165cm, the lower part is fixed and the upper part is

sliding as shown on drawings.

No. 15

11.1.4 Aluminum windows W2', 7700 of overall dimensions No. 211.1.4 Aluminum windows W2', 7700 of overall dimensions

110x195cm, the lower and upper parts are fixed and the

middle part is sliding as shown on drawings.

No. 2

11.1.5 Aluminum windows W3, 4500 of overall dimensions

80x105cm, as shown on drawing plan

No. 5

11.1.6 Aluminum windows W4, 4500 of overall dimensions

60x105cm, as shown on drawing plan

No. 2

11.1.7 Aluminum windows W5, 7700 of overall dimensions

130x195cm, the lower and upper parts are fixed and the

middle part is sliding as shown on drawings.

No. 2

11.1.8 Aluminum windows W6, 7700 of overall dimensions

120x195cm, the lower and upper parts are fixed and the

middle part is sliding as shown on drawings.

No. 2

11.1.9 Aluminum windows W7, 7700 of overall dimensions

130x195cm, the lower and upper parts are fixed and the

middle part is sliding as shown on drawings.

No. 2

11.1.10 Aluminum windows W8, 7700 of overall dimensions

105x195cm, the lower and upper parts are fixed and the

middle part is sliding as shown on drawings.

No. 2

11.1.11 Aluminum windows W9, 7700 of overall dimensions

140x195cm, the lower and upper parts are fixed and the

middle part is sliding as shown on drawings.

No. 2

11.1.12 Aluminum windows W10, 7700 of overall dimensions

100x195cm, the lower and upper parts are fixed and the

middle part is sliding as shown on drawings.

No. 5

11.1.13 Aluminum windows W11, 2200 of overall dimensions

345x195cm&0.55×1.95cm, the lower and upper parts are

fixed and the middle part is sliding as shown on drawings.

No. 4

Civil 17/19

Page 18: Construction of the First and Second floor in Jenin · PDF fileJenin Hospital-BOQ-Construction of the First and Second floor in Jenin Hospital-BOQ-Consultants:-AL-Ta'meer engineering

Jenin Hospital

-BOQ-

Section -BOQ- Unit QTY Unit Rate Total

11.1.14 Aluminum windows W12, 7700 of overall dimensions

110x165cm, the lower and upper parts are fixed and the

middle part is sliding as shown on drawings.

No. 2

11.1.15 Aluminum windows W13, 7700 of overall dimensions

200x165cm, the lower is fixed and the middle part is

sliding as shown on drawings.

No. 1

11.1.16 Aluminum windows W14, 7700 of overall dimensions

225x195cm, the lower and upper parts are fixed and the

middle part is sliding as shown on drawings.

No. 4

11.1.17 Wooden glass windows for the Incubators, the price shall

include 6mm glass, the Ironmongery and carpentry works

as per drawings. Detail C2 as per plan No A32

No. 1

11.1.18 Ditto, but for blood bank Detail C1, as per plan No A31 No. 1

11.2 Steel Works

Supply and install the following steel doors and frames,

as per details. The price should include the following :

Galvanized steel, galvanized sheet cover , braces, frame,

insert, rubber, hinge, fire cylinder type SN2000, and rock

wool. The price includes painting two coats of antirust

paint and powder coating paints.

11.2.1 MD1 ( 1.00 * 2.10 m) As shown in drawing No A25 No. 4

11.4 Steel structure for escape staircase:11.4 Steel structure for escape staircase:

Supply, fabricate and install a complete steel structure for

the emergency staircase, as per drawings A29 and A30.

The contractor shall submit shop drawings to for the

engineer's approval before fabrication the structure. The

unit rate shall cover all associated costs to install a safe

steel structure, including the steel plates and anchors,

3mm chequered plates for steps and landings, steel

columns 10*10*4 mm( No.1), steel profiles H10×5×0.5

cm for landings and flights (No.2), solid rectangular bars

1.4×1.4 cm@11cm for handrail (No.3), 2.5×5 cm

rectangular steel section for handrail(No.4), steel section

5×2.5 cm(No.5), and all required material and

workmanship to install the complete structure in

accordance with the drawings and the Engineer

approvals.The unit rate shall also include cost of painting

the steel structure with three coats of oil paint, complete.

LS 1

Total of Metal works carried to summary sheetTotal of Metal works carried to summary sheet

Civil 18/19

Page 19: Construction of the First and Second floor in Jenin · PDF fileJenin Hospital-BOQ-Construction of the First and Second floor in Jenin Hospital-BOQ-Consultants:-AL-Ta'meer engineering

Jenin Hospital

-BOQ-

Section -BOQ- Unit QTY Unit Rate Total

12 Other Works

The contractor shall, when pricing the rates of this bill,

take into consideration including and allow for the costs or

expenses of all requirements stipulated in the preambles,

drawings and technical specification of the contract.

12.1 Supply and install Avis curtain rail, complete with all fixing

accessories, Aluminum carrier main profile and locks.

Mr. 450

12.2 corner protection similar to type "SPM" or equally

approved "5cm×5cm and height 2.00 m as detail plan No

A25

No. 235

12.3 wooden wall guards to wall protections at the beds level

cut to size according to the site requirements as made by

(SPM ) or equivalent, including all necessary fittings &

fixings complete as per manufacture recommendations,

the color will be as per Eng. approval, as detail plan No

A25.

M2 34

12.4 Supply and install a wooden wall guards for corridors with

all fixing accessories as per the detailed drawings and

engineer instructions. color to be selected by the

Engineer, as detail plan No A25.

Mr. 504

Total of Other Works carried to Summary Sheet

Civil 19/19

Page 20: Construction of the First and Second floor in Jenin · PDF fileJenin Hospital-BOQ-Construction of the First and Second floor in Jenin Hospital-BOQ-Consultants:-AL-Ta'meer engineering

Jenin Hospital

Electrical BOQ

Electrical Works

ITEM DESCRIPTION UNIT Qty U/Price Amount

Important Notes: All materials and accessories to be used shall

be according to the Approved Manufacturer List attached to the

tender Documents.

Preamble

*-This Section shall be read in conjunction with general and particular

electrical technical specifications, the Electrical Drawings, Addendums

and invitation to bid conditions except where otherwise indicated.

*-The unit price for all items in this Section shall include for Supplying,

installation, connecting, testing, and commissioning of electrical works

and materials, unless otherwise specifically mentioned or instructed by

Engineer.

*-All Civil and Finishing Works related to the concerned item shall be

included in the unit price.

*-Preparing of (coordinated )shop drawings and submitting to

Engineer for approval, coordination with other activities, material

storage, removing away from site the remnant of electrical works and

handling over the electrical works to local electrical distribution

authority. is contractor responsibility.

*-light points/power point considered to include single core (S.C.)

cables, conduits, (from related DB) boxes and variant types of control

switches and socket outlets.

*-All embedded and surface mounted PVC conduits to be flexible type

of min. 20mm dia.

*-All parts of PVC conduits above false ceiling (conduit & boxes) to be

of fire retardant types.

*-Separate conduit colors to be used to enable systems recognition

*- Electrical cables up to mechanical equipment, to be supplied,

installed connecting to mains, testing and to be commissioned by

electrical contractor, cables termination to mechanical equipment to

be carried on by mechanical contractor.

Sec. 13.1) - Electrical Points.

The electrical power supply from electrical switchboard to first point in

circuit shall be included in the unit price of that point (by means of

wires, cables or leads in self extinguishing conduits and cables). All

as per specifications and as required.

13.1.1 Supply, install and connect standard lighting point internal or external,

in slab or over false ceiling, to include a 19 mm diameter conduit, 1.5

or 2.5 sq.mm cross-section leads or cable, and, as required single ,

double, two way or push button lighting switch , and outlet for

luminaries with junction box and terminals.

Comp. 400

13.1.2 Ditto but for emergency lighting point Comp. 120

13.1.3 Supply, install and connect a 16A wall socket point - to include a 19

mm dia. Conduit, (3x2.5) sq.mm cross-section leads or cables, and as

required 16 A wall socket .(for regular power or UPS sockets)

Comp. 150

13.1.4 Ditto as item 13.1.3 but double socket. Comp. 40

13.1.5 Ditto as item 13.1.3 but with water proof socket. Comp. 60

13.1.6 Ditto as item 13.1.4 but with water proof cover. Comp. 20

13.1.7 Supply, install and connect a three-phase (5x16) A, single-circuit wall

socket point, to include a 23 mm diameter conduit, (5x2.5) sq.mm

cross section leads or cables and a (5x16) single-circuit wall socket

accessory .

Comp. 5

Electrical 1/11

Page 21: Construction of the First and Second floor in Jenin · PDF fileJenin Hospital-BOQ-Construction of the First and Second floor in Jenin Hospital-BOQ-Consultants:-AL-Ta'meer engineering

Jenin Hospital

Electrical BOQ

ITEM DESCRIPTION UNIT Qty U/Price Amount

13.1.8 Supply, install and connect Intercom connection point (Price includes

19 mm diameter conduit with a standard Intercom cable, leading from

point to the Intercom section in LV box).

Comp. 36

13.1.9 Supply, install and connect Public Address System connection point

(Price includes 19 mm diameter conduit with cable, leading from point

to the LV box or to the nearest point).

Comp. 35

13.1.10 Supply, install and connect Fire Alarm connection point (Price includes

19 mm diameter conduit with cable, leading from point to the LV box

or to the nearest point).

Comp. 105

13.1.11 Supply, install and connect TV connection point (Price includes 23

mm diameter conduit with cable, boxes , and the socket outlet leading

from point to the LV box).

Comp. 19

13.1.12 Supply, install and connect SAT connection point (Price includes 23

mm diameter conduit with cable, boxes , and the socket outlet leading

from point to the LV box).

Comp. 19

13.1.13 Supply, install and connect Nurse Call connection point (Price includes

19 mm diameter conduit with cable, leading from point to the nurse

call station).

Comp. 125

13.1.14 Supply, install, connect, test and commission complete data point

including boxes, 23mm dia. conduits, RJ-45 (3M) socket outlet with 8

pins being crimped and also earth pin for (Cat 6A) FTP (4x2x23) data

cables as per drawings, specification and related codes.

Comp. 40

13.1.15 Supply, install and connect Telephone socket point in a 23 mm conduit

- to include a 23 mm diameter conduit from nearest telephone cabinet

to accessory output in junction box, standard socket telephone

accessory, and standard 2x2x.5mm2- telephone lead, inserted from

cabinet to accessory including connection at both ends.

Comp. 50

13.1.16 Supply, install and connect point for thermostat to include a 19 mm

diameter conduit installed on one side near socket for fan coils and

termination with a suitable box on other side at thermostat output. 3

mm thick Nylon draw-string shall be inserted inside conduit.

Comp. 40

13.1.17 Supply, install and connect Emergency push-button point, to include a

19 mm diameter conduit, (3x1.5) sq.mm cross-section leads, and a

dual contact emergency push-button installed in a box with frame,

transparent plastic cover to be broken in case of emergency, and

engraved bakelite "sandwich" type sign, per plan (box such as

TELEMENIA model ZAS-E25).

Comp. 3

13.1.18 Supply, install and connect power point for bed head units, the price

to include BHU junction box , 3x2.5mm2 NYY cable and 23mm dia

conduit from electrical switchboard to BHU junction box with all

required accessories and materials.

No. 260

13.1.19 Supply, install and connect Point as above, but by a 3x1.5 sq.mm NYY

cable and16mm dia conduit.

No. 115

13.1.20 Supply, install and connect Point as above, but by a 6 sq.mm cross-

section grounding lead and 23 mm diameter conduit.

No. 115

13.1.21 Supply, install and connect Point as above, but for communication, by

a 23 mm conduit diameter conduit.

No. 115

13.1.22 Supply, install and connect Point as above, but for telephone in B.H.U,

by a 23 mm conduit and standard 2x2x.5mm2- telephone lead.

No. 115

13.1.23 Supply, install and connect Point as above, but for data, by a 23 mm

conduit and standard CAT 6 lead.

No. 115

13.1.24 Supply, install and connect lighting point for the suspended lighting

fixtures in the delivery rooms, the price shall include 19 mm dia.

conduit and 3*2.5 sq.mm cable or lead.

No. 10

Electrical 2/11

Page 22: Construction of the First and Second floor in Jenin · PDF fileJenin Hospital-BOQ-Construction of the First and Second floor in Jenin Hospital-BOQ-Consultants:-AL-Ta'meer engineering

Jenin Hospital

Electrical BOQ

ITEM DESCRIPTION UNIT Qty U/Price Amount

13.1.25 Supply, install and connect Point as above, but by a 4 sq.mm cross-

section grounding lead and 23 mm diameter conduit for the operating

theater lighting fixtures.

No. 2

(Provisional Items) for any required works not included in the

mechanical works items

13.1.26 Supply, install and connect a 16A Power Point including 16A (1PH)

isolator switch, conduits, boxes and cables for the fan coil units , the

works all according to drawings, specifications and Engineer

instructions.

No. 40

13.1.27 Ditto as item 13.1.26 but for the Exhaust fans on the roof. No. 10

13.1.28 Ditto as item 13.1.26 but for Booster Pumps. No. 10

13.1.29 Ditto as item 13.1.26 but 16A ( 3PH) for Booster Pumps. No. 4

13.1.30 Supply, install and connect a 25A Power Point including 25A (3PH)

isolator switch, conduits, boxes, cables for the Package Unit, the

works according to drawings, specifications and Engineer instructions.

No. 2

Total Sec. 13.1)- Points….carried to summary.

Electrical 3/11

Page 23: Construction of the First and Second floor in Jenin · PDF fileJenin Hospital-BOQ-Construction of the First and Second floor in Jenin Hospital-BOQ-Consultants:-AL-Ta'meer engineering

Jenin Hospital

Electrical BOQ

ITEM DESCRIPTION UNIT Qty U/Price Amount

13.2 - Conduit, Rigid Piping and Excavation Works

Supply, install and connect Self-extinguishing type plastic conduit,

processed over or under plaster or inside castings, including junction

boxes, unions, connectors, etc. including excavation , backfilling ,

sand , tape , manholes and covers and galvanized draw-strings, ready

for use (for works not included in points works).

13.2.1 23 mm diameter. ML 50

13.2.2 29 mm diameter. ML 50

13.2.3 36 mm diameter. ML 50

13.2.4 50 mm diameter. ML 50

13.2.5 4" diameter. ML 50

13.2.6 6" diameter. ML 50

Total sec. 13.2) - Conduit, Rigid Piping and Excv…..carried to

summary

Sec. 13.3) - Cables

Supply, install and connect XLPE non-armored type thermoplastic

copper cables, including insertion into conduit or attachment to

structural elements or laying in ductwork, including all associated

materials, insulation materials, unions, and connection of cable at both

ends.

13.3.1 3x240+120sq. mm+120sq.mm Cu. M.L. 35

13.3.2 3x185+90mm2+90mm2 cable M.L. 30

13.3.3 3x150+95mm2+95mm2 cable M.L. 80

13.3.4 3x95+50mm2+50mm2 cable M.L. 110

13.3.5 3x70+35mm2+35mm2 cable M.L. 50

13.3.6 3x50+25mm2+25mm2 cable M.L. 50

13.3.7 5x16 sq.mm cross section. M.L. 50

13.3.8 5x10 sq.mm cross section. M.L. 210

13.3.9 5x6 sq.mm cross section. M.L. 100

13.3.10 5x4 sq.mm cross section. M.L. 100

13.3.11 3x2.5 sq.mm cross section. M.L. 50

13.3.12 3x1.5 sq.mm cross section. M.L. 50

Total Sec. 13.3) - Cables ……carried to summary

Electrical 4/11

Page 24: Construction of the First and Second floor in Jenin · PDF fileJenin Hospital-BOQ-Construction of the First and Second floor in Jenin Hospital-BOQ-Consultants:-AL-Ta'meer engineering

Jenin Hospital

Electrical BOQ

ITEM DESCRIPTION UNIT Qty U/Price Amount

Sec. 13.4) - Structural Elements, Cabinets and Ductwork

Supply and laying of the following horizontal/vertical heavy duty cable

tray/cable ladder systems according to BS EN 61537 and NEMA VE 2-

2000 made of heavy gauge hot deep galvanized (after fabrication)

perforated sheet steel with original angles, elbows and T pieces and

ready made suspension to ceiling/wall or shaft wall system including

fixing and suspension accessories in approved manner as per

drawings, specifications and related cods as following:

13.4.1 40/6 cm. M.L. 150

13.4.2 30/6 cm. M.L. 50

13.4.3 40 cm. ladder M.L. 10

Total 13.4) Structural Elements, Cabinets….. carried to summary

Sec .13.5 ) Grounding Systems

Sec. 13.5.1) - Lightning System

13.5.1 Supply, install, connect, test and commission lightning protection

system including air terminal, pulsar, 30/2mm copper tape, testing

point in CI box and 125/5mm Cu strip ready to connect 3rods with all

accessories, surge arrestor for MDB, surge arrestor for Patch Panels

and earth rods with pits and covers as per specification, and related

code.

L.S 1

Sec. 13.5.2) - Operational Theaters Grounding

13.5.2 Supply, install, connect, testing and commissioning of the following

operation theater stand alone earthing system including copper mesh

under antistatic tiles, 25mm2 cable up to earth rod, earth rods, earth

pit, soldering and all necessary accessories, as per drawings,

specifications and related codes.

L.S 1

Sec. 13.5.3) - Building Grounding (Provisional Item)

13.5.3 Supply, install, connect and test the earthing system including cables ,

rods , pits ,checking boxes ,main earthing box with equipotential bus

bars ,and connecting to the existing foundation earthing ready for

operation according to specifications, drawings and engineers

instructions .

L.S 1

Sec.13.5.4) Grounding for metal works

13.5.4 Supply, install, connect, test and commission earthing for all

mechanical, electrical and false ceiling metal structure works as per

specification, and local electrical utility requirements.

L.S 1

Total 13.5)Grounding Systems….. carried to summary

Electrical 5/11

Page 25: Construction of the First and Second floor in Jenin · PDF fileJenin Hospital-BOQ-Construction of the First and Second floor in Jenin Hospital-BOQ-Consultants:-AL-Ta'meer engineering

Jenin Hospital

Electrical BOQ

ITEM DESCRIPTION UNIT Qty U/Price Amount

Sec. 13.6) - Electrical Switchboards

a. Supply, install and connect the electrical switchboards to the site,

including all associated materials and labor, as described in the

technical specifications.

b. Cabinets with no access from the rear, made up of transparent

polycarbonate cells, or sheet-metal cabinets with a 25% surplus space.

c. The switchboards are to be placed on the floor, in a niche against the

wall.

d. Main supply lines enter from the switchboard bottom, top or side, while

outgoing lines exit the switchboard from both its bottom and top sides.

e. Price to include all structural elements required in order to install the

switchboard, including bus-bars, terminals, wiring, bolts, clamps, etc.

and for the equipment listed below.

f. The switchboards shall contain accessories shall be according to the

approved manufacturer list.

g. Prices for supply, installation and connection of various accessories

including all associated labor and materials such as bus-bars,

terminals, wiring reinforcements, mounts, engraved "sandwich" type

identification plates, etc. including connection to mains supply -

complete ready for use.

h. The price shall include connection of the distribution board to the

existing MDB.

13.6.1 SMSB-F Unit 1

13.6.2 SMSB-S Unit 1

13.6.3 DB-F1 Unit 1

13.6.4 DB-F2 Unit 1

13.6.5 DB-F3 Unit 1

13.6.6 DB-F4 Unit 1

13.6.7 DB-F5 Unit 1

13.6.8 DB-F6 Unit 1

13.6.9 DB-LAB1 Unit 1

13.6.10 DB-LAB2 Unit 1

13.6.11 DB-S1 Unit 1

13.6.12 DB-S2 Unit 1

13.6.13 DB-S3 Unit 1

13.6.14 DB-S4 Unit 1

13.6.15 DB-S5 Unit 1

13.6.16 MDB-UF Unit 1

13.6.17 MDB-US Unit 1

13.6.18 DB-OP Unit 1

Electrical 6/11

Page 26: Construction of the First and Second floor in Jenin · PDF fileJenin Hospital-BOQ-Construction of the First and Second floor in Jenin Hospital-BOQ-Consultants:-AL-Ta'meer engineering

Jenin Hospital

Electrical BOQ

ITEM DESCRIPTION UNIT Qty U/Price Amount

13.6.19 DB-M Unit 1

13.6.20 DB-I Unit 1

13.6.21 DB-Lift Unit 1

13.6.22MCC for ch. Pumps

Unit 2

Additional MCCB,s (Provisional)

13.6.22 Supply, install, connect, testing and commissioning of the following

Moulded Case Circuit Breakers (MCCB) in existing MDB, the breakers

to be equipped with thermo magnetic protection (TM-D) with short

circuit rupturing capacity not less than 35KA to achieve cascading, this

shall include all necessary accessories.

a. 400A TP MCCB Adj 400-630A Unit 1

b. 320A TP MCCB Adj 300-400A Unit 1

Total sec. 13.6) Electrical Switchboards…..carried to summary.

Electrical 7/11

Page 27: Construction of the First and Second floor in Jenin · PDF fileJenin Hospital-BOQ-Construction of the First and Second floor in Jenin Hospital-BOQ-Consultants:-AL-Ta'meer engineering

Jenin Hospital

Electrical BOQ

ITEM DESCRIPTION UNIT Qty U/Price Amount

Sec. 13.7- Luminaries Supply and Installation

a. Supply, install, connect, test and commission complete lighting fixture,

including all supports, lamps , approved connections, suspension

system, clamps, Magnetic Control Gears, electronic starters and

Electronic Ballast as per below description, fire retardant internal

conductors and/or cables, and all other accessories necessary as per

drawings, specifications and related standards.

b. All lamps shall be of the energy-saving type (18,36, 58 Watts).

13.7.1 Type A.4X18W recessed fluorescent with HF. electronic ballast

control gear, body made of enameled sheet steel with double

parabolic satib brite aluminum louver

Unit 130

13.7.2 Type B.2X36W recessed fluorescent with HF. electronic Ballast

Control gear, body made of enameled sheet steel with OPAL diffuser

Unit 60

13.7.3 Type C.2X36W surface mounted fluorescent with HF. electronic

ballast control gear, body made of enameled sheet steel with OPAL

diffuser

Unit 110

13.7.4 TypeD: 2X18W PL/ 860 R & CT circular. Ceiling mounted IP54 with

class (A3) electronic Control Gears .

Unit 55

13.7.5 Type E. Ditto but wall mounted. Unit 20

13.7.6 Type I.4x24W T16 Recessed 60x60cm module with sheet steel body

white coated to resist oil, vapor, chemical substances disinfectant and

cleaning agents, and double parabolic satin brite louver with glare

limitation with painted anodized aluminum frame and 4mm safety

glass suitable for clean rooms IP65 and HF. Control gear with self

regulating breather.

Unit 20

13.7.7 Type J 4x18W recessed lighting fixture with prismatic diffuser and

white painted sheet steel body IP65

Unit 2

13.7.8 Type EX 1x8W recessed 3 Hrs duration Exit sign complete with Ni cad

batteries and Legend single or double sided

Unit 10

13.7.9 Supply, install, connect and commission of complete self contained,

non-maintained Emergency Lighting Kit as per list of approved

manufacturers. The kit shall provide 3 hours operation after mains

failure for 1x18/1*36 watt lamps with nickel cadmium battery replaced

within fitting container. internal wiring to be of fire retardant type as per

specifications, drawings and related standards.

Unit 80

Total sec. 13.7 )Luminaries Supply…carried to summary

Electrical 8/11

Page 28: Construction of the First and Second floor in Jenin · PDF fileJenin Hospital-BOQ-Construction of the First and Second floor in Jenin Hospital-BOQ-Consultants:-AL-Ta'meer engineering

Jenin Hospital

Electrical BOQ

ITEM DESCRIPTION UNIT Qty U/Price Amount

Sec 13.8- Nurse Calling System

Note: All equipment items for the nurse- calling system shall be

according to the approved manufacturer list.. The work to include the

supply of the equipment specified, installation of same, connection,

wiring, commissioning and all other details, as specified in the

technical specification and drawings.

13.8.1 Master station 30- call master type . Unit 1

13.8.2 Master station 20- call master type. Unit 2

13.8.3 Master station 30- call master type. Unit 3

13.8.4 Reset button . Unit 30

13.8.5 Bedside call switch. Unit 130

13.8.6 Metal jack for Bed side call switch. Unit 130

13.8.7 Corridor lamp. Unit 34

13.8.8 Call button Unit 2

13.8.9 Ceiling mount 180mm O(7-1/8"O) Unit 30

13.8.10 Moisture resistant pull cord switch . Unit 30

13.8.11 Power supply . Unit 8

Total Sec.13.8) Nurse Calling System Carried to Summary

Sec 13.9-Fire Alarm System

Supply install and connect complete in place and in an operable

manner the fire alarm system . The work is to include the supply of

the equipment specified, installation of same connection, wiring,

cables, commissioning and all of the details and connecting to the

existing system as specified in the technical specifications and

drawing type shall be according to the approved manufacturer list. this

include adding one loop operating and control module to enable

controlling extension fire alarm sensors.

13.9.1 (Provisional Item) Main addressable fire alarm control panel for 500

addressable points, expandable up to 1000 points with batteries and

charger such as QS4 or equivalent approved

Unit 1

13.9.2 Manually operated alarm call point . Unit 8

13.9.3 Indoor fire alarm siren . Unit 6

13.9.4 Ionization smoke detector. Unit 100

13.9.5 Intelligent heat detector. Unit 5

13.9.6 (Provisional Item) Automatic telephone dialer such as DL-125C Unit 1

13.9.7 24v DC Magnetic Door Holder for fire doors Unit 3

Total Sec. 13.9) Fire Alarm System Carried to Summary

Electrical 9/11

Page 29: Construction of the First and Second floor in Jenin · PDF fileJenin Hospital-BOQ-Construction of the First and Second floor in Jenin Hospital-BOQ-Consultants:-AL-Ta'meer engineering

Jenin Hospital

Electrical BOQ

ITEM DESCRIPTION UNIT Qty U/Price Amount

Sec 13.10 - Intercom System

Note: All equipment items for the intercom system shall be according

to the approved manufacturer list.. Work is to include the supply of the

equipment specified installation of same, connection, wiring,

commissioning and all other details, as specified in the technical

specifications and drawings.

13.10.1 Hands free master station . Unit 6

13.10.2 Power supply adaptor . Unit 6

13.10.3 Door phone adaptor . Unit 6

13.10.4 Door station . Unit 6

13.10.5 Power supply adaptor . Unit 6

13.10.6 Door release . Unit 6

13.10.7 AC transformer for door release . Unit 6

13.10.8 Digital keypad Unit 6

13.10.9 12V AC power supply transformer Unit 6

Total of Sec 13.10) Intercom System carried to summary

Sec 13.11- Public Address System

Supply, install, test and commission a public address system, the

system shall be according to the approved manufacturer list, including

all required connections with the existing system of the Hospital

including all required cables, boxes and conduits complete ready for

work.

13.11.1 9/6 watt ceiling loudspeaker, 8” round with metal grille, screw mount. Unit 35

Total of Sec 13.11) Public Address System carried to summary

Sec-13.12- Telephone System

13.12.1 Supply install and connect main telephone cables from the low voltage

boxes in all the new floors to the main low voltage box in each

proposed floor and from the main low voltage box to the telephone

exchange of the Hospital. Rate to include 2 NO's. 36 pair cables,

conduits, terminal blocks and all accessories as specified in the

technical specification and drawings complete ready for work and

covering all telephone sockets in the proposed building with all

required materials.

Job 1

Total of Sec 13.12) Telephone System carried to summary

Sec- 13.13- LV Boxes

Supply install and connect the following LV boxes. Rate to include all

required materials,condiuts,wires, cables and accessories

manufacturing from galvanized sheet metal sheets , painted with the

same color of the switch boards all as specified in the technical

specification and drawings.

13.13.1 SMLVB Approximate dim.2 (80x60x25) cm No. 2

13.13.2 LVB Approximate dim.( 60x60x25) cm No. 8

Total of Sec-13.13) LV Boxes carried to summary

Electrical 10/11

Page 30: Construction of the First and Second floor in Jenin · PDF fileJenin Hospital-BOQ-Construction of the First and Second floor in Jenin Hospital-BOQ-Consultants:-AL-Ta'meer engineering

Jenin Hospital

Electrical BOQ

ITEM DESCRIPTION UNIT Qty U/Price Amount

Sec- 13.14- UPS System

13.14. Supply install and connect uninterruptible power supply (U.P.S.)

system, consisting of a charger/rectifier unit, a solid-state inverter unit,

and a static bypass transfer switch, Power and control connecting

cables between the U.P.S. system and the battery bank, including

protective devices, all in accordance with the technical specifications

.The UPS System back up time 15 min.

(Complete and ready for work, including all required materials and

connections)

13.14.1 40KVA No. 1

13.14.2 30KVA No. 1

13.14.3 15KVA No. 1

Total of Sec-13.14) UPS System carried to summary

13.15 Patch Panels (PP) (Provisional Item)

Supply, install, connect, test and commission the following Cat6 Patch

Panels with switch and air PP in between complete with 10U cabinet,

power distribution unit, patch cables, rack accessories and all

accessories as per specifications and drawings.

13.15.1 PP-F(10U) No. 1

13.15.2 PP-S (10U) No. 1

13.15.3 24 port patch panel No. 3

13.15.4 Patch cables LS 1

13.15.5 Backbone cable between P.Panels LS 1

13.15.6 Power strip No. 2

Total of Sec-13.15) Patch Panels (PP) carried to summary

Electrical 11/11

Page 31: Construction of the First and Second floor in Jenin · PDF fileJenin Hospital-BOQ-Construction of the First and Second floor in Jenin Hospital-BOQ-Consultants:-AL-Ta'meer engineering

Section-14: Mechanical Bill of Quantities

Rate Amount

Preamble

a- The contractor shall, when pricing the rates of this bill, take

into consideration to include and allow for the costs and

expenses of all requirements stipulated herein below, drawings

and the specifications of the tender.

b- The contractor should visit the site to verify the amount of

work and familiarize himself with the nature of work for proper

construction of the new floors.

c-The surplus & demolished materials shall be removed out from

the site to a dump site approved by the municipality through a

pre-coordinated manner to ensure minimal noise and dust

pollution within the vicinity and to avoid obstruction for hospital

activities. The contractor should coordinate with the client for any

possible materials or elements that need to be preserved and

handed over to the client stores.

d- The contractor should also take all necessary shoring

measures to protect the existing building elements during all

stages of work until safely completing all new construction works.

The contractor should submit a clear methodology for the

proposed stages of work and protection and shoring methods for

the Engineers approval prior to commencing the works.

Careful demolishing and reinstatement of existing structural

elements for proper construction of the new floor works; all as

Item Description Unit Quantity

elements for proper construction of the new floor works; all as

shown in the demolishing plan and in accordance with the

Engineer's instructions.

The contractor is requested to equally consider the

following notes when quoting his prices:

1- The price shall include all required chipping in concrete walls,

cutting holes (any diameter), excavation, backfilling and cement

covering as specified.

2- The contractor must keep the existing HVAC system running

throughout the construction period. Any interruption needed to

complete the work should be coordinated with the hospital

management

3-The Contractor is requested to read the bill of quantities in

conjunction with the set specifications, drawings, addendums

and contract conditions.

4- (S & I) implies supply and install, including testing, adjusting,

balancing, ….all the way to a successful operation, including the

commissioning.

Mechanical 1/27

Page 32: Construction of the First and Second floor in Jenin · PDF fileJenin Hospital-BOQ-Construction of the First and Second floor in Jenin Hospital-BOQ-Consultants:-AL-Ta'meer engineering

Section-14: Mechanical Bill of Quantities

Rate Amount

Waste and drainage system:

14.1 S&I PVC pipes (UAP, Royal, or equally approved (E.A)) for air

conditioning drainage network. Price includes all kinds of digging

in concrete slabs and walls, supports, hangers and all rubber

joints and sealants, syphones and connection to floor drain and

flexible connections and all types of fittings. All done according to

drawings, specifications and approval of the Engineer.

14.1.1 2" M.R 120

14.1.2 11/2" M.R 23

14.1.3 11/4" M.R 240

14.2 S&I UPVC similar to (Al-Hill-Egypt) or E.A for waste or stand

pipes, running exposed along partitions, false ceiling, walls,

shafts, under tiles or laid in walls. Price include all type of fittings,

supports, hooks, connection to existing sewage and drainage

system, stainless steel fasteners and all excavation and

quarrying. Connections to be done according to specifications,

drawings, and the approval of the Engineer.

14.2.1 6" pipe M.R 10

14.2.2 4" pipe M.R 170

Item Description Unit Quantity

14.2.2 4" pipe M.R 170

14.2.3 3" pipe M.R 40

14.2.4 2" pipe M.R 200

14.3 (S&I) 4" diameter Al-Hill UPVC (or EA) floor drain with 15x15cm

square chrome plated cover (high quality), and multi inlet

adjustable trap. The rate shall include excavation and backfilling

for all connections with drain pipes and fixtures, all done

according to drawings, specifications and approval of the

Engineer.

No 60

14.4 Ditto, but connection box 4"/2", all done according to drawings,

specifications and approval of the Engineer.

No 10

14.5 S&I heavy duty non adjustable 11x11 cm floor clean out with

UPVC body, with gas and water tight ABS plug and frame,

complete with all needed elbow and all types of fittings, all done

according to drawings, specifications and the approval of the

Engineer.

No 30

14.6 Diverting of existing drain water risers and connecting to nearest

existing sewage manhole including excavation, backfilling, with

all needed elbows and all types of fittings, all to be done

according to drawings, specifications and the approval of the

Engineer.

LS 2

Total of Section-14: Waste and Drainage Systems carried to Summary sheet

Mechanical 2/27

Page 33: Construction of the First and Second floor in Jenin · PDF fileJenin Hospital-BOQ-Construction of the First and Second floor in Jenin Hospital-BOQ-Consultants:-AL-Ta'meer engineering

Section-15: Mechanical Bill of Quantities

Rate Amount

15 Roof drain system:

All dismantled materials and parts of the existing systems on

roof, which are not needed for future extension, should be turned

in to the hospital authorized personnel. Similar materials and

parts of the systems, which are to be used for the extended

works, shall be kept at the contractor's disposal and custody.

15.1 UPVC pipe

S&I UPVC pipes and fittings as per Al-Hill-Egypt or E.A. The rate

shall include all needed connections to existing rain water pipes

and all types of fittings, all done according to drawings,

specifications and the approval of the Engineer.

15.1.1 4" pipe M.R 80

15.1.2 3" pipe M.R 15

15.2 Roof rain water drain

S&I Polypropylene (PP) Roof rain water drain size 4" with cover

of 20x20 plastic mesh (REDI make or E.A) to be connected to

rain water vertical pipes with all required fittings, price shall

include the piping works until the connection to the vertical rain

pipe, all done according to drawings, specifications and the

No 17

Item Description Unit Quantity

approval of the Engineer.

15.3 Roof vent

S&I REDI or E.A. 4" roof vent with screened cap for vent stacks

including connection to the vent pipe by solvent welding. The rate

include all needed connection accessories, all done according to

drawings, specifications and the approval of the Engineer.

No 12

Total of Section-15: Roof Drain System carried to Summary sheet

Mechanical 3/27

Page 34: Construction of the First and Second floor in Jenin · PDF fileJenin Hospital-BOQ-Construction of the First and Second floor in Jenin Hospital-BOQ-Consultants:-AL-Ta'meer engineering

Section-16: Mechanical Bill of Quantities

Rate Amount

16 Sanitary Fixtures and Accessories:

16.1 Wash basin

S&I Porcelain wall hung Semi pedestal wash basin for patient

toilets type SAN-REMO Ideal Standard (IS) or E.A of size

600x490 mm model A7460. The rate shall include fixing

galvanized screws, white color PVC syphone Lipsky or EA, and

all the needed accessories to complete the job as per drawings,

specifications and the approval of the Engineer.

No. 26

16.1.1 Ditto, But of size 550x450 Model A7450 or E.A. No. 18

16.2 Mixers

S&I Chrome plated gear mixer type CERADISC (IS) model

A5390 or E.A complete with all the needed fixing accessories,

sockets, copper adaptors and 3"/8" angle valves type (Giacomini

or E.A.) for connecting with water pipes, all to be done as per the

drawings, specifications and the approval of the Engineer.

No. 44

16.3 W.C

S&I Porcelain wall mounted W.C white color European type with

P-trap as per SANREMO from IS or E.A. Price shall include all

fixation and hanging brackets, 9-lt capacity concealed cistern,

valves, fittings, hard solid seat and 13mm stop angle valves,

chrome plated 13mm hose of 1 meter length c/w 13mm Chrome

No. 26

Item Description Unit Quantity

chrome plated 13mm hose of 1 meter length c/w 13mm Chrome

plated hand shower for wc (heavy duty) with spring nozzle outlet

and all other required materials, including connection to

drainage and water pipes, and including 3/8" angle valve

(Giacomini or E.A.), all to be done as per the drawings,

specifications and the approval of the Engineer.

16.4 Paper holder

S&I stainless steel paper holder type BOBRICK model B-6699 or

E.A for single roll fixed to wall with all needed fixing accessories,

all to be done as per drawings, specifications and the approval of

the Engineer.

No. 44

16.5 Sink

S&I stainless steel sink for kitchens of size 40x50 cm (single

bowl) like (Rocca or E.A ) of thickness 18/10 Price shall include

connecting to drain of system by 2" HDPE pipes inside sanitary

blocks, also proper fixation to marble, all to be done as per

drawings, specifications and the approval of the Engineer.

No. 4

16.6 Chrome plated mixer

S&I chrome plated mixer type Cerlaman (IS) A5396. With steel

wire mesh, and connection to water supply with 3/8" angle valve

type Giacomini or E.A., including all the required fittings, all to be

done as per drawings, specifications and the approval of the

Engineer.

No. 4

Carried To Section-16 Collection

Mechanical 4/27

Page 35: Construction of the First and Second floor in Jenin · PDF fileJenin Hospital-BOQ-Construction of the First and Second floor in Jenin Hospital-BOQ-Consultants:-AL-Ta'meer engineering

Section-16: Mechanical Bill of Quantities

Rate Amount

16.7 Sluice sink

Supply and install 316 stainless steel gauge 12 sluice sink

complete with chrome plated swivel - spout mixer type (IS)

A5396 or E.A. with steel wire mesh. Price includes connection to

water supply with 3"/8" angle valve type (Giacomini or E.A.),

including all the required fittings, all to be done as per drawings,

specifications and the approval of the Engineer.

No. 1

16.8 Soap dispenser

S&I Heavy duty soap dispenser type BOBRICK model B2111or

EA. with all fixing accessories needed. All to be done as per

drawings, specifications and the approval of the Engineer.

No 61

16.9 Towel paper holder

S&I Heavy duty towel paper holder type 304 st st BOBRICK

model B- 6699 or EA for single roll to be fixed at wall with all

fixing accessories needed. All to be done as per drawings,

specifications and the approval of the Engineer.

No 27

16.10 Janitor closet

S&I Porcelain floor mounted janitor closet type (IS) model

R3852or EA. The rate includes grilled cover, fixing screws,

rubber and all needed fixing accessories. The rate shall include

the supply and installation of 11/2" Flush valve type (IS) and

Chrome plated single tap for cold water. All to be done as per

No 2

DescriptionItem Unit Quantity

Chrome plated single tap for cold water. All to be done as per

drawings, specifications and the approval of the Engineer.

16.11 Shower gear mixer

S&I Chrome plated shower gear mixer type CERADISC (IS)

model A5394 or E.A and for the connecting rod model A3052 or

E.A, compete with hand shower, flexible hose 150mm length,

fixing anchor and all needed accessories, all to be executed as

per drawings, specifications and the approval of the Engineer.

No 34

16.11.1 Shower syphone

S&I shower syphone heavy duty type Lipski or E.A. with round

cover of 4" size.

No 34

16.11.2 Shower seat

S&I folding shower seat, padded seat, right hand seat type

BOBRICK model B517 or E.A.

No 34

16.11.3 Robe/clothes hook

S&I single robe/clothes hook with concealed mounting type

BOBRICK model B2116 or E.A.

No 61

16.11.4 Soap dish

S&I recessed soap dish type BOBRICK model B6607 or E.A. No 61

16.11.5 Grab bar

S&I horizontal two way grab bar for handicapped shower

914x1372 mm type BOBRICK model B-5837 or E.A. The rate

shall include for fixing the bar at wall using special mortar mix.

No 4

16.12 Mirror

S&I mirror with aluminum frame suitable to be used for hospitals

with different sizes. The rate shall include fixing the mirror to wall

and according to the provided drawings.

No 61

Carried To Section-16 Collection

Total of Section-16: Sanitary Fixtures carried to Summary sheet

Carried To Section-16 Collection

Mechanical 5/27

Page 36: Construction of the First and Second floor in Jenin · PDF fileJenin Hospital-BOQ-Construction of the First and Second floor in Jenin Hospital-BOQ-Consultants:-AL-Ta'meer engineering

Section-17: Mechanical Bill of Quantities

Rate Amount

17 Domestic hot and cold water system:

17.1 CPVC pipes

Supply and install galvanized CPVC pipes (Al-Hill/Egypt) or EA

made for domestic cold and hot water. The work includes all

fittings, valves, required flow direction signs, TOLGO type

hangers, all required fittings, connection to existing system and

all needed accessories.

17.1.1 1/2" M.R 75

17.1.2 3/4" M.R 150

17.1.3 1" M.R 130

17.1.4 11/4" M.R 100

17.1.5 11/2" M.R 90

17.1.6 2" M.R 95

17.1.7 3" M.R 20

17.2 Thermal Insulation for hot water supply and circulation pipes

Supply and install 9mm thick insulation for domestic hot water

supply and circulation pipes type ANAVID or E.A. The work

includes insulating all fittings, valves, non-return valve … etc.,

and wrapping with 10cm plastic wrap, also required flow direction

signs,.

Description Unit QuantityItem

17.2.1 1/2" M.R 35

17.2.2 3/4" M.R 80

17.2.3 1" M.R 60

17.2.4 11/4" M.R 45

17.2.5 11/2" M.R 30

17.2.6 2" M.R 50

17.2.7 3" M.R 10

Carried To Section-17 Collection

Mechanical 6/27

Page 37: Construction of the First and Second floor in Jenin · PDF fileJenin Hospital-BOQ-Construction of the First and Second floor in Jenin Hospital-BOQ-Consultants:-AL-Ta'meer engineering

Section-17: Mechanical Bill of Quantities

Rate Amount

17.3 Pipe Cladding

Supply and install 0.5mm Galvanized sheet cladding for

protection of exposed pipes for hot and air conditioning and

heating systems including all screws, saddles, and fittings

needed. The work also includes covering all valves, strainer,

unions, nipples, fittings, hangers and all other needed

accessories and marks to protect the pipes along their paths.

17.3.1 11/4" M.R 77

17.3.2 11/2" M.R 70

17.3.3 2" M.R 55

17.3.4 21/2" M.R 58

17.3.5 3" M.R 40

17.3.6 4" M.R 35

17.4 Hot and cold water collectors

Supply and install hot and cold water collectors type GIACOMINI

or E.A. The collectors are installed above the ceiling of bathroom

with all required hangers and supports, air vents, shut-off valves

on the collectors inlets, records, and all required accessories to

complete the job.

QuantityUnitDescriptionItem

17.4.1 3/4" Eye 30

17.4.2 1" Eye 106

17.5 XLPE pipes

S&I crossed linked PE pipe 16mm pipe with 25 mm sleeve type

Aquapex or E.A. The rate shall include all fittings eg: copper

elbow inside walls (type GIACOMINI), 1/2" male and female

adaptors and all needed accessories for connection between

copper collectors to fixtures.

M.R 1600

Carried To Section-17 Collection

Total of Section-17: Domestic Hot and Cold Water carried to Summary sheet

Carried To Section-17 Collection

Mechanical 7/27

Page 38: Construction of the First and Second floor in Jenin · PDF fileJenin Hospital-BOQ-Construction of the First and Second floor in Jenin Hospital-BOQ-Consultants:-AL-Ta'meer engineering

Section-18: Mechanical Bill of Quantities

Rate Amount

18 Fire Fighting System:

Supply, install, and test the following items complete with the

necessary fixing accessories as specified and as shown on

drawings:

18.1 Fire cabinet

Wall mounted fire cabinet 120x80x30 cm equipped with 1"

swinging hose reel 25 m polystyrene hose 1" aluminum nozzle,

1" ball valve, 12 kg powder extinguisher, 2" linen hose (2 x 15

m) with quick coupling, 2" nozzle, 2" landing valve, 2" ball valve,

and all required fittings and valves. The cabinet shall be locally

made of minimum Gage-16 GI sheet with sturdy hinges, latches

and locks, all with oven paint finish, while the described inner

components of the cabinets should be as per Lahavot make or

EA.

No. 6

18.2 Sch.40 pipes

Supply and install black steel Sch. 40 pipes jointed by welding for

diameters above 2" and by threads for 2" pipes and below, all as

made by MODGAL or E.A. The work also includes all valves,

strainer, unions, nipples, fittings, hangers and all needed other

accessories including painting with the final red color paint

according to specifications and the approval of the Engineer.

Item Unit QuantityDescription

18.2.1 3" M.R 5

18.2.2 21/2" M.R 5

18.2.3 2" M.R 180

Total of Section-18: Fire Fighting system carried to Summary sheet

Mechanical 8/27

Page 39: Construction of the First and Second floor in Jenin · PDF fileJenin Hospital-BOQ-Construction of the First and Second floor in Jenin Hospital-BOQ-Consultants:-AL-Ta'meer engineering

Section-19: Mechanical Bill of Quantities

Rate Amount

19.1 HVAC System

S&I of an air cooled chiller of capacity 110 Ton as made by York

(USA), Daikin (Japan), Carrier (France), or EA. The chiller

operates with friendly to Ozone refrigerant (R407-C) and runs

with hermetic screw type compressor, leaving water

Temperature = 7.2 C and inlet water Temperature = 12 C, all in

accordance with the prevailing climate conditions of the city of

Jenin. The unit shall be equipped with direct drive condenser propeller,

condenser fan motor, heat exchanger, high and low pressure

switch,anti freeze sensor, braided flexible connections, outlet

water temperature sensor, return water temperature sensor,

ambient temperature sensor, crank case heater, supply and

return headers as shown on drawings, double regulating valves,

filter drier, sight glass, service valves, water flow switch and

pressure gage (high & low), electrical controllers and electrical

control board with all required electrical connections,. The work

includes but not limited to concrete base and all requirements for

proper installation and operation, all done according to drawings

specifications and approval of the Engineer.

N.O 2

19.2 Fan Coil Unit

S&I ducted fan coil unit with forward curved fans as made by

Daikin (Japan), Carrier (France), York (USA) or EA. The unit

shall be with a single coil, stainless steel drain pan, and with all

Item Description Unit Quantity

shall be with a single coil, stainless steel drain pan, and with all

parts such as 3-way valve, inlet & outlet ball valves type

GIACOMINI or E.A, strainer, inlet and outlet rubber flexible

connections with braided steel, washable flat filter, multi speed

electric motor and room thermostat with three speed switch (wall

mounted type installed inside lockable protection box). The rate

includes connecting the unit to piping. The units are categorized

as follows:

19.2.1 Cooling Load =3 kw No. 419.2.2 Cooling Load =4.2 kw No. 1019.2.3 Cooling Load = 6.3 kw No. 519.2.4 Cooling Load = 7.4 kw No. 519.2.5 Cooling Load =8 kw No. 619.2.6 Cooling Load = 9 kw No. 819.2.7 Cooling Load = 10 kw No. 2

19.3 Air Ceiling Diffusers

S&I size 12"X12" aluminum supply air ceiling diffusers as made

by Cooling Industries or E.A, four-way square type with

removable core, key operated opposed-blade volume damper

and equalizing grid, suitable for mounting flush with false ceiling.

The unit price shall include connection to duct with flexible

insulated duct of compatible diameter and of maximum 1 meter

in length , and all accessories and works required to complete

the work, all done according to drawings, specifications and

approval of the Engineer.

No. 62

19.3.1 Ditto, but size 18"X18" No. 44

19.3.2 Ditto, but size 9"X9" No. 29

19.3.3 Ditto, but size 15"X15" No. 5

19.3.4 Ditto, but size 16"X16" No. 2

19.4. Ditto but 1-way wall mounted of sizes

19.4.1 18"X8" No. 39

19.4.2 10"X8" No. 9

Carried To Section-19 Collection

Mechanical 9/27

Page 40: Construction of the First and Second floor in Jenin · PDF fileJenin Hospital-BOQ-Construction of the First and Second floor in Jenin Hospital-BOQ-Consultants:-AL-Ta'meer engineering

Section-19: Mechanical Bill of Quantities

Rate Amount

19.5 Aluminum Grills

S&I exhaust air aluminum grills made by Cooling Industries or

E.A, fixed 45-degree blades, double deflection, 1" thick frame,

3/4" spacing. The unit price shall include connection to duct, and

all accessories and works required to complete the work, all

done according to drawings specifications and approval of the

Engineer.

19.5.1 6"X6" No. 80

19.5.2 9"X9" No. 57

19.5.3 12"X12" No. 98

19.5.4 16"X16" No. 9

19.6 Operating Theatre Diffusers

Supply and install perforated aluminum ceiling diffusers for the

operating theatres of size 18"X18", ceiling module with neck size

as shown on the drawings, flush face, adjustable 4-way

deflectors, with integral or field fabricated plenum box, key

operated opposed-blade volume damper and equalizing grid

with plasma filter. The unit price shall include connection to duct

via flexible connection not exceeding one meter in length, and all

accessories and works required to complete the work as shown

on the drawings and as per the specifications and supervision

Engineer's instructions.

No. 4

Item QuantityUnitDescription

19.7 Packaged Units

S&I modular, weather proof type 100% fresh air packaged unit

for the operating theater, being double deck with plate heat

exchanger constructed from Galv.sheet metal 1.5mm thick penta

post with double skin panels on the evaporator side and

insulated with injected polyurethane 2" thick as made by Daikin

(Japan), Carrier (France), York (USA) or EA of capacity 12.4Ton.

. The rate includes built-in heating battery of 18KW capacity

made of stainless steel finned tube heating elements covering all

the face area of the air flow and including all protection gadgets

such as air flow switch,

automatic and manual reset thermal cut-outs, and controlled via

4 stages controller. It should also include a built-in plate heat

exchanger and return fan for energy recovery between the return

(exhausted) air and the fresh air supply, built-in sound

attenuators for the supply and return openings, built-in Hepa filter

of 99.997% efficiency, drain siphon and all needed fixing

accessories such as mounting base frame, damper motor at

fresh air intake made by danfos or E.A and electrical connection.

all to be according to drawings, specifications, and approval of

the Engineer.

N.O 1

19.7.1 Ditto as above but without humidifier

a- Laboratories A.H.U of 20 ton capacity N.O 1

b- Sterilizing A.H.U of 10 ton capacity. N.O 1

c- Newborn A.H.U of 42 ton capacity. N.O 1

19.7.2 Ditto as in 19.7, but without plate heat exchanger and Hepa filter.

a- First floor A.H.U of 14.5 ton capacity. N.O 1

b- Second floor A.H.U of 22.7 ton capacity. N.O 1

Section-19: Mechanical Bill of Quantities

Mechanical 10/27

Page 41: Construction of the First and Second floor in Jenin · PDF fileJenin Hospital-BOQ-Construction of the First and Second floor in Jenin Hospital-BOQ-Consultants:-AL-Ta'meer engineering

Section-19: Mechanical Bill of Quantities

Rate Amount

19.8 Thermostat

Supply and install minimum two stage cooling and four stage

heating thermostat for the packaged unit made by Honeywell or

EA.

No. 6

19.9 Exhaust Air Fans

S&I exhaust air fans (roof-mounted dome type) as manufactured

by Vortice or E.A, all of sturdy industrial structure, galvanized

steel parts and aluminum impellers, directly driven by IP 65

electric motors, powered by 380V/3phase/50Hz electric power

supply. Price shall include all materials needed for complete

installation, steel stands and protections, as well as, weather

proof disconnect switch for maintenance needs, where all shall

be done as per the detailed drawings, specifications, and

Engineer's instructions.

19.9.1 Exhaust:900 CFM roof mounted No. 1

19.9.2 Exhaust: 1000 CFM roof mounted No. 1

19.9.3 Exhaust: 300 CFM wall mounted (propeller type with gravity

louver)

No. 7

19.9.4 Exhaust:1980 CFM roof mounted No. 1

Item Description Unit Quantity

Carried To Section-19 Collection

Mechanical 11/27

Page 42: Construction of the First and Second floor in Jenin · PDF fileJenin Hospital-BOQ-Construction of the First and Second floor in Jenin Hospital-BOQ-Consultants:-AL-Ta'meer engineering

Section-19: Mechanical Bill of Quantities

Rate Amount

19.10 Air Ducts

Supply and install single skin galvanized steel duct made

according to SMACNA standard and requirements vis-a-vis

support, sizing, branching, air tightening, jointing, etc, with 2"

thick, 12kg/m3 density glass wool insulation wrapped with

reinforced aluminum foil, which shall be confined in place by

aluminum adhesive tape at the joints and spirally wound

aluminum wire all around and along. The rate shall include all

required hangers, supports, isolators, splitting dampers, canvas

type flexible connections at units inlets and outlets, and all

required accessories needed as shown on drawings, according

to specifications, and to the Engineer's instructions.

M² 1300

19.10.1 Ditto, but with 0.6mm galvanized metal sheet cladding for

protection of exposed duct work on roof including all screws and

fittings needed, excluding the spirally wound aluminum wires,

where the job shall be rendered according to SMACNA , all in

accordance with the drawings, specifications and the approval of

the Engineer.

M² 95

19.11 Exhaust Duct

Supply and install galvanized steel duct for exhaust system made

according to SMACNA. The rate shall include all required

hangers, supports, canvas flexible connections and all required

accessories made as shown on drawings, according to

specifications, and to the approval of the Engineer.

M² 350

QuantityUnitDescriptionItem

specifications, and to the approval of the Engineer.

19.12 A/C Piping Network

Supply and install black steel Sch.40 pipes for the A/C network

with 19mm Vidoflex insulation and nylon wrapping. The work also

includes all unions, nipples, tees, elbows, hangers, required flow

direction signs, and all other needed accessories to lay the pipe

along its path, all done according to drawings specifications and

approval of the Engineer.

19.12.1 3" MR. 32

19.12.2 21/2" MR. 88

19.12.3 2" MR. 120

19.12.4 11/2" MR. 116

19.12.5 11/4" MR. 58

19.12.6 1" MR. 95

19.12.7 3/4" MR. 32

19.13 Valves

Supply and install isolation ball type valves as made by

Giacomini for the A/C piping network, as follows:

19.13.1 3" No. 4

19.13.2 21/2" No. 6

19.13.3 2" No. 6

19.13.4 11/2" No. 6

19.13.5 11/4" No. 6

19.13.6 1" No. 8

19.13.7 3/4" No. 1019.13.7 3/4" No. 10

Carried To Section-19 Collection

Mechanical 12/27

Page 43: Construction of the First and Second floor in Jenin · PDF fileJenin Hospital-BOQ-Construction of the First and Second floor in Jenin Hospital-BOQ-Consultants:-AL-Ta'meer engineering

Section-19: Mechanical Bill of Quantities

Rate Amount

19.14 Chilled water pumps

S&I circulating chilled water pumps (in alternating mode) as

made by Grundfos, Salmson or E.A. The rate includes all fixing

accessories , concrete mounting base and neoprene pads,

flexible connections at inlets and outlets, pressure gages at inlets

and outlets, strainers at inlets, globe valves at inlets and outlets,

complete insulation for the related fittings, galvanized sheet

metal shelter to protect the pumps from rain, flow direction signs.

The price shall include also the electrical controllers and

electrical power and control sub-board where needed, with the

required electrical connection and all needed parts to complete

the job according to drawings, specifications and the approval of

the Engineer.

19.14.1 Q=8.2L/s , H=16m primary pump No. 2

19.14.2 Q=8L/s , H=16m secondary No. 2

19.14.3 pressure pump 0.7 L\S h=30m No. 1

19.15 Headers

S&I 8" diameter headers at the pumps inlets & outlets as shown

on drawings. The headers shall include all needed outlets (with

2" extra clogged outlets on each for future expansion), ball

valves (Giacomini or equivalent), pressure gauges,

L.S 1

DescriptionItem QuantityUnit

valves (Giacomini or equivalent), pressure gauges,

thermometers, convexed end caps, 24kg/m3 fiberglass

insulation, 0.7 galvanized metal steel sheet claddings, and steel

supports.

Carried To Section-19 Collection

Mechanical 13/27

Page 44: Construction of the First and Second floor in Jenin · PDF fileJenin Hospital-BOQ-Construction of the First and Second floor in Jenin Hospital-BOQ-Consultants:-AL-Ta'meer engineering

Section-19: Mechanical Bill of Quantities

Rate Amount

19.16 Relocation of the Existing HVAC Equipment and

Accessories to New Roof:

The contractor shall, when pricing the rates of this bill, take into

consideration including and allow for the cost expenses of all

requirements stipulated in the preambles, drawings and technical

specifications of the contract. Before the removal of the existing

parts, the contractor shall submit a detailed report about the

quantity of the parts, units and machines that have to be

relocated on the future roof. The contractor afterwards shall

examine and present a detailed report about the status and the

conditions of all the parts, units, machines, and inform of any

damaged existing part or machine, prior to disassembling the

system.

The contractor then has to submit his methodology for relocating

all the existing units to the future roof, and should take into

consideration that in all stages work shall be done in conjunction

with the various work activities on site. This implies proper

planning with UNDP and hospital authorized personal, to ensure

smooth relocation of equipment and minimal HVAC interruption

time inside the hospital building. When disassembling, the

contractor has to maintain all the disassembled parts in good

condition and take full responsibility for the intactness of all the

disassembled parts.

Damaged or broken parts on the existing system should be noted

QuantityUnitDescriptionItem

Damaged or broken parts on the existing system should be noted

prior to disassembling the system and shall be paid for upon

replacement according to the offered unit rate. Any damage done

to the parts during the relocation shall be covered by the

contractor.

The price shall include Dismantling all existing electrical

installations, panel boards and all accessories from existing

mechanical A.C. room on the roof and reinstalling and

reconnecting all electrical needs in the new mechanical room and

changing all small cables and control wires if required, as well as,

providing joints for any extension (by proper cable jointing

method) for large cables. Main feeders (large size cables that are

19.16.1 Connecting all existing vent pipes and storm water pipes to the

extended stand pipes in the concrete walls of the new structure,

and relocating the existing vent caps on future roof , which shall

include (but excluding the cost of pipes which shall be covered in

the corresponding pipe supply and installation item) breaking and

openings in concrete and all required labor, materials according

to the instruction of the Engineer.

No. 20

Carried To Section-19 Collection

Mechanical 14/27

Page 45: Construction of the First and Second floor in Jenin · PDF fileJenin Hospital-BOQ-Construction of the First and Second floor in Jenin Hospital-BOQ-Consultants:-AL-Ta'meer engineering

Section-19: Mechanical Bill of Quantities

Rate Amount

19.16.2 Relocating the existing AHUs on roof and re-installing them on

on future roof as shown in drawings. The work shall include all

piping from main riser to the units, pumps, valves, strainers, and

galvanized ducts, openings in concrete for the existing slab,

electrical panel and all required labor, materials, conduits and

electrical wiring and fitting equipment according to the instruction

of engineer. Price also includes the workmanship and know-how

for the replacement of any of the following damaged parts or

additional needed parts with new (same in size, capacity and

quality) ones:

No. 1

19.16.3.1 Insulated 2" Sch-40 black steel pipe as existing. LM 10

19.16.3.2 Butterfly valve 4" as existing. No 1

19.16.3.3 Butterfly valve 3" as existing. No 1

19.16.3.4 Butterfly valve 21/2" as existing. No 1

19.16.3.5 Flow switch as existing. No 1

19.16.3.6 Temperature gauge as existing. No 1

19.16.3.7 Pressure gauge as existing. No 1

19.16.3.8 4" flexible connection as existing. No 1

19.16.3.9 3" flexible connection as existing. No 1

19.16.3.10 4" non-return valve as existing. No 1

19.16.3.11 3" non-return valve as existing. No 1

Item Description Unit Quantity

19.16.3.12 Duct Works as existing. M2 10

19.16.3.13 Double Regulating valve 4" as existing. No 1

19.16.3.14 Double Regulating valve 3" as existing. No 1

19.16.3.15 Double Regulating valve 21/2" as existing. No 1

19.16.4 Replacing all existing exhaust fans on roof and the re-installation

on future roof as shown in drawings. The work shall include

galvanized ducts, PVC piping, openings in concrete for the

existing slab, connection to existing electrical panel and all

required labor, conduits and electrical wiring, materials and

lifting equipment all made according to the instruction of the

engineer. Price also includes the workmanship and know-how

needed for the replacement of any of the following damaged

parts or additional needed parts with new (same in size, capacity

and quality) ones:

No 3

19.16.4.1 Duct Works as existing. M2 100

Carried To Section-19 Collection

Mechanical 15/27

Page 46: Construction of the First and Second floor in Jenin · PDF fileJenin Hospital-BOQ-Construction of the First and Second floor in Jenin Hospital-BOQ-Consultants:-AL-Ta'meer engineering

Section-19: Mechanical Bill of Quantities

Rate Amount

19.16.5 Relocating all existing chillers ont roof and the re-installation on

future roof as shown on drawings. The relocation covers the

piping connections, pumps, heat exchanger, valves, foundation

isolation, all existing equipment, electrical connections and all

required labor, conduits and electrical wiring, materials and

lifting equipment, all must be made according to the instruction

of the Engineer. Price also includes the workmanship and know-

how needed for the replacement of any of the following damaged

or any needed additional parts with new (same in size, capacity

and quality) ones:

No 2

19.16.5.1 Insulated 4" Sch-40 black steel pipe as existing. MR. 10

19.16.5.2 Insulated 3" Sch-40 black steel pipe as existing. MR. 10

19.16.5.3 Insulated 21/2" Sch-40 black steel pipe as existing. MR. 10

19.16.5.4 Insulated 2" Sch-40 black steel pipe as existing. MR. 10

19.16.5.5 Butterfly valve 4" as existing. No 1

19.16.5.6 Butterfly valve 3" as existing. No 1

19.16.5.7 Butterfly valve 21/2" as existing. No 1

19.16.5.8 4" flange as existing. No 1

19.16.5.9 3" flange as existing. No 1

19.16.5.10 21/2" flange as existing. No 1

19.16.5.11 4" strainer as existing. No 1

Item Description QuantityUnit

19.16.5.11 4" strainer as existing. No 1

19.16.5.12 3" strainer as existing. No 1

19.16.5.13 Flow switch as existing. No 1

19.16.5.14 Temperature gauge as existing. No 1

19.16.5.15 Pressure gauge as existing. No 1

19.16.5.16 4" flexible connection as existing. No 4

419.16.5.17 3" flexible connection as existing. No 1

19.16.5.18 4" non-return valve as existing. No 1

19.16.5.19 3" non-return valve as existing. No 1

Carried To Section-19 Collection

Total of Section-19: HVAC system carried to Summary sheet

Carried To Section-19 Collection

Mechanical 16/27

Page 47: Construction of the First and Second floor in Jenin · PDF fileJenin Hospital-BOQ-Construction of the First and Second floor in Jenin Hospital-BOQ-Consultants:-AL-Ta'meer engineering

Section-20: Mechanical Bill of Quantities

Rate Amount

20 Medical Gases

20.1 Medical gas copper piping as per ASTM / HTM02.01

Supply, install, connect, and testing of the following degreased

medical oxygen compatible seam-less copper pipes type L. The

pipes must be cleaned and treated for medical gas usage

including capping the ends of each pipe to ensure that no foreign

bodies or dusts or vapors affect the pipes. The copper pipes

must meet the international standard of

ASTM B-819 and to be cleaned for medical usage (degreased) in

accordance with CE 0473.

Each pipe must be pro-factory marked continuously with:_

OXY/MED ASTM B-819

Pipeline network must be welded and hanged according to the

latest welding and hanging methods of healthcare technical

memorandum HTM 02.01, ASTM B819 and G-01

Price includes proper isolation for piping under plastering and

penetrations , hangers, brackets, fasteners, etc.., as well as

various fittings and accessories needed to complete the works as

shown on drawings and as per specifications. Price also includes

proper flushing of the entire piping network using purified

Nitrogen or Medical Compressed Air.

20.1.1 ½” inch O.D. M.R 630

20.1.2 5/8” inch O.D. M.R 720

Item Description Unit Quantity

20.1.3 7/8” inch O.D. M.R 680

20.1.4 1 3/8” inch O.D. M.R 450

20.1.5 1 1/8” inch O.D. M.R 50

20.1.6 1 5/8” inch O.D. M.R 150

20.1.7 2 1/8” inch O.D. M.R 80

20.1.8 2 5/8” inch O.D. M.R 70

20.2 Area Valves Control Boxes

Supply, install, connect, and testing of the following recessed

area valve control box for medical oxygen and vacuum, including

2 full-port 3-parts NIBCO shut off valves which controls the

supply of gases or vacuum through the pipelines, and line

pressure and vacuum gauges. The valves diameter varies

between 15 up to 35 mm, as per drawings.

20.2.1 The area valves control boxes should also include an emergency

external supply port, equipped with disk and clutch mechanism

for quick plug-in connection of the

Unit 9

emergency external supply source.

the front should be made of labeled transparent polycarbonate

flexible unbreakable cover to ease access in emergency

situation, all as per Dragger/Germany, Gregerson Germany,

AIMCO/Canada, or EA.

20.2.2 Same as Item No.20. 2.1 but for medical oxygen, medical

compressed air and vacuum.

Unit 1

20.2.3 Same as Item No.20. 2.1 but for medical oxygen, nitrous-oxide,

medical compressed air and vacuum.

Unit 2

20.2.4 Same as Item No. 20.2.1 but for medical oxygen, nitrous oxide,

high pressure compressed air, medical compressed air and

vacuum

Unit 1

vacuum

Carried To Section-20 Collection

Mechanical 17/27

Page 48: Construction of the First and Second floor in Jenin · PDF fileJenin Hospital-BOQ-Construction of the First and Second floor in Jenin Hospital-BOQ-Consultants:-AL-Ta'meer engineering

Section-20: Mechanical Bill of Quantities

Rate Amount

20.3 Digital Local Area Pressure and Vacuum Alarm Panel

20.3.1 Supply, install, connect, and testing of digital local alarm panel

for one compressed gas and one vacuum service, the alarm

panel shall be capable of accommodating pressure and vacuum

services as special application, the sensor shall be capable of

local or remote mounting, each sensor and electronic panel shall

be gas specific to avoid cross-connecting of the sensor with its

digital display panel, each digital display panel must be equipped

with three decimal seven-segment digits, each service shall have

a LED display indicating the on-line measured pressure - up to

250 PSI (400 PSI for Nitrogen), each service shall have trend bar

for showing the pressure direction (Green-Normal, yellow-

caution, Red-High/Low) in the case of alarm the red light will

flash and the alarm will sound, cancelling the alarm by the

"CILENCE" bottom will stop the audible alarm but the red light

will continue to flash until failure is fixed. TEST & CILENCE

bottoms shall be easily accessed for operating and testing the

unit. it shall be field programmable push buttons for adjusting the

high and low set points (+/-20% of Normal Pressure), selecting

the pressure/vacuum units and configuring the alarm repeat

intervals. Input Power shall be 90 VAC to 230 VAC, 50-60Hz, for

real-time monitoring of medical oxygen and vacuum, all as per

Dragger/Germany, Gregerson/Germany, Amico/Canada, or EA..

Unit 9

Item QuantityUnitDescription

20.3.2 Same as .Item No. 20.3.1 but for medical oxygen, medical

compressed air and vacuum.

Unit 1

20.3.3 Same as Item No. 20.3.1 but for medical oxygen, nitrous-oxide,

medical compressed air and vacuum.

Unit 2

20.3.4 Same as Item No. 20.3.1 but for medical oxygen, nitrous oxide,

high pressure compressed air, medical compressed air and

vacuum

Unit 1

Carried To Section-20 Collection

Mechanical 18/27

Page 49: Construction of the First and Second floor in Jenin · PDF fileJenin Hospital-BOQ-Construction of the First and Second floor in Jenin Hospital-BOQ-Consultants:-AL-Ta'meer engineering

Section-20: Mechanical Bill of Quantities

Rate Amount

AGSS Outlets

Supply, install, connect, and testing of anesthesia gas

scavenging system with on-off switching indicator, to remove

surplus anesthetic gas and explosive gas mixtures from

operating theatres and anesthesia rooms, recessed type, with

22 mm. evacuation port according to DIN standards, all shall be

as per Dragger/Germany, Gregerson/Germany, or

Amico/Canada.

Unit 2

20.6 Diamond Service Wall Outlets for Oxygen and Vacuum.

Two gases wall outlet

20.6.1 Supply, install, connect, and testing of recessed type, chrome

plated, color and pin coded die-cast front assembly, primary

check inlet/outlet valve with decorative frame for two different

codes of Oxygen and Vacuum, a hanging slide for 2 liters

vacuum collecting bottle must be included, all shall be as per

Dragger/Germany, Gregerson/Germany, or Amico/Canada.

Unit 6

20.6.2 Four gases wall outlet

Same as Item No. 6.1 but for Oxygen, Nitrous Oxide,

Compressed Air and Vacuum.

Unit 1

QuantityUnitDescriptionItem

20.5

Carried To Section-20 Collection

Mechanical 19/27

Page 50: Construction of the First and Second floor in Jenin · PDF fileJenin Hospital-BOQ-Construction of the First and Second floor in Jenin Hospital-BOQ-Consultants:-AL-Ta'meer engineering

Section-20: Mechanical Bill of Quantities

Rate Amount

20.7 Factory-Preassembled Bed head unit for one bed, according

to CE-0473, EN-46001, ISO 9001

Intermediate Care Bed Head Units

20.7.1 Supply, install, connect, and testing of encompassing extruded

and smooth rounded edges aluminum duct system, with four

cavities, three of which are directly accessed using snap-on

covers. Supplying electrical and lighting service, as well as

medical gas service. The gas outlets should be installed in a

separate compartment. The number of electrical circuits, apart of

the low voltage circuit, should be three: main line power circuit,

UPS power circuit, and lighting circuit provided by others, each

connected to the corresponding terminals at the electrical

connection in the bed-head unit. The piping connections to the

BHU shall be made directly without any interface facility, and

including wall hung rail for secondary equipment. BHU shall be

as per Dragger/Germany, Medicop/Austria, AHC/USA,

Gregerson/Germany, or Medaes/England, or E.A

Unit 91

The bed head unit is equipped with the following services :

One oxygen outlet

One compressed air outlet

One vacuum outlet

2 electrical sockets, Main line

2 electrical sockets, coded-UPS line

one potential grounding socket

indirect light (36W Fl. lamp), class A3 electronic CG.

QuantityUnitDescriptionItem

indirect light (36W Fl. lamp), class A3 electronic CG.

direct light (18W PL BIAX lamp), class A3 electronic CG.

cut-off switch for direct / indirect lights

one telephone socket

preparation for nurse call socket

The Price shall include complete interior wiring, cabling, piping,

insulating… etc , for complete installation.

The contractor must provide detailed drawing (supported with all

required standard conformities) prior to supply for approval.

20.7.2 Intensive Care bed Head Units

Bed head unit for one bed

Supply, install, connect, and testing of double 100/140 mm.

profile Encompassing extruded aluminum duct system, with

preparation of integrated upper & lower hanging rail assembly,

Supplying electrical and lighting service, as well as medical gas

service, including the following preparations for each patient bed:

Unit 4

Two oxygen outlet

One compressed air outlet

One vacuum outlet

4 electrical sockets, Main line

2 electrical sockets, UPS line

2 potential grounding socket

Day Light (full spectrum) light Color magnifying examination light

Cut-off switch for magnifying examination light

One telephone socket

Preparation for nurse call socket

All in accordance with EN-737 6, ISO 13485, 2003 and G-01 and

as per Dragger/Germany, Medicop/Austria, Amico/Canada,

Gregerson/Germany, or Medaes/England.

20.7.3 Same as Item No. 7.2 but for four beds to serve four pre-matured

incubators.

Unit 2

20.7.4 Same as Item No. 7.2 but for six beds to serve six pre-matured Unit 220.7.4 Same as Item No. 7.2 but for six beds to serve six pre-matured

Incubators

Unit 2

Carried To Section-20 Collection

Mechanical 20/27

Page 51: Construction of the First and Second floor in Jenin · PDF fileJenin Hospital-BOQ-Construction of the First and Second floor in Jenin Hospital-BOQ-Consultants:-AL-Ta'meer engineering

Section-20: Mechanical Bill of Quantities

Rate Amount

Vital Life Support Column for one Emergency bed,

according to EN-793 and EN-60601-1-2

Supply, install, connect, and testing of vertical column surface

made of medical high pressure laminate decorative Trespa,

electro-polished anodized 2000 mm x 600 mm x 250 mm.

Aluminum. structure

Horizontal hanging rail and vertical anodized Aluminum tracks

provides three-dimensional hanging of various type of

equipment, complete with two medical oxygen outlets, two

medical compressed air outlets, two vacuum outlets, four

essential electrical sockets and four UPS coded sockets, each

socket is equipped with built-in normal-power on LED indication

connected to independent electrical circuit and marked terminals

for each socket, with two potential equalization grounding

sockets connected to main grounding line by two separate

grounding bridges. Columns shall be as per Drager/Germany,

Medicop/Austria, Amico/Canada, Gregerson/Germany, or

Medaes/England.

Unit 6

Integrated Combinational Ceiling-suspended System for

Operating TheatreSupply, install, connect, and testing of central Ceiling-suspended

system for the OR, comprising prismatic cool operating light, with

130,000 lux light intensity at 1m distance, with full spectrum day-

light color temperature of 4,300 K, with automatic switch-over

standby lamp, electronic intensity and focus control, with power

Unit 1

Description Quantity

20.8

20.9

Item Unit

standby lamp, electronic intensity and focus control, with power

module and emergency relay, and tandem ceiling pendant with

double boom arms, drop tube, modular service head, and

medical rail with pneumatic control, including : two medical

oxygen outlets, two medical compressed air outlets, two nitrous-

oxide outlets, two vacuum outlets, one AGSS outlet, one air

motor outlet, with four electrical sockets for main power wired to

two separate electrical circuits, with two electrical sockets for

UPS power wired to a separate electrical circuit, and two

potential equalization sockets, both suspended from central

ceiling flange, interface plate, and ceiling canopy, all in

accordance with 93/42/EEC conformity. The OR system shall be

as per Herus/Germany, Dragger/Germany, Trumph/Switzerland,

or EA.

Delivery, Labor, Preparation Room Lights

Supply, install, connect, and testing of ceiling-mounted Labor,

Preparation, and Examination Rooms Lights, examination light

for ceiling mounting, of 300 mm diameter with 40,000. lux

intensity at 1m distance, complies with Protection class I

according to IEC The hermetically sealed aluminum light housing

is dust- and fracture-proof. The light should be plastic-coated for

fast and easy cleaning.

The powerful halogen lighting system ensures the optimum

illumination of the operating field. Special filter components

guarantee cool, white light free from any deep shadows. The

high-quality reflector technology ensures a uniform light field and

first-rate color rendering properties.

The light exit surface consists of hardened safety glass that is

highly resistant to mechanical and chemical influences, with

spring regulated arm for easy height adjustment. The

examination light shall be as per Herus/Germany,

Dragger/Germany, Trumph/Switzerland, or EA.

Unit 6

20.10

Dragger/Germany, Trumph/Switzerland, or EA.

Carried To Section-20 Collection

Mechanical 21/27

Page 52: Construction of the First and Second floor in Jenin · PDF fileJenin Hospital-BOQ-Construction of the First and Second floor in Jenin Hospital-BOQ-Consultants:-AL-Ta'meer engineering

Section-20: Mechanical Bill of Quantities

Rate Amount

Baby Bath Tubs

Supply, install, connect, and testing of baby bath tubs as per Lido

Baby/ 01 or equal, each set consisting of:

Unit 4

• Acrylic Ceramic bath tub & washing sink

• Hand shower

• Electronic water tab

• Thermostatic water mixer

• Transformer

Electronic hand washing scrub sinks

Supply, install, connect, and testing of stainless steel suspended

electronic hand washing units with channel type tank and

paneling under basin, two electronic taps, one electronic soap

dispenser and thermostatic mixer.

Made of AISI 316 stainless steel , size 120x55x110 cm. overflow-

proof tank (35 cm deep) with rounded inner edges and inclined

front part to prevent water from spraying outside, which shall be

as per Steris/USA or EA.

Unit 1

Supply and installation of Ceiling Column, rigid, according

to EN 737, 793, 12218

Supply, install, connect, and testing of ceiling column surface as

made of Trespa, polished anodized or painted Aluminum.

Horizontal hanging rail and vertical anodized Aluminum tracks

provided for hanging various type of equipment, complete with

Unit 1

Description

20.13

QuantityUnit

20.11

20.12

Item

provided for hanging various type of equipment, complete with

two medical oxygen outlets, two medical compressed air outlets,

two nitrous-oxide outlets, two vacuum outlets, one AGSS outlets,

one air motor outlet, four electrical sockets for mains power,

connected in two separate electrical circuits, and two electrical

sockets for UPS power, connected in a separate electrical circuit,

with two potential equalization sockets, all as per

Dragger/Germany, Gregerson/Germany, or EA..

20.14 Extra Incorporated Additional items

20.14.1 Secondary equipment hanging rail assembly including one meter

long rail

unit 1

20.14.2 Panel mounted gas outlet Unit 1

20.14.3 Panel mounted electrical socket Unit 1

20.14.4 Panel mounted potential grounding socket Unit 1

20.14.5 Panel mounted RJ-45 data socket Unit 1

20.14.6 Panel mounted telephone socket Unit 1

20.14.7 Panel mounted pressure gauge Unit 1

Carried To Section-20 Collection

Total of Section-20: Medical Gases carried to Summary sheet

Carried To Section-20 Collection

Mechanical 22/27

Page 53: Construction of the First and Second floor in Jenin · PDF fileJenin Hospital-BOQ-Construction of the First and Second floor in Jenin Hospital-BOQ-Consultants:-AL-Ta'meer engineering

Section-21: Laboratory Works(provisional works)

Rate Amount

21 Laboratory working benches

21.1 Clinical pathology & bacteriology lab benches

21.1.1 Middle bench “Island bench” Unit 2

Structure:

A doubled 60x30x2 mm-thick hot galvanized steel profile

structure, “H” structure consists of vertical stands and horizontal

brackets, supported by horizontal rectangular structures and

vertical rectangular structures to carry the work top surfaces and

the modular lower storing cabinets, the structure is protected by

three layers of epoxy oven paint, color as selected by customer,

all as made by PV Lab, or EA.

Dimensions: length: 2,800 mm.

Width: 1,400 mm.

Height: 900 mm. “working surface”, 1,600 mm

upper shelve

Working surface:

All made of 20 mm-thick rigid polypropylene TOP LAB TRESPA,

both heat and chemical resistance, manufactured by

HOESCHT/Germany, or EA..

Item QuantityUnitDescription

Central service board:

20 cm. Width, made by laminated wood “sandwich and coated

with 3 mm-thick TRESPA, Prepared to carry lab fittings and cup

sinks and water faucets…etc.

Double upper shelve:

Two upper shelves installed on the center of the working surface,

50 cm width, 30 mm-thick post-forming covered by Formica

Electricity energy carrier:

45 degrees panel aluminum profile contains 12 power sockets

from each side and installed in the center of the working surface

at the lower shelve bottom with possibility to add any low tension

sockets or telephone sockets or potential sockets

21.1.2 Central Bench washing Stand Unit 2

Dimensions: 1400x700x900 mm.

Structure:

All made of 17 mm-thick laminated wood, covered by Formica

from inside and back, PVC layer from outside.

Test tubes drying rack

A 1400x660H mm. drying rack made of laminated wood and

covered by PVC layer, equipped by 3 lines of different diameters

test tube hangers

Washing sink:

A 600x400x200H mm. ceramic sink installed in the center of the

washing stand working surface including drain valve and siphon

valve and all required connections

Working surface: made by 20 mm-thick TRESPA or Ceramic

Tiles, all as per PV Lab make, or EA.Tiles, all as per PV Lab make, or EA.

Carried To Section-21 Collection

Mechanical 23/27

Page 54: Construction of the First and Second floor in Jenin · PDF fileJenin Hospital-BOQ-Construction of the First and Second floor in Jenin Hospital-BOQ-Consultants:-AL-Ta'meer engineering

Section-21: Mechanical Bill of Quantities

Rate Amount

Side Working Bench MR 40

Structure:

A 60x30x2 mm-thick hot galvanized steel profile structure, “C”

structure consists of vertical stands and horizontal brackets,

supported by horizontal rectangular structures and vertical

rectangular structures to carry the work top surfaces and the

modular lower storing cabinets, the structure is protected by

three layers of epoxy oven paint, color as selected by customer,

all as made by PV Lab, or EA.

Dimensions: 700W x 900H mm.

Working surface:

20 mm-thick TOP LAB TRESPA

21.1.3.b Modular lower cabinet or drawer set (600x400x488) mm Unit 15

21.1.4 Fume Hoods Unit 2

Dimensions: Width: 1200 mm.

Depth: 750 mm.

Height:2620 mm.

Structure:

18 mm laminated wood “sandwich” with 63 mm-thick edges.

External coating:

Tap Formica, color as selected by customer.

Internal coating:

3 mm-thick. TOPLAB TRESPA, all as made by PV Lab, or EA.

21.1.3.a

QuantityUnitDescriptionItem

3 mm-thick. TOPLAB TRESPA, all as made by PV Lab, or EA.

Working surface: CERAMIC TILES. with a front 30 mm

elevated threshold and tapering edge which provides a 10 mm

elevation above the worktop, including preparing bores for valves

and sink and water faucet… etc. the unit is equipped by 4 power

sockets type GEWISS and cut-off switch to operate the blower

and the lighting

Back of the hood:

There will be a double back, allowing routing and regulating the

air flow from the upper and the lower parts of the hood by means

of upper and lower flues, the hood back is made of 6 mm-thick

TRESPA, a polypropylene lattice will be mounted at the outlet of

the air suction inlet to prevent foreign bodies from entering the

blower.

Status indication:

An electrical mechanism for indicating the operation status of the

air suction blower by means of red lamp and green lamp

mounted on the front panel of the hood

Vertical window:

Made of 6 mm-thick safety glass and stainless-steel frame slides

on polypropylene rails and balanced by means of ball bearing

wheels, balancing bar and counter weight.

Electrical accessories and wiring:

A Thermo magnet drive for driving the blower motor, 2 single

phase power sockets, a lighting switch, a safety fuse and control

lamp. All mounted on the hood’s front panel.

A 2 x 20 watts fluorescent lamps will be mounted on the upper

cover outside hood, with a sealed transparent window to ensure

that no gases enters the lamp area.

A CL terminal box and marked terminal connections to the mains

and to the blower will be mounted on the hidden upper part of the and to the blower will be mounted on the hidden upper part of the

hood.

Carried To Section-21 Collection

Mechanical 24/27

Page 55: Construction of the First and Second floor in Jenin · PDF fileJenin Hospital-BOQ-Construction of the First and Second floor in Jenin Hospital-BOQ-Consultants:-AL-Ta'meer engineering

Section-21: Mechanical Bill of Quantities

Rate Amount

Suction blower:

Rigid PVC, UV resistance centrifugal polypropylene booster

made by COLASIT, Swiss made, or EA.

Motor:

3-phase, Completely tight, TEFC, F isolation grade, 1400 r/pm. ½

hp. Manufactured by SIEMENS, Germany or equal approved.

Direct drive, model RN-250 protected by a safety switch.

21.2 Lab fitting for burning gas

21.2.1 A bench fitting with 2 valves (180°) and lift/turn safety handles

Metals: Brass DIN 17660-CuZn39Pb3 and nickel

Sealing: Nitrile.

Lubricant: approved for burning gases, all as per Broen or EA.

Lab fitting for burning gas Unit 6

A bench fitting with single valve (90°) and lift/turn safety handles

Metals: Brass DIN 17660-CuZn39Pb3 and nickel

Sealing: Nitrile.

Lubricant: approved for burning gases, all as per Broen or EA.

Lab fitting for burning gas Unit 6

A bench fitting with 2 valves (90°) and lift/turn safety handles

Metals: Brass DIN 17660-CuZn39Pb3 and nickel

Sealing: Nitrile.

QuantityUnitDescriptionItem

21.2.2

21.2.3

Sealing: Nitrile.

Lubricant: approved for burning gases, all as per Broen or EA.

Lab fittings for non-burning gases Unit 9

A bench fitting with single valve (90°) and coded turn lift safety

handles

Metals: Brass DIN 17660-CuZn39Pb3 and nickel

Sealing: Nitrile.

Lubricant: approved for non-burning gases, all as per Broen or

EA.

Lab fittings for water Unit 4

Bench fitting with built-in BALLOFIX®

shut-off valve, ceramic head work, on

site adjustable spout and detachable

nozzle, all as per Broen 15279009, or EA.

Lab fittings for water Unit 4

Bench mounted one hole mixer with

swivel spout, ceramic head works and

detachable nozzle, al as per Broen 15274009, or EA.

21.2.4

21.2.5

21.2.6

Carried To Section-21 Collection

Mechanical 25/27

Page 56: Construction of the First and Second floor in Jenin · PDF fileJenin Hospital-BOQ-Construction of the First and Second floor in Jenin Hospital-BOQ-Consultants:-AL-Ta'meer engineering

Section-21: Mechanical Bill of Quantities

Rate Amount

Combined emergency eye wash and body shower Unit 1

Combined Body and eye shower, wall mounted in brass with

chemical resistant Poly-coat with self-draining shower head.

Water

inlet at the top or bottom. Eye shower has built-in FLOWFIX (6.7

g/pm).

Eye shower, combined wall mounted with two heads in brass

with chemical resistant Poly-coat. Water is regulated with a built-

in FLOWFIX (6.7 g/pm).

Body shower 3/4” NPT male inlet.

In brass with chemical

resistant Poly-coat, all as Broen 17455909, or EA

21.4 Poly-propylene sinks for side working benches Unit 4

21.4.1 A 600x400x200H mm. polypropylene sink installed in the center

of the washing stand working surface including drain valve and

siphon valve and all required connections as per Polysink

PS0503S, or EA

Description QuantityUnitItem

21.3

Poly-propylene cup sinks for central console working

benches

Unit 4

A 300x150x200H mm. ellipse polypropylene cup sink installed in

the center of the washing stand working surface including drain

valve and all required connections, as per Polysink PS3015, or

EA

Carried To Section-21 Collection

21.4.2

Total of Section-21: Laboratory Works(provisional) carried to Summary sheet

Carried To Section-21 Collection

Mechanical 26/27

Page 57: Construction of the First and Second floor in Jenin · PDF fileJenin Hospital-BOQ-Construction of the First and Second floor in Jenin Hospital-BOQ-Consultants:-AL-Ta'meer engineering

Section-22: Lift Works

Rate Amount

22.1 Supply and install one set of micro lift, capacity 100Kg, 0.3m/s speed,

by-parting doors, cabin walls and doors are stainless steel 304, 2 stops

in-line, 3 floors, all as per BKG /Germany or EA.Cabin .

- cant off system finish with hair line stainless steel , adjustment guides

shoes on both sides and removable shelf .

- compensation device on suspension ropes / chains .

Doors Finish

*Door made of hair line stainless steel .

*Frames are made with hair line stainless steel .

Controller :

B.K.G / Germany production which has all the functions as the

suggested specifications .

1- call and send control with 24 v safety .

2- pre – wired with pluas .

3- adjustable and time – limited dispatch device .

4- acoustic arrival signal .

5- position indicator on each entrance .

6- thermal motor protection as main switch on control panel .

Complete 1

7- machine room light with socket and hand lamp .

Counter weight :

Galvanized frame construction with iron infills .

Drive unit :

- Drive unit with slandered motor IPS4 . DISC brake and handwhell ,

3*400V , 50 HZ , according to IEC

Machine room door :

- single hinged door with sash lock , both hinging sides available- with

side frames made of STAINLESS STEEL .

Item Description Unit Quantity

side frames made of STAINLESS STEEL .

Structure :

- steel structure , made of cold rolled galvanized special profiles, pre

installed with T guides T45X5 + plastic trunking in ZM segments .

Conduct the necessary maintenance and repair to the existing three

"Thyssen" passenger elevators and one " LG" lift, including providing

the necessary parts and material for satisfactory operation of the lifts.

The repair work shall include the supply and installation of the following

parts:A- Thyssen lifts - parts:

22.2a Door Spring No 3

22.2b Top roller No 1

22.2c Landing Door Contact No 7

22.2d Alarm bell 12 V No 3

22.2e Rechargeable lamp No 3

22.2f Thyssen Push Button- Crystal No 10

22.2g Door Lock "Thyssen" No 10

22.2h Indicator with Arrow in the head No 10

22.2i Inductor – Posi-detector No 3

22.2j Tall Photo Cell No 1

22.2k Door Cam (Right + Left) No 4

22.2l Landing Door Hanger1000mm No 10

B- LG lifts -parts:

22.2k Landing Door Shoe No 4

22.2l Complete Lamp up the Car No 1

22.2m Rechargeable lamp No 1

22.2n Alarm bell 12 V No 1

22.2o P.V.C –Luck strong for car Floor M2 3.5

22.2p Rotary Encoder No 1

22.2q IPM 100A No 1

22.2r Condenser 6800µF No 2

22.2s Resistance 56Ohm No 2

22.2t Rectifier Bridge 100A No 1

22.2v Inverter Cables No 4

22.2w DPP PCB No 1

Total of Section-22: Lift Works carried to Summary sheet

Mechanical 27/27

Page 58: Construction of the First and Second floor in Jenin · PDF fileJenin Hospital-BOQ-Construction of the First and Second floor in Jenin Hospital-BOQ-Consultants:-AL-Ta'meer engineering

Project: Jenin Hospital

Sec. Description Amount

1 1) Total of Preliminary Works

2 2) Total of Concrete Works

3 3) Total of Stone Works

4 4) Total of Block Works

5 5) Total of Plastering Works

Civil works Summary ( Bill 1)

6 6) Total of Flooring and Covering Works

7 7) Total of Water Proofing Works

8 8) Total of Carpentry Works

9 9) Total of Suspended Ceiling Works

10 10) Total of Painting Works

11 11) Total of Metal Works

12 12) Total of Other Works

Total of the Civil Works..carried to main summary

Summary - Civil

Page 59: Construction of the First and Second floor in Jenin · PDF fileJenin Hospital-BOQ-Construction of the First and Second floor in Jenin Hospital-BOQ-Consultants:-AL-Ta'meer engineering

Jenin Hospital

Electrical Summary Sheet

Sec. Description Amount

13.1 Total for Sec.13.1) Points

13.2 Total for Sec.13.2) Conduit, piping, and excavations

13.3 Total for Sec.13.3) Cables

13.4 Total for Sec.13.4) Structural elelement cabinet

13.5 Total for Sec.13.5) Grounding

13.6 Total for Sec.13.6) Electrical Switchboards

13.7 Total for Sec.13.7 ) Lumenaire supply and Installation.

13.8 Total for Sec.13.8) Nurse call System

13.9 Total for Sec.13.9) Fire alarm system.

13.10 Total for Sec.13.10) Intercome system.

13.11 Total for Sec.13.11) Public adress system

13.12 Total for Sec.13.12 ) Telephone system

13.13 Total for Sec.13.13 ) LV Boxes

13.14 Total for Sec.13.14 ) UPS System

13.15 Total for Sec.13.15 ) Patch Panels (PP)

Bill 3 Total for Electrical Works ..carried to main summary

Electrical Works Summary Sheet (Bill 2)

Summary -Electrical

Page 60: Construction of the First and Second floor in Jenin · PDF fileJenin Hospital-BOQ-Construction of the First and Second floor in Jenin Hospital-BOQ-Consultants:-AL-Ta'meer engineering

Sec. Description Amount

14 Total of waste and drainage works:

15 Total of roof drain works:

16 Total of Sanitary fixtures and their accessories works:

17 Total of Domestic Cold and Hot Water system works:

18 Total of Fire Fighting system works:

19 Total of HVAC System works:

20 Total of Medical Systems works:

21 Total of Laboratory works(provisional)

22 Tota of Lift works

Total of the Mechanical works, including sec 21 provisional works,

carried to main summary

Project: Jenin Hospital

Mechanical works Summary( Bill 3)

Summary - Mechanical

Page 61: Construction of the First and Second floor in Jenin · PDF fileJenin Hospital-BOQ-Construction of the First and Second floor in Jenin Hospital-BOQ-Consultants:-AL-Ta'meer engineering

Over All Summary

Bill No. Description Total

Bill # 1 Civil Works Summary

Bill # 2 Electrical Works Summary

Bill # 3 Mechanical Works Summary

Total of All Works including Provesional Items

Percentage % discount or addition

Amount of discount or addition

Net Grand Total

Contractor:

Signature:

Date:

The sum of ________________________________________

Project: Jenin Hospital

Main Summary