E-001
1
LX
EZ
14
-4
28
7E
00
1.D
WG
CAMP FOSTER, OKINAWA, JAPAN
VICINITY MAP
CONSTRUCTION OF
PAD-MOUNTED VOLTAGE
REGULATOR AND BY-PASS
SWITCH, PLAZA HOUSING AREA
NORTH
58
329
58
IE SHIMA
329
330
329
58
329
331
ISHIKAWA S.
E A S T C H I N A S E A
P A C I F I C O C E A N
CAMP FOSTER:
NAHA C.
OKINAWA C.
NAGO C.
PLAZA
SCOPE OF WORK
1. THIS PROJECT IS FUNDED BY OFFCE OF NAVAL RESEARCH (ONR) TO INSTALL AND MONITOR
A CONSERVATION VOLTAGE REDUCTION (CVR) SYSTEM IN THE SELECTED PORTION OF
PLAZA HOUSING AREA.
2. THE PROJECT WOULD CONSTRUCT A PAD-MOUNTED VOLTAGE REGULATOR AND BY-PASS
SWITCH NEXT TO EXISTING SWITCH HOUSE "GS-32" (BUILDING 4140), TO ALLOW THE SYSTEM
TO OPTIMIZE THE VOLTAGE AND IMPROVE ENERGY EFFICIENCY.
DWG CODE
REV
STATUS
SHEET
ID
SHEET
NO
SHEET TITLE
E-001
4
5
6
7
ELECTRICAL SCOPE OF WORK, ELECTRICAL NOTES,
LEGEND AND ABBREVIATIONS
PARTIAL PRIMARY POWER DISTRIBUTION PLAN2
3
1
NEW WORK
1. INSTALL NEW CONCRETE ENCASED 13.8KV UNDERGROUND PRIMARY LINES, 15kV VOLTAGE
REGULATOR, BY-PASS SWITCH, AND ASSOCIATED CONCRETE PAD, GROUNDING SYSTEM,
AND ACCESSORIES.
2. INSTALL NEW PLASTIC CABLE TAGS INDICATING THE FEEDER NUMBER, VOLTAGE RATING,
CABLE TYPE, CABLE SIZE, INSTALLED DATE, AND THE TERMINATION SUCH AS "SWITCHING
STATION ~ SUBSTATION".
3. RESTORE THE AC PAVED ROADWAY, CONCRETE CURBS, GUTTERS, CONCRETE SIDEWALKS
AND SODDING INCLUDING TOPSOIL, AFFECTED BY NEW UNDERGROUND CONSTRUCTION.
4. ALL NEW INSTALLATION THAT CAN BE DONE WITHOUT DISRUPTING THE OPERATION OF THE
EXISTING INSTALLATION SHALL BE GIVEN PRIORITY TO MINIMIZE POWER OUTAGE.
5. MAXIMUM ELECTRICAL POWER OUTAGE OF 8 HOURS PER DAY SHALL BE ALLOWED. POWER
SHOULD BE FULLY RESTORED AFTER EACH OUTAGE.
ELECTRICAL NOTES:
1. ALL FACILITIES, SURFACES, UNDERGROUND AND OVERHEAD UTILITIES DAMAGED DUE TO
REMOVAL OF EXISTING SYSTEM OR CONSTRUCTION/MODIFICATION WORK SHALL BE
REPAIRED TO MATCH EXISTING CONDITIONS.
2. CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER FOR ANY UNFORESEEN ITEM OR
ANY DISCREPANCY BETWEEN THE DRAWING AND THE ACTUAL SITE CONDITIONS.
3. CONSIDER THE SEQUENCE OF WORK TO MINIMIZE POWER INTERRUPTION DURING
CONSTRUCTION.
4. POWER OUTAGES SHALL BE MINIMIZED DURING THE DEMOLITION, INSTALLATION AND
CONNECTION OF THE EXISTING, NEW EQUIPMENT, AND HIGH VOLTAGE CABLES.
5. ALL NON CURRENT CARRYING METAL PARTS OF THE INSTALLATION SUCH AS CONDUIT
RUNS AND SWITCHES, SHALL BE MADE ELECTRICALLY CONTINUOUS BY MEANS OF
COUPLING, BUSHINGS, FITTINGS OR BONDING WIRES, FOR EFFECTIVE GROUNDING.
NON-THREADED CONDUITS SHALL BE PROVIDED WITH A BONDING SYSTEM.
6. CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFICATION OF ALL EXISTING
LOCATIONS AND CONDITIONS OF ITEMS RELATED TO THIS PROJECT.
7. PATCH AND PROVIDE TOUCH-UP PAINT ON ALL PAINTED CONCRETE/MASONRY SURFACES
PREVIOUSLY EMBEDDED WITH CONDUITS AND OTHER ELECTRICAL DEVICES. COLOR OF
PAINT SHALL MATCH WITH THE ADJACENT SURFACES.
8. FOR INSTALLATION OF NEW ELECTRICAL UNDERGROUND DUCT LINES, THE LOCATIONS
SHALL BE COORDINATED WITH OTHER COMMUNICATION, MECHANICAL AND CIVIL
UNDERGROUND UTILITIES.
9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE EXACT LOCATION, SIZE
AND DEPTH OF UTILITIES THAT WILL BE AFFECTED BY THE CONSTRUCTION, INCLUDING
LINES WHICH MAY NOT BE SHOWN ON DRAWINGS, AND EXERCISE PROPER CARE IN
EXCAVATING THE AREA. ANY DAMAGE TO THESE UTILITIES SHALL BE REPAIRED AND PAID
FOR BY THE CONTRACTOR.
10. EXISTING SURFACE CONDITIONS THAT ARE DISTURBED BY CONTRACTOR'S OPERATIONS,
INCLUDING BUT NOT LIMITED TO PAVEMENTS, SIDEWALKS, CURBS AND GUTTERS, AND
OTHER EXISTING STRUCTURES WHICH MAY OR MAY NOT BE SHOWN ON DRAWINGS, SHALL
BE RESTORED TO A CONDITION SATISFACTORY TO THE CONTRACTING OFFICER AND
SHALL MATCH EXISTING ADJACENT SURFACES.
11. ELECTRICAL OUTAGES SHALL BE ABSOLUTE MINIMUM. COORDINATE SCHEDULED
ELECTRICAL OUTAGES WITH BASE AUTHORITIES. MINIMUM 30 DAYS NOTICE.
12. DISTRIBUTION EQUIPMENT INCLUDING TRANSFORMERS, CABLE JUNCTION PEDESTALS,
MANHOLES, HANDHOLES, ETC. ARE SHOWN IN APPROXIMATE LOCATION ONLY. LOCATE
CLEAR OF EXISTING UTILITIES (CATCH BASIN, MANHOLES, HANDHOLES, ETC) AND/OR
STRUCTURES.
13. COORDINATE WITH BASE UTILITIES TO LOCATE EXISTING UNDERGROUND UTILITIES PRIOR
TO ANY EXCAVATION WORK.
14. IT IS EXPECTED THAT WORK WILL BE PERFORMED IN AREAS OF PREVIOUSLY DISTURBED
SOIL. NONETHELESS, ENVIRONMENTAL ASSETS MAY BE PRESENT WITHIN THE WORK
AREA, AND CAUTION MUST BE EXERCISED DURING GROUND DISTURBANCE. A MAP OF
ENVIRONMENTALLY SENSITIVE AREAS WILL BE PROVIDED. FOR WORK TO BE PERFORMED
IN PREVIOUSLY UNDISTURBED SOIL, WITHIN ENVIRONMENTALLY SENSITIVE AREAS,
CONTRACTOR SHALL NOTIFY TO CONTRACTING OFFICER ONE (1) WEEK IN ADVANCE OF
EXCAVATIONS. THE CONTRACTING OFFICER WILL NOTIFY BASE CIVIL ENGINEER (BCE) AND
ENVIRONMENTAL OFFICE. CONTRACTOR SHALL IMMEDIATELY NOTIFY CONTRACTING
OFFICER UPON DISCOVERY OF CULTURAL ASSETS.
15. CONTRACTOR SHALL PERFORM TEST DIGS FOR CULTURAL ASSETS, IN ACCORDANCE WITH
SPECIFICATION SECTION 01 14 00, AT ALL NEW MANHOLE/HANDHOLE AND PAD-MOUNTED
TRANSFORMER LOCATION.
16. EXISTING UTILITIES ARE BASED ON INCOMPLETE RECORD DRAWINGS AND NOT ALL
UTILITIES ARE SHOWN ON THE DRAWINGS FOR CLARITY. CONTRACTOR SHALL REVIEW
AS-BUILT DRAWINGS AND EXERCISE EXTREME CAUTION WHEN EXCAVATING.
17. CONTRACTOR SHALL BE COORDINATE LABELS OF BY-PASS SWGR AND VOLTAGE
REGULATOR WITH USMC FE. NEW XFMR LABEL SHALL BE COORDINATED WITH 18TH CES.
18. CONTRACTOR SHALL VERIFY FIELD CONDITIONS AND PROVIDE LEVEL LANDING, AND
SODDING OF DISTURBED AREA BY NEW CONSTRUCTION IF NECESSARY.
19. CONCRETE NOTES: CONCRETE COMPRESSIVE STRENGTH SHALL BE 21 MPA.
REINFORCING BARS SHALL CONFORM TO JIS G3112, 295 MPA.
SHEET OF
SHEET
IDENTIFICATION
AS
S
HO
WN
s.w
.w
.i.
17
M
AY
, 2
01
9
A1
DE
SIG
NE
D B
Y:
DW
N B
Y:
CK
D B
Y:
SO
LIC
IT
AT
IO
N N
O.:
DA
TE
:
CO
NT
RA
CT
N
O.:
FIL
E N
UM
BE
R:
IS
SU
E D
AT
E:
PL
OT
S
CA
LE
:
SU
BM
IT
TE
D B
Y:
FIL
E N
AM
E:
SIZ
E:
A
B
C
D
1 2 3 4 5
MA
RK
DE
SC
RIP
TIO
N
DA
TE
AP
PR
.
SIGNED
THIS WORK WAS
PREPARED BY ME OR
UNDER MY SUPERVISION
SG
E
NG
IN
EE
R
WE
SL
EY
IS
HIH
AR
A
I N
T
E
R
N
A
T
I O
N
A
L
11
HO
NO
LU
LU
, H
AW
AII 9
68
17
50
1 S
UM
NE
R S
TR
EE
T, S
UIT
E 6
20
CO
NS
TR
UC
TIO
N O
F P
AD
-M
OU
NT
ED
V
OL
TA
GE
RE
GU
LA
TO
R A
ND
B
Y-P
AS
S S
WIT
CH
PL
AZ
A H
OU
SIN
G A
RE
A
KA
DE
NA
A
IR
B
AS
E, JA
PA
N
E-101
E-102
E-501
E-502
E-601
E-602
ENLARGED SITE ELECTRICAL PLAN
NEW VOLTAGE REGULATOR, BY-PASS SWITCH, AND PIPE
GUARD DETAILS
NEW UNDERGROUND DUCT SECTIONS AND RESTORATION DETAILS
PRIMARY DISTRIBUTION DIAGRAM - EXISTING
8
9
10
11
E-603
VOLTAGE REGULATOR CONTROL DIAGRAM
E-701
MISCELLANEOUS DETAILS
E-702
MISCELLANEOUS DETAILS
E-703
MISCELLANEOUS DETAILS
PRIMARY DISTRIBUTION DIAGRAM - NEW
4100
4
1
3
5
4
0
3
7
4
0
4
0
4
0
3
8
4
0
5
3
4
0
5
4
4
0
9
5
4
0
9
3
4
0
9
1
4
1
3
6
4
1
2
5
4
1
3
8
4
0
5
2
C
J
P
T
S
A
-
1
MH411B
MH411C
D
/
C
D
/
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
T
M
H
1
0
6
7
T
M
H
1
0
6
5
T
M
H
1
0
6
3
T
M
H
1
0
6
4
T
M
H
1
0
6
2
T
M
H
1
0
5
0
T
M
H
1
0
6
6
D
/
C
D
/
C
D
/
C
D
/
C
D
/
C
D
/
C
T
015-012
T
015-008
T
015-004
26
23
23
015-0
11
G
e
P
e
P
e
P
P
Wx
W
x
W
x
W
x
W
x
W
x
W
x
W
x
W
x
W
x
W
x
W
x
W
x
W
x
W
x
W
x
W
x
W
x
W
x
W
x
W
x
W
x
W
x
S
S
x
S
S
x
S
S
x
S
S
x
S
S
x
S
S
x
S
S
x
S
S
x
S
S
x
S
S
x
S
S
x
S
S
x
S
S
x
S
S
x
S
S
x
S
S
x
S
S
x
S
S
x
S
S
x
SSx
C
A
T
V
C
A
T
V
C
A
T
V
C
A
T
V
C
A
T
V
C
A
T
V
C
A
T
V
C
A
T
V
E
R
N
E
P
Y
L
E
R
O
A
D
4
2
6
11
1
1
1
7
2
0
e
P
e
P
e
P
e
P
e
P
e
P
e
P
e
P
eP
e
PP
P
P
P
JB434
MH-C10
C
J
P
CJP
C
J
P
C
J
P
C
J
P
C
J
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
SW
P
E
M
H
-
3
T
S
A
-
1
EMH-4
E
M
H
-5
E
M
H
-6
E
M
H
-
7
E
M
H
-
9
EMH-10
EMH-11
EMH-12
EMH-13
EMH-14
EMH-15
TS A-3
T
S
A
-2
TS
C
-3
TS
C
-2
M
H
4
0
9
M
H 408
MH 407
M
H
4
1
0
B
M
H
4
1
0
C
MH406
MH-405
MH404
MH434
T
S
B
4
1
0
T
S
C
-
1
C
JP
-4
1
7
7
TS-4079
EMH-17
C
D
/
C
D
/
C
D/C
D
/
C
D
/
C
D/C
D
/
C
D/C
D
/
C
D
/
C
D
/
C
D
/
C
D
/C
D
/
C
D/C
D/C
D/C
D
/C
D
/C
D
/C
D
/
C
D
/
C
D
/
C
D
/C
D/C
D/C
D/C
D/C
D/C
D
/C
D
/C
D
/
C
D/C
D
/
C
D
/
C
D
/C
D
/C
D
/
C
D/C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
D
/
C
C
C
D
/
C
C
C
C
C
D
/
C
C
C
C
C
C
C
C
C
C
C
C
C
CC
C
C
C
C
C
C
C
C
C
C
C
C
TM
H 1068
TMH 1067
T
M
H
1
0
6
5
T
M
H
1
0
6
3
T
M
H
1
0
6
4
T
M
H
1
0
6
2
T
M
H
1
0
5
0
T
M
H
1
0
4
9
T
M
H
1
0
4
8
T
M
H
T
M
H
1
0
6
0
THH 1061
THH 1
042
T
M
H
1
0
4
7
T
M
H
1
0
5
1
T
M
H
1
0
5
4
T
M
H
1
0
5
3
T
M
H
1
0
5
2
T
H
H
1
0
5
5
T
H
H
1
0
5
6
TMH 1043
TMH 1045
TMH 1044
TMH 1069
TMH 1070
T
M
H
1071
TMH 1072
TM
H
1
073
T
M
H
1
0
6
6
T
M
H
1
0
5
7
T
M
H
1
0
5
8
1
0
5
9
C
C
C
C
D
/C
D/C
D
/
C
D
/C
D
/
C
D
/
C
D
/C
D
/C
D
/C
EXST TMH
EXST TMH
SHED
C
TMH
TMH
14
S
015-006
T
T
T
015-012
T
015-008
17
8
12
12
12
T
015-009
14
T
015-004
20
23
26
23
23
20
20
015-005 G
G
015-011
G
015-002 G
8
e
P
e
P
TS-4071
EMH-16
TMH
1047
CJP-4089
1
4
W
x
Wx
Wx
W
x
W
x
Wx
W
x
WxWx
W
x
W
x
W
x
W
x
W
x
W
x
W
x
W
x
W
x
W
x
W
x
W
x
Wx
Wx
W
x
Wx
W
x
W
x
W
x
W
x
W
x
W
x
W
x
W
x
W
x
W
x
W
x
W
x
W
x
W
x
W
x
W
x
W
x
W
x
W
x
W
x
W
x
W
x
W
x
W
x
W
x
Wx
W
x
W
x
W
x
W
x
W
x
W
x
W
x
W
x
W
x
W
x
W
x
Wx
Wx
Wx
W
x
Wx
W
x
W
x
W
x
W
x
W
x
W
x
W
x
Wx
W
x
W
x
W
x
W
x
W
x
W
x
W
x
W
x
W
x
W
x
W
x
W
x
W
x
W
x
W
x
W
x
W
x
W
x
W
x
W
x
W
x
W
x
W
x
W
x
W
x
W
x
W
x
W
x
W
x
W
x
W
x
W
x
W
x
W
x
W
x
W
x
W
x
W
x
W
x
W
x
W
x
Wx
Wx
W
x
W
x
SSx
SSx
SSx
S
S
x
S
S
x
S
S
x
S
S
x
S
S
x
S
S
x
SS
x
S
S
x
S
S
x
S
S
x
S
S
x
SS
x
SS
x
S
S
x
SS
x
S
S
x
S
S
x
S
S
x
S
S
x
SSx
S
S
x
S
S
x
S
S
x
S
S
x
S
S
x
SSx
SSx
SS
x
SSx
S
S
x
S
S
x
S
S
x
SSx
SSx
S
S
x
SS
x
SSx
S
S
x
SSx
S
S
x
S
S
x
S
S
x
S
S
x
SSx
S
S
x
SSx
S
S
x
S
S
x
S
S
x
S
S
x
SSx
SSx
SSx
SS
x
S
S
x
S
S
x
SSx
S
S
x
S
S
x
S
S
x
S
S
x
SSx
S
S
x
SSx
S
S
x
S
S
x
S
S
x
S
S
x
S
S
x
S
S
x
S
S
x
S
S
x
S
S
x
S
S
x
SSx
S
S
x
SSx
C
C
C
C
E
M
H
-8
C
J
P
CATV
C
A
T
V
C
A
T
V
CATV
C
ATV
S
C
A
T
V
C
A
T
V
C
A
T
V
C
A
T
V
C
A
T
V
C
A
T
V
CATV
CATV
C
A
T
V
CATV
CATV
CATV
C
A
T
V
C
A
T
V
C
A
T
V
C
A
T
V
C
A
T
V
C
A
T
V
CATV
C
A
T
V
C
A
T
V
C
A
T
V
C
A
T
V
C
A
T
V
C
A
T
V
CA
TV
C
A
T
V
C
A
T
V
C
A
T
V
C
A
T
V
C
A
T
V
C
A
T
V
C
A
T
V
C
A
T
V
C
A
T
V
C
A
T
V
C
A
T
V
C
A
T
V
C
A
T
V
C
A
T
V
C
A
T
V
CJP-4081
11
17
20
4
4
4
14
11
8
1
4
26
26
11
17
8
8
11
26
11
11
17
20
23
17
2
0
14
20
17
e
P
e
P
e
P
eP
eP
e
P
eP
P
P
P
P
UP-E106
10
SCALE: 1:500
0 20 30 50m40
GRAPHIC SCALE:
NO
RT
H
NO
RT
H
1
E101
PARTIAL PRIMARY POWER DISTRIBUTION PLAN
SCALE 1 : 500
KEY MAPNTS
(E)MH411
(E)MH411A2
(E)MH411B
(E)EMH-1
(E)EMH-2
(E)MH411A1
(E)MH411A
(E)MH412
(N)VOLTAGE
REGULATOR &
BY-PASS SWITCH
SHEET OF
SHEET
IDENTIFICATION
AS
S
HO
WN
s.w
.w
.i.
17
M
AY
, 2
01
9
A1
DE
SIG
NE
D B
Y:
DW
N B
Y:
CK
D B
Y:
SO
LIC
IT
AT
IO
N N
O.:
DA
TE
:
CO
NT
RA
CT
N
O.:
FIL
E N
UM
BE
R:
IS
SU
E D
AT
E:
PL
OT
S
CA
LE
:
SU
BM
IT
TE
D B
Y:
FIL
E N
AM
E:
SIZ
E:
A
B
C
D
1 2 3 4 5
MA
RK
DE
SC
RIP
TIO
N
DA
TE
AP
PR
.
SIGNED
THIS WORK WAS
PREPARED BY ME OR
UNDER MY SUPERVISION
SG
E
NG
IN
EE
R
WE
SL
EY
IS
HIH
AR
A
I N
T
E
R
N
A
T
I O
N
A
L
11
HO
NO
LU
LU
, H
AW
AII 9
68
17
50
1 S
UM
NE
R S
TR
EE
T, S
UIT
E 6
20
CO
NS
TR
UC
TIO
N O
F P
AD
-M
OU
NT
ED
V
OL
TA
GE
RE
GU
LA
TO
R A
ND
B
Y-P
AS
S S
WIT
CH
PL
AZ
A H
OU
SIN
G A
RE
A
KA
DE
NA
A
IR
B
AS
E, JA
PA
N
PA
RT
IA
L P
RIM
AR
Y P
OW
ER
D
IS
TR
IB
UT
IO
N P
LA
N
EL
EC
TR
IC
AL
E-101
2
SEE ENLARGE
ELECTRICAL
SITE PLAN
1
E102
(E)MH413
(E)MH415
(E)TS-4038
(E)TH415
(E)JB-415A
(E)TS-4029
(E)TS-4100
(E)TS-4135
(E)TS-4125
(E)TS-411B
(E)GS32
W
x
W
x
W
x
S
S
x
S
S
x
W
x
C
x
Cx
C
x
C
x
e
P
e
P
eP
e
P
e
P
e
P
e
P
e
P
P
P
P
P
P
J
B
4
3
4
C
J
P
C
JP
C
J
P
P
P
P
P
P
P
E
M
H
-
3
T
S
A
-
1
EMH-4
E
M
H
-5
E
M
H
-
9
EMH-10
TS A-3
T
S
A
-2
M
H
4
0
9
M
H
4
1
0
B
M
H
4
1
0
C
MH434
T
S
B
4
1
0
T
S
C
-
1
TS
-4079
14
015-006
T
T
T
015-008
1
7
12
14
T
015-004
26
23
23
20
20
015-005
G
G
8
P
CJP-4089
E
M
H
-
8
C
J
P
CATV
C
A
T
V
C
A
T
V
CATV
C
A
T
V
S
C
A
T
V
C
A
T
V
C
A
T
V
C
A
T
V
C
A
T
V
C
A
T
V
C
A
T
V
C
A
TV
C
A
TV
C
A
T
V
C
A
TV
C
A
T
V
C
A
T
V
C
A
T
V
C
A
T
V
C
A
T
V
C
A
T
V
C
A
T
V
C
A
T
V
C
A
T
V
C
A
T
V
C
A
T
V
C
A
T
V
C
A
T
V
CJP-4081
1
7
2
0
4
4
4
26
26
11
23
17
2
0
17
W
x
W
x
W
x
W
x
S
S
x
SSx
SSx
S
S
x
S
S
x
W
x
C
x
Cx
C
x
C
x
C
x
e
P
e
P
eP
e
P
e
P
e
P
e
P
e
P
P
P
P
P
P
DUCT SIZECABLE SIZE
ID No. REMARKS
NEW NEW
NEW ELECTRICAL DISTRIBUTION LINE SCHEDULE
VOLTAGE
FEEDER
NO.
P1
F-6
13.8KV
2
SCALE: 1:100
0 4 6 10m8
GRAPHIC SCALE:
NO
RT
H
NO
RT
H
1
E102
ENLARGED SITE ELECTRICAL PLAN
SCALE 1 : 100
KEYMAPNTS
P3
(E)MH411
(E)EMH-411B
(E)GS-32
(E)MH-411A
(N)VOLTAGE
REGULATOR
(N)BY-PASS
SWITCH
P3
EXIST FEEDER FROM GS-29, CIRCUIT "A"
P2F-6
(E)15KV EPR 3#4/0-1C
EXIST
P3F-6
13.8KV
EXIST CIRCUIT "B" TO JB-415A. MODIFIED TO
FEED NEW VOLTAGE REGULATOR
15KV EPR 3#4/0-1C
13.8KV
(E)PVC 100
13.8KV
PVC 125
SHEET OF
SHEET
IDENTIFICATION
AS
S
HO
WN
s.w
.w
.i.
17
M
AY
, 2
01
9
A1
DE
SIG
NE
D B
Y:
DW
N B
Y:
CK
D B
Y:
SO
LIC
IT
AT
IO
N N
O.:
DA
TE
:
CO
NT
RA
CT
N
O.:
FIL
E N
UM
BE
R:
IS
SU
E D
AT
E:
PL
OT
S
CA
LE
:
SU
BM
IT
TE
D B
Y:
FIL
E N
AM
E:
SIZ
E:
A
B
C
D
1 2 3 4 5
MA
RK
DE
SC
RIP
TIO
N
DA
TE
AP
PR
.
SIGNED
THIS WORK WAS
PREPARED BY ME OR
UNDER MY SUPERVISION
SG
E
NG
IN
EE
R
WE
SL
EY
IS
HIH
AR
A
I N
T
E
R
N
A
T
I O
N
A
L
11
HO
NO
LU
LU
, H
AW
AII 9
68
17
50
1 S
UM
NE
R S
TR
EE
T, S
UIT
E 6
20
CO
NS
TR
UC
TIO
N O
F P
AD
-M
OU
NT
ED
V
OL
TA
GE
RE
GU
LA
TO
R A
ND
B
Y-P
AS
S S
WIT
CH
PL
AZ
A H
OU
SIN
G A
RE
A
KA
DE
NA
A
IR
B
AS
E, JA
PA
N
EN
LA
RE
GE
D S
IT
E E
LE
CT
RIC
AL
P
LA
N
EL
EC
TR
IC
AL
E-102
3
1
KEY NOTES:
2
SPLICE NEW PRIMARY CABLES TO THE EXISTING TO
RESTORE SERVICE.
PROVIDE NEW PRIMARY CABLES UTILIZING EXISTING
CONDUIT.
1
1
(E)BLDG
4140
(N)CONCRETE
PAD
P2
P5
P7
P4
2
P1
(E)PVC100
EXIST13.8KV
EXIST CIRCUIT "D" TO CJB-4089.
(E)15KV EPR 3#4/0-1C
15KV EPR 3#4/0-1C
UTILIZE EXIST SPARE DUCT TO RESTORE
SERVICE TO JB-415A
NEW CIRCUIT "B" TO VOLTAGE REGULATOR
15KV EPR 3#4/0-1C
P4F-6
13.8KV
NEW CIRCUIT "E" TO BY-PASS SWITCH, USING
EXIST SPARE DUCT
15KV EPR 3#4/0-1C
P5F-6
13.8KV
PVC 125
NEW CIRCUIT "B" TO VOLTAGE REGULATOR
15KV EPR 3#4/0-1C
P6F-6
13.8KV
PVC 125
NEW CIRCUIT FROM BY-PASS SWITCH TO
RESTORE SERVICE TO TS-411B, 4125 & 4135
15KV EPR 3#4/0-1C
P7F-6
13.8KV
PVC 12515KV EPR 3#4/0-1C
P8F-6
(E)PVC 100
EXIST CIRCUIT "C" TO BE REMOVED AND
DUCT WILL BE USED AS SPARE
15KV EPR 3#4/0-1C
P6
P8
15KV EPR 3#4/0-1C
15KV EPR 3#4/0-1C
PVC 125
PVC 125
13.8KV
13.8KV
(E)PVC 100
NEW CIRCUIT FROM BY-PASS SWITCH TO
JB-415A
NEW CIRCUIT "E" TO BY-PASS SWITCH
NEW CIRCUIT FROM BY-PASS SWITCH TO
TS-411B, 4125 & 4135
PROJECT
LOCATION
2
THE CONTRACTOR SHALL TONE THE AREA FOR THE NEW
PROPOSED DUCTS NEAR THE EXISTING UTILITIES.
1E-601
PRIMARY DISTRIBUTION DIAGRAM -EXISTINGSCALE NOT TO SCALE
LX
EZ
14
-4
28
7E
50
6.D
WG
(E)MH411
(E)EMH-1
(E)EMH411A
TO
(E)CJP-4089
(E)EMH-2 (E)EMH-3
(E)EMH-12
SPLICE POINT
SPLICE POINT
(E)MH410
EXISTING PRIMARY CABLES SHALL BE CUT WITH
ADEQUATE SLACKS FOR NEW SPLICES.
REMOVE EXISTING PRIMARY CABLES BACK TO THE
SWITCH. EXISTING CONDUIT SHALL BE SALVAGED
AND REUSED FOR INSTALLATION OF NEW HV CABLES
OR LEFT AS SPARE.
a
KEY NOTES:
b
a
a
b
b
PR
IM
AR
Y D
IS
TR
IB
UT
IO
N D
IA
GR
AM
S
EL
EC
TR
IC
AL
E-601
6SHEET OF
SHEET
IDENTIFICATION
AS
S
HO
WN
s.w
.w
.i.
17
M
AY
, 2
01
9
A1
DE
SIG
NE
D B
Y:
DW
N B
Y:
CK
D B
Y:
SO
LIC
IT
AT
IO
N N
O.:
DA
TE
:
CO
NT
RA
CT
N
O.:
FIL
E N
UM
BE
R:
IS
SU
E D
AT
E:
PL
OT
S
CA
LE
:
SU
BM
IT
TE
D B
Y:
FIL
E N
AM
E:
SIZ
E:
A
B
C
D
1 2 3 4 5
MA
RK
DE
SC
RIP
TIO
N
DA
TE
AP
PR
.
SIGNED
THIS WORK WAS
PREPARED BY ME OR
UNDER MY SUPERVISION
SG
E
NG
IN
EE
R
WE
SL
EY
IS
HIH
AR
A
I N
T
E
R
N
A
T
I O
N
A
L
11
HO
NO
LU
LU
, H
AW
AII 9
68
17
50
1 S
UM
NE
R S
TR
EE
T, S
UIT
E 6
20
CO
NS
TR
UC
TIO
N O
F P
AD
-M
OU
NT
ED
V
OL
TA
GE
RE
GU
LA
TO
R A
ND
B
Y-P
AS
S S
WIT
CH
PL
AZ
A H
OU
SIN
G A
RE
A
KA
DE
NA
A
IR
B
AS
E, JA
PA
N
FROM (E)GS-29
B ADE C
(E)EMH411B
(E)EMH-13
(E)EMH411A1
(E)TS411B
1-150kVA
(E)TS4125
1-150kVA
(E)EMH411A2
(E)TS4135
1-75kVA
(E)EMH-15
(E)JB-415A
(E)TS4100
1-750kVA
(E)EMH-13
(E)TS4029
1-200kVA
(E)TH415
2-167kVA
(E)TS4038
1-100kVA
(E)100C:3-1/C,
#4/0, 15kV
(E)100C:3-1/C,
#4/0, 15kV
(E)GS32, 15kV
SWITCH HOUSE
VERIFY AND ENSURE THAT ALL EXISTING SITE CONDITIONS MATCH
WITH THE INFORMATION SHOWN. REFER TO SHEET E-602 FOR
PROPOSED PHASING WORK.
±6,600
20
0
G G G
G G G
G
G
G
G
300
±2,555
60
0
±2
,0
50
20
0
150
2,120
±1,940
300
±1,05
0
±7
50
±7
50
±6
15
10
0M
IN
2,120
609
PLAN
FRONT VIEW
1E-501
NEW VOLTAGE REGULATOR & BY-PASS SWITCH INSTALLATION DETAILNOT TO SCALE
PAD MOUNTED BY-PASS
SWITCH (H=±1220,
W=±2160, D=±2032)
3mm
6mm
2mm
6mm
4mm
3mm
CKT. -511, ØA
#4/0 EPR, 15KV
CABLE SIZE
DATE INSTALLED
WHITE POLYETHYLENE
PLATE, 3mm THICK
6mm
3mm
6mm
2mm
6mm
3mm
CKT. -K11, ØA,
#4/0 EPR, 15KV
NOTES :
1. NEW SWITCHGEAR DIMENSIONS ARE APPROXIMATE, MANUFACTURERS
DIMENSIONS OF ACQUIRED EQUIPMENT SHALL PREVAIL.
2. THE CONTRACTOR SHALL PERFORM THE ARC FLASH EVALUATION AND
PROVIDE WARNING SIGN (LABEL) FOR THE NEW HIGH-VOLTAGE
EQUIPMENT RELATED TO THIS PROJECT, IF REQUIRED.
30
0m
m3
00
mm
127mm
3E-501
CABLE TAG DETAILSNOT TO SCALE
NOTES :
1. LETTERINGS SHALL BE ENGRAVED ON THE PLATE AT LEAST 1mm
DEEP AND PAINTED BLACK.
2. PROVIDE A ONE-PIECE NYLON, SELF-LOCKING TIE AT EACH END
OF THE CABLE TAG".
3. PROVIDE TWO CABLE TAGS PER CABLE, ONE GOING IN AND ONE
GOING OUT OR MANHOLE, OR EQUIPMENT LIKE SWITCH OR CABLE
JUNCTION ON PEDESTAL.
19mmØx3m COPPER
CLAD STEEL GROUND
ROD (TYP)
D12@350 O.C.
150mm THICK
COMPACTED
AGGREGATED
BASE COURSE
EXOTHERMIC
WELD, TYP.
PAD MOUNTED VOLTAGE
REGULATOR (H=±1905,
W=±2286, D=±3048)
TO EQMT
ENCLOSURE AND
CABLE SHIELD
#4/0 IN
16mm PVC
GROUND ROD
19mmØx3m
LONG
#4/0 BC (TYP
FOR GROUND
GRID)
#4/0 BC IN
16mm PVC
125PVC,
TYP.
FINISHED
GRADE
40mm DEEP SAW
CUT JOINT
#4/0 BCW (TYP
FOR GROUND
GRID)
NE
W V
OL
TA
GE
R
EG
UL
AT
OR
, B
Y-P
AS
S S
WIT
CH
, A
ND
PIP
E G
UA
RD
D
ET
AIL
S
EL
EC
TR
IC
AL
E-501
4
SHEET OF
SHEET
IDENTIFICATION
AS
S
HO
WN
s.w
.w
.i.
17
M
AY
, 2
01
9
A1
DE
SIG
NE
D B
Y:
DW
N B
Y:
CK
D B
Y:
SO
LIC
IT
AT
IO
N N
O.:
DA
TE
:
CO
NT
RA
CT
N
O.:
FIL
E N
UM
BE
R:
IS
SU
E D
AT
E:
PL
OT
S
CA
LE
:
SU
BM
IT
TE
D B
Y:
FIL
E N
AM
E:
SIZ
E:
A
B
C
D
1 2 3 4 5
MA
RK
DE
SC
RIP
TIO
N
DA
TE
AP
PR
.
SIGNED
THIS WORK WAS
PREPARED BY ME OR
UNDER MY SUPERVISION
SG
E
NG
IN
EE
R
WE
SL
EY
IS
HIH
AR
A
I N
T
E
R
N
A
T
I O
N
A
L
11
HO
NO
LU
LU
, H
AW
AII 9
68
17
50
1 S
UM
NE
R S
TR
EE
T, S
UIT
E 6
20
CO
NS
TR
UC
TIO
N O
F P
AD
-M
OU
NT
ED
V
OL
TA
GE
RE
GU
LA
TO
R A
ND
B
Y-P
AS
S S
WIT
CH
PL
AZ
A H
OU
SIN
G A
RE
A
KA
DE
NA
A
IR
B
AS
E, JA
PA
N
GROUNDING
TEST WELL
FROM VS#4, 20 JUNE, 2019
TAG FOR
INCOMING CABLE
CKT. NO. &
PHASE
TAG FOR
OUTGOING CABLE
4mm
6mm
TO VS#4, 20 JUNE, 2019
TURF
NEW TURF AND TOPSOIL
COMPACTED NATURAL BACKFILL
NEW WARNING TAPE
CONDUIT SPACER
3-WAY2-WAY
1-WAY
NEW PLAIN CONCRETE (21Mpa)
75
75
75 75 75
100
400
600 (M
IN
)
75
75
AS
R
EQ
D
75 75
300AS REQD
300
75
75
75 75 75 75
1E-502
(SODDING AREA / CONCRETE ENCASED)NOT TO SCALE
TYPICAL NEW UGND PRIMARY LINE DUCT SECTIONS
NOTES :
1. 4-WAY SHALL BE 2 LAYERS (1ST LAYER = 2-WAY, 2ND LAYER = 2-WAY).
2. 5-WAY SHALL BE 2 LAYERS (1ST LAYER = 3-WAY, 2ND LAYER = 2-WAY).
3. 6-WAY SHALL BE 2 LAYERS (1ST LAYER = 3-WAY, 2ND LAYER = 3-WAY).
4. DUCT CLEARANCE AND SAND CUSHION FOR 5-WAY THROUGH
5. THESE ABOVE NOTES SHALL BE ALSO APPLIED IN AC PAVEMENT AREA.
10-WAY SHALL BE FOLLOWED AS 4-WAY.
SHEET OF
SHEET
IDENTIFICATION
AS
S
HO
WN
s.w
.w
.i.
17
M
AY
, 2
01
9
A1
DE
SIG
NE
D B
Y:
DW
N B
Y:
CK
D B
Y:
SO
LIC
IT
AT
IO
N N
O.:
DA
TE
:
CO
NT
RA
CT
N
O.:
FIL
E N
UM
BE
R:
IS
SU
E D
AT
E:
PL
OT
S
CA
LE
:
SU
BM
IT
TE
D B
Y:
FIL
E N
AM
E:
SIZ
E:
A
B
C
D
1 2 3 4 5
MA
RK
DE
SC
RIP
TIO
N
DA
TE
AP
PR
.
SIGNED
THIS WORK WAS
PREPARED BY ME OR
UNDER MY SUPERVISION
SG
E
NG
IN
EE
R
WE
SL
EY
IS
HIH
AR
A
I N
T
E
R
N
A
T
I O
N
A
L
11
HO
NO
LU
LU
, H
AW
AII 9
68
17
50
1 S
UM
NE
R S
TR
EE
T, S
UIT
E 6
20
CO
NS
TR
UC
TIO
N O
F P
AD
-M
OU
NT
ED
V
OL
TA
GE
RE
GU
LA
TO
R A
ND
B
Y-P
AS
S S
WIT
CH
PL
AZ
A H
OU
SIN
G A
RE
A
KA
DE
NA
A
IR
B
AS
E, JA
PA
N
NE
W U
ND
ER
GR
OU
ND
D
UC
T S
EC
TIO
NS
A
ND
RE
ST
OR
AT
IO
N D
ET
AIL
S
EL
EC
TR
IC
AL
E-502
5
NEW SCHED 40 PVC
CONDUIT (SIZE AS
REQUIRED)
NEW SCHED 40 PVC
CONDUIT (SIZE AS
REQUIRED)
2E-502
TYPICAL 15kV ELBOW DETAILSNOT TO SCALE
1 2 3 4 5
ED C B A
FLFL
GROUNDING WIRE #4/0
TO NEW CJP-4089
SEE SIDE VIEW
4E-502
EXISTING SWITCH (GS-32) DETAILNOT TO SCALE
40mm
500
300
150
300
600mm
MIN.
RED PLASTIC WARNING
TAPE IMPRINTED WITH
"CAUTION BURIED ELECTRIC
LINE BELOW", ENTIRE LENGTH
OF GROUND GIRDLE
200mmØ CLAY PIPE
MECHANICAL GROUND CLAMP
COVER WITH ASPHALTIC-TYPE
PAINT.
REMOVABLE
CONCRETE COVER
FINISHED GRADE
19.1mm Øx3.1m L.
SECTIONAL
COPPER-CLAD
GROUND ROD.
CONCRETE COVER
G
ENGRAVE OR CAST-IN
88mm HIGH LETTER IN
CONCRETE, "G" FOR GROUND.
mm
mm
mm
mm
5E-502
GROUND TEST BOX DETAILNOT TO SCALE
VERIFY NUMBER
OF DUCTS
REQUIRED AT
EACH LOCATION
CONCRETE DUCT
ENCASEMENT
EXIST MANHOLE
WALL
END BELL
CORE DRILL HOLE,
TYP
6E-502
END BELL DETAILNOT TO SCALE
NEW QUIK-CHANGE
BUSHING ELBOW,
15KV, 600A, 110KV BIL
NEW 15KV
PRIMARY CABLE
STUB-UP 4" OR
5" CONDUIT
GROUNDING
WIRE #4/0
75 x 75 x 65 STAINLESS STEEL
ANGLE MOUNTING FRAME, BOLTED
CONSTRUCTION OPEN TYPE
OPERATING SHAFT AND
LOCKING ASSEMBLY ON
ALL SWITCHED WAYS
VIEWING WINDOW IN
THE CONTACT OPEN
POSITION ON ALL
SWITCH WAYS
RELOCATED
EXISTING INSULATION
BUSHING CAP FROM
"E" LINE TO "D" LINE
NEW QUIK-CHANGE
BUSHING ELBOW,
15KV, 600A, 110KV BIL
TO EXIST TS-411B, TS-4125 AND TS-4135
TO EXIST JB-415A (TH415 AND TS-4038)
FROM EXIST SWITCHHOUSE "GS-29"
TO EXISTING
MANHOLE "MH-411"
INTEGRAL
BUSHING
COMPRESSION
LUG
THREADED
STUD
600 SERIES
ELBOW
CABLE
ADAPTER
INSULATING
PLUG
VOLTAGE
DETECTOR
CAP
LOADBREAK
ELBOW
HV CABLE
LOADBREAK
INSERT
BUSHING
WELL
15KV, 200A LOAD-BREAK ELBOW DETAIL
HV CABLE
15KV, 600A DEAD-BREAK ELBOW DETAIL
VOLTAGE
REGULATOR
EXISTING AND
NEW BY-PASS
SWITCH
ELASTIMOLD:
162A40D270-0MA OR
EQUIVALENT
3E-502
15kV SHRINK FIT CABLE JOINTNOT TO SCALE
ELASTIMOLD: SFJ315C2270RK
WITH 20MA-J TAPE SHEIELD
ADAPTERS (2) OR EQUIVALENT
HV CABLEHV CABLE
#4/0 BC (TYP
FOR GROUND
GRID)
LX
EZ
14
-4
28
7E
50
6.D
WG
(E)GS32, 15kV
SWITCH HOUSE
(E)EMH411B
TO (E)TS-411B,
4125, 4135
(E)EMH-12
TO
(E)JB-415A
(E)EMH-1
TO
(E)CJP-4089
FROM (E)GS-29
(E)EMH-2 (E)EMH-3
(E)EMH411A
1E-602
PRIMARY DISTRIBUTION DIAGRAM -NEWSCALE NOT TO SCALE
1
PROPOSED SEQUENCE OF WORK:
2
PROVIDE HV CABLES, UTILIZING SPARE DUCT BETWEEN
EXISTING SWITCH SC32 AND EMH-411B.
PROVIDE HV CABLES BETWEEN EMH-411B AND BY-PASS SWITCH,
AND TERMINATE THE HV CABLES AT BOTH ENDS.
PROVIDE HV CABLES, UTILIZING SPACE DUCT BETWEEN EMH-411
AND EMH-411B.
PROVIDE HV CABLES BETWEEN EMH-411B AND BY-PASS SWITCH,
AND TERMINATE THE HV CABLES AT BY-PASS SWITCH.
DE-ENERGIZE CIRCUIT "B", SPLICE EXISTING HV CABLES TO NEW
IN EMH-411. REMOVE EXISTING HV CABLES BETWEEN SC32 AND
EMH-411.
PROVIDE HV CABLES BETWEEN NEW BY-PASS SWITCH AND
VOLTAGE REGULATOR.
TEST THE NEW HV CABLES. ENERGIZE CIRCUIT "E" TO RESTORE
SERVICE TO OLD CIRCUIT "B" VIA BY-PASS SWITCH.
PR
IM
AR
Y D
IS
TR
IB
UT
IO
N D
IA
GR
AM
- N
EW
EL
EC
TR
IC
AL
E-602
7SHEET OF
SHEET
IDENTIFICATION
AS
S
HO
WN
s.w
.w
.i.
17
M
AY
, 2
01
9
A1
DE
SIG
NE
D B
Y:
DW
N B
Y:
CK
D B
Y:
SO
LIC
IT
AT
IO
N N
O.:
DA
TE
:
CO
NT
RA
CT
N
O.:
FIL
E N
UM
BE
R:
IS
SU
E D
AT
E:
PL
OT
S
CA
LE
:
SU
BM
IT
TE
D B
Y:
FIL
E N
AM
E:
SIZ
E:
A
B
C
D
1 2 3 4 5
MA
RK
DE
SC
RIP
TIO
N
DA
TE
AP
PR
.
SIGNED
THIS WORK WAS
PREPARED BY ME OR
UNDER MY SUPERVISION
SG
E
NG
IN
EE
R
WE
SL
EY
IS
HIH
AR
A
I N
T
E
R
N
A
T
I O
N
A
L
11
HO
NO
LU
LU
, H
AW
AII 9
68
17
50
1 S
UM
NE
R S
TR
EE
T, S
UIT
E 6
20
CO
NS
TR
UC
TIO
N O
F P
AD
-M
OU
NT
ED
V
OL
TA
GE
RE
GU
LA
TO
R A
ND
B
Y-P
AS
S S
WIT
CH
PL
AZ
A H
OU
SIN
G A
RE
A
KA
DE
NA
A
IR
B
AS
E, JA
PA
N
ABCDE
(N)VOLTAGE
REGULATOR
(N)BY-PASS SWITCH
BB/E
X
X
X
X
X
X
(E)MH411
(E)100C:15kV, 3#4/0-1/C
(CKT-"C")
EB/E
125EC:15kV, 3#4/0-1/C
NEW
SPLICES
NEW
SPLICES
PHASE 1: CIRCUIT "B"
VERIFY AND ENSURE THAT ALL EXISTING SITE CONDITIONS MATCH
WITH THE INFORMATION SHOWN. COMPLETE ALL INFRASTRUCTURE
AND EQUIPMENT PAD INSTALLATION, INCLUDING INSPECTION,
TESTING AND ACCEPTANCE, PRIOR TO HV CABLE INSTALLATION.
NEW VOLTAGE REGULATOR AND BY-PASS SWITCH SHOULD BE
INSTALLED AND SECURED ON THE CONCRETE EQUIPMENT PAD WITH
ALL GROUNDING CONNECTIONS COMPLETED AND TESTED.
1
2
3
3
4
4
5
5
6
7
a
b
PROVIDE HV CABLES BETWEEN BY-PASS SWITCH AND EMH-411A VIA
EMH-411B, TERMINATE THE HV CABLES AT BY-PASS SWITCH. LEAVE
SLACK IN EMH-411B TO ALLOW FOR RECONNECTION TO CIRCUIT "E"
SHOULD THE REGULATOR BE REMOVED IN THE FUTURE.
DE-ENERGIZE CIRCUIT "C", SPLICE EXISTING HV CABLES TO NEW IN
EMH-411A. REMOVE EXISTING HV CABLES BETWEEN SC32 AND
EMH-411A. CAP UNUSED SWITCH BUSHING WITH INSULATING CAPS.
TEST THE NEW HV CABLES. ENERGIZE CIRCUIT TO RESTORE
SERVICE TO OLD CIRCUIT "C" VIA BY-PASS SWITCH.
PHASE 2: CIRCUIT "C"
c
7
6
a
a
b
b
b
5
c
I
II
UTILIZING THE EXISTING SWITCH AND DUCT THAT BECAME
AVAILABLE BY REMOVAL OF THE ORIGINAL CIRCUIT "B", PROVIDE
HV CABLES BETWEEN SC32 AND EMH-411.
PROVIDE NEW HV CABLES BETWEEN EMH-411 AND VOLTAGE
REGULATOR VIA EMH-411B, AND TERMINATE THE HV CABLES AT
BOTH ENDS.
TEST THE NEW HV CABLES. LEAVE VOLTAGE REGULATOR
DE-ENERGIZED. COORDINATE WITH EATON ENGINEER SYSTEMS
AND SERVICES (EESS: KOA SAPLA, HAWAII OFFICE,
1-808-228-0757) TO ENERGIZE AND PLACE THE VOLTAGE
REGULATOR INTO SERVICE. HNEI WILL CONTACT DIRECTLY
WITH EESS TO PROVIDE THESE SERVICES.
PHASE 3: VOLTAGE REGULATOR
III
II
II
I
III
125EC:15kV, 3#4/0-1/C
125EC:15kV,
3#4/0-1/C
125EC:15kV,
3#4/0-1/C
125EC:15kV,
3#4/0-1/C
125EC:15kV,
3#4/0-1/C
125EC:15kV,
3#4/0-1/C
125EC:15kV,
3#4/0-1/C
125EC:15kV,
3#4/0-1/C
125EC:15kV,
3#4/0-1/C
(E)100C:15kV, 3#4/0-1/C
(CKT-"B")
(E)100C:15kV, 3#4/0-1/C
(CKT-"D")
(E)100C:15kV, 3#4/0-1/C
(CKT-"A")
LX
EZ
14
-4
28
7E
50
6.D
WG
1E-603
VOLTAGE REGULATOR CONTROL DIAGRAMSCALE NOT TO SCALE
1
KEY NOTES:
2
THE NECESSARY METERING AND COMMUNICATION
LINK FOR THE NEW VOLTAGE REGULATOR HAVE
BEEN INSTALLED AT THE EXISTING TRANSFORMERS.
COMPLETE COMMUNICATIONS AND CONTROL
SYSTEMS INTERFACE WITH THE VOLTAGE
REGULATOR AND BY-PASS SWITCH AFTER THE
INSTALLATION IS COMPLETED.
WORK WITH EATON ENGINEERING SYSTEM SERVICES
TO COMPLETE COMMUNICATIONS AND CONTROL
SYSTEMS INTERFACE WITH THE VOLTAGE
REGULATOR AND BY-PASS SWITCH AFTER THE
INSTALLATION IS COMPLETED.
(N)VOLTAGE
REGULATOR
M
(E)TS411B
(1-150kVA)
M
(E)TS4125
(1-500kVA)
M
(E)TS4135
(1-75kVA)
M
(E)TS4100
(1-750kVA)
M
(E)TS4029
(1-200kVA)
(E)JB-415A
M
(E)TH415
(2-167kVA)
M
(E)TS4038
(1-100kVA)
HNEI
CONTROLLER
(N)PQube METER,
(TYP)
RADIO COMMUNICATION
LINK, (TYP)
1
1
2
VO
LT
AG
E R
EG
UL
AT
OR
C
ON
TR
OL
D
IA
GR
AM
EL
EC
TR
IC
AL
E-603
8SHEET OF
SHEET
IDENTIFICATION
AS
S
HO
WN
s.w
.w
.i.
17
M
AY
, 2
01
9
A1
DE
SIG
NE
D B
Y:
DW
N B
Y:
CK
D B
Y:
SO
LIC
IT
AT
IO
N N
O.:
DA
TE
:
CO
NT
RA
CT
N
O.:
FIL
E N
UM
BE
R:
IS
SU
E D
AT
E:
PL
OT
S
CA
LE
:
SU
BM
IT
TE
D B
Y:
FIL
E N
AM
E:
SIZ
E:
A
B
C
D
1 2 3 4 5
MA
RK
DE
SC
RIP
TIO
N
DA
TE
AP
PR
.
SIGNED
THIS WORK WAS
PREPARED BY ME OR
UNDER MY SUPERVISION
SG
E
NG
IN
EE
R
WE
SL
EY
IS
HIH
AR
A
I N
T
E
R
N
A
T
I O
N
A
L
11
HO
NO
LU
LU
, H
AW
AII 9
68
17
50
1 S
UM
NE
R S
TR
EE
T, S
UIT
E 6
20
CO
NS
TR
UC
TIO
N O
F P
AD
-M
OU
NT
ED
V
OL
TA
GE
RE
GU
LA
TO
R A
ND
B
Y-P
AS
S S
WIT
CH
PL
AZ
A H
OU
SIN
G A
RE
A
KA
DE
NA
A
IR
B
AS
E, JA
PA
N
3
3
LX
EZ
14
-4
28
7E
50
6.D
WG
MIS
CE
LL
AN
EO
US
D
ET
AIL
S
EL
EC
TR
IC
AL
E-701
9SHEET OF
SHEET
IDENTIFICATION
AS
S
HO
WN
s.w
.w
.i.
17
M
AY
, 2
01
9
A1
DE
SIG
NE
D B
Y:
DW
N B
Y:
CK
D B
Y:
SO
LIC
IT
AT
IO
N N
O.:
DA
TE
:
CO
NT
RA
CT
N
O.:
FIL
E N
UM
BE
R:
IS
SU
E D
AT
E:
PL
OT
S
CA
LE
:
SU
BM
IT
TE
D B
Y:
FIL
E N
AM
E:
SIZ
E:
A
B
C
D
1 2 3 4 5
MA
RK
DE
SC
RIP
TIO
N
DA
TE
AP
PR
.
SIGNED
THIS WORK WAS
PREPARED BY ME OR
UNDER MY SUPERVISION
SG
E
NG
IN
EE
R
WE
SL
EY
IS
HIH
AR
A
I N
T
E
R
N
A
T
I O
N
A
L
11
HO
NO
LU
LU
, H
AW
AII 9
68
17
50
1 S
UM
NE
R S
TR
EE
T, S
UIT
E 6
20
CO
NS
TR
UC
TIO
N O
F P
AD
-M
OU
NT
ED
V
OL
TA
GE
RE
GU
LA
TO
R A
ND
B
Y-P
AS
S S
WIT
CH
PL
AZ
A H
OU
SIN
G A
RE
A
KA
DE
NA
A
IR
B
AS
E, JA
PA
N
MH-411 (EXIST)
1 TO GS32: 15kV, 3#4/0-1C
LEGEND:
2 TO GS29: 15kV, 3#4/0-1C
3 TO GS32: (TS4100/4029/TH415)
15kV, 3#4/0-1C
4 TO TS4100/4029/TH415
15kV, 3#4/0-1C
5 TO GS32 (CJP-4089)
15kV, 3#4/0-1C
6 TO EMH-1 (CJP-4089)
15kV, 3#4/0-1C
1
2
3
4
5
6
TO GS32 (CIRCUIT "D")
TO EMH-1
TO MH-412
TO EMH-10
(GS29)
TO MH-411B
MH-411B (EXIST)
TO MH-411
TO GS32
MH-411A (EXIST)
TO MH-411A1
1 TO GS32: 15kV, 3#4/0-1C
LEGEND:
2 TO EH-411A1 (TS411B/TS4125/TS4135)
15kV, 3#4/0-1C
1
2
NOTES:
1. THE CONTRACTOR SHALL VERIFY ALL INFORMATION
SHOWN IN THE FIELD PRIOR TO START ANY
MODIFICATIONS.
2. THE CONTRACTOR SHALL BE RESPONSIBLE TO
DE-WATER THE MANHOLE AS REQUIRED. COORDINATE
SPECIFIC REQUIREMENTS WITH THE BASE.
TO GS32 (CIRCUIT "B")
TO GS32 (CIRCUIT "A")
TO GS32
(CIRCUIT "C")
LX
EZ
14
-4
28
7E
50
6.D
WG
MIS
CE
LL
AN
EO
US
D
ET
AIL
S
EL
EC
TR
IC
AL
E-702
10SHEET OF
SHEET
IDENTIFICATION
AS
S
HO
WN
s.w
.w
.i.
17
M
AY
, 2
01
9
A1
DE
SIG
NE
D B
Y:
DW
N B
Y:
CK
D B
Y:
SO
LIC
IT
AT
IO
N N
O.:
DA
TE
:
CO
NT
RA
CT
N
O.:
FIL
E N
UM
BE
R:
IS
SU
E D
AT
E:
PL
OT
S
CA
LE
:
SU
BM
IT
TE
D B
Y:
FIL
E N
AM
E:
SIZ
E:
A
B
C
D
1 2 3 4 5
MA
RK
DE
SC
RIP
TIO
N
DA
TE
AP
PR
.
SIGNED
THIS WORK WAS
PREPARED BY ME OR
UNDER MY SUPERVISION
SG
E
NG
IN
EE
R
WE
SL
EY
IS
HIH
AR
A
I N
T
E
R
N
A
T
I O
N
A
L
11
HO
NO
LU
LU
, H
AW
AII 9
68
17
50
1 S
UM
NE
R S
TR
EE
T, S
UIT
E 6
20
CO
NS
TR
UC
TIO
N O
F P
AD
-M
OU
NT
ED
V
OL
TA
GE
RE
GU
LA
TO
R A
ND
B
Y-P
AS
S S
WIT
CH
PL
AZ
A H
OU
SIN
G A
RE
A
KA
DE
NA
A
IR
B
AS
E, JA
PA
N
MH-411 (EXIST)
a
LEGEND:
b TO GS29:
(N)15kV, 3#4/0-1C
TO TS4100/4029/TH415
(E)15kV, 3#4/0-1C
b
a
TO EMH-1
TO MH-412
TO EMH-10
(GS29)
TO MH-411B
1 TO GS32: 15kV, 3#4/0-1C
LEGEND:
2 TO GS29: 15kV, 3#4/0-1C
3 TO GS32: (TS4100/4029/TH415)
15kV, 3#4/0-1C
4 TO TS4100/4029/TH415
15kV, 3#4/0-1C
5 TO GS32 (CJP-4089)
15kV, 3#4/0-1C
6 TO EMH-1 (CJP-4089)
15kV, 3#4/0-1C
1
2
3
4
5
6
TO EMH-1
TO MH-412
TO EMH-10
(GS29)
TO MH-411B
a
LEGEND:
b TO GS29:
(N)15kV, 3#4/0-1C
TO TS411B/TS4125/TH4135
(N)15kV, 3#4/0-1C
b
a
TO EMH-1
TO MH-412
TO EMH-10
(GS29)
TO MH-411B
MH-411 (EXIST)
MH-411 (EXIST)
TO MH-411B
PHASE 1: DEMOLITION WORK PHASE 1: NEW WORK
NEW
SPLICES
NEW
SPLICES
PHASE 2: NEW WORK
NEW 125C DUCT
TO EMH-411B
TO GS32 (CIRCUIT "D")
TO GS32 (CIRCUIT "B")
TO GS32 (CIRCUIT "A")
TO GS32 (CIRCUIT "D")
TO GS32 (CIRCUIT "B")
TO GS32 (CIRCUIT "A")
TO GS32 (CIRCUIT "D")
TO GS32 (CIRCUIT "B")
TO GS32 (CIRCUIT "A")
LX
EZ
14
-4
28
7E
50
6.D
WG
MIS
CE
LL
AN
EO
US
D
ET
AIL
S
EL
EC
TR
IC
AL
E-703
11SHEET OF
SHEET
IDENTIFICATION
AS
S
HO
WN
s.w
.w
.i.
17
M
AY
, 2
01
9
A1
DE
SIG
NE
D B
Y:
DW
N B
Y:
CK
D B
Y:
SO
LIC
IT
AT
IO
N N
O.:
DA
TE
:
CO
NT
RA
CT
N
O.:
FIL
E N
UM
BE
R:
IS
SU
E D
AT
E:
PL
OT
S
CA
LE
:
SU
BM
IT
TE
D B
Y:
FIL
E N
AM
E:
SIZ
E:
A
B
C
D
1 2 3 4 5
MA
RK
DE
SC
RIP
TIO
N
DA
TE
AP
PR
.
SIGNED
THIS WORK WAS
PREPARED BY ME OR
UNDER MY SUPERVISION
SG
E
NG
IN
EE
R
WE
SL
EY
IS
HIH
AR
A
I N
T
E
R
N
A
T
I O
N
A
L
11
HO
NO
LU
LU
, H
AW
AII 9
68
17
50
1 S
UM
NE
R S
TR
EE
T, S
UIT
E 6
20
CO
NS
TR
UC
TIO
N O
F P
AD
-M
OU
NT
ED
V
OL
TA
GE
RE
GU
LA
TO
R A
ND
B
Y-P
AS
S S
WIT
CH
PL
AZ
A H
OU
SIN
G A
RE
A
KA
DE
NA
A
IR
B
AS
E, JA
PA
N
TO MH-411A1
1 TO GS32: 15kV, 3#4/0-1C
LEGEND:
2 TO EH-411A1 (TS411B/TS4125/TS4135)
15kV, 3#4/0-1C
1
2
a
LEGEND:
b TO GS32:
(N)15kV, 3#4/0-1C
TO TS411B/TS4125/TH4135
(N)15kV, 3#4/0-1C
b
a
TO EMH-1
TO MH-412
TO EMH-10
(GS29)
TO MH-411B
MH-411A (EXIST)
MH-411B (EXIST)
TO MH-411B
PHASE 1, 2 & 3: NEW WORK
PHASE 2: DEMOLITION WORK
MH-411 (EXIST) PHASE 2: NEW WORK
NEW DUCT
TO MH-411
TO MH-411A1
MH-411A (EXIST) PHASE 2: NEW WORK
TO EMH-411B
NEW DUCT
NEW
SPLICES
TO BY-PASS
TO REG
TO
EMH-411A
NEW
DUCTS
NEW DUCT
a
LEGEND:
b TO GS32 VIA EMH-411:
(N)15kV, 3#4/0-1C
a
TO TS4100/4029/TH415 VIA
EMH-411: (N)15kV, 3#4/0-1C
b
c
c
TO GS32: 15kV, 3#4/0-1C
d
d TO VOLTAGE REGULATOR:
15kV, 3#4/0-1C
e
e
TO EH-411A1 (TS411B/TS4125/TS4135)
15kV, 3#4/0-1C
f
f TO BY-PASS SWITCH:
15kV, 3#4/0-1C
a
LEGEND:
b TO EH-411A1 (TS411B/TS4125/TS4135)
15kV, 3#4/0-1C
b
a
TO BY-PASS SWITCH VIA EMH-411B:
15kV, 3#4/0-1C
TO GS32 (CIRCUIT "D")
TO GS32 (CIRCUIT "B")
TO GS32 (CIRCUIT "A")
TO GS32
(CIRCUIT "C")
TO GS32
(CIRCUIT "C")
TO GS32
(CIRCUIT "E")