Page 1: Construction of a Modular building and corrosion road at Jaguar Land Rover - Case Study

O’Brien Contractors Limited – Case Study

www. obriencontractors.co.uk | Tel: 01926 423 918

Page 2: Construction of a Modular building and corrosion road at Jaguar Land Rover - Case Study

O'Brien Contractors LtdManor Cottage, Church LaneLeamington SpaCV32 7JT www. obriencontractors.co.uk |[email protected]| Tel: 01926 423 918

Project Profile:

Jaguar Land Rover Case Study

O’Brien is confident to say, using its wealth of knowledge it is able to target each and every new contract with a smart approach, offering clients the best in quality and construction knowledge.

Client: Jaguar Land Rover Project: Modular Building, Corrosion Roadway Location: Gaydon Engineering Plant, Warwick Value: £550K Contract Duration: 10 weeks

Page 3: Construction of a Modular building and corrosion road at Jaguar Land Rover - Case Study

O'Brien Contractors LtdManor Cottage, Church LaneLeamington SpaCV32 7JT www. obriencontractors.co.uk |[email protected]| Tel: 01926 423 918

About the Project:

Work carried out by O’Brien Construction of a modular building and corrosion road at Jaguar Land Rover. The work carried out by O’Brien included infrastructure works, foundations, drainage and an entrance road to the new car parks of the modular building. We opted for trenchless pipe installation and utilised directional drilling which avoided disturbing busy access roads and eliminated risks of working around services.

The corrosion road used to test paintwork on new vehicles consisted of the construction of a 4000m2 carriageway. This took place adjacent to the live braking-test track. Personnel safety and minimum disruption were paramount to ensure Land Rover could continue to test unhindered.

The project was completed within the designated time frame and to the high standards required by Jaguar Land Rover.

Page 4: Construction of a Modular building and corrosion road at Jaguar Land Rover - Case Study

O'Brien Contractors LtdManor Cottage, Church LaneLeamington SpaCV32 7JT www. obriencontractors.co.uk |[email protected]| Tel: 01926 423 918

Core Operations:

“O’Brien – Delivering a Smart Approach to Construction”

O’Brien Group offers expert teams across a diverse range of services. All five construction led services, Design and Build, Construction, Sports Pitches, Earthworks, Laser Levelling and Plant Hire operate highly skilled teams who aim to provide the best in construction knowledge and a smart approach to every aspect of our works.

• Bulk earthworks and site clearance• Ground stabilization• Reinforced concrete works including foundations, floors, retaining walls and external service yards• Roads and sewers• Drainage, pipework and associated works• External works including block paving and slabbing• Parking areas• Earthworks’ design and ground modelling facilities• Fine tolerance Laser Levelling and 3D machine control system

Page 5: Construction of a Modular building and corrosion road at Jaguar Land Rover - Case Study

O'Brien Contractors Ltd Manor CottageChurch LaneLeamington SpaCV32 7JT

Website: www. obriencontractors.co.uk

Email: [email protected]

Tel: 01926 423 918

Contact Details:

Connect with us via our social media channels:

Twitter

Google+

Facebook

Linkedin